ASP/3 NECF Seminar

25 June 2013

Page 3: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

3

WELCOME

Matthew Hindson

Manager - Contestability

Page 4: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

4

AGENDA

9:00am Introduction and management update Matthew Hindson

9:15am National Energy Customer Framework Adam Simitsiotis

10:15am BREAK

10:30am CAD template updates Max Labecki

11:30am Designer Safety Reports Matthew Hindson

11:40am ASP/3 access to GIS Wayne Griffith

11:50am Q & A All

12:00am CLOSE Matthew Hindson

Page 5: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

5

INTRODUCTIONS and HOUSEKEEPING

• Emergency exits and facilities.• Mobile phones off/silent please.• Questions at the end of the seminar please:

– Verbal answers today,– All questions recorded,– Some may be deferred,– Only relevant to the seminar topics today.

• Ausgrid staff in attendance.• Seminar feedback form.

Page 6: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

6

CONTESTABILITY UPDATE

Page 7: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

7

IMPORTANT REMINDERS

• Correct details in ASP list on DTIRIS website.

• Consistency in charging fees.

• Designer Safety Reports now required.

• ASP/3 access to GIS available.

• NS 104 update.

• URD master planning.

• Contacting Peter Wright and keeping CPCs informed.

• Contacting us on [email protected], Ausgrid web page, and 1800 051 017.

Page 8: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

8

National Energy Customer Framework (NECF)

Overview

Adam Simitsiotis

Contestability

Page 9: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

9

TOPICS

1. NECF Overview.

2. Chapter 5A.

3. New class of customer offer.

4. New connection application forms.

5. New Design Contract – Connection Assets (DCCA).

Page 10: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

10

1. NECF Overview

Page 11: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

11

NECF HISTORY

• Ministerial Council on Energy (MCE) started consultation in 2006.

• Ausgrid commenced background work in 2006.

• Legislation passed in SA March 2011.

• Ausgrid established five work streams to bring together the NECF changes.

• NECF was meant to start in NSW on 1 July 2012, delayed by NSW Government to 1 July 2013.

• NSW Adoption Regulations enacted NECF April 2013.

• NECF already introduced in Tasmania, ACT and SA.

Page 12: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

12

WHAT IS NECF?

The National Energy Customer Framework (NECF) is the next stage in national energy reform. It involves:

• Harmonisation of state based regulatory frameworks for the retail energy market and energy distribution sector (Electricity and Gas Networks and Retailers),

• A single set of national rules and laws to replace State based laws and regulations. The concept started as a retailer initiative as retailers operate across state borders,

• A range of energy specific consumer protections, e.g. ‘network connection offers’ that lead to a contract for connection services,

• Commences 1 July 2013.

Page 13: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

13

LEGISLATION CHANGES

• Connection services will now be governed by the National Energy Retail Law, the National Electricity Law, and rules and regulations under those laws.

• Chapter 5 of the National Electricity Rules is a key component, it applies to registered participants in the NEM, and Chapter 5A applies to all non-registered participants.

• Relevant NSW legislation:

– National Energy Retail (Adoption) Act and Regulation,– Energy Legislation Amendment (National Energy Retail

Law) Act 2012. Amends Electricity Supply Act,– Electricity Supply (General) Amendment (National

Energy Retail Law) Regulation. Amends Electricity Supply (General) Regulation.

Page 14: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

14

WHO IS IMPACTED BY THIS CHANGE?

Everyone who is involved in the connection and supply of energy to customers will be impacted. This includes:

• Ausgrid employees who process connection applications, undertake connection works, manage connection assets, undertake planning, manage projects, deal with customers and those involved with design and compliance,

• ASPs who provide services to both customers and Ausgrid,

• Any people applying to connect to the network or applying to modify their existing connection in any way,

• Retailers who provide an interface with customers and Ausgrid will need to be aware of the changes.

Page 15: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

15

HOW WILL IT AFFECT CUSTOMERS?

• All new and altered customer connections in NSW will have to follow the new Chapter 5A contract process.

• Customers arranging either a new connection to the network, or an alteration to their connection will have new forms to complete.

• Ausgrid will respond to the application within 10 business days with a connection offer for the connection services that we provide to connect the customer.

• The connection offer becomes a contract for delivery of these services if the customer accepts the offer.

• There will be a new ‘Deemed Standard Connection Contract’ that replaces the Standard Form Customer Connection Contract.

Page 16: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

16

HOW WILL IT AFFECT CUSTOMERS?

• It will apply to ongoing connection services after electrification of the service. This contract sets out the connection services that we must provide and the customers’ obligations once connected to our network.

• This contract is based on a model contract required under the NECF rules with only variations permitted by the NSW specific requirements.

• All existing customers will automatically roll onto this deemed standard connection contract.

• This continues over from the Chapter 5A connection contract.

Page 17: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

17

WEB TREE

Page 18: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

18

2. Chapter 5A

Page 19: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

19

CHAPTER 5A – KEY CHANGES AND IMPACTS

• All customer connection offer terms and conditions must include:

–Timeframes for commencing and completing the work,

–A description of the connection and the costs.

• Connection services include design services, market system updates, meters, construction work and substation commissioning.

• The connection offers will be on the Ausgrid website as “Model Standing Offers” (MSO) that a customer can obtain and read. Once accepted, the MSO becomes a contract.

• There are defined timeframes for Ausgrid to send an offer in response to a connection application.

Page 20: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

20

• Timeframes for Ausgrid to commence and complete its part of the project will be in the contracts.

• Failure to meet these timeframes is a potential contract breach and a reportable regulatory breach.

• A standard connection offer must be sent to the applicant within 10 business days of receiving a connection application.

• A negotiated connection offer must be sent to the applicant within 65 business days of receiving a connection application.

• There is an “expedited option” for connection offers.

CHAPTER 5A – KEY CHANGES AND IMPACTS

Page 21: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

21

3. New Class of Customer Offers

Page 22: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

22

TRANSITION

• New NECF forms and connection offers required from 1 July 2013.

• ES9 agreements still used until 1 July 2013.

• Connection applications received by Ausgrid from 1 July 2013 must use a new NECF connection application form.

• All projects with an existing ES9 agreement will continue, using current non NECF processes through to electrification, unless the applicant wants to submit a new connection application form.

• Parallel processes to be managed in the short term.

Page 23: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

23

BASIC CONNECTION OFFERS

• There are three Basic Connection Offers (100 amps, Micro EG, and > 100 amps).

• These apply to customer connections where there will be minimal or no network augmentation.

• The only network augmentation is the service cable and metering equipment (ASP/2).

Page 24: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

24

STANDARD CONNECTION OFFERS

There are four Model Standing Offers targeted towards the more common customer connection work that occurs on our Network:

– Ausgrid off site augmentation,

– Ausgrid augmentation (substation upgrade),

– Ausgrid on site augmentation,

– Model standing offer Standard Connection Services for Contestable ASP/1 Premises Connections no greater than 11kV (MSO).

Page 25: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

25

NEGOTIATED CONNECTION OFFERS

• Under NECF, the applicant has the right not to accept a MSO, and to negotiate an offer. If negotiation is required, a process will be available on our website.

• If our MSO’s are not suitable for the proposed connection, Ausgrid will propose a negotiated connection offer.

• A 65 business day timeframe for preparing and sending an offer will apply.

• Ausgrid can require an applicant to pay any reasonable costs incurred in negotiating an offer.

Page 26: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

26

STANDARD CONNECTION OFFER – CONTESTABLE

Model standing offer Standard Connection services for Contestable ASP/1 Premises Connections no greater than 11kV (MSO).

• This applies to connections where there will be network augmentation. This offer is for contestable connections where an ASP/1 installs new infrastructure.

• Note: Relocation projects are not required to have connection offers. However, relocation projects are expected to be managed with a similar contestable process.

Page 27: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

27

EXPEDITED OPTION IN ALL OFFERS

There is an “expedited option” for connection offers:

• If an applicant agrees to one of Ausgrid’s model offers then there is no need to have a formal offer and acceptance,

• To accept this, the applicant or its representative must indicate this on the relevant connection application form,

• If expedited, the contract commences on the date the connection application was “completed” with the certification number,

• Ausgrid has the option not to accept a connection offer as “expedited” if it believes the offer nominated on the application form is not suited to the connection application.

Page 28: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

28

4. New Application Forms

Page 29: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

29

NEW APPLICATION FORMS

• Ausgrid released CIA 1377 as an introductory pack to assist in the understanding of the NECF.

• Forms will be available on Ausgrid’s new website.

• To initiate a contestable process, the applicant must complete a connection application.

• A preliminary enquiry form is available, however, these are not expected to initiate many contestable projects.

Page 30: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

30

• Designed to meet specific NECF requirements to capture:– Retail customer,– Connection applicant (person submitting the form),– Premises connection assets required.

• Why multiple forms?– It will be easier to manage,– Forms are designed to match the new connection

offers.

• eForms being re-designed to accommodate NECF, allowing for easier submission of connection applications.

NEW APPLICATION FORMS

Page 31: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

31

• So what are they?– NECF 01 Preliminary Enquiry,– NECF 02 Residential and Small Commercial Connections,– NECF 03 Large, Multiple & Remote Connections,– NECF 04 Embedded Generation,– NECF 05 Micro Embedded Generation.

• All forms have a similar front page which captures:– Location,– Applicant,– Customer.

• Remaining pages capture technical or site specific information pertaining to the particular connection application.

• * Means Mandatory field.

NEW APPLICATION FORMS

Page 32: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

32

ALL FORMS HAVE…

• Information on when to use the form and where to send it.

• Location and land owner details.

• Retail customer or developer details.

• Connection applicant details.

Page 33: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

33

An Expedited option:

• If the connection application indicates an expedited connection, the contract commences on the certification date (i.e. the date the connection application was “completed” with the certification number),

• While all Basic and Standard offers will be able to be expedited, it is anticipated this option will be mostly associated with works that typically involve ASP/2 work only.

ALL FORMS HAVE…

Page 34: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

34

• Additional Information assists Ausgrid to determine if an applicant has previously enquired about this possible connection and if there is any possibility of relocation works.

• Signatory field is used by the person who is making the connection application, this may be the customer or someone acting on their behalf.

• Applicants must have authority from the customer if making an application, requesting expedition or accepting an offer.

ALL FORMS HAVE…

Page 35: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

35

CONNECTION APPLICATION GUIDES

• Guides will assist in completing the forms.

• They provide more detail for each component of the connection application.

• These will be available on Ausgrid’s website.

• There is no guide to NECF – 01 Preliminary Enquiry.

Page 36: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

36

NECF - 01

NECF-01 Preliminary Enquiry

• Requests general information on a possible new or altered connection.

• Formalises old processes of phone calls, emails, etc. to Ausgrid.

* Means Mandatory Field

Page 37: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

37

NECF-03 Large, Multiple and Remote Connections

• New or altered connections > 100amp.

• Subdivisions requiring new infrastructure.

• More than 6 separate units.• Equipment rated 30 amps or

more.• High voltage connections.• Expected to be most common

form for contestable projects.

* Means Mandatory Field

NECF – 03 (Page 1)

Page 38: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

38

NECF – 03 (Page 2)

NECF-03 Large, Multiple and Remote Connections

• Electrical contractor details. • Part B Load Details:

– Connection timeframes,– Exist asset numbers,– Subdivision information,– Proposed point of common

coupling,– Proposed point of supply,– Connection type,– EG details.

* Means Mandatory Field

Page 39: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

39

NECF – 03 (Page 3)

NECF-03 Large, Multiple and Remote Connections

• Part B Load Details:– Service type and size,– Metering details,– Land title type and usage,– Calculated max demand,– Proposed supply points,– Additional development

details.

* Means Mandatory Field

Page 40: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

40

NECF – 03 (Page 4)

NECF-03 Large, Multiple and Remote Connections

• Part B Load Details: – Location diagram,– Single item of plant

> 75amps,– HV connection detail,– Power quality details.

* Means Mandatory Field

Page 41: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

41

NECF-03 Large, Multiple and Remote Connections

• Part B Load Details: – Expedited connection

contract option,– Other Information, including

certification number,– Plus space to detail

anything additional that may assist assessment of the application.

NECF – 03 (Page 5)

* Means Mandatory Field

Page 42: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

42

NECF – 03 (Page 6)

NECF-03 Large, Multiple and Remote Connections

• Part B Load Details: – Street address at top of

each page helps identify and collate forms,

– Signatory of connection applicant,

– A checklist.

* Means Mandatory Field

Page 43: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

43

5. New Design Contract – Connection Assets (DCCA)

Page 44: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

44

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

• Contract between Ausgrid and a Connection Applicant (CA) who retains an ASP/3 to design electricity assets.

• Sets out the terms and conditions on which Ausgrid will provide design information and certify the ASP/3's design.

Page 45: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

45

SECTION 1 – CONTRACT DOCUMENTS

• Ausgrid has the right to request further information prior to DIP.

SECTION 2 – CONTRACT TERM AND TERMINATION

• Contract commences on acceptance of offer by CA.

• Contract terminates 3 years after electrification, unless:

– No design has been certified after 12 months of DIP issue, unless Ausgrid agrees to an extension,

– Development has changed significantly. In this case, DIP and any design certified becomes invalid,

– In the above cases, a new application will be required and a new DCCA established.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 46: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

46

SECTION 3 – CONTRACT SURVIVES

• If the customer’s CA changes, the DCCA novates to the new CA. If the customer does not replace the CA, the customer becomes the CA.

• If the customer changes but development continues, CA must advise Ausgrid.

SECTION 4 – FEES

• Ausgrid specifies monopoly fees.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 47: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

47

SECTION 5 – DESIGN INFORMATION

• Ausgrid issues design information within 30 business days of contract commencement.

• Ausgrid will advise the CA if it requires additional time for complex projects.

SECTION 6 – CA TO ENGAGE ASP/3

• Outlines CA obligations in respect to ASP/3 and the design.

• Rechecking fees payable by ASP/3.

• ASP/3 obligations in this contract continue after certification, including covering 3 year rectification period.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 48: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

48

SECTION 7 – WHS OBLIGATIONS

• CA has commissioned ASP/3 to produce the design.

• ASP/3 must provide written designer safety report to CA, copies to Ausgrid, ASP/1 and other parties as required in the WHS Act.

SECTION 8 – FURTHER ASP/3 OBLIGATIONS

• CA is responsible for ensuring that the ASP/3 complies with all obligations including performance, designer safety report, designer’s warranties as per Appendix 2, EIA and community consultation.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 49: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

49

SECTION 9 – CERTIFICATION OF A DESIGN

• Only designs submitted with the appropriate documentation and in the correct format will be accepted for certification.

• Certification process is a desktop audit only.

• Certification procedures.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 50: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

50

SECTION 10 – LIMITATIONS ON THE USE OF A CERTIFIED DESIGN

A certified design must not be used:

– Until all lease or easement documents are delivered to Ausgrid,

– If there has been a material change in the scope of works,

– If the design is not fit for purpose.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 51: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

51

SECTION 11 - ASP/3 TO ATTEND MEETINGS

• ASP/3 is required to attend an on-site meeting with Ausgrid and the ASP/1 before the ASP/1 starts work.

• If requested by Ausgrid at any other time.

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 52: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

52

SECTION 12 – DISPUTE RESOLUTION

SECTION 13 – NOTICES

SECTION 14 – INTERPRETATION AND DICTIONARY

APPENDIX 1 – MONOPOLY FEES

APPENDIX 2 – DESIGNER’S WARRANTIES

DESIGN CONTRACT – CONNECTION ASSETS (DCCA)

Page 53: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

53

TIMEFRAME OBLIGATIONS

)

Page 54: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

54

ADDITIONAL INFORMATION

• EIA will not be verified unless ASP/3 has been to site, e.g. provide photos etc.

• As required, easement or lease detail on existing assets must be indicated on the design submitted for certification.

• Rechecking fee changes and consistency improved, now allow for one set of rechecking.

• Improved consistency with standard set of rechecking fees.

• If 3rd submission is not certifiable, meeting will be required between Ausgrid, ASP/3 and customer.

Page 55: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

55

CAD TEMPLATE UPDATES

Max Labecki

CAD / BIM Manager

Page 56: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

56

TOPICS

1. CAD Template Updates.Re-arrangement of Layout Tabs including:– Notes (Safety in design).– Tables.– Sub_Schematics.– XSections.– Lines_Symbols.– Text_Blocks and Text_Blocks (2).– Chamber Subs (Tentative).

2. Template release date.3. ASP best practices Training / Webinar.

Page 57: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

57

NOTES: UPDATES

• Separate sheet.• Don’t explode notes.• Warnings updated.

Safety In Design

All designs must comply with the requirements of the Work Health and Safety Act 2011 (NSW) and the Work Health and Safety Regulation 2011 (NSW).

Ausgrid requires the designer to provide adequate information regarding any plant, substance or structure associated with the design of any network asset, including overhead or underground distribution mains, overhead or underground subtransmission mains, distribution substations, street lighting, etc. In so doing, the designer must:

Page 58: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

58

(a) Identify hazards that may arise in the application of the design.(b) Assess the risks to health and safety arising from each hazard.(c) To the extent possible, eliminate or minimise all risks that may arise during the design development process by designing suitable control measures.(d) Review the control measures as required and control any residual risks. Provide each person who receives the design all necessary information regarding the safe use of the plant, substance or structure, including the information required by Items (a) to (c) above.(e) Provide a Designer Safety Report that identifies any unusual or atypical features of the design and all hazards and risks that are unique to the particular design. (f) Include in the Designer Safety Report an assessment of risks arising throughout the construction, operation and maintenance phases of all components of the design plan.(g) Include in the Designer Safety Report appropriate information on the identified hazards, assessment of risks, adopted control measures and the residual risks of all plant and structure comprising the design plan.

NOTES: UPDATES

Page 59: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

59

TABLES: UPDATES

Page 60: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

60

TABLES: UPDATES

Page 61: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

61

SUB_SCHEMATICS: UPDATE

• Pole substation schematics diagram updated.• Link pillars diagrams added.• Site plan with distance (3m, 6m and 10m rule).

Page 62: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

62

XSECTIONS_SLIGHTS: UPDATE

• Minor adjustment to proposed under bore cross section (more details to follow).

• New streetlighting mounting plans / diagrams.

Page 63: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

63

LINES_SYMBOLS: UPDATE

• LV underground / overhead.• HV underground / overhead.• Streetlighting.• LV equipment.• HV equipment.• Services.

Page 64: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

64

TEXT_BLOCKS: UPDATE

• Poles.• Substations.• Auxiliary & communication.• Conduits cross section.• Cadastre.• Systems diagrams (New symbols).

Page 65: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

65

TEXT_BLOCKS (2): UPDATE

• Earthing (NEW cable and symbols). Each drawing will require an earthing plan / diagram.• Substation.• Sub-transmission.• Text and annotation.• Text leaders.• ‘To be Removed’ symbology (NEW lines and symbols).• Pits (NEW comms, structural pits).

Page 66: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

66

CHAMBER_SUBS: UPDATE

• Chamber substation diagrams.• Chamber substation system diagrams views.

Page 67: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

67

TEMPLATE RELEASE DATE

• Mid to late July.• External CAD bulletin.• Proposed CAD training postponed due to NECF.• Webinar option (Recorded)?

Page 68: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

68

ASP/3 BEST PRACTICES CAD TRAINING / WEBINAR

OR

TrainingLocations: Newcastle, Sydney,

SilverwaterDuration: TBCCost : TBC

WebinarDetailed look at external CAD templateDuration: 1 hr

Page 69: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

69

DESIGNER SAFETY REPORTS

Matthew Hindson

Manager - Contestability

Page 70: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

70

DESIGNER SAFETY REPORTS (DSR)

• WH&S Legislation commenced 1 January 2012.

• WH&S obligations for ASP/3s.

• Advice to ASP/3s by Ausgrid 17 January 2013.

• DSRs required by Ausgrid from 1 February 2013.

• DSR templates will not be provided.

• Ausgrid’s expectations.

Page 71: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

71

DESIGNER SAFETY REPORTS - EXPECTATIONS

• The name of the client/organisation commissioning the works [Principal].

• The name of organisation producing the report.

• The name of the person signing out the report as approved.

• The name, job title, qualifications & discipline of the person checking the report.

• Includes a title that it is a Designer’s Safety Report.

• Includes a certification statement detailing that the report is in line with the requirements of the current WH&S regulations.

Page 72: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

72

• Describes the project being designed.

• Describes the extent and scope of the works.

• Describes the discipline of the works [electrical, civil, structural].

• Describes the design intent (reason for project).

• Includes an issue date.

DESIGNER SAFETY REPORTS - EXPECTATIONS

Page 73: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

73

• Reflects appropriate level of detail for size and complexity of project.

• Includes relevant hazard & risk register for medium to large projects.

• Includes relevant unusual or atypical residual hazards and controls register, associated with: Construction, fit-out, commissioning, operations, maintenance, decommissioning, demolition/removal.

DESIGNER SAFETY REPORTS - EXPECTATIONS

Page 74: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

74

• Describes any other hazards [that may not be associated with design] indentified in execution of design.

• Describes any hazards eliminated [not essential but very positive].

• Recommended controls associated with any known hazards.

• Contact information.

Notes:

This list does not ensure DSR is adequate, it provides indication if further investigation into suitability of DSR is required. This list is not a template for DSRs.

DESIGNER SAFETY REPORTS - EXPECTATIONS

Page 75: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

75

ASP/3 ACCESS TO GIS

Wayne Griffith

Contestability

Page 76: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

76

ASP/3 ACCESS TO GIS

• Recognition of work undertaken by Ausgrid’s Melanie Wilmot & her team in developing this tool.

• A design tool to allow ASP/3’s to receive relevant AutoCAD files containing GIS information, for specified project areas.

• Functionality testing undertaken internally and with Ausgrid staff externally.

• Not to replace the CAD file provided in the design information provided.

Page 77: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

77

NEWSLETTER

• Newsletter emailed mid May 2013.

• Over 150 responses from ASP/3’s.

• Go Live 26 June 2013.• Ausgrid to maintain a list of valid

email addresses.• Email any issues to

[email protected] and include ‘ASP/3 GIS issues’ as heading.

• More information to be provided on Ausgrid’s website.

Page 78: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

78

HOW TO ESTABLISH YOUR USER ACCOUNT

• Use your individual company email address to register.• Forward your email address to

[email protected] and include ‘GIS Access for ASP/3’ as the subject.

• You will be notified once your user account has been created.

• Once an account has been created, log in to the URL provided to access the DWG Extractor tool: (https://forms.energy.com.au/webgis/minigis).

• Enter the username (email address used to register with Ausgrid) and the supplied default password.

Page 79: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

79

USING THE WebGIS EXTRACTOR

• Once logged into WebGIS, you will be presented with a screen displaying the Ausgrid area.

• Assets on the Google Map background on WebGIS are a geoschematic representation and not indicative of what is presented in the exported DWG file.

Page 80: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

80

GOOGLE MAPS

Page 81: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

81

Finding where you need to go:Users can navigate to their relevant areas of interest in 3 ways:

1. Navigation using panning and zooming: using the built-in Google Maps navigation tools on the left side of the screen, or by using the mouse scroll function to zoom, and a click- and-drag to pan the map.

2. Search by Address: enter the address to centre that address on the map, ensure that you include the suburb to reduce ambiguity.

3. Search by Asset: enter the name of an asset (e.g. Sub number) to locate and centre that asset on the map.

USING THE WebGIS EXTRACTOR

Page 82: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

82

ZOOMING AND EXTRACTING AN AUTOCAD FILE

• When the relevant area has been viewed on the map, and zoomed to a sufficient scale, the export to AutoCAD DWG button will appear on the top bar of the screen.

• Note: this button is only accessible when the map has been zoomed sufficiently to prevent overly large DWG files being generated.

• Once this button has been clicked, follow the prompts to generate the DWG file.

• A link to the generated DWG file will be emailed to your nominated email address.

Page 83: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

83

SAMPLE CAD FILE PRODUCED

Page 84: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

84

WebGIS DWG Video Guide.wmv.lnk

USER VIDEO GUIDE

Page 85: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

85

QUESTIONS / FEEDBACK

Page 86: ASP/3 NECF Seminar - ausgrid.com.au · – Only relevant to the seminar topics today. ... where an ASP/1 installs new infrastructure. ... • eForms being re-designed to accommodate

86

Thank you and Close