© 2010 Aspen Technology, Inc. All rights reserved© 2010 Aspen Technology, Inc. All rights reserved
Aspen Economic Evaluation
Entering Project Components
© 2010 Aspen Technology, Inc. All rights reserved | 2All capabilities and dates are for planning purposes only and may not be used in any contract.
Entering Project Components
© 2010 Aspen Technology, Inc. All rights reserved | 3All capabilities and dates are for planning purposes only and may not be used in any contract.
Entering Components Overview
If Plot Plan or Operational Units are not available, use single area for entering Components
If entering from Equipment List, consider using Spreadsheet View
Enter all components in sequence
Enter “?” for missing data
Recommend “?” entries be put in the Remarks Field
Three methods for entering Components
– Components Tab
– Area Selection
– Spreadsheet View
© 2010 Aspen Technology, Inc. All rights reserved | 4All capabilities and dates are for planning purposes only and may not be used in any contract.
Components Tab (Method 1)
Select the Components Tab in Palette
Expand Components by selecting “+” on selections
Click on Selected Component and Drag to List View
Enter Item Description and Tag Number (recommended) and select Area from Scroll List
Select OK to bring up Component Form
© 2010 Aspen Technology, Inc. All rights reserved | 5All capabilities and dates are for planning purposes only and may not be used in any contract.
Select the Components Tab
2. Expand selections
1. Select components tab
3. Select component
and drag to List View
(Main Window)
© 2010 Aspen Technology, Inc. All rights reserved | 6All capabilities and dates are for planning purposes only and may not be used in any contract.
Enter Item Description, User Tag Number and Select Area
•Item Description must be unique
•User Tag Number is optional but
strongly recommended as entry
•Select Area Name for placement
•Select “OK” to get input form
© 2010 Aspen Technology, Inc. All rights reserved | 7All capabilities and dates are for planning purposes only and may not be used in any contract.
Area Selection (Method 2)
Select Area for Component Entry
Right-click mouse and select “Add Project Component”
Enter Project Component Name
Double click mouse on each entry until Component Form appears
Tag Number must be entered on Component Form
© 2010 Aspen Technology, Inc. All rights reserved | 8All capabilities and dates are for planning purposes only and may not be used in any contract.
Select Area and Add Project Component
1.Right mouse click on Area
2.Select Item
© 2010 Aspen Technology, Inc. All rights reserved | 9All capabilities and dates are for planning purposes only and may not be used in any contract.
Enter Item Description
2. Double mouse click to select
1. Add Unique Component Name
© 2010 Aspen Technology, Inc. All rights reserved | 10All capabilities and dates are for planning purposes only and may not be used in any contract.
Select Component to Add (Method 2)
3. Double mouse click on Component to Add to Project
© 2010 Aspen Technology, Inc. All rights reserved | 11All capabilities and dates are for planning purposes only and may not be used in any contract.
Enter Component Data (Methods 1 & 2)
Black text is User Entered Data
Blue text is System default
Select Evaluate when Data Entry
is complete to review Item
Red Border is Required Entry
© 2010 Aspen Technology, Inc. All rights reserved | 12All capabilities and dates are for planning purposes only and may not be used in any contract.
Item Evaluation Report - HTML
© 2010 Aspen Technology, Inc. All rights reserved | 13All capabilities and dates are for planning purposes only and may not be used in any contract.
Selecting Recommended Report Type
© 2010 Aspen Technology, Inc. All rights reserved | 14All capabilities and dates are for planning purposes only and may not be used in any contract.
Capital Cost Item Report - Equipment
Shows both User Entered Values and Values Used for Calculations
© 2010 Aspen Technology, Inc. All rights reserved | 15All capabilities and dates are for planning purposes only and may not be used in any contract.
Capital Cost Item Report - Details
Details are not shown on HTML report
© 2010 Aspen Technology, Inc. All rights reserved | 16All capabilities and dates are for planning purposes only and may not be used in any contract.
Component Adjustments
Adjustment to Equipment or Volumetric Model can be made using Options Menu
© 2010 Aspen Technology, Inc. All rights reserved | 17All capabilities and dates are for planning purposes only and may not be used in any contract.
Adding Components via Spreadsheet View (Method 3)
Select Spreadsheet View from View Menu
Select View (e.g. Pumps | Centrifugal | Process)
Select Add
Select Project Component Name
Select Component Type to Add and select “OK”
Repeat from “Add” Step until all like components on Equipment List have an entry
Use Copy/Paste function of Excel to Copy Data From Equipment List to Spreadsheet View (Note: Can only copy one column at a time)
Save all entered data
© 2010 Aspen Technology, Inc. All rights reserved | 18All capabilities and dates are for planning purposes only and may not be used in any contract.
Spreadsheet View Selection
© 2010 Aspen Technology, Inc. All rights reserved | 19All capabilities and dates are for planning purposes only and may not be used in any contract.
Spreadsheet View Example
© 2010 Aspen Technology, Inc. All rights reserved | 20All capabilities and dates are for planning purposes only and may not be used in any contract.
Spreadsheet View Example
Created 6 pumps to match the Equipment List (shown on next slide). No data entered except „Item description‟ and Model selection.
© 2010 Aspen Technology, Inc. All rights reserved | 21All capabilities and dates are for planning purposes only and may not be used in any contract.
Typical Equipment List
Highlight row or rows of data and select Copy
© 2010 Aspen Technology, Inc. All rights reserved | 22All capabilities and dates are for planning purposes only and may not be used in any contract.
Spreadsheet View Example
• Highlight the cells in which to paste the copied data, right-click on cells and select „Paste Selection‟.• Select „Apply‟ to save selections• Select „Ok‟ to exit Spreadsheet
Note: Copy and Paste does not work on cells with dropdown scroll lists.