19
1 Net-Centric Integration & Interoperability Improvement in the Department of the Navy Unclassified Mr. Carl Siel ASN(RDA) Chief Engineer [email protected] ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office [email protected]

ASN (RDA) Chief [email protected] ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office [email protected]

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

1

Net-Centric Integration & Interoperability

Improvement in the Department of the Navy

Unclassified

Mr. Carl SielASN(RDA) Chief Engineer

[email protected]

ASN (RDA)Chief Engineer

28 October 2009

Mr. J. Kevin SmithTechnical Director

ASN(RDA) Chief Engineer’s [email protected]

Page 2: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

2

Purpose

Provide a update on progress being made with Department of the Navy to improve integration, interoperability, and net-centricity across the Department of the Navy.

Page 3: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

3

Background From February 2006 to September 2009, ASN(RDA) Chief

Systems Engineer has been leading an initiative to improve the Department’s approach to systems engineering of Net-Centric derived requirements.– ASN(RDA) CHSENG has assumed the role of systems-of-systems

engineer at the Naval mission level.– PEO systems engineers and technical directors coordinate systems

engineering within their organizations.– PMO system engineers have responsibility for program-level

systems engineering.

Page 4: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

4

Mission Area System-of-Systems Engineering

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform & SoS Developmental

Test

System VerificationICD / CDD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

Page 5: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

5

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

ASN (RDA)

Mission Area System-of-Systems Engineering

Page 6: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

6

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

CONOPS

Operational Needs

Mission Operational

Requirements

- Operational Capability Needs

- DOTMLPF

- KPPs

Mission Area System-of-Systems Engineering

Page 7: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

7

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

Develops, Designs, Simulations, Models, Prototypes, Builds, Tests

ASN (RDA)

DerivedRequirements

Platform Verify

System Verify

Components Verify

Mission Area System-of-Systems Engineering

Page 8: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

8

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

Validation- OAs/ OPEVAL-System Mission Environment

Mission Area System-of-Systems Engineering

Page 9: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

9

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

Operations & Maintenance

Deployment

- Fielding Support- Facilities- Personnel

Mission Area System-of-Systems Engineering

Page 10: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

10

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

DoD 5000 Process

Depending on the “System”

it can take 1, 5, 10,

or 20 years.

Page 11: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

11

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

To Architect and Engineer the Naval Force…

….What’s Missing?

?

Page 12: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

12

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

Engineering at the Mission Level

Derived

Mission Operations

RequirementsValidation

Aggregating

Development & Assessment

Page 13: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

13

RDA CHSENG Initiative

Mission Operations

RequirementsValidation

Net-Centric Integration & Interoperability

DODAF Usability For Engineers-DON Enterprise Architecture -Architecture Common Data Elements-Architecture Repository-Architecture Hierarchy based on JCAs

DON-Focused ISP Review

NR KPP Guidebook

Mission SoS Engineering Guidebook

Mission Area CHENG

Modeling and Simulation

•NMSO•Large Scale Capability Assessment•COTF

Analysis – Engineering – T&E CommunityMeta Data Strategy

Mission Threads Mission Based Test Scripts

Use of Live Virtual Constructive Environment

Page 14: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

14

Government Role as LSIKey Stakeholders

Gov't Role/ Responsibilities

Problem/ Challenge Requirements Strategy

ID Capability Reqm'tsProvide SE rigor in Arch.

& Reqm'tsReqm'ts flowdown/

verification

Coord. SI across programs

Decompose SI reqm'ts

Validate sys performance

Acq Strat., report SI activities at reviews, T&E

facilities

Integration approaches

SI & Technical Authority People, processes,

facilities

Ensure industry compliance with SI

reqm'ts

Reqm'ts Traceability

Ability to integrate mission

capabilitities across muti missions, platforms, systems

Eng. mission capability in SoS arch., Allocating capability reqm'ts across PORs, SI reqm't in revieiws,

T&E facilities

Contracting

Insufficient SI Requirements for

optimum interoperability

Designs based on Gov't defined

Arch.

Insufficient Gov't Insight

Insufficient Gov't Technical Insight

Knowledge to make SI

decisions and lack of clear reqm'ts to maximize

commonality

Align evolving sys, tech,

People, processes, facilities to maximize value across lifecycle

MissionForce Focus

SoS(Platform/Net

Centric)Capability Focus

SystemFunctional Focus

ComponentEnd Item Focus

Update technical processes (e.g. SETR) to address SI related information

Intellectual Property RightsAssess Human Capital Capacity

Contracting strategy and language to address IPIincreased Gov't activity in sys arch & specs

Gov't Rapid Prototyping (sustain knowledge base)

Clear Architectural DepictionsCodify Mission Area Chief Engineers

Test and Validation Facilities

Insight into sys development & SI implicationsGov't owns IP and sys arch.

Access to SoS T&E FacilitiesGov't mechanism to track/report SI

q Processes, stds,

specs & best

Facilities, Gov't access to IP,

Tech insight to execute "Smart

Buyer" role, Hands on work

ContractingIP and Arch

Human CapitalCapacity (TA)

PM, SYSCOM, Industry

Joint Staff, FFC, Combatant CDR, OPNAV, RD&A

OPNAV, RD&A, PEO

PEO, SYSCOM

Largest payoff is at the highest level, must technically launch the project correctly to avoid costly course corrections later in development/support

Technical discipline (competency) is required at each level Quality SI information is essential to delivering mission capability through multiple PORs

Page 15: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

15

RDA CHSENG Mission Engineer Accomplishments

DODAF Usability (On-going)– NetCentric I&I Management Plan: Kevin Smith, RDA CHSENG– Architecture Common Data Elements: Mark Econie, SPAWAR– Architecture Repository: Mark Econie; Pat Roche, SPAWAR– DON Enterprise Architecture: Mike Jacobs, DoN CIO, Kevin Smith, RDA CHSENG

DON-Level ISP Review Process (Exists): Dr. Cheryl Walton; RDA CHSENG

NR KPP Guidebook (Fall 2009): Dr. Cheryl Walton; RDA CHSENG

Aggregation of Documentation (Fall 2009): Dr. Cheryl Walton; RDA CHSENG – Consolidated ISPs.– Restructured IA certifications.

Mission SoS Engineering Guidebook (v1 Exists / v2 Spring 2010): Melinda Reed, RDA CHSENG

Page 16: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

16

RDA CHSENG Mission Engineer Accomplishments (continued)

Mission Area CHENG (On-going): Kevin Smith, RDA CHSENG– Segment Reference Architecture development.– Segment-to-Solution Architecture alignment.– JCIDS matching to Segment Reference Architectures

Predictors of Program Success (POPS) (v1 Exists): Mike Yang, RDA CHSENG– Net-Centric parameters incorporated.

Analysis / Engineering / T&E Meta Data Strategy (On-Going): John Moore, NMSO

Large Scale CPA / CPE (Fall 2009): Tony Devino, RDA CHSENG– CFFC pre-deployment evaluations.– OPTEVFOR evaluations.

Government Role as LSI (Initial Exists / Follow-On): Joan Johnson, NAVAIR

Page 17: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

17

RDA CHSENG Mission Engineer Plans

DODAF Usability (On-going)– NetCentric I&I Management Plan: Kevin Smith, RDA CHSENG– Institutionalize Architecture Common Data Elements: Mark Econie, SPAWAR– Exercise Architecture Repository: Mark Econie; Pat Roche, SPAWAR– Populate the Segment Reference Architectures in the DON Enterprise Architecture: Mike Jacobs, DoN

CIO, Kevin Smith, RDA CHSENG – Align DON SRAs to USJFCOM, Army, Air Force mission architectures: Kevin Smith, RDA CHSENG

DON-Level ISP Review Process (Exists): Dr. Cheryl Walton; RDA CHSENG– Extend DON-level reviews to programs at ACAT III and below.

NR KPP Guidebook (Fall 2009): Dr. Cheryl Walton; RDA CHSENG– Publish– Begin using OV data to quantify NR-KPP requirements at OPEVAL

Aggregation of Documentation (Fall 2009): Dr. Cheryl Walton; RDA CHSENG Consolidated ISPs.– Implement platform-only ISPs

Page 18: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

18

RDA CHSENG Mission Engineer Plans (continued)

Mission Area CHENG (On-going): Kevin Smith, RDA CHSENG– Institutionalize MACE control of Segment Reference Architectures.– Continue Segment-to-Solution Architecture alignment during DON-level review of ISPs.– Institutionalize JCIDS matching to Segment Reference Architectures.– Export mission-level system-of-systems engineering to other Naval management

processes:• Campaign and mission analyses.• Programming and Budgeting

Predictors of Program Success (POPS) (v1 Exists): Mike Yang, RDA CHSENG– Update based on lesson learned.

Analysis / Engineering / T&E Meta Data Strategy (On-Going): John Moore, NMSO

Large Scale CPA / CPE (Fall 2009): Tony Devino, RDA CHSENG– Institutionalize CFFC pre-deployment evaluations.– Conduct initial OPTEVFOR system-of-system evaluation.

Page 19: ASN (RDA) Chief Engineer...carl.siel@navy.mil ASN (RDA) Chief Engineer 28 October 2009 Mr. J. Kevin Smith Technical Director ASN(RDA) Chief Engineer’s Office kevin.k.smith1@navy.mil

19

MISSION

SYSTEM

COMPONENTS

MISSION

SYSTEM

COMPONENTS

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

TESTING (DT / OT)• Platform Operation Testing (OT)• Platform Training• Platform &

SoS Developmental Test

System VerificationICD / CCD / CPD

• SETR Process• Interface Management

Analysis ProcessImplementation

PLATFORM PLATFORM

Sub-System

Sub-System

Sub-System

System Functional Behavior

Platform

CONOPS

Operational Needs

Mission Operational

Requirements

Operations & Maintenance

Deployment

Validation

ASN (RDA)

Summary