25
D’Angelo Consulting Asphalt Binders and Aging 20Hr or 40Hr PAV John A. D’Angelo D’Angelo Consulting, LLC [email protected]

Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

D’A

ngel

o C

onsu

lting

Asphalt Binders and Aging 20Hr or 40Hr PAV

John A. D’Angelo D’Angelo Consulting, LLC [email protected]

Page 2: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Fatigue Cracking

Rutting

PAV - aging

RTFO - aging No aging

Time

Construction

[RV] [DSR]

Low Temp Cracking

[BBR]

[DTT]

Superpave Binder Specification

Page 3: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Raveling

Page 4: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Fatigue Cracking

Page 5: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Low Temperature Cracking

Page 6: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Superpave Conditioning

RTFOT – Short term aging

Page 7: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Aging Long Term

Current PAV 20 hrs at 100 C, 100 psi.

20 hr PAV mandates two days for binder classification.

Page 8: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Fatigue Cracking

Rutting

PAV - aging

RTFO - aging No aging

Time

Construction

[RV] [DSR]

Low Temp Cracking

[BBR]

[DTT]

Superpave Binder Specification

Page 9: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

New Criteria being looked at for Durability and Fatigue ΔTc Difference between BBR S failure

temp and m failure temp This is intended to capture brittle cracking

Glover Rowe G*(cosδ)2/sinδ Original parameter by Charles Glover Texas A&M to capture Ductility at 15°C 0.005 rads/s

CAM Model R value Defines shape of the master curve indicating

if binder has higher G* lower δ.

Page 10: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Binder Relaxation Properties

Bending Beam Rheometer measures Stiffness and m value.

BBR m value measures relaxation of the binder at cold temperatures.

As binder ages the m value continues to decrease indicating loss of relaxation properties while the stiffness increase levels off.

The difference in temp where S = 300MPa and m value = 0.3 ΔTc is an indicator of embrittlement.

Page 11: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Binder Relaxation Properties

Ductility Ductility run on unaged or short term aged

binders at one temperature does not relate well to cracking.

Glover TAMU investigated recovered binders for the roadway and correlated ductility at 15°C to cracking. Surrogate property rheological property

G′/(η′/G′) measured at 15°C 0.005rad/s correlated to ductility.

Page 12: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Binder Relaxation Properties

Rowe recalculated Glover property G′/(η′/G′) to G*(cosδ)2/sinδ. This can be plotted in Black Space.

Glover TAMU study indicated ductility 5 cm indicates onset of cracking and ductility of 3 cm will exhibit cracking.

Page 13: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Current Aging approaches

Current 20 hour PAV does not represent long enough aging condition to identify critical conditions Extend 20 hour PAV to 40 hour PAV

Longer time to grade Use thinner films in the PAV

Reduced material for testing Use extremely thin films in an oven.

Very small amounts of material special testing 4mm DSR

Page 14: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Binder Aging

Longer Aging times being look at to identify embrittlement. Are Longer times needed? Longer time to grade binders

Can aging ratios identify the same issues? More tests Same time for grading binder

Page 15: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Binder aging

Does one 40hr PAV provide similar results to two 20hr PAV conditioning back to back?

Mathy has done small preliminary study.

Page 16: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

2 20hr PAV vs 40hr PAV

-2.50

-2.00

-1.50

-1.00

-0.50

0.00

0.50

1.00

1.50

PG 64-22,Source 1

PG 58-34,Source 1

PG 64-22,Source 2

PG 64-22,Source 3

PG 64-22,Source 4 +

REOBPG 64-22,Source 5

LT P

G 2

PAV

-40h

r PAV

Page 17: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

2 20hr PAV vs 40hr PAV

-3.00-2.50-2.00-1.50-1.00-0.500.000.501.001.502.00

PG 64-22,Source 1

PG 58-34,Source 1

PG 64-22,Source 2

PG 64-22,Source 3

PG 64-22,Source 4 +

REOBPG 64-22,Source 5

LT P

G 2

PAV

-40h

r PAV

S Critical m-critical

Page 18: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Relationship of crossover Frequency to ΔTc

y = 0.0002e0.5601x

R² = 0.5843

1.00E-07

1.00E-06

1.00E-05

1.00E-04

1.00E-03

1.00E-02

1.00E-01

1.00E+00-10 -8 -6 -4 -2 0 2 4

ωc

ΔTc

Page 19: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Relationship of R value to ΔTc

y = -0.0086x2 - 0.1534x + 2.573R² = 0.6379

1.00

1.50

2.00

2.50

3.00

3.50

4.00

-10 -8 -6 -4 -2 0 2 4

R va

lue

ΔTc

Page 20: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Relationship of GR to ΔTc

y = -64.648x + 103.13R² = 0.6755

-200.0

0.0

200.0

400.0

600.0

800.0

1000.0

1200.0

-10 -8 -6 -4 -2 0 2 4

G R

ΔTc

Page 21: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

ΔTc 20 and 40 hour PAV

Can we determine where the 40hr PAV value we go based on the 20hr PAV?

Look at the 20hr value and the change from original to 20hr.

Page 22: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

ΔTc

There are clear indications that the 20hr PAV and the change from original provides clear indications if 40 hr PAV will fail.

Rate of change of RTFOT to 20hr PAV (RTFOT ΔTc – 20hr PAV)/20hr projected to 40hr

Page 23: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Prediction of 40hr ΔTc

Age ΔTc,°C

RTFO 0.5 1.0 -2.6 1.7 2.8 2.3 -1.3 1.3 0.6 1.9 0.4 1.3 1.7 1.6

20 hr. PAV -3.3 -0.9 -7.0 -1.0 1.7 -0.5 -4.8 -0.9 -2.7 0.8 -3.1 -0.5 -0.7 -2.3

40 hr. PAV -6.1 -1.4 -12.4 -2.3 0.8 -4.7 -7.6 -2.6 -5.8 -2.6 -8.7 -2.9 -2.2 -8.4 predicted -7.1 -2.8 -11.4 -3.8 0.6 -3.3 -8.3 -3.0 -6.0 -0.3 -6.6 -2.3 -3.1 -6.2

diff 1.1 1.4 -1.0 1.5 0.2 -1.4 0.7 0.5 0.2 -2.3 -2.1 -0.6 0.9 -2.2

To predict 40hr ΔTc determine rate of change RTFOT to 20hr PAV (ΔTc RTFOT - ΔTc 20hr PAV)/20hr , to predict 40hr ΔTc

Page 24: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,

Asphalt Binder Aging

Are longer aging times needed? Binder aging ratios may capture the same

issues without longer aging times. The task group will continue to evaluate

more materials and different criteria to determine if poor materials can be identified without longer aging.

Page 25: Asphalt Binders and D’Angelo Consulting Aging 20Hr or 40Hr PAV€¦ · 2 20hr PAV vs 40hr PAV -3.00-2.50-2.00-1.50-1.00-0.50 0.00 0.50 1.00 1.50 2.00 PG 64-22, Source 1 PG 58-34,