ASRS DamageManagement System
Prepared by: Jerime Molina
Date: December 18, 2012
7/29/2019 ASRS Damage fDecember Week 2
http://slidepdf.com/reader/full/asrs-damage-fdecember-week-2 2/8
167
349
184195
123 0
130 0 4 0 0
10
51
0
41
0
26
0
35
0 0 0 0 0 0 0 0 0 0 0 0 00102030405060708090
100110120130140150160170180190200210220230240250260270280290300310320330340350360370380
C A S E S
ASRS DAMAGE MONITORING
MONTHLY DAMAGE Total Damage
Damage Current Situation
As ofDecember 17,2012195 Damage cases
were encounteredwhich is abruptly
increases comparedlast month
7/29/2019 ASRS Damage fDecember Week 2
http://slidepdf.com/reader/full/asrs-damage-fdecember-week-2 3/8
Damage per NCRF Codes
Damage Current Situation
Currently ASRS Damage forDecember week 1 & 2 (Dec.01- 17) are 195 cases withdaily average of 11- 12 casesa day which increases with
almost 200% compared toWEEK 1 damage dailyaverage
Last November Damagesdecrease to 47.28% (165
damage decrease)compared last October
167
349
184195
0
50
100
150
200
250
300
350
400
September October November December
C A S E S
ASRS Monthly Damage monitoring
Damage Quantiy
7/29/2019 ASRS Damage fDecember Week 2
http://slidepdf.com/reader/full/asrs-damage-fdecember-week-2 4/8
195
6662
43
13 7 3 10
20
40
60
80
100
120
140
160
180
200
220
240
T o t a l
4 S
4 Q
4 F
4 R
4 O 4
L 4 P
C A S E S
REASON CODE
December ASRS Damage Monitoring
Damage Count Warehousing vs.Techteam
Analyzing the Data Gathered
Compared last week 4S( Broken pallet before enteringASRS) has now the large
percentage of damagecontributor followed by 4Q(Substandard placement ofstretch film caught onconveyor) which needs moreconcentration on how to
minimize the same non-conformity
Damage per Error /Reason Code
7/29/2019 ASRS Damage fDecember Week 2
http://slidepdf.com/reader/full/asrs-damage-fdecember-week-2 5/8
3
2 21 1 1 1
0
2
4
6
8
10
12
14
16
18
20
4 S
4 Q
4 F
4 O
4 P
4 L
4 R
F r e q u e n c i e s
REASON CODE
Frequency of Errors
Analyzing the Data Gathered
For the previous weekthere some added errorshad encountered whichadds-up damages
And these are•4S- Broken pallet before
entering ASRS•4F - Mis calculation on VTLwhile manually
operated/centering palleton VTL
•And the other codes asseen on this slide
7/29/2019 ASRS Damage fDecember Week 2
http://slidepdf.com/reader/full/asrs-damage-fdecember-week-2 6/8
108
41
1511
17
2 10
20
40
60
80
100
120
140
bonux longbars
tide cut-ups
tide longbars
safeguard Pampers tide powder bonux cut-ups
C A S E S
Products
Damage per Product
Analyzing the Data Gathered
Still bonux long barswhich is manuallystretch wrapped is themajor products beingaffected by the said
error codes followed bycut-ups
7/29/2019 ASRS Damage fDecember Week 2
http://slidepdf.com/reader/full/asrs-damage-fdecember-week-2 7/8
Next Action………..
•
Already proven that the manual stretch wrapping has a great effecton the damage accumulation at asrs
This problem can be minimized by verifying the no. of turns beingmade during manual stretching =( on going) or by following the patternduring auto stretch wrapping :
•For 4s (Broken pallet before entering ASRS) = the pallet ownershould verify or making sampling if all the pallets are in good conditionwhile delivering it to palletizers and on other areas.
•For 4F (Mis calculation on VTL while manually operated/centering
pallet on VTL ) this requires more visible markings that would help thepersonnel while centering the pallets