ascife.27510.0001

Embed Size (px)

Citation preview

  • 8/12/2019 ascife.27510.0001

    1/22

  • 8/12/2019 ascife.27510.0001

    2/22

    Externally

    applied

    total

    stress

    Flexible impermeable membrane

    Pore

    water

    pressureu

    u Saturated soil

  • 8/12/2019 ascife.27510.0001

    3/22

  • 8/12/2019 ascife.27510.0001

    4/22

    X X

    u

    u

    u

    1

    u u

    u

    u

    p

    p

    A

    u

    u

    (p/A u)A

    u

    A+

  • 8/12/2019 ascife.27510.0001

    5/22

  • 8/12/2019 ascife.27510.0001

    6/22

  • 8/12/2019 ascife.27510.0001

    7/22

    D

    Unit column

    Total stresses Pore water

    pressure

    Effective

    stresses

    u

    v (vu)

    (hu)h

  • 8/12/2019 ascife.27510.0001

    8/22

    Piezometers

    Rapidlyconstructed

    embankment

    Ground

    level

    Water

    level

    t>> 0

    t> 0

    t= 0

    t=

    u/ w

  • 8/12/2019 ascife.27510.0001

    9/22

    1

    3 = 3

    3

    ua/ wub/ w

    u/ w

    (13)

    + 0

  • 8/12/2019 ascife.27510.0001

    10/22

  • 8/12/2019 ascife.27510.0001

    11/22

  • 8/12/2019 ascife.27510.0001

    12/22

    96

    576

    496

    96

    336

    416456

    1116

    1116

    1036

    416456

    1586

    1036

    1586

    3136

    3216

    3136

    3136

    3136

    24

    210

    Gravel

    Clay

    Gravel

    Clay

    Gravel

    Clay

    Gravel

    Clay

    (u)u kPa

    416

    416

    496416

    496416

    210

    210

    155

    155

    416456

    202

    4

    4

    0

    Long term

    Short term

    336

  • 8/12/2019 ascife.27510.0001

    13/22

    p

    p = o

    (u) = p

    t = o

    u = p

    (u) = p

    v =o

    t = u = o

    (u) = p+p

    v >o

    t > o

    o

  • 8/12/2019 ascife.27510.0001

    14/22

    p pp

    u = o

    (u) = p+p

    t = o

    u = p

    (u) = p+p

    v =o

    t = u = o

    (u) = p

    v >o

    t > o

    p u

  • 8/12/2019 ascife.27510.0001

    15/22

  • 8/12/2019 ascife.27510.0001

    16/22

    Original ground

    water level for

    static water

    table

    Final groundwater level for

    steady seepage

    Equipotential

    line

    p

    hf

    ho

    End of excavation

    pore water pressure

    Depth of cut

    Shear stress on slip

    line through P

    Time

    Time

    Time

    Time

    (a)

    (b)

    (c)

    (d)

    Porewaterpressure

    h0

    w

    Effectivestress

    atP

    Factorofsafet

    y

    Rapid

    construction

    Pore pressure

    dissipation

    Pore pressure

    equilibrium

    hfw

    atP

  • 8/12/2019 ascife.27510.0001

    17/22

    Equilibrium

    ground water

    levelh

    P

    End of loading

    piezometric level

  • 8/12/2019 ascife.27510.0001

    18/22

    Height of fill

    Shear stress on slip

    line through P

    Time

    Time

    Time

    Time

    (a)

    (b)

    (c)

    (d)

    Porewaterpressure

    hw

    Effectivestress

    atP

    Factorofsafety

    Rapid

    construction

    Pore pressure

    dissipation

    Pore pressure

    equilibrium

    atP

  • 8/12/2019 ascife.27510.0001

    19/22

  • 8/12/2019 ascife.27510.0001

    20/22

  • 8/12/2019 ascife.27510.0001

    21/22

    = 0c = su

  • 8/12/2019 ascife.27510.0001

    22/22