AWiFs Collection, Norman, OK
Toney Cooper
ASRC Ground Station
Brief History
• Operations began in April of 1992
• First commercial ground station that supported LandSat4, 5, & 6
• Continue to provide operational support for Resourcesat-1, Ikonos, and IRS-1D
• Added IRS Production capabilities in 1997
Overview
• Process Flow of Norman Operations
– Data Acquisition
– Data Capture
– Data Processing
– Orthorectification of Resourcesat Imagery
– Final QC
– Product Delivery
• Q&A
Data Acquisition
•The Norman Facility includes
–Datron 11 meterparabolic dual S-band/X-band Antenna
–Steerable ViaSat(Scientific Atlanta)Antenna
–Grounded lightning rods
–Configured forredundancy and multi-mission supports.
Data Acquisition
•Customer specifies path, row,quad, and date for collection
•Inside CONUS:
–Scenes down linked andcaptured in real-time toNorman Operations facility.
–Norman Operations supports2-3 Resourcesat acquisitionsper day during growing season.
IRS-P6 Receiving Stations
Norman, Oklahoma: GeoEye
Fairbanks, Alaska: Geoeye
Data Acquisition
• Outside CONUS:
– Real-timecollection/downlink toIRS-P6 regional affiliatestation;or stored on OBSSR anddown linked at India.
– Source image generatedat NRSA ProcessingCenter or regionalaffiliate station
– Image delivered toNorman via FTP transfer
IRS-P6 Receiving StationsHyderabad: NRSANeustralitz: EuromapAbu Dhabi: FalconBeijing: RSGS
Data Capturing
• Direct Archival and Quick LookBrowse System (DAQLB)handles simultaneous ingest ofserial bit streams of data fromResourceSat in real-time
• The system also archives thedata on DLT media afterappropriate formatting in FREDformat.
SD
Pro fessio nal Workstati on 6000
PRO
Data Capturing
• The system processes theancillary information andarchives it within a database,that is subsequently used forproduct generation.
• Additionally, this system alsogenerates thumbnail imagesthat can be used in the dataselection process.
SD
Pro fessio nal Workstati on 6000
PRO
Data Processing
• Data Production GenerationSystem (DPGS) consists of aset of processes and runtimefiles containing Satellite andSensor parameters,radiometric look-up tables,configuration files andrelated information requiredfor processing.
SD
Professional Workstation 6000
PRO
Data Processing
• The system downloadsthe raw video datacorresponding to the userarea of interest from theDAQLB system.
• The system thengenerates the sourcedata by executing a set ofprocesses in pre-definedsequence andprecedence.
Data Processing
• Quality control (QC) of source image consists of a visualexamination of the scene. The operator would identifythe following:
– Cloud Cover
– Processing/Downlink anomalies
– Correct path/row/quad/acquisition date
• Customer contacted (email with screen captures) for anyquestionable scenes. All scenes that pass source imageQC are prepared for orthorectification.
Orthorectification
• Most Resourcesat-1 imagerysold to USDA is in the form oforthorectified AWiFS scenes.
• GeoEye has developed aproduction workflow withcustom software to streamlinethe process of datamanagement, control pointmeasurement, blockadjustment andorthorectification
Orthorectification
Major workflow steps:• Ancillary data compilation
- Data staging utility compiles reference orthoimagery andthe DEM
• Control point measurement– Automated image matching software used to collect tie
points– Configured for AWiFS file naming conventions– Matches TIFF + RPC/DEM and reference orthoimage– Operator has the option to redefine the spacing of tie point
measurements. They also have the option to selectmin/max number of points to extract.
• Orthorectification– Imagery optionally scaled from 10 bits per pixel to 8 bits
per pixel– Cubic convolution resampling employed
Final QC
Steps in Quality controlprocess:
• QC operator checksseveral areas withinimage for alignment.
• All areas should be within1 pixel of reference image
• More tie points added andortho regenerated iftolerance is not met
Final QC
• ERDAS IMAGINE ‘swipe’tool used to compareortho with referenceorthoimage
• Ortho viewed withdifferent bandcombinations to ensurethat all 4 bands are OK
• 1 pixel alignment withreference is typicallyachieved with no reworknecessary.
Product Delivery
• 4-band ortho TIFF split into separate bands is generated.
• Final product is transferred to FTP server, wherecustomer can download.
4-band TIFF ortho Output GeoTIFF ortho product
Summary
• Norman Operations continues to provide reliable dataacquisition service of Resourcesat-1
• Custom software used for most data processing steps
• Geoeye’s Resourcesat Orthorectification process isinteractive, but not labor intensive. Providing numerousoperator QC points to ensure the highest productquality.