ASME CERTIFICATIONASME CERTIFICATION
REQUIREMENTSREQUIREMENTS
By : Samy A. FattouhAuthorized Inspector
8/6/2019 Asme Certification
2/13
11/9/2005
2
Program GoalsProgram Goals
l How To obtain an ASME Certificate ofauthorization.
l To compete with other boilers and pressurevessels manufacturers
8/6/2019 Asme Certification
3/13
11/9/2005
3
Type of CertificatesType of Certificatesl U Certificate
- Fabrication of pressure vessels.
l S Certificate
- Fabrication of boilers.
l A Certificate
- Assembly of boilers.l PP Certificate
- Fabrication piping.
8/6/2019 Asme Certification
4/13
11/9/2005
4
DescriptionDescriptionl A certificate of authorization from ASME
allow the manufacturer to fabricate code
stamped vessels as required by many clients.l The certificate of authorization will be valid
for three years.
8/6/2019 Asme Certification
5/13
11/9/2005
5
ResourcesResourcesl Resources required for this project:
- Qualified Work force.
- Calibrated Equipments.
- Defined Location.
- Manufacturing Techniques.
- Document & Records control.
8/6/2019 Asme Certification
6/13
11/9/2005
6
Competitive AnalysisCompetitive Analysisl Competitors
- Currently there are 5 Certificate holders inQatar.
l Strengths
- The manufacturer are proposed to be the
leader.l Weaknesses
- The delay to get the certificate till now.
8/6/2019 Asme Certification
7/13
11/9/2005
7
RequirementsRequirementsl Have an agreement with an Authorized
Inspection Agency.
l Have the applicable ASME code.
l Fill an application form & send to ASME
8/6/2019 Asme Certification
8/13
11/9/2005
8
ProcedureProcedurel Company has to prepare a quality manual
according to ASME code requirements.
l Pre-survey to be carried out by the authorizedInspection Agency (AIA).
l Joint Review to be conducted by both theASME designee & the AIA.
l Certificate will be issued by ASME.
8/6/2019 Asme Certification
9/13
11/9/2005
9
ScheduleSchedule
l Time Span for the program
approximately one year
Preparation of Quality Manual
Pre-survey & Joint Review
Issue of Certificate
8/6/2019 Asme Certification
10/13
11/9/2005
10
Current StatusCurrent Statusl An inspection agreement need to be signed
with the (AIA).
l A consultancy service for preparation of themanual is optional and can be provided by the( AIA).
l Fees will be discussed with GermanischerLloyd.
8/6/2019 Asme Certification
11/13
11/9/2005
11
Inspection AgreementInspection Agreementl ASME Rules
- The manufacturer shall maintain an inspection
agreement with an Authorized Inspection Agency.- A joint Review to be conducted by the ASME
designee and the AIA.
- Annual audit may be carried out by the AIA.
l The AIA
- Germanischer Lloyd agreement with Royal &Sunalliance will be cancelled at the the end ofNovember 2005 and an agreement will be signedwith an other AIA .
8/6/2019 Asme Certification
12/13
11/9/2005
12
Inspection Agreement (cont.)Inspection Agreement (cont.)l The Agreement
- The AIA will provide the Authorized Inspector (AI)
on an intermittent basis to provide ASME codeInspection .
- The AIA will provide the Authorized (AIS)
for pre-survey , joint review & consultation.
l The Annual Audits
- Annual audits may be carried out by AIA to verify thecompliance with the ASME requirements.
8/6/2019 Asme Certification
13/13
11/9/2005
13
THE ENDTHE END