ASPHALT ASPHALT ASPHALT ASPHALT CONSTRUCTION CONSTRUCTION INFORMATION INFORMATION FOR FOR CQC CQC SPECIFICATIONS SPECIFICATIONS This presentation will give you an overview of what’s required for Asphalt documentation. It includes links to forms, contacts, guidelines, and procedures. A special thanks to the Asphalt Task Team for their input. 1

ASPHALT INFORMATION OUTLINE(3-18-10).ppt · Bridge Construction The link below has the latest revisions to the standardThe link below has the latest revisions to the standard

  • Upload
    phamnhu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

ASPHALTASPHALTASPHALT ASPHALT CONSTRUCTION CONSTRUCTION INFORMATION INFORMATION

FOR FOR

CQCCQCQQSPECIFICATIONSSPECIFICATIONS

This presentation will give you an overview of what’s required for Asphalt documentation. It includes links to forms, contacts, guidelines, and procedures. A special thanks to the Asphalt Task Team for their input.

1

ASPHALT CONSTRUCTION ASPHALT CONSTRUCTION TT

•• Please contact Richard R Massey for anyPlease contact Richard R Massey for any

INFORMATIONINFORMATION

Please contact Richard R. Massey for any Please contact Richard R. Massey for any corrections, changes or comments at the corrections, changes or comments at the following efollowing e--mail address:mail address:following efollowing e mail address:mail address:

i h d @d [email protected]

2

Table of ContentsTable of ContentsTable of ContentsTable of Contents

I.I. Section 1 Section 1 –– Contact List and Phone NumbersContact List and Phone NumbersA.A. Technical Advisory Committee Member ListTechnical Advisory Committee Member ListB.B. List of Asphalt Producers with Approved QC ProgramsList of Asphalt Producers with Approved QC ProgramsC.C. Plant Listings by ContractorPlant Listings by ContractorC.C. Plant Listings by ContractorPlant Listings by ContractorD.D. Plant Listings by DistrictPlant Listings by DistrictE.E. Local District and Resident Contact ListLocal District and Resident Contact List

II. Section 2 II. Section 2 –– General Project Management InformationGeneral Project Management InformationA.A. Standard Specifications for Road and Bridge ConstructionStandard Specifications for Road and Bridge ConstructionB.B. Asphalt PreAsphalt Pre--Paving Conference AgendaPaving Conference AgendaC.C. State Construction Office MemorandumsState Construction Office MemorandumsD.D. The MatrixThe Matrix

TABLE OF CONTENTS 3

D.D. The MatrixThe Matrix

Table of Contents (cont )Table of Contents (cont )Table of Contents (cont.)Table of Contents (cont.)

II.II. Section 2 Section 2 –– General Project Management Information (General Project Management Information (Con’tCon’t))j g (j g ( ))

E.E. LIMS InstructionsLIMS InstructionsF.F. CPAM CPAM ––Construction Project Administration ManualConstruction Project Administration ManualGG Materials ManualMaterials ManualG.G. Materials ManualMaterials ManualH.H. Flexible Pavement Design ManualFlexible Pavement Design ManualI.I. Preparation and Documentation Manual Preparation and Documentation Manual –– Chapter 9Chapter 9JJ Review and Administration ManualReview and Administration Manual Chapter 9Chapter 9J.J. Review and Administration Manual Review and Administration Manual –– Chapter 9Chapter 9

III. Section 3 III. Section 3 –– Forms and InstructionsForms and Instructions

AA A h l PlA h l Pl k h (6 5k h (6 5 030030 25)25)A.A. Asphalt Plant Asphalt Plant –– Worksheet (675Worksheet (675--030030--25)25)B.B. Asphalt Plant Asphalt Plant –– Daily Report of Quality Control (675Daily Report of Quality Control (675--030030--18)18)C.C. Asphalt Plant Asphalt Plant –– Verification Report (675Verification Report (675--030030--19)19)

TABLE OF CONTENTS 4

Table of Contents (cont.)Table of Contents (cont.)Table of Contents (cont.)Table of Contents (cont.)

III. Section 3 III. Section 3 –– Forms and Instructions (Forms and Instructions (Con’tCon’t))(( ))

D.D. Asphalt Roadway Asphalt Roadway –– Daily Report of Quality Control (675Daily Report of Quality Control (675--030030--20)20)E.E. Asphalt Roadway Asphalt Roadway –– Verification Report (675Verification Report (675--030030--21)21)FF Asphalt PlantAsphalt Plant –– Pay Factor Worksheets (675Pay Factor Worksheets (675--030030--22)22)F.F. Asphalt Plant Asphalt Plant –– Pay Factor Worksheets (675Pay Factor Worksheets (675 030030 22)22)G.G. Asphalt Independent Verification Report (675Asphalt Independent Verification Report (675--030030--17)17)H.H. Asphalt Resolution Report (675Asphalt Resolution Report (675--030030--22)22)II Cross Slope Measurement Data Form (700Cross Slope Measurement Data Form (700 010010 98)98)I.I. Cross Slope Measurement Data Form (700Cross Slope Measurement Data Form (700--010010--98)98)J.J. Roadway Roadway –– AsAs--Built Pavement Data (700Built Pavement Data (700--050050--12)12)K.K. Pavement Smoothness Measurement Data FormPavement Smoothness Measurement Data Form

(Laser Profiler)(Laser Profiler)(Laser Profiler)(Laser Profiler)L.L. Straightedge Test ReportStraightedge Test Report

IV S ti 4IV S ti 4 L t S b itt l P k d I t tiL t S b itt l P k d I t ti

TABLE OF CONTENTS 5

IV. Section 4 IV. Section 4 –– Lot Submittal Package and InstructionsLot Submittal Package and Instructions

Table of Contents (cont.)Table of Contents (cont.)Table of Contents (cont.)Table of Contents (cont.)

V. Asphalt Construction GuidelinesV. Asphalt Construction GuidelinesV. Asphalt Construction GuidelinesV. Asphalt Construction Guidelines

A.A. Asphalt Guidelines Asphalt Guidelines –– Roadway QC / Roadway VT / Plant QC Roadway QC / Roadway VT / Plant QC / Plant VT / Project Administrator / QC Manager / / Plant VT / Project Administrator / QC Manager / Paper Work Paper Work TimelineTimeline

VI. Miscellaneous InformationVI. Miscellaneous Information

AA QAQA / QC Statewide Inspection Guide List/ QC Statewide Inspection Guide ListA. A. QA QA / QC Statewide Inspection Guide List/ QC Statewide Inspection Guide List1. 1. Asphalt Plant / Lab (Number 7A)Asphalt Plant / Lab (Number 7A)2. 2. Asphalt Milling / Paving (Number 7B)Asphalt Milling / Paving (Number 7B)

BB S idS id C i i l R i LiC i i l R i LiB. B. Statewide Statewide Critical Requirements ListCritical Requirements List1. 1. Quality Assessment Number 7A (Asphalt Plant/Lab)Quality Assessment Number 7A (Asphalt Plant/Lab)22. . Quality Assessment Number 7B (Asphalt Quality Assessment Number 7B (Asphalt Milling/PavingMilling/Paving))

TABLE OF CONTENTS 6

Table of Contents (cont.)Table of Contents (cont.)Table of Contents (cont.)Table of Contents (cont.)

VI. VI. Miscellaneous Miscellaneous InformationInformation

C. C. IA ChecklistIA Checklist1. 1. FM FM 55--509 Rolling Straightedge509 Rolling Straightedge2. 2. AASHTO AASHTO TT--312 SuperPave Gyratory Compaction312 SuperPave Gyratory Compactionp y y pp y y p3. 3. FM FM 1 1 –– T030 Mechanical Analysis of Extracted AggregateT030 Mechanical Analysis of Extracted Aggregate4. 4. FM FM 1 1 –– T166 Bulk Specific GravityT166 Bulk Specific Gravity5. 5. FM FM 1 1 –– T168 Sampling Bituminous Paving MaterialsT168 Sampling Bituminous Paving Materials5.5. FF T 68 Sa p g tu ous Pav g ate a sT 68 Sa p g tu ous Pav g ate a s6. 6. FM FM 1 1 –– T209 Maximum Specific Gravity of Bituminous T209 Maximum Specific Gravity of Bituminous

Paving MaterialsPaving Materials7.7. FMFM 55 –– 563 Asphalt Content by Ignition Oven563 Asphalt Content by Ignition Oven7. 7. FM FM 5 5 563 Asphalt Content by Ignition Oven563 Asphalt Content by Ignition Oven

D. D. Specification 334 FlowchartSpecification 334 FlowchartE. E. Engineering Analysis Report (EAR) Flowchart and GuidelinesEngineering Analysis Report (EAR) Flowchart and Guidelines

TABLE OF CONTENTS 7

Section 1Section 1 –– Contact ListsContact ListsSection 1 Section 1 Contact ListsContact Lists

•• A.A. Technical Advisory Committee MembersTechnical Advisory Committee Members

ThisThis list can be obtained at the link below:list can be obtained at the link below:This This list can be obtained at the link below: list can be obtained at the link below: ((Use Tabs on bottom of spreadsheet for different disciplines.)Use Tabs on bottom of spreadsheet for different disciplines.)

Names and Phone numbersNames and Phone numbers

SECTION 1 A 8

Section 1Section 1 –– Contact Lists (cont.)Contact Lists (cont.)Section 1 Section 1 Contact Lists (cont.)Contact Lists (cont.)

•• B.B. List of Asphalt Producers with Approved List of Asphalt Producers with Approved QC ProgramsQC Programs

ThisThis list can be obtained at the linklist can be obtained at the link below:below:This This list can be obtained at the link list can be obtained at the link below:below:Asphalt Asphalt ProducersProducers

SECTION 1 B 9

Section 1Section 1 –– Contact Lists (cont.)Contact Lists (cont.)Section 1 Section 1 Contact Lists (cont.)Contact Lists (cont.)

•• C.C. Plant Listings by ContractorPlant Listings by Contractor

ThisThis list can be obtained at the link below:list can be obtained at the link below:This This list can be obtained at the link below:list can be obtained at the link below:Contractors Contractors PlantsPlants

SECTION 1 C 10

Section 1Section 1 –– Contact Lists (cont.)Contact Lists (cont.)Section 1 Section 1 Contact Lists (cont.)Contact Lists (cont.)

•• D.D. Plant Listings by DistrictPlant Listings by District

ThiThi li t b bt i d t th li kli t b bt i d t th li k b lb lThis This list can be obtained at the link list can be obtained at the link below:below:Contractors Contractors Plants by DistrictPlants by District

SECTION 1 D 11

Section 1Section 1 –– Contact Lists (cont.)Contact Lists (cont.)Section 1 Section 1 Contact Lists (cont.)Contact Lists (cont.)

•• E.E. Local District and Resident Contact ListLocal District and Resident Contact List

This This list can be obtained at the link list can be obtained at the link below:below:NamesNames, Phone Numbers, and E, Phone Numbers, and E--mailmail

SECTION 1 E 12

Section 2 Section 2 –– General Project General Project Management Information Management Information

•• A. Standard Specifications for Road and A. Standard Specifications for Road and Bridge ConstructionBridge Construction

The link below has the latest revisions to the standardThe link below has the latest revisions to the standardThe link below has the latest revisions to the standard The link below has the latest revisions to the standard specifications. It can also be used for review of specifications. It can also be used for review of upcoming upcoming changes, and past specifications, changes, and past specifications, etc.etc.g , p p f ,g , p p f ,

SpecificationsSpecifications

SECTION 2 A 13

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• B.B. Asphalt PreAsphalt Pre--Paving Conference AgendaPaving Conference Agenda

This This can be obtained at the link can be obtained at the link below:below:AsphaltAsphalt PrePre--Paving AgendaPaving Agendasphalt sphalt P eP e Pav ng gendaPav ng genda

SECTION 2 B 14

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• C.C. State Construction Office MemorandumsState Construction Office Memorandums

ThisThis can be obtained at the linkcan be obtained at the link below:below:This This can be obtained at the link can be obtained at the link below:below:((This This will take you to the Table of Contents. Choose the ones pertinent to will take you to the Table of Contents. Choose the ones pertinent to Asphalt)Asphalt)

SCOSCO memosmemosSCO SCO memosmemos

SECTION 2 C 15

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• D. The MatrixD. The Matrix

This This can be obtained at the link can be obtained at the link below:below:The The MatrixMatrix

SECTION 2 D 16

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• E.E. LIMS InstructionsLIMS Instructions

ThiThi b bt i d t th li kb bt i d t th li k b lb lThis This can be obtained at the link can be obtained at the link below:below:LIMS LIMS InstructionsInstructions

SECTION 2 E 17

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• F.F. CPAM Construction Project CPAM Construction Project Administration ManualAdministration Manual

This This can be obtained at the link belowcan be obtained at the link below::((Particularly Chapters 3, 5, and Particularly Chapters 3, 5, and 11)11)

CPAMCPAM

SECTION 2 F 18

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• G. Materials ManualG. Materials Manual

ThiThi b bt i d t th li k b lb bt i d t th li k b lThis This can be obtained at the link belowcan be obtained at the link below::((Particularly Section Particularly Section 3)3)

M i lM i l M lM lMaterials Materials Manual Manual

SECTION 2 G 19

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• H. Flexible Pavement Design ManualH. Flexible Pavement Design Manual

ThiThi b bt i d t th li k b lb bt i d t th li k b lThis This can be obtained at the link belowcan be obtained at the link below::((Particularly Chapters 4 and Particularly Chapters 4 and 5)5)

Fl iblFl ibl P D i M lP D i M lFlexible Flexible Pavement Design ManualPavement Design Manual

SECTION 2 H 20

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• I.I. Preparation and Documentation ManualPreparation and Documentation Manual

Ch t 9Ch t 9Chapter 9 Chapter 9

This This can be obtained at the link can be obtained at the link below:below:Preparation Preparation and Documentation Manualand Documentation Manual

SECTION 2 I 21

Section 2 Section 2 –– General Project General Project Management Information (cont.)Management Information (cont.)

•• J.J. Review and Administration ManualReview and Administration Manual

Chapter 9Chapter 9Chapter 9Chapter 9

This This can be obtained at the link can be obtained at the link below:below:Review Review and Administration Manualand Administration Manual

SECTION 2 J 22

Section 3Section 3 –– Forms and InstructionsForms and InstructionsSection 3 Section 3 Forms and InstructionsForms and Instructions

A A h l PlA A h l Pl W k h (675W k h (675 030030 25)25)•• A. Asphalt Plant A. Asphalt Plant –– Worksheet (675Worksheet (675--030030--25)25)

This This can be obtained at the links below: can be obtained at the links below: AsphaltAsphalt Plant Worksheet (Excel )Plant Worksheet (Excel )Asphalt Asphalt Plant Worksheet (Excel )Plant Worksheet (Excel )

Asphalt Plant Worksheet (Excel 2007)Asphalt Plant Worksheet (Excel 2007)Form AssistanceForm Assistance

SECTION 3 A 23

Form AssistanceForm Assistance

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.) (cont.)

•• B.B. Asphalt Plant Asphalt Plant –– Daily Report of Quality Control Daily Report of Quality Control (675(675--030030--18)18)

This This can be obtained at the links can be obtained at the links below:below:Plant Plant -- Daily Report of Quality Daily Report of Quality ControlControl

(Excel (Excel format) format)

SECTION 3 B 24

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• C. Asphalt Plant C. Asphalt Plant –– Verification ReportVerification Report(675(675--030030--19)19)

This This can be obtained at the links can be obtained at the links below:below:Plant Plant –– VT Report (Excel format)VT Report (Excel format)

SECTION 3 C 25

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• D. Asphalt Roadway D. Asphalt Roadway –– Daily Report of Daily Report of

Quality Control (675Quality Control (675--030030--2020))Quality Control (675Quality Control (675 030030 2020))

This This can be obtained at the links can be obtained at the links below:below:Roadway Roadway -- Daily Report of Quality Control Daily Report of Quality Control yy y p yy p y

(Excel Format)(Excel Format)(PDF Format)(PDF Format)

SECTION 3 D 26

(PDF Format)(PDF Format)

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• E. Asphalt Roadway E. Asphalt Roadway –– Verification Report Verification Report (675(675--030030--21)21)(( ))

This This can be obtained at the links below:can be obtained at the links below:Roadway Roadway –– VT Report (Excel format)VT Report (Excel format)yy p ( )p ( )

(PDF format)(PDF format)

SECTION 3 E 27

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• F. Asphalt Plant F. Asphalt Plant –– Pay Factor Worksheets Pay Factor Worksheets (675(675--030030--2222))

This This can be obtained at the link belowcan be obtained at the link below::((Use Tabs at bottom of the spreadsheet for different sieves and reports.)Use Tabs at bottom of the spreadsheet for different sieves and reports.)

Composite Composite Pay Factor WorksheetPay Factor Worksheet(Excel Format)(Excel Format)

SECTION 3 F 28

(Excel Format)(Excel Format)

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• G. Asphalt Independent Verification Report G. Asphalt Independent Verification Report (675(675--030030--17)17)

This This can be obtained at the links below:can be obtained at the links below:I d d t V ifi ti R tI d d t V ifi ti R tIndependent Verification ReportIndependent Verification Report

(Excel format)(Excel format)

SECTION 3 G 29

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• H. Asphalt Resolution Report (675H. Asphalt Resolution Report (675--030030--23)23)

This This can be obtained at the links below:can be obtained at the links below:AsphaltAsphalt Resolution ReportResolution ReportAsphalt Asphalt Resolution Report Resolution Report

(Excel format)(Excel format)

SECTION 3 H 30

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• I. Cross Slope Measurement Data Form I. Cross Slope Measurement Data Form

(700(700--010010--98)98)(700(700 010010 98)98)

This can be obtained at the link below:This can be obtained at the link below:This can be obtained at the link below:This can be obtained at the link below:

Cross Slope FormCross Slope Form(Word Format)(Word Format)(PDF Format)(PDF Format)

SECTION 3 I 31

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• J. Roadway J. Roadway –– AsAs--Built Pavement Data Built Pavement Data

(700(700--050050--12)12)(700(700 050050 12)12)

This can be obtained at the links below:This can be obtained at the links below:This can be obtained at the links below:This can be obtained at the links below:

Roadway Roadway –– AsAs--Built Pavement DataBuilt Pavement Data(Excel 2007 format)(Excel 2007 format)

SECTION 3 J 32

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• K. Pavement Evaluation Request Form K. Pavement Evaluation Request Form (Laser Profiler)(Laser Profiler)(Laser Profiler)(Laser Profiler)

This can be obtained at the link below:This can be obtained at the link below:Laser Profiler Request FormLaser Profiler Request Form

SECTION 3K 33

Section 3 Section 3 –– Forms and Instructions Forms and Instructions (cont.)(cont.)

•• L. Asphalt Pavement Straightedge Test L. Asphalt Pavement Straightedge Test Report (675Report (675--060060--10)10)

This can be obtained at the links below: This can be obtained at the links below:

Straightedge Report (Excel format)Straightedge Report (Excel format)Straightedge Report ( PDF format)Straightedge Report ( PDF format)Straightedge Report ( PDF format)Straightedge Report ( PDF format)

Form AssistanceForm Assistance

SECTION 3L 34

Section 4 Section 4 –– Lot Submittal Package Lot Submittal Package and Instructionsand Instructions

A. Lot Submittal PackageA. Lot Submittal Package ––A. Lot Submittal Package A. Lot Submittal Package Documentation OrderDocumentation Order

This can be obtained at the link below:This can be obtained at the link below:Preparation and Documentation Preparation and Documentation M lM lManualManual

(Then go to page(Then go to page 3030 ofof 42)42)(Then go to page (Then go to page 30 30 of of 42)42)

SECTION 4 35

Section 4 Section 4 –– Lot Submittal Package Lot Submittal Package and Instructions (cont.)and Instructions (cont.)

•• The Asphalt Plant The Asphalt Plant –– Pay Factor Worksheet Pay Factor Worksheet

(675(675--030030--22)22)(( ))

This can be obtained at the link below:This can be obtained at the link below:(Use tabs on bottom for different sieves and reports.)(Use tabs on bottom for different sieves and reports.)

Composite Pay Factor Composite Pay Factor Worksheet Worksheet (Excel Format)(Excel Format)

SECTION 4 36

(Excel Format)(Excel Format)

Section 4 Section 4 –– Lot Submittal Package Lot Submittal Package and Instructions (cont.)and Instructions (cont.)

•• The Asphalt PlantThe Asphalt Plant –– Pay Factor Worksheet (675Pay Factor Worksheet (675--The Asphalt Plant The Asphalt Plant Pay Factor Worksheet (675Pay Factor Worksheet (675030030--22),22), on the previous slide, will be used to create the on the previous slide, will be used to create the forms for numbers 1,2,3,4, and the Ticket Packet cover forms for numbers 1,2,3,4, and the Ticket Packet cover sheets sheets (6,etc(6,etc.).)

11 Lot Information & Packet Cover SheetLot Information & Packet Cover Sheet1. 1. Lot Information & Packet Cover SheetLot Information & Packet Cover Sheet

2. 2. Composite Pay Factor SheetComposite Pay Factor Sheet

3. 3. Verification Verification Roadway Report Roadway Report

4.4. QCQC Plant Daily ReportPlant Daily Report

SECTION 4 37

4.4. QC QC Plant Daily Report Plant Daily Report

Section 4 Section 4 –– Lot Submittal Package Lot Submittal Package and Instructions (cont.)and Instructions (cont.)

55. . Any Additional Information Any Additional Information

66. . Ticket Packet Ticket Packet –– Day 1Day 1yy

77. . Ticket Packet Ticket Packet –– Day 2Day 2

88 Ti k P kTi k P k DD 3388. . Ticket Packet Ticket Packet –– Day Day 33

SECTION 4 38

Section 5 Section 5 –– Asphalt Construction Asphalt Construction GuidelinesGuidelines

•• A. Asphalt Guidelines A. Asphalt Guidelines –– Roadway VT / Roadway VT / Roadway QC / Plant VT / Plant QC /Roadway QC / Plant VT / Plant QC /Roadway QC / Plant VT / Plant QC / Roadway QC / Plant VT / Plant QC / Project Administrator / QC Manager / Project Administrator / QC Manager / Paper work TimelinePaper work TimelinePaper work TimelinePaper work Timeline

This can be obtained at the link below:This can be obtained at the link below:This can be obtained at the link below:This can be obtained at the link below:

Asphalt GuidelinesAsphalt Guidelines

SECTION 5 A 39

Section 6 Section 6 –– Miscellaneous Miscellaneous InformationInformation

•• A. QA / QC Statewide Inspection Guide A. QA / QC Statewide Inspection Guide ListList

1. Asphalt Plant / Lab (Number 7A)1. Asphalt Plant / Lab (Number 7A)

This This can be obtained at the link can be obtained at the link below:below:PlantPlant Inspector Guide ListInspector Guide ListPlant Plant Inspector Guide ListInspector Guide List

SECTION 6 A-1 40

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• A. QA/QC Statewide Inspection Guide A. QA/QC Statewide Inspection Guide ListList

2. Asphalt Milling / Paving (Number 7B)2. Asphalt Milling / Paving (Number 7B)p g / g ( )p g / g ( )

This This can be obtained at the link can be obtained at the link below:below:Roadway Roadway Inspector Guide ListInspector Guide Listyy pp

SECTION 6 A-2 41

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• B. Statewide Critical Requirements ListB. Statewide Critical Requirements List

1 Q lit A t N b 7A1 Q lit A t N b 7A1. Quality Assessment Number 7A 1. Quality Assessment Number 7A

(Asphalt Plant / Lab)(Asphalt Plant / Lab)

This This can be obtained at the link can be obtained at the link below:below:QAR QAR Guide List Guide List -- PlantPlant

SECTION 6 B-1 42

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• B. Statewide Critical Requirements ListB. Statewide Critical Requirements List

2 Q lit A t N b 7B2 Q lit A t N b 7B2. Quality Assessment Number 7B 2. Quality Assessment Number 7B (Asphalt Milling & Paving)(Asphalt Milling & Paving)

This This can be obtained at the link can be obtained at the link below:below:QARQAR G id LiG id Li R dR dQAR QAR Guide List Guide List -- Roadway Roadway

SECTION 6 B-2 43

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

1 FM 51 FM 5 509509 Rolling StraightedgeRolling Straightedge1. FM 51. FM 5--509509 Rolling Straightedge Rolling Straightedge

ThiThi b bt i d t th li kb bt i d t th li k b lb lThis This can be obtained at the link can be obtained at the link below:below:IA IA Checklist Checklist -- StraightedgeStraightedge

SECTION 6 C-1 44

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

2.2. AASHTO TAASHTO T -- 3123122.2. AASHTO T AASHTO T 312 312

SuperPave Gyratory CompactionSuperPave Gyratory Compaction

This This can be obtained at the link can be obtained at the link below:below:IAIA Ch kli tCh kli t G r t r C mp t rG r t r C mp t rIA IA Checklist Checklist –– Gyratory CompactorGyratory Compactor

SECTION 6 C-2 45

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

3 FM3 FM 11 T030T030 M h i l A l i fM h i l A l i f3. FM 3. FM 1 1 –– T030 T030 Mechanical Analysis of Mechanical Analysis of Extracted Extracted AggregateAggregate

This This can be obtained at the link can be obtained at the link below:below:IAIA Ch kliCh kli Si A l iSi A l iIA IA Checklist Checklist –– Sieve AnalysisSieve Analysis

SECTION 6 C-3 46

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

4 FM 14 FM 1 T166T166 B lk S ifi G iB lk S ifi G i4. FM 1 4. FM 1 –– T166 T166 Bulk Specific GravityBulk Specific Gravity

This This can be obtained at the link can be obtained at the link below:below:IA IA Checklist Checklist –– Bulk Specific GravityBulk Specific Gravity

SECTION 6 C-4 47

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

5. FM 1 5. FM 1 –– T168 T168 Sampling Bituminous Sampling Bituminous p gp gPaving MaterialsPaving Materials

This This can be obtained at the link can be obtained at the link below:below:IAIA ChecklistChecklist –– Sampling HMASampling HMA Checkl st Checkl st Sa pl ng M Sa pl ng M

SECTION 6 C-5 48

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

6. FM 16. FM 1 –– T209T209 Maximum Specific GravityMaximum Specific Gravity6. FM 1 6. FM 1 T209 T209 Maximum Specific Gravity Maximum Specific Gravity of Bituminous Paving Materialsof Bituminous Paving Materials

This This can be obtained at the link can be obtained at the link below:below:AA Ch kliCh kli GGIA IA Checklist Checklist -- GMM GMM

SECTION 6 C-6 49

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• C. IA ChecklistC. IA Checklist

7 FM 57 FM 5 563563 Asphalt Content by IgnitionAsphalt Content by Ignition7. FM 5 7. FM 5 –– 563 563 Asphalt Content by Ignition Asphalt Content by Ignition OvenOven

This This can be obtained at the link can be obtained at the link below:below:IA IA Checklist Checklist –– AC ContentAC Content

SECTION 6 C-7 50

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

• D. Specification 334 Flowchart

This can be obtained at the link below:This can be obtained at the link below:Spec. 334 Flowchart – (Current)

Spec. 334 Flowchart – (R^2)

SECTION 6 D 51

Section 6 Section 6 –– Miscellaneous Miscellaneous Information (cont.)Information (cont.)

•• E. Engineering Analysis Report (EAR) E. Engineering Analysis Report (EAR) GuidelinesGuidelines

This This can be obtained at the links can be obtained at the links below:below:EAR EAR GuidelinesGuidelines

SECTION 6E 52