221
JSC-48005-114 Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration Lyndon B. Johnson Space Center Houston, Texas Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html

Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

Embed Size (px)

Citation preview

Page 1: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

JSC-48005-114

Ascent Checklist

STS-114

Mission Operations Directorate Flight Design and Dynamics Division

Final, Rev A January 25, 2005

National Aeronautics and Space Administration

Lyndon B. Johnson Space Center Houston, Texas

Verify this is the correct version for the pending operation (training, simulation or flight). Electronic copies of FDF books are available. URL: http://mod.jsc.nasa.gov/do3/FDF/index.html

Page 2: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration
Page 3: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

ASC/114/FIN A

JSC-48005-114

MISSION OPERATIONS DIRECTORATE

ASCENT CHECKLIST STS-114

FINAL, REVISION A January 25, 2005

PREPARED BY:

________________________ ________________________ Allison R. McCagg Michael J. Menard Book Manager VITT Lead

APPROVED BY:

______________________________ Glenn E. Pogue

Lead Ascent GPO

______________________________ Gregory T. Oliver

Chief, Ascent/Descent Dynamics Branch

This document is under the configuration control of the Crew Procedures Control Board (CPCB). All proposed changes must be submitted on FDF Workflow Crew Procedure Change Request (CR) to DO3/FDF Manager.

Additional distribution of this book for official use must be requested in writing to DO3/FDF Manager. The request must include justification and requester's name, organization, position, and phone number. Contractor requests are made through the NASA or DOD organization supported. Deletions, reduction in quantity, or change of address may be submitted to DO3/FDF Management Office, 281-244-1184.

Page 4: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

ii ASC/114/FIN A

Incorporates the following: 482#: ASC-1681C

ASC-1684 ASC-1685 ASC-1686 ASC-1687A ASC-1688 ASC-1689 ASC-1690D ASC-1691 (P)

ASC-1692 ASC-1693 ASC-1694 ASC-1695 ASC-1697 ASC-1698 ASC-1699 ASC-1700 ASC-1701

MULTI-1660 MULTI-1663 MULTI-1668A MULTI-1672 MULTI-1680A MULTI-1681 MULTI-1686

(P) Partial

AREAS OF TECHNICAL RESPONSIBILITY

Book Manager DM4/A. McCagg 281-483-7752

Switch List CA4/M. Menard 281-244-8778

Entry DM4/M. Trump 281-483-8029

Cue Cards DO3/M. Feierstein 281-483-1861

Page 5: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

iii ASC/114/FIN A

NOTES

1. The STS-114 trajectory data in this checklist is based on the STS-114 One Cycle to Flight load and the March environment.

2. The Handover/Ingress Switch List gives the vehicle configuration at LCC/MCC handover (SRB Ignition) and flight crew ingress (T-3:00). If there is a switch position difference between ingress and handover, the ingress position will be boxed beside the handover position.

3. The time reference used in the Prelaunch procedures is the T- (Time to Launch) that LCC uses. This time does not reflect planned holds. The second time referenced in parentheses reflects the planned holds. The mission elapsed time (MET) has MET = 0 at SRB ignition.

4. Normal Flight Procedures are for liftoff through the OMS 2 burn.

5. The Abort to Orbit (ATO) procedures and the Backup Flight System (BFS) procedures are integrated into the appropriate parts of this checklist.

6. AOA procedures terminate with ENTRY MANEUVERS Cue Cards.

7. Ascent Flip Book for the CDR and PLT will be fabricated from the FB pages in section 2.

8. Ascent related cue cards are contained in this document. The cue cards are listed in the Ascent Cue Card section. Some cards are printed in the body of the checklist for MS use and also in the Cue Card Config section for reference of crop marks and fabrication instructions. The size, shape, and Velcro location of the cue cards are controlled by the Cue Card Book Manager.

9. Mission STS-114 is flown with vehicle OV103.

Page 6: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

iv ASC/114/FIN A

This Page Intentionally Blank

Page 7: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

v ASC/114/FIN A

ASCENT CHECKLIST STS-114

LIST OF EFFECTIVE PAGES

FINAL 11/18/02 REV A 01/25/05

Sign Off ...........* 114/FIN A ii .....................* 114/FIN A iii.....................* 114/FIN A iv ....................* 114/FIN A v .....................* 114/FIN A vi ....................* 114/FIN A vii....................* 114/FIN A viii ...................* 114/FIN A ix ....................* 114/FIN A x .....................* 114/FIN A xi .................... 114/FIN A xii.................... 114/FIN A 1-1.................. 114/FIN A 1-2.................. 114/FIN A 1-3.................. 114/FIN A 1-4.................. 114/FIN A 1-5.................. 114/FIN A 1-6.................. 114/FIN A 1-7.................. 114/FIN A 1-8.................. 114/FIN A 1-9.................. 114/FIN A 1-10................� 114/FIN A 1-11................ 114/FIN A 1-12................ 114/FIN A 1-13................ 114/FIN A 1-14................ 114/FIN A 2-1.................. 114/FIN A FB 2-2 ............ 114/FIN A FB 2-3 ............ 114/FIN A FB 2-4 ............ 114/FIN A FB 2-5 ............ 114/FIN A FB 2-6 ............ 114/FIN A

FB 2-7 ............ 114/FIN A FB 2-8 ............ 114/FIN A FB 2-9 ............ 114/FIN A FB 2-10 .......... 114/FIN A FB 2-11 .......... 114/FIN A FB 2-12 ..........� 114/FIN A FB 2-13 .......... 114/FIN A FB 2-14 ..........� 114/FIN A FB 2-15 .......... 114/FIN A FB 2-16 .......... 114/FIN A FB 2-17 .......... 114/FIN A FB 2-18 .......... 114/FIN A FB 2-19 .......... 114/FIN A FB 2-20 .......... 114/FIN A FB 2-21 .......... 114/FIN A FB 2-22 .......... 114/FIN A FB 2-23 .......... 114/FIN A FB 2-24 .......... 114/FIN A FB 2-25 .......... 114/FIN A 2-26................ 114/FIN A 2-27................ 114/FIN A 2-28................ 114/FIN A 2-29................ 114/FIN A 2-30................ 114/FIN A 2-31................* 114/FIN A 2-32................* 114/FIN A 2-33................* 114/FIN A 2-34................* 114/FIN A 2-35................* 114/FIN A 2-36................* 114/FIN A 2-37................* 114/FIN A 2-38................* 114/FIN A

* – Omit from flight book � – Prelift-off information required

Page 8: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

vi ASC/114/FIN A

2-39................* 114/FIN A 2-40................* 114/FIN A 2-41................* 114/FIN A 2-42................* 114/FIN A 2-43................* 114/FIN A 2-44................* 114/FIN A 3-1.................. 114/FIN A 3-2.................. 114/FIN A 3-3.................. 114/FIN A 3-4.................. 114/FIN A 3-5.................. 114/FIN A 3-6.................. 114/FIN A 3-7.................. 114/FIN A 3-8.................. 114/FIN A 4-1.................. 114/FIN A 4-2.................. 114/FIN A 4-3.................. 114/FIN A 4-4.................. 114/FIN A 5-1.................. 114/FIN A 5-2.................. 114/FIN A 5-3.................. 114/FIN A 5-4.................. 114/FIN A 6-1.................. 114/FIN A 6-2.................. 114/FIN A 6-3.................. 114/FIN A 6-4.................. 114/FIN A 6-5.................. 114/FIN A 6-6.................. 114/FIN A 6-7.................. 114/FIN A 6-8.................. 114/FIN A 6-9.................. 114/FIN A 6-10................ 114/FIN A 6-11................ 114/FIN A 6-12................ 114/FIN A 6-13................ 114/FIN A 6-14................ 114/FIN A 6-15................ 114/FIN A 6-16................ 114/FIN A 6-17................ 114/FIN A 6-18................ 114/FIN A

6-19................ 114/FIN A 6-20................ 114/FIN A 6-21................ 114/FIN A 6-22................ 114/FIN A 6-23................ 114/FIN A 6-24................ 114/FIN A 6-25................ 114/FIN A 6-26................ 114/FIN A 6-27................ 114/FIN A 6-28................ 114/FIN A 6-29................ 114/FIN A 6-30................ 114/FIN A 6-31................ 114/FIN A 6-32................ 114/FIN A 6-33................ 114/FIN A 6-34................ 114/FIN A 6-35................ 114/FIN A 6-36................ 114/FIN A 6-37................ 114/FIN A 6-38................ 114/FIN A 6-39................ 114/FIN A 6-40................ 114/FIN A 7-1.................. 114/FIN A 7-2.................. 114/FIN A 7-3.................. 114/FIN A 7-4.................. 114/FIN A 7-5.................. 114/FIN A 7-6.................. 114/FIN A 7-7.................. 114/FIN A 7-8.................. 114/FIN A 7-9.................. 114/FIN A 7-10................ 114/FIN A 8-1.................. 114/FIN A 8-2.................. 114/FIN A 8-3..................� 114/FIN A 8-4..................� 114/FIN A 8-5..................� 114/FIN A 8-6..................� 114/FIN A 8-7..................� 114/FIN A 8-8.................. 114/FIN A

* – Omit from flight book � – Prelift-off information required

Page 9: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

vii ASC/114/FIN A

9-1..................* 114/FIN A 9-2..................* 114/FIN A 9-3..................* 114/FIN A 9-4..................* 114/FIN A 9-5..................* 114/FIN A 9-6..................* 114/FIN A 9-7..................* 114/FIN A 9-8..................* 114/FIN A 9-9..................* 114/FIN A 9-10................* 114/FIN A 9-11................* 114/FIN A 9-12................* 114/FIN A 9-13................* 114/FIN A 9-14................* 114/FIN A 9-15................* 114/FIN A 9-16................* 114/FIN A 9-17................* 114/FIN A 9-18................* 114/FIN A 9-19................* 114/FIN A 9-20................* 114/FIN A 9-21................* 114/FIN A 9-22................* 114/FIN A 9-23................* 114/FIN A 9-24................* 114/FIN A 9-25................* 114/FIN A 9-26................* 114/FIN A 9-27................* 114/FIN A 9-28................* 114/FIN A 10-1................* 114/FIN A CC 10-2..........* 114/FIN A CC 10-3..........* 114/FIN A CC 10-4..........* 114/FIN A (A)CC 10-5.....* 114/FIN A (A)CC 10-6.....* 114/FIN A (B)CC 10-5.....* 114/FIN A (B)CC 10-6.....* 114/FIN A (C)CC 10-5.....* 114/FIN A (C)CC 10-6.....* 114/FIN A CC 10-7..........* 114/FIN A CC 10-8..........* 114/FIN A

CC 10-9 .........* 114/FIN A CC 10-10 .......* 114/FIN A CC 10-11 .......* 114/FIN A CC 10-12 .......* 114/FIN A CC 10-13 .......* 114/FIN A CC 10-14 .......* 114/FIN A CC 10-15 .......* 114/FIN A CC 10-16 .......* 114/FIN A CC 10-17 .......* 114/FIN A CC 10-18 .......* 114/FIN A CC 10-19 .......* 114/FIN A CC 10-20 .......* 114/FIN A CC 10-21 .......* 114/FIN A CC 10-22 .......* 114/FIN A CC 10-23 .......* 114/FIN A CC 10-24 .......* 114/FIN A CC 10-25 .......* 114/FIN A CC 10-26 .......* 114/FIN A CC 10-27 .......* 114/FIN A CC 10-28 .......* 114/FIN A CC 10-29 .......* 114/FIN A CC 10-30 .......* 114/FIN A CC 10-31 .......* 114/FIN A CC 10-32 .......* 114/FIN A CC 10-33 .......* 114/FIN A CC 10-34 .......* 114/FIN A CC 10-35 .......* 114/FIN A CC 10-36 .......* 114/FIN A CC 10-37 .......* 114/FIN A CC 10-38 .......* 114/FIN A CC 10-39 .......* 114/FIN A CC 10-40 .......* 114/FIN A CC 10-41 .......* 114/FIN A 10-42..............* 114/FIN A

* – Omit from flight book

Page 10: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

viii ASC/114/FIN A

ASCENT CUE CARDS

Title Ref. Page Card No. ADI ERROR/RATE SWITCH ASCENT (Front) ........................ CC 10-2 ASC-1a/A,E/D ENTRY (Back)........................... CC 10-2 ASC-1b/A,E/D ASCENT/ENTRY SPEC (Front) ........................................ CC 10-3 ASC-2a/A,E/E (Back) ........................................ CC 10-3 ASC-2b/A,E/C SPEED BRAKE CMD (Front) ........................................ CC 10-4 ASC-3a/A,E/D (Back) ........................................ CC 10-4 ASC-3b/A,E/C CONTINGENCY ABORT

CDR (Front)............................... (A)CC 10-5 ASC-30a/114/A/C RTLS CONTINGENCY

CDR (Back) ............................... (A)CC 10-6 ASC-30b/114/A/C CONTINGENCY ABORT

PLT (Front) ................................ (B)CC 10-5 ASC-31a/114/A/C RTLS CONTINGENCY

PLT (Back)................................. (B)CC 10-6 ASC-31b/114/A/C CONTINGENCY ABORT

MS (Front) ................................. (C)CC 10-5 ASC-32a/114/A/C RTLS CONTINGENCY

MS (Back).................................. (C)CC 10-6 ASC-32b/114/A/C OMS 2 BURN MONITOR (Front) CC 10-7 ASC-5a/114/A,O/B OMS FAILURES (Back) .............. CC 10-8 ASC-5b/A,O,E/I OMS 2/ORBIT OMS BURNS

(Front) ........................................ CC 10-9 ASC-6a/114/A,O/B OPS 1 RCS BURN (Back)........... CC 10-10 ASC-6b/114/A,O/B ASCENT ADI – NOMINAL

(Front) ........................................ CC 10-11 ASC-14a/114/A/D ENTRY ALPHA – KSC 15

(Back) ........................................ CC 10-11 ASC-14b/114/A,E/C AOA DEORBIT BURN (2 ENG) (Top/Front)................................. CC 10-12 ASC-8a/A/E (Bottom/Front) ........................... CC 10-13 ASC-8aa/114/A/B AOA DEORBIT BURN (1 ENG) (Top/Back)................................. CC 10-14 ASC-8b/A/B (Bottom/Back)............................ CC 10-15 ASC-8bb/114/A/B AOA DEORBIT BURN (RCS) (Top/Front)................................. CC 10-16 ASC-7a/A/B (Bottom/Front) ........................... CC 10-17 ASC-7aa/114/A/B (Top/Back)................................. CC 10-18 ASC-7b/A/B (Bottom/Back)............................ CC 10-19 ASC-7bb/A/B

Page 11: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

ix ASC/114/FIN A

ZZA TAL REDESIGNATION (Front) ........................................ CC 10-20 ASC-9a/114/A/C ECAL – ZZA or MRN or FMI PRIME TAL (Back).................... CC 10-21 ASC-9b/114/A/C MRN TAL REDESIGNATION (Front) ........................................ CC 10-22 ASC-10a/114/A/C ECAL – ZZA or MRN or FMI PRIME TAL (Back).................... CC 10-23 ASC-10b/114/A/C FMI TAL REDESIGNATION (Front) ........................................ CC 10-24 ASC-12a/114/A/C ECAL – ZZA or MRN or FMI PRIME TAL (Back).................... CC 10-25 ASC-12b/114/A/C ASCENT/ABORT SUMMARY (Front) ........................................ CC 10-26 ASC-11a/114/A/C (Back) ........................................ CC 10-26 ASC-11b/A/C EMERGENCY EGRESS (Front) ........................................ CC 10-27 ASC-15a/A,E/G (Back) ........................................ CC 10-28 ASC-15b/A,E/D ESCAPE PANEL EGRESS (Front) ........................................ CC 10-29 ASC-16a/A,E/D (Back) ........................................ CC 10-29 ASC-16b/A,E/C GPC/FCS CHANNEL CONFIG (Front) ........................................ CC 10-30 ASC-17a/A,O,E/B (Back) ........................................ CC 10-30 ASC-17b/A,O,E/B PANEL R14 – OV103 ONLY (Front) ........................................ CC 10-31 ASC-18a/A,O,E/G (Back) ........................................ CC 10-32 ASC-18b/A,O,E/C LOC/BREAK-UP.......................... CC 10-33 ASC-21a/A/C EMERGENCY EGRESS (OVERSIZED) (Top/Front)................................. CC 10-34 ASC-25a/A,E/E (Bottom/Front) ........................... CC 10-35 ASC-25aa/A,E/C (Top/Back)................................. CC 10-36 ASC-25b/A,E/B (Bottom/Back)............................ CC 10-37 ASC-25bb/A,E/B EMERGENCY EGRESS (RUSSIAN) (Top/Front)................................. CC 10-38 ASC-26a/A,E/C (Bottom/Front) ........................... CC 10-39 ASC-26aa/A,E/B (Top/Back)................................. CC 10-40 ASC-26b/A,E/B (Bottom/Back)............................ CC 10-41 ASC-26bb/A,E/B PLT & CDR Ascent

Flip Book.................................... FB 2-2 thru FB 2-25

Page 12: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

x ASC/114/FIN A

This Page Intentionally Blank

Page 13: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

xi ASC/114/FIN A

CONTENTS PAGE

PRELAUNCH PROCEDURES .......................................... 1-1 ASCENT PROCEDURES (FLIP BOOK)............................ 2-1

RTLS CDR (CIL) ....................................................... FB 2-12 TAL CDR (CIL) .......................................................... FB 2-14

ASCENT/ENTRY CUE CARDS ......................................... 2-27 ABORT CUE CARDS ........................................................ 2-33 POST OMS 1 BURN PROCEDURES ............................... 3-1 OMS 2 BURN CARDS ....................................................... 4-1 POST OMS 2 BURN PROCEDURES ............................... 5-1 AOA PADS......................................................................... 6-1

AOA PROCEDURES .................................................... 6-7 AOA DEORBIT BURN AND DEORBIT BURN MONITOR CARDS...................................................... 6-17

AOA POST DEORBIT BURN........................................ 6-27 OMS/RCS POST BURN RECONFIG (CIL)................... 6-28 OMS FAILURE.............................................................. 6-37 OMS/RCS ∆V................................................................ 6-39

OMS TARGETS, COMM COVERAGE, LAND SITES ....... 7-1 WEATHER PADS .............................................................. 8-1 SWITCH LIST .................................................................... 9-1 CUE CARD CONFIG ......................................................... 10-1

Page 14: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

xii ASC/114/FIN A

This Page Intentionally Blank

Page 15: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-1 ASC/114/FIN A

PRELAUNCH PROCEDURES

PR

E-

LA

UN

CH

Page 16: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-2 ASC/114/FIN A

PRELAUNCH PROCEDURES ABORT/RECYCLE PROCEDURES

NOTE These recycle procedures will be used inside T-5 min

OTC (or NTD) will call for BFS Safing, SRB Safing, APU Shutdn, Heater Reconfig (Aerosurface positioning complete), MPS He Reconfig, OMS/RCS Reconfig, RCS Driver and OMS Safing, and Main Bus Switch Safing as reqd

C BFS SAFING (On NTD call) O6 GPC MODE 5 – HALT

Report BFS Safing complete MS1 SRB SAFING (On NTD call – if reqd) O17 MEC 1 – OFF

. . . Wait 2 sec, then . . . MEC 2 – OFF Report SRB Safing complete

P APU SHUTDN (On OTC call) R2 APU OPER (three) – OFF

APU FU TK VLV (three) – CL √Shutdn (HYD PRESS < 200) APU CNTLR PWR (three) – OFF HYD CIRC PUMP (three) – GPC

Report APU SHUTDN complete

C HEATER RECONFIG (On OTC call) L2 FLASH EVAP FDLN HTR (two) – 2

Report Heater Reconfig complete

PR

E-

LA

UN

CH

Page 17: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-3 ASC/114/FIN A

NOTE Numerous non-time-critical steps for recycle will be individually called by OTC

P MPS He RECONFIG (On OTC call) R2 MPS He ISOL A,B (six) – GPC

MPS PNEU He ISOL – GPC

Report MPS He Reconfig complete P OMS/RCS RECONFIG (On OTC call) O8 L,R OMS

√TK ISOL (four) – GPC (tb-OP) √XFEED (four) – GPC (tb-CL)

FWD RCS He PRESS (two) – GPC (tb-OP)

√TK ISOL (two) – GPC (tb-OP) √MANF ISOL 1,2,3,4,5 (five) – GPC (tb-OP)

O7 AFT L,R RCS

He PRESS (four) – GPC (tb-OP) √TK ISOL (six) – GPC (tb-OP) √MANF ISOL 1,2,3,4,5 (ten) – GPC

(tb-OP)

Report OMS/RCS Reconfig complete

Page 18: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-4 ASC/114/FIN A

C, RCS DRIVER AND OMS SAFING MS2 (On OTC call) MS2 O14:F RJD DRIVER (three) – OFF

RJD LOGIC (three) – OFF L OMS ENG VLV – OFF

O15:F RJD DRIVER (two) – OFF RJD LOGIC (two) – OFF

O16:F RJD DRIVER (four) – OFF RJD LOGIC (three) – OFF R OMS ENG VLV – OFF

C C3 OMS ENG (two) – OFF

Report RCS Driver and OMS Safing complete

MS2 MAIN BUS SWITCH SAFING (On OTC call) O13:A cb ESS 1BC MNA CONTR – op O13:C cb ESS 2CA MNB CONTR – op O13:E cb ESS 3AB MNC CONTR – op O14:B cb MNA MNC CONTR – op O15:B cb MNB MNA CONTR – op O16:B cb MNC MNB CONTR – op

Report Main Bus Switch Safing complete

Page 19: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-5 ASC/114/FIN A

1: GNC GPC MEMORY 2: GNC 104 GND IMU CNTL/MON 3: GNC GPC MEMORY

-3:00:00 PRE-INGRESS SW RECONFIG (Hold)

ASP configures OI PCMMU PWR – 1*** (C3), INST PWR – FLT/MPS (F6) (OV103,5), INST PWR – ON (F8) (OV103,5). ESS BUS SOURCE FC (three) – ON, AC BUS SNSR (three) – OFF (1 sec) then AUTO TRIP (R1), cb APU FU TK VLV ENA (six) – cl (R2). OTC will call: (~2 min) ESS BUS SOURCE FC (three) – OFF, AC BUS SNSR (three) – OFF (1 sec) then MON (R1), cb ESS MN CONTR (three) – cl (O13), cb MN CONTR (three) – cl (O14,O15,O16), cb AC1 H2O LOOP PUMP 1 A/2 (three) – op (L4)

PAYLOAD ACTIVATION A6U √PL RETEN PL SEL – MON NAVAIDS ACTIVATION O8 MLS CH pb/tw (three) – 6

RADAR ALTM (two) – ON O7 TACAN CH pb/tw (three) – 059Y

TACAN ANT SEL (three) – AUTO TACAN MODE (three) – GPC If OV103:

A13 √GPS PRE AMPL UC – MNC √LC – MNA GPS PWR – ON

√GPS/SIGI PWR – OFF √GPS ENCRYPT – NORM √GPS/SIGI ENCRYPT – NORM

(-2:25:00 A INGRESS ORBITER & SEATS (-3:15:00)

During seat ingress COMM PWR – ON (L5,R6) CCU PWR – ON (A11,A15,MO39M)

O5,O9, AUD VOX SENS (as needed) – adj as reqd R10,L9, Contact LCC (OTC & NTD) and MCC on MO42F A/G 1

Page 20: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-6 ASC/114/FIN A

1: GNC GPC MEMORY 2: GNC 104 GND IMU CNTL/MON 3: GNC GPC MEMORY

Install ASC Flip Cards

√Cue Card positions (-2:10:00 POST INGRESS SW RECONFIG (-3:00:00)

ASP turns on RCS 1,2,3,4 DRIVERS (eight) (O14,O15,O16), OMS ENG VLV (two) (O14,O16), GPC OUTPUT 5 – B/U (O6)

NOTE

ASP doing C/W VOL adjust, expect MA

(-1:57:00 (IDP Equivalent) (-2:47:00)

NOTE IMU preflight align begins

(-1:35:00 A LCC ASTRO COMM CHECK (-2:25:00)

LCC will contact all crew on A/G 1, A/G 2, ICOM A, ICOM B then A/A

A MCC A/G VOICE CHECK B A/G 1 VOICE CHECK O5,O9 L,R AUD A/G 2 (two) – OFF

L,R AUD A/A (two) – OFF Voice check with MCC

A/G 2 VOICE CHECK L,R AUD A/G 2 (two) – T/R L,R AUD A/G 1 (two) – OFF Voice check with MCC

A/A VOICE CHECK L,R AUD A/A (two) – T/R L,R AUD A/G 2 (two) – OFF Voice check with MCC

Page 21: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-7 ASC/114/FIN A

1: GNC GPC MEMORY 2: GNC 104 GND IMU CNTL/MON 3: GNC GPC MEMORY

A SIMO VOICE CHECK (LAUNCH CONFIG) O5,O9, L,R AUD A/G 1 (two) – T/R R10,L9, L,R AUD A/G 2 (two) – T/R MO42F Voice check with MCC

NOTE Side hatch closure

(-1:10:00 C CABIN LEAK CHECK (-2:00:00) L2 CAB VENT ISOL – OP (tb-OP)

√tb – CL O1 √CAB PRESS – incr to 16.7 (MA)

NOTE Flt crew functions from this point on will be initiated by a call from OTC to proceed. Flt crew will report back to OTC after completion

(-45:00 C CABIN VENT REDUNDANCY CONFIG (-1:35:00)

NOTE Vent vlv operation may occur earlier or later at LCC direction

L2 CAB VENT ISOL – CL (tb-CL)

CAB VENT – OP (tb-OP) (-40:00 C CABIN VENT (-1:30:00) L2 CAB VENT ISOL – OP (tb-OP)

(klaxon) √tb – OP

O1 √PRESS – decr

Page 22: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-8 ASC/114/FIN A

1: GNC GPC MEMORY 2: GNC 104 GND IMU CNTL/MON 3: GNC GPC MEMORY

(-32:00 C PASS/BFS TRANSFER PREP (-1:22:00) O6 √GPC MODE 5 – STBY (tb-RUN) C3 √BFC CRT SEL: 3+1

BFC CRT DISP – ON

3: GNC BFS MEMORY CRT3 PASS/BFS XFER ENA – ITEM 25 EXEC

√ITEM 25 (*) NOTE

‘*’ blanks when transfer is complete (~10 min)

(-30:00 C OMS GN2 PRESS (-1:20:00) C3 OMS ENG (two) – ARM/PRESS P WSB GN2 SUPPLY ACTIVATION R2 BLR N2 SPLY (three) – ON (-25:00 A A/G VOICE CHECK (-1:15:00)

SIMO VOICE CHECK (LAUNCH CONFIG) Voice check with MCC

Update Abort Winds Pad, ASC Flip Book, and ALTM, 1-10 (if reqd)

NOTE

Cabin Press Reporting and vent vlv closure may occur earlier or later at LCC direction

(-22:00 C REPORT CABIN PRESS (-1:12:00)

3: BFS, SM SYS SUMM 1 CRT3,O1 Report cabin pressure (two) to OTC

3: BFS, GNC BFS MEMORY C CLOSE VENT VLVS L2 CAB VENT ISOL – CL (tb-CL)

CAB VENT – CL (tb-CL)

Page 23: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-9 ASC/114/FIN A

1: GNC GPC MEMORY 2: GNC 104 GND IMU CNTL/MON 3: BFS, GNC BFS MEMORY

NOTE

At T-20 there will be a planned 10-min hold

TRAJECTORY UPDATE

√MCC for max rates and trajectory config, 8-7

(-20:00 OPS 1 LOAD (IDP Equivalent) (-1:00:00) 1: GNC LAUNCH TRAJ 2: GNC LAUNCH TRAJ 1: GNC 0 GPC MEMORY 1: GNC FAULT

Report faults other than from unpwrd equipment

CRT1 GNC, SPEC 99 PRO

NOTE Gnd-controlled Fuel Cell purge

(-18:30 C BFS TO OPS 1 (-58:30)

3: BFS, GNC FAULT CRT3 GNC, SPEC 99 PRO O6 GPC MODE 5 – RUN (tb-RUN) CRT3 GNC, OPS 101 PRO

3: BFS, GNC LAUNCH TRAJ 3: BFS, GNC FAULT

Report faults other than from unpwrd equipment

CRT3 GNC, SPEC 99 PRO

Page 24: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-10 ASC/114/FIN A

1: GNC FAULT 2: GNC LAUNCH TRAJ 3: BFS, GNC FAULT

2: GNC 50 HORIZ SIT

3: BFS, GNC 50 HORIZ SIT (-17:00 P HORIZ SIT CONFIG (-57:00)

ALTM – ITEM 9 + .

PASS ITEM BFS ITEM PTI TAL SITE (MCC) RTLS SITE PRI (MCC) SEC (MCC) TAC RA TAEM TGT G&N HSI XEP AIM TAC GPS DRAG H ADTA H ADTA TO G&C TAC AIF_G

INH √1 3(4,29) √40 1 √41 KSC 15 √3 KSC 33 √4 -59 √5 blank √46 OVHD √6 blank NEP √7 NOM √8 (or CLSE) INH √20 INH √43 AUT √22 INH √26 INH √29 DELTA √35 INH √48

3(4,29) √40 1 √41 KSC 15 √3 KSC 33 √4 -59 √5 OVHD √6 blank NEP √7 NOM √8 (or CLSE) INH √20 INH √43 AUT √22 INH √26 AUT √28

1: GNC LAUNCH TRAJ 2: GNC SYS SUMM 1

3: BFS, GNC SYS SUMM 2 C CONFIG CONT ABORT YAW STEER

CRT1 √ITEM 5 E N A

Page 25: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-11 ASC/114/FIN A

1: GNC LAUNCH TRAJ 2: GNC SYS SUMM 1 3: BFS, GNC SYS SUMM 2

(-16:00 P MPS He RECONFIG (-56:00) R2 MPS He ISOL A,B (six) – OP

MPS PNEU He ISOL – OP (-15:00 CONFIG OMS/RCS XFEED VLVS (-55:00)

NOTE OMS/RCS XFEED vlvs reconfigured for launch by LPS. At T-9 there will be a planned 40 min hold

WEATHER UPDATE (if reqd)

Update Abort winds, RWY and ALTM setting

(-9:00 (~-17:00) P CLEAR HARDWARE C/W MEMORY C3 C/W MEM – CLEAR (-9:00 MS1 (~-15:00) Activate V10 Recorder (-9:00 ‘GO FOR LAUNCH’ (All) C2 EVENT TIMER – START F7 √TIME ind – counting down

NOTE GLS starts

(-8:00 P CONNECT ESS BUSES TO FC (GLS √@ T-7:24) R1 ESS BUS SOURCE FC (three) – ON -7:30 NOTE

Access arm retract

√Seat in launch position √LES zippers and gloves

Cinch down shoulder harness and lap belt

Page 26: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-12 ASC/114/FIN A

1: GNC LAUNCH TRAJ 2: GNC SYS SUMM 1 3: BFS, GNC SYS SUMM 2

3: BFS, SM SYS SUMM 2

-6:15 P APU PRE START (GLS √ @ T-5:25) R2 √BLR N2 SPLY (three) – ON

√PWR (three) – ON √CNTLR/HTR (three) – A

√HYD CIRC PUMP (three) – GPC √cb APU FU TK VLV ENA (six) – cl √APU FU TK VLV (three) – CL

√AUTO SHTDN (three) – ENA √SPEED SEL (three) – NORM √OPER (three) – OFF HYD MN PUMP PRESS (three) – LO APU CNTLR PWR (three) – ON APU FU TK VLV (three) – OP

√APU/HYD RDY tb (three) – gray

**

If any tb not gray, consult LCC before continuing

**

-5:00 P APU START (GLS √ @ T-4:05) R2 APU OPER (three) – START/RUN HYD/ √HYD PRESS ind (three) – LO green APU R2 √APU/HYD RDY tb (three) – bp

HYD MN PUMP PRESS (three) – NORM HYD/ √PRESS ind (three) – HI green APU R2 HYD CIRC PUMP (three) – OFF F7 √PRESS lt – off

Page 27: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-13 ASC/114/FIN A

1: GNC LAUNCH TRAJ 2: GNC SYS SUMM 1 3: BFS, SM SYS SUMM 2

C HTR RECONFIG L2 FLASH EVAP FDLN HTR (two) – OFF

NOTE Motion/Vibration may be felt in crew module due to Main Engine gmbl profile cks at -3:25 and move to start at -3:10

-2:30 P CLEAR C/W MEMORY 2: GNC FAULT

3: BFS, GNC FAULT

Verify no unexpected errors CRT2, GNC, SPEC 99 PRO CRT3 2: GNC SYS SUMM 1

3: BFS, GNC SYS SUMM 1 C3 C/W MEM – CLEAR -2:00 A SUIT PREP

√Tabs/visor – cl/LES O2 – ON MS1 ICOM RCDR – ON (if reqd)

Page 28: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

1-14 ASC/114/FIN A

This Page Intentionally Blank

Page 29: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

2-1 ASC/114/FIN A

ASCENT PROCEDURES (FLIP BOOK)

BA

ILO

UT

EG

RE

SS

Page 30: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-2 ASC/114/FIN A

TAB TITLE BLANK ON THIS PAGE ONLY TOP

MOUNT ON LEFT SIDE OF BACKBOARD FACING ’BAILOUT MODE 8’

PRELAUNCH MODE 1

TABS – RELEASE

VISOR – CLOSE / LOCK

LES O2 – ON

GREEN APPLE – PULL

KNEEBOARDS – REMOVE

COOLING – DISCONNECT

RESTRAINT – RELEASE

PARACHUTE (four) – RELEASE

COMM – DISCONNECT

LES O2 – DISCONNECT

EGRESS SEAT

HATCH – OPEN MANUALLY

SLIDEWIRE BASKETS

POST LANDING MODE 5

TABS – RELEASE

VISOR – CLOSE / LOCK

LES O2 – ON

GREEN APPLE – PULL

KNEEBOARDS – REMOVE

COOLING – DISCONNECT

RESTRAINT – RELEASE

PARACHUTE (four) – RELEASE

COMM – DISCONNECT

(G-SUIT CLIP – PULL)

LES O2 – DISCONNECT

PLT – EMER PWR DOWN

EGRESS SEAT

SLIDE/ESCAPE PANEL

ASCENT FLIP BOOK (EMERGENCY EGRESS)

Page 31: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-3 ASC/114/FIN A

TOP

AS

C

BAILOUT MODE 8

REPORT POSITION

√MACH < 1.0

P, R/Y – CSS

OPS 305/603 PRO (if reqd)

SB – AUTO; BF – AUTO

FLY 185-195 KEAS, Φ = 0° ABORT MODE – ATO

ABORT PBI – PUSH

P,R/Y – AUTO

FLT CNTLR PWR (two) – OFF

~50K FT

TABS – RELEASE

VISOR – CLOSE / LOCK

LES O2 – ON

GREEN APPLE – PULL

~40K FT

MS3 – VENT CABIN

CDR,PLT SEATS – LOWER

KNEEBOARDS – REMOVE

COOLING – DISCONNECT

RESTRAINT – RELEASE

D-RING – UNCOVER

~30K FT

MS3 – JETTISON HATCH

COMM – DISCONNECT

(G-SUIT CLIP – PULL)

LES O2 – DISCONNECT

EGRESS SEAT

POLE – DEPLOY

D-RING – HOOK UP

BAILOUT

Page 32: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-4 ASC/114/FIN A

TOP BACK OF ‘EMERGENCY EGRESS’

SYS FLIGHT RULES RTLS TAL OMS – 2 He TKs X – 1 OX & 1 FU TKs (diff pods) X – 2 OX or 2 FU TKs X APU/HYD – Impending loss of all capability X X CABIN LEAK – (-EQ dP/dT > .15) X X CRYO – All O2(H2) X X

2 FREON LOOPS ↓ [Accum Qty (↓ and decr) and/or Flow (↓)]

X X

2 MAIN BUSES ↓ X

THERMAL WINDOW PANE X NO COMM MODE BOUNDARIES

2 ENG ZZA (104) 5900

ABORT TAL ZZA (4)

EO VI

SE OPS 3 ZZA (109) (4)

SE ZZA (104) (4)

2 ENG MRN (104) 5800

ABORT TAL MRN (3)

EO VI

SE OPS 3 MRN (109) (3)

SE MRN (104) (3)

2 ENG FMI (104) 6200

NEG RETURN (104) 8100

PRESS TO ATO (104) 10600

SE OPS 3 (109) 12100

SE ZZA (104) 14300

PRESS TO MECO (104) 17600

SE PRESS (104) 19000

NEG MRN (2 @ 67) 19800

LAST PRE MECO TAL 23000

LAST TAL YJT 20100 YYT 20200 YQX 21900 IKF 23600 INN 24100 FFA 24200 MRN,BEJ 24300 KBO 24400 ESN 24800 ZZA,KKI 25000 FMI 25100 JDG 25200

ABORT TAL FMI (29)

EO VI

SE OPS 3 FMI (109) (29)

SE FMI (104) (29)

BA

ILO

UT

E

GR

ES

S

Page 33: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-5 ASC/114/FIN A

TOP

ASCENT PROCEDURES R180 LVLH 1.96M √Pc → 172% 1.24M √Pc → 104% Pc < 50+5 s √SRB SEP (Backup AUTO SEP 2:21)

√TMECO * * If NOT STABLE (10 sec):

NO COMM – CSS & MAN THROT * *

MM103+10 s √OMS assist Close suit O2, open visor

3:00 √EVAP OUT (T < 60) * * * *

If Systems ABORT reqd: RTLS at 3:40 or TAL Select prior to 23000 Otherwise Manual MECO 23700

* * * *

VI = 13.2K √Roll Heads Up * * * * * * *

If Man Throttle (3 eng): Man Shutdn at 25700

If 1 eng: TRAJ √SERC ON When MPS PRPLT = 2%:

MAN THROT, Pc → 67% Man MECO @ CO mark BFS

* * * * * * *

MECO √VI = 25819 MECO+20 s √ET SEP

* * * * * * * * * * * *

If ‘SEP INH’: ET SEP – MAN If Rates > .7,.7,.7:

MPS PRPLT DUMP SEQ – STOP Null rates ET SEP – SEP Post ET Sep -Z xlation:

MPS PRPLT DUMP SEQ – GPC If Rates < .7,.7,.7:

Assume Feedline Fail If VI < 25760 or BFS Engaged:

OPS 104 – PRO (√BFS 104) NOTE: Expect – ‘Illegal Entry’ (PASS) NOTE: Expect – ‘Illegal TIG’ (BFS)

* * * * * * * * * * * *

► MM104+2 s If ET Sep complete and HA > 72 : +X xlation for 11 sec

√TGTS √ASC PKT for failures

If OMS 1 not reqd: OMS ENG (two) – OFF Go to POST OMS 1

OM

S 1

T

GT

ING

Page 34: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-6 ASC/114/FIN A

TOP BACK OF ‘ASCENT PROCEDURES’

STS-114 OCF CY OMS 1/2 TARGETING

RENDEZVOUS RECOVERY

AS

C

Page 35: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-7 ASC/114/FIN A

TOP

OM

S 1

B

UR

N

STS-114 OCFR4 CY OMS 1/2 TGTING

Page 36: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-8 ASC/114/FIN A

TOP BACK OF ‘OMS 1/2 TGTING’

OMS 1 BURN

****************

IF TIG LATER THAN MECO + 6 min: MECO + 4 min: √BDY FLP pb – lt off (MPS dump complete) √MCC for APU shutdn (if time permits)

FEEDLINE FAIL: Expect 'Illegal Entry' (PASS)/'Illegal TIG' (BFS) @ tgt select pre ET Sep; input TIG manually & LOAD tgt

If TIG > MECO + 6 min: TIG-1:30 or MECO + 6 min (whichever comes first):

ET SEP – SEP >> If TIG < MECO + 6 min:

MPS PRPLT DUMP SEQ – STOP TIG-1:30: ET SEP – SEP Post ET SEP -Z xlation:

MPS PRPLT DUMP SEQ – GPC 1 OMS ENG FAIL and ∆VTOT > 500:

Burn good OMS + I’cnct both OMS to RCS, THC +X at TIG

***************

DAP – AUTO/DISC MNVR – BURN ATT (√INRTL) OMS XFEED (four) – OP

√CNTLR PWR (two) – ON √OMS ENG (two) – ARM/PRESS

Note ∆VTOT ___ ____ ____ TIG -:15 EXEC -:00 TIG; start watch (√Pc, ∆VTOT, ENG VLVs) ***************

OMS ENG FAIL: Failed ENG – OFF If ∆VTOT < 500:

At QTY = 5%, good OMS TK ISOL (two) – CL If ∆VTOT > 500:

RCS XFEED (four) – OP RCS TK ISOL (six) – CL THC +X

At first QTY = 5%, good OMS TK ISOL (two) – CL At second QTY = 5%, THC – Release

RCS COMPLETION: Interconnect to either OMS that was ENG FAIL

THC +X (OMS% vs RCS ∆V) OMS TK SW (if reqd)

***************

CUTOFF +:02 OMS ENG (two) – OFF

Trim inplane X,Z residuals < 2 fps OMS XFEED (four) – CL (√RCS straightfeed)

OM

S 1

T

GT

ING

:

Page 37: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-9 ASC/114/FIN A

TOP

OMS 1 BURN MONITOR

OMS TEMP* FU IN P ≥ OMS ENG FAIL

≤ OMS ENG FAIL (PRPLT FAIL if 1 Pod Feed) or No FU IN P

OMS PC* & OMS ↓ (BFS: √accel) OMS ENG FAIL

OMS OX/FU TK P (√ENG IN P) OX/FU LOW He PRESS/VAP ISOL (two) – OP

If aff TK P not incr: He PRESS/VAP ISOL (two) – CL At Good OMS Qty = 5%

OMS XFEED (four) – CL

OX & FU HIGH He PRESS/VAP ISOL (two) – CL OMS XFEED (four) – CL Cycle He A(B) to maintain TK P 234-284

OMS He TK P LOW (√ OMS/MPS )

At He P < 640 √OMS XFEED (four) – OP

Aff OMS TK ISOL (two) – CL At Good OMS Qty = 5%

OMS TK ISOL (four) – OP XFEED (four) – CL

OMS N2 REG P HIGH or LOW OMS ENG – ARM

OMS N2 TK P LOW (√ OMS/MPS )

At N2 TK P < 470: OMS ENG – ARM

OMS GMBL PRI fail L(R) OMS GMBL – SEC (twice)

SEC fail If high RCS usage: OMS ENG FAIL

GPC 1(4) & aff GPC PWR – OFF Burning OMS aff If SEC GMBL avail:

aff MDM FF 1(4) – OFF,ON L(R) OMS GMBL – SEC (twice)

SEC GMBL lost If high RCS usage: OMS ENG FAIL 2 FAs lost √MAN SHUTDN

I/O ERROR FA 1(4) L(R) OMS GMBL – SEC I/O RESET (if recov: BFS I/O RESET)

If high RCS usage: OMS ENG FAIL 2 FAs lost √MAN SHUTDN

BCE STRG D I/O RESET (if recov: >>)

1(4) If high RCS usage: L(R) OMS GMBL – SEC (twice)

I/O ERROR PCM OI PCMMU PWR – 2(1)

*If XFD, BLDN, or sensor fail, monitor ENG IN P for off-nominal performance

OM

S 2

T

GT

ING

L R 225 220

205 204

Page 38: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-10 ASC/114/FIN A

TOP BACK OF ‘OMS 1 BURN MONITOR’

OMS 2 TARGETING (DIR INSERTION)

FAILURE OMS 2 TARGET

OMS – 2 N2 TKs (Perform burn

Single OMS Eng)

NOM

OMS – 2 OMS ENGs – 1 He TK – 1 PRPLT TK EPS – MNA & B, MNB & C MNA & C ET SEP

PEG 7; TTA = 1 CUTOFF HP = 85

OMS – 2 OX or 2 FU TKs – 1 OX & 1 FU TK

diff PODs – 2 He TKs

AOA-S

2 FREON LOOPS [Accum Qty (↓ and decr) and/or Flow (↓)]

2 H2O LOOPS CABIN LEAK (-EQ dP/dT ≥ .08)

AOA

APU/HYD – impending loss of all capability

AOA

CRYO – All O2(H2) AOA

OMS

He % He % 4800 4580 4180 3780 3380

96 90 80 70 60

2980 2580 2180 1780 1380

980

50 40 30 20 10

0

OM

S 1

B

UR

N

Page 39: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-11 ASC/114/FIN A

TOP

ATO

OMS BLOWDOWN

RT

LS

R IG H T O M S G A G E Q T Y ( % )

L E F T O M S G A G E Q T Y ( % )

L E F T O M S B L D N E Q U IV ( % )

R IG H T O M S B L D N E Q U IV ( % )

3 0 4 0 5 0 6 0 7 0 8 0 9 0

3 5 3 3 2 7 2 2 1 7 1 2 7 3 0 3 5 3 0 2 5 2 0 1 5 1 0

3 0 4 0 5 0 6 0 7 0 8 0 9 0

3 4 3 3 2 7 2 2 1 7 1 2 7 3 0 3 5 3 0 2 5 2 0 1 5 1 0

Page 40: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-12 ASC/114/FIN A

TOP BACK OF ‘ATO’

RTLS CDR

Abort initiated: After 2:30 (2 eng) At 3:40 (3 eng)

ABORT RTLS

**

No joy: OPS 601 PRO

**

√GUIDANCE STATUS on RTLS TRAJ Expect PPA when GUID % to go = 0

******

If GUID ‘INHB’: √UNCONVERGED GUID TABLE

MAN PPA per PRPLT REMAINING

After GUID CONVERGE: P,R/Y AUTO/AUTO THROTTLE

******

After PPA: √BFS ITEM 1 (*)

TRAJ √Bugs, HSI √ ,

Pitchdn (β = 0°, α = -2°)

√ET SEP (MECO + 16 sec) √MM602 (α > 10° and SEP + 10 sec) √P,R/Y, SPDBK, BDY FLP – AUTO

α = 50° until ~1.8g, maintain 2.2g

Adjust seat

H > -320↑ VERT SIT √α vs Mach V = 5K √RUD, AIL TRIM and g < 2 AIR DATA PROBE (two) – Deploy (√Heat)

M = 3.2 √SPDBK → 65% M = 2.7 L HUD PWR – ON

* If M < 2.5, P CSS for ADTA to G&C incorp *

M = 2.0 Ensure ADTA to G&C else THETA limits M < 1.0 P,R/Y – CSS, √SPDBK CMD vs POS

√NWS – 1 Lock Inertia Reels

POST LANDING: ENT, POST LDG

OM

S 2

T

GT

ING

WINDS 50K / 38 / 28 / 20 / 12 /

7 / 3 / 1 /

SURF / SPDBK @ 3000 FT

MECO MECO

.

R

Page 41: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-13 ASC/114/FIN A

TOP

RTLS PLT If CSS: MAN THROT Man MECO

√Pc = 104% (2 eng)/69% (3 eng) √DUMP

UNCONVERGED GUIDANCE TABLE ENG OUT

OUTBOUND

INITIAL θ PITCHAROUND

at % (8°/sec) FLYBACK INITIAL θ

Liftoff :30

60° 56°

44% 47%

64° 63°

1:00 :30

57° 56°

47% 48%

63° 62°

2:00 :30

49° 42°

51% 51%

61° 52°

3:00 :30

38° 34°

52% 53%

50° 48°

4:00 Last RTLS 52% 46° √Pc at PPA + 20 sec

**

If Pc = 104% (2 eng): G51 MAX THROT – ITEM 4 (*)

**

Pitchdn: √Pc → 67%

KEAS = 77 √SPDBK → 81% √ET DOORS – Closed and latched (MECO +1:30) √ET SEP, SRB SEP – AUTO

Adjust seat √TACANS, INCORPORATE

**

If KSC TACAN Fail: TACAN Ch 073X (OMN), ITEM 5 EXEC

**

G51 √AIR DATA, INCORPORATE MM603 HYD MPS/TVC ISOL VLV (three) – CL

(hold 5 sec, tb-CL) H = 85K MLS (three) – ON

If Rwy 33(15): MLS CH (three) – 6(8) I/O RESET

M = 2.7 R HUD PWR – ON M < 1.0 √R FLT CNTLR PWR – ON

Lock Inertia Reels M = 0.7 √LG EXTD ISO VLV – OP H = 10K √BDY FLP – TRAIL

LES Visors – Down POST LANDING: ENT, POST LDG

TA

L

MECO MECO

Page 42: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-14 ASC/114/FIN A

TOP BACK OF ‘RTLS PLT’

TAL CDR If VI > 23000 manual MECO 23700 , go to post MECO ABORT TAL G50 √SITE & RWY (PASS/BFS), √HDG

* *

If second eng fails: TRAJ √SERC ON G50 √ SITE (√Redes card)

* *

VI = 15.0K √Roll Heads Up

VI ~24.0K @ CO mark BFS

MECO+20 s √ET SEP, √AUTO -Z TRANS MECO+37 s √MM104

Abort TAL (if reqd): √TAL flag set: G50 ITEM 41 = TAL SITE (any site) √MECO VI vs HI/LO Energy (TAL PLT)

√Rates < .5°/sec; θ > 15°, Y = 0 ± 30° PASS, OPS 301 PRO (√304)

* *

No joy in 68 sec: BFS – ENGAGE BFS, OPS 301 PRO

* *

BFS, OPS 301 PRO (√304) G50 √SITE, RWY, TACAN S/B & ALTM (PASS/BFS)

TRAJ √BUGS, HSI √ , RANGE, AMI √α = 43°

***

Low energy: TRAJ ITEM 3 (Lo Energy ENA) If Variable/man 37: Pitch – CSS at α = 37°

Pitch – AUTO when H = 0 ↑ (2nd pullout)

* * *

V = 10K √SPDBK → 81% V = 7K Go to ENTRY MANEUVERS

(Cue Card)

SITE RWY TACANS ITEM 5 MLS LENGTH 2 BEN 36/18 BEN 108 MAK 80 (DME) 6/– 13720/12720 3 MRN 20/02 MRN 100 AOG 23 6/– 11730/11730 4 ZZA 30L/12R ZZA 64 ZZA 77 (DME) 6/– 12200/12200

12 *BEN 36/18 BEN 108 MAK 80 (DME) 6/– 13720/12720 13 *MRN 20/02 MRN 100 AOG 23 6/– 11730/11730 14 *ZZA 30L/12R ZZA 64 ZZA 77 (DME) 6/– 12200/12200 19 YJT 09/27 YJT 78 YDF 80 (DME) –/– 9500/9500 20 YYT 29/11 UYT 23 YYT 82 (DME) –/– 8500/8500 21 YQX 21/31 YQX 74 IQX 32 (DME) –/– 9700/8900 23 LAJ 15/33 TRM 109 LAJ 45 –/– 10870/10870 24 BEJ 01L/19R MOJ 37 BEJ 105 –/– 10820/10820 25 IKF 20/29 KEF 57 HL44 (DME) –/– 9520/9560 26 INN 06/24 SHA 80 (DME) CRN 37 (DME) –/– 9540/9540 27 FFA 27/09 FFA 81 BZN 56 –/– 9490/9490 28 KBO 14L/32R GIX 18 DOR 23Y (DME) –/– 12020/12020 29 FMI 33/15 FMI 16 NIM 53 6/– 11300/12300 30 ESN 03R/21L BAG 78 (DME) BUK 90 (DME) –/– 11800/11800 31 KKI 15R/33L RIY 92 KIA 80 –/– 13300/13300 32 JDG 31/13 NKW 57 NKW 57 –/– 12000/12000

RT

LS

SURF WIND / SPDBK @ 3000 FT

ALTM AIM PT SPDBK

MM304

MECO MECO

TAL HDG ZZA 010 MRN 016 FMI 006

*LO XRNG

H

..

Page 43: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-15 ASC/114/FIN A

TOP

TAL PLT √OMS DUMP

****

If second eng fail: G51 DUMP – ITEM 6 (*), 7 (*) If OMS He PRESS < 2K: DUMP STOP Failed ME SHUTDN pb (two) – push

* * * *

√AUTO THROT ****

If second eng fail or STUCK TAL: When MPS PRPLT = 2%:

MAN THROT, Pc → 67% Man MECO @ CO mark BFS

****

VI ~24.0K @ CO mark BFS

√OMS DUMP √ET DOORS – Closed and latched (MM304 +1:30)

V = 19K HYD MPS/TVC ISOL VLV (three) – CL

(hold 5 sec, tb-CL)

V = 10K **

If RCS < 57 % either side: G51 AFT RCS INH, ITEM 13 EXEC

**

V = 7K MLS (three) – ON (√channels)

I/O RESET Go to ENTRY MANEUVERS (Cue Card)

EC

AL

MECO MECO

MM304

Page 44: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-16 ASC/114/FIN A

TOP BACK OF ‘TAL PLT’

POWERED ECAL G51 √MAX THROT – ITEM 4 (*)

√ADI (two) – REF √θ → 60°, Yaw → 45° √Roll to Heads Up

G50 Select SITE and TACAN When EAS > 4 and incr:

√Yaw to √Pitch down at 3°/sec √MECO, ET SEP

ET SEP + 8s: CSS, pull to α = 58° at 4°/sec, AUTO √MM602 (BFS, OPS 602 PRO)

Go to ECAL ENTRY 2 E/O ECAL (51.6°)

Velocity (VI) IP - 2:30 In Plane IP + 2:30 Location Site RWY TACANs

*5.3-6.8 *5.3-6.7 *5.3-6.7 6.8-7.3 Wilmington 16 ILM 06 ILM 117

*6.8-8.6 RTLS

*6.7-6.9 6.9-8.1 *8.1-8.4 RTLS

6.7-7.9 *7.9-8.0 RTLS

Cherry Point 17 NKT 32L EWN 83 (D)

*8.6-9.7 *8.4-8.6 8.6-9.3

*8.0-8.1 8.1-9.8 Oceana NAS 18 NTU 32R NFE 19Y

*9.7-10.5 9.2-9.9 *9.9-10.2 8.6-10.5 Wallops 19 WAL 28 SBY 49

*10.2-10.5 9.5-11.2 Atlantic City 11 ACY 31 CYN 81 10.5-12.3 10.1-12.7 Gabreski 15 FOK 06 HTO 83 *10.5-10.9 10.9-13.3 10.7-13.4 10.5-13.7 Otis ANGB 16 FMH 32 BOS 74

11.5-13.2 11.1-13.9 Pease Int’l 17 PSM 34 ENE 118 *Probable bailout region (D) - DME only

3 E/O ECAL (51.6°) MM 602 Velocity (Vrel)

IP - 2:30 In Plane IP + 2:30 Location Site RWY TACANs *5.3-6.6 *5.3-6.6 *5.3-6.7 Wilmington 16 ILM 06 ILM 117 *6.6-8.9 *6.6-8.7 *6.7-7.3

7.3-8.0 *8.0-8.6

Cherry Point

17

NKT 32L

EWN 83 (D)

*8.9-10.2 *8.7-10.0 *8.6-9.7 Oceana NAS 18 NTU 32R NFE 19Y *10.2-10.9 *10.0-10.7 *9.7-10.6 Wallops 19 WAL 28 SBY 49 *10.7-11.0 *10.6-11.0 Atlantic City 11 ACY 31 CYN 81 *10.9-11.9 11.9-13.9

*11.0-11.6 11.6-14.4

*11.0-11.2 11.2-14.7 Otis ANGB 16 FMH 32 BOS 74

11.8-12.4 11.2-13.0 Gabreski 15 FOK 06 HTO 83 12.8-13.8 12.9-14.2 Pease Int’l 17 PSM 34 ENE 118 13.5-17.2 13.3-17.4 13.1-17.2 Halifax Int’l 18 YHZ 24 UAW 38 15.2-18.0 15.0-18.0 14.9-18.0 Stephenville 19 YJT 09 YJT 78 15.4-18.0 15.3-18.0 15.3-18.0 St. Johns Int’l 20 YYT 29 UYT 23 15.5-18.0 15.4-18.0 15.2-18.0 Gander Int’l 21 YQX 21 YQX 74 17.3-17.6 Goose Bay 22 YYR 26 UYR 40 *Probable bailout region (D) - DME only

TA

L

Page 45: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-17 ASC/114/FIN A

TOP

ECAL ENTRY If 3 OUT ECAL or 2 OUT SECOND GREEN:

G50 Select SITE and TACAN BFS, OPS 602 PRO

VERT SIT √ECAL/BDA (ITEM 1) – ENA

Before NZ Hold:

RHC/PNL TRIM – ENA If M < 5, √AIL/RUD TRIM Expect 20° ≤ α ≤ 58°

BFS, G50 √SITE and TACAN

Nz Hold:

Expect prebank = 20° if TGT Nz < ~3.3g and ∆AZ > 20° At H = -600 ↑ expect initial bank 2x∆AZ (70° max) If E/W ≥ STN, expect bank = 70° until ∆AZ increased to 15-30°

past site, then 2x∆Az

G50 √TACANS, INCORPORATE

M < 5 and g < 2: AIR DATA PROBE (two) – Deploy (√Heat)

G50 INCORPORATE Air Data ASAP

M = 3.2: √OPS 603

Select UHF-G T/R

NO COMM ECAL LNDG CRITERIA @H = 70K, √Range:

****

If Range < 28 nm or Range > 54 nm: P, R/Y CSS Bank (≤ 30°) to HDG 120° Go to BAILOUT

****

G50 √SPDBK (ITEM 39) per ECAL LANDING Table

ECAL LANDING: Runway Length + Ovrun Spdbk MGTD Distance

≥ 11,000’ NOM 205 2500

≥ 8500 to < 11,000’ SHORT 205 1500 < 8500’ ELS 195 1000

MAIN GEAR TD: EARLY CHUTE, DEROTATE, √SPDBK – 100% NOSE GEAR TD: BRAKE – as reqd

**

If 5K’ remaining and V > 140 KGS – MAX BRAKING (smooth application, not < 2 sec)

**

Go to RTLS (enter POST-MECO M = 2.7 step) or BAILOUT

HI-

EN

ER

T

AL

.

Page 46: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-18 ASC/114/FIN A

TOP BACK OF ‘TAL PLT’

HIGH-ENERGY GANDER CDR

MM104 Abort TAL:

√TAL flag set: G50 ITEM 41 = TAL SITE (any site) √Rates < .5°/sec; θ > 15°, Y = 0 ± 30°

PASS, OPS 301 PRO (√304)

MM304 P, R/Y – CSS √VREL

VREL ROLL (CSS)

ALPHA (CSS)

VREL ≥ 19,900 0° 55° VREL < 19,900 0° 50°

H = -800↑ Roll towards site (φ ~80°), initial target H = -350,

hold initial Alpha per table G50 Hold 3.0g Nz using roll

***

If Nz ≥ 3.5: Reduce Alpha (40°< α <55°) and H until Nz < 3.5

***

Orbiter bug Pitch down at 1°/sec, center needles, below P, R/Y – AUTO upper line or V = 6K

Go to ENTRY MANEUVERS (Cue Card)

EC

AL

MM304

.

.

.

Page 47: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-19 ASC/114/FIN A

TOP

HIGH-ENERGY GANDER PLT

BFS, OPS 301 PRO (√304)

G50 Select Site YQX – ITEM 41 +2 1

TRAJ √BUGS, HSI √ , RANGE

√ET DOORS – closed and latched (MM304 +1:30)

H = -800↑ Monitor H, Nz

When H Ensure Nz stays < 3.5 stabilizes

Monitor Report when orbiter bug reaches upper line Traj

Orbiter bug Monitor pitchdown at 1°/sec to center needles, Below √P,R/Y – AUTO upper line or V = 6K

V = 19K HYD MPS/TVC ISOL VLV (three) – CL (hold 5 sec, tb-CL)

V = 15K G50 √RWY, TACAN, S/B, ALTM

(PASS/BFS)

V = 10K **

If RCS < 57 % either side: G51 AFT RCS INH, ITEM 13 EXEC

**

V = 10K √SPDBK → 81%

Go to ENTRY MANEUVERS (Cue Card)

HI-

EN

ER

T

AL

. .

.

MM304

H

Page 48: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-20 ASC/114/FIN A

TOP BACK OF ‘TAL PLT’

HIGH-ENERGY TAL CDR

MM104 Abort TAL:

√TAL flag set: G50 ITEM 41 = TAL SITE (any site) √Rates < .5°/sec; θ > 15°, Y = 0 ± 30°

PASS, OPS 301 PRO (√304)

MM304 P, R/Y – CSS √VREL

VREL ROLL (CSS)

ALPHA (CSS)

VREL ≥ 23,800 23,300 ≤ VREL < 23,800

VREL < 23,300

180° 180°

80° (θ = 280°) 55° 55°

H = -200 ↓ If Alpha = 80°, push to Alpha = 55° (θ = ~305°)

H = -700 ↓ Roll Heads Up, maintain Alpha = 55°

H = -500 ↑ R/Y – AUTO (√Rolls toward site)

Limit roll to 90° until V = 6K: TRAJ Roll CMD > 90° R/Y CSS @ 90° TRAJ Roll CMD < 90° R/Y AUTO

Orbiter bug When commanded drag ( ) < 40: below Pitch down at 0.5°/sec, center pitch needle, upper line P – AUTO

V = 6K If energy still high:

Pitch down at 1°/sec, center pitch needle, P, R/Y – AUTO

Go to ENTRY MANEUVERS (Cue Card)

HI-

EN

ER

G

AN

DE

R

.

.

.

MM304

Page 49: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-21 ASC/114/FIN A

TOP

HIGH-ENERGY TAL PLT

BFS, OPS 301 PRO (√304)

G50 If FMI GO TAL Site – Select FMI – ITEM 41 + 29

Otherwise, select best Wx site ZZA (Site 4) or FMI

TRAJ √BUGS, HSI √ , RANGE

√ET DOORS – closed and latched

(MM304 +1:30) Guid Init: (D = 3, q = 8, EAS = 48)

****

If no comm and initial Commanded Drag ( ) ≥ ,

G50 Select Site ESN – ITEM 41 + 30

****

V = 19K HYD MPS/TVC ISOL VLV (three) – CL (hold 5 sec, tb-CL)

V = 15K G50 √RWY, TACAN, S/B, ALTM

(PASS/BFS)

V = 10K **

If RCS < 57 % either side: G51 AFT RCS INH, ITEM 13 EXEC

**

V = 10K √SPDBK → 81%

V = 7K MLS (three) – ON (√channels)

I/O RESET

Go to ENTRY MANEUVERS (Cue Card)

AB

OR

T

DU

MP

S

ZZA/FMI 35

MM304

H

Page 50: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-22 ASC/114/FIN A

TOP BACK OF ‘ECAL ENTRY’

5

FRCS

4 +X RCS

sec

Abort Select

Abort Select RTLS DUMP

Pre MECO

:00

2 OMS

Post MECO

MM602 +:20

:00

TAL DUMP

Pre MECO

:00

2 OMS

MM304 (AUTO START)

24/10 RCS (from OMS) (If INCNCT ‘ENA’)

:03

:03

2 OMS (If INCNCT ‘ENA’)

NZ > .05 Gs or

NZ > .05 Gs or

FU FU

MM304 & MACH 9

4 +X RCS (If INCNCT

‘INH’) :00 :05 :07 :10 :20

24/10 RCS (from OMS) (If INCNCT ‘ENA’)

2 OMS (If INCNCT ‘INH’)

sec :00

4 +X RCS

2 + 10 jets 2 + 24 jets 2 oms

sec

sec

2 + 10 jets 2 + 24 jets 2 oms

24/10 RCS (from OMS) (If INCNCT ‘ENA’)

Null Dump

:00 sec

Null Dump

:00

MM304 (AUTO START)

sec

FRCS

3 1 1 2 0 4 5 5

0 2 5 0 0 0

2 7 8 1 8 3 4 9 5

2 1 % 1 2 %

1 2 0 0 6 5

Quan/Side

7 4

Quan/Side

8 3

Quan/Side

8 3

MM602

RTLS/TAL DUMPS

HI E

NE

R

TA

L

Page 51: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-23 ASC/114/FIN A

TOP

MM103 +:10

MECO or

G51 DUMP ARM,

MM602

Abort Select ATO DUMP

Pre MECO

2 OMS

G51 DUMP

Pre MECO

:00 :03

:00 :03

:00

:05

24/10 RCS (from OMS) (If INCNCT ‘ENA’)

2 OMS

G51 DUMP

:07

NZ > 0.05Gs or

4 +X RCS (from OMS) (If INCNCT

‘ENA’)

4 +X RCS (If INCNCT

‘ENA’) NZ > 0.05Gs

24/10 RCS (from OMS) (If INCNCT

‘ENA’) NZ > 0.05Gs

or

sec

2 + 10 jets 2 + 24 jets 2 oms

START

ARM, START

sec

2 + 10 jets 2 + 24 jets 2 oms

24/10 RCS (from OMS) (If INCNCT ‘ENA’)

2 OMS

sec FU

sec FU

4 +X RCS (If INCNCT ‘INH’)

Quan/Side 2 4 3 6 4 4 3 2

5 5 4 2 0 4 3 1 0 8 2

1 3 0 2 0 %

1 3 0 1 3 %

2 OMS

1 6 0

2 oms

1 3 9 sec

ASSIST DUMP

Quan/Side

2 0

Quan/Side

:03

ASSIST/ATO/ G51 DUMPS

PW

RD

C

SS

:00

Page 52: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

PILE

FB 2-24 ASC/114/FIN A

TOP BACK OF ‘ASSIST/ATO/ G51 DUMPS’

POWERED CSS – UPHILL/TAL

CSS & MAN THROT (IF MET < 1:30, ENGAGE BFS)

AB

OR

T

DU

MP

S

If TAL √HDG ZZA - 010 - MRN - 016 - FMI - 006 -

Yaw to until 2:30

Then uphill

or if TAL

E

I

R

Roll heads up @ - 15.0 - TAL - 13.2 - uphill

Max H = 400 – 420K for early TAL

Man MECO @ CO mark BFS

Incr θ ~ 10° if 1 eng fail

Idle @ 2% or

C/O bug alive

3g Throt

If CSS: Man Throt Man MECO 1 eng @ 104% = 4%/min

Early TAL: Initial θ ~50°

MECO – 90sec: Work +H&

H& = - 273 -

If TAL: H& = +100

Page 53: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

HOOK

FB 2-25 ASC/114/FIN A

TOP

POWERED CSS – RTLS

CSS & MAN THROT (IF MET < 1:30, ENGAGE BFS)

TGT H& = +800 @ PPD

1st Stage: use θ on ASC ADI

Cue Card +3° if 1 EO

Post SEP: Pull to α = 50° TGT Nz ~2.2g

If CSS: Man Throt Man MECO

1 eng @ 104% = 4%/min

Yaw to E

Pc < 50: Hands off

PPD Idle & Pitch DN to

horiz (α -2°) Man MECO @ CO mark Hold FWD stick until SEP

H& control: Use θ then Throttle

-1200 max neg. H&

PPA on PRPLT √ RATE – HIGH

8°/sec √ RATE – MED

AFTER ABORT: Fly Outbound θ per RTLS PLT table

√ PRPLT If < 26% (−60 sec) or < 18% (Vrel = 0) Throttle up

Post PPA 2 eng = 100% 3 eng = 69%

Pre PPA 2 eng = 104% 3 eng = 69%

R Yaw to

R

Page 54: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

2-26 ASC/114/FIN A

This Page Intentionally Blank

Page 55: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 2-27 ASC/114/FIN A

ASCENT/ENTRY CUE CARDS

AS

C/E

NT

C

UE

CA

RD

S

Page 56: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 2-28 ASC/114/FIN A

AS

C/E

NT

C

UE

CA

RD

S

Page 57: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 2-29 ASC/114/FIN A

Page 58: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 2-30 ASC/114/FIN A

This Page Intentionally Blank

Page 59: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 2-31 ASC/114/FIN A

Page 60: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 2-32 ASC/114/FIN A

Page 61: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-33 ASC/114/FIN A

ABORT CUE CARDS

CO

NT

A

BO

RT

Page 62: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-34 ASC/114/FIN A

CONTINGENCY ABORT

CO

NT

A

BO

RT

High Inclination51.6°

GREEN√ θ → 100° (or 0° → 100°)√ Roll Heads Up When EAS > 10 and incr:

√ Pitch Dn @ 3°/sec√ MECO, ET SEP

√ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

BLUEPOST SRB SEP:

√ θ → 0°, Roll Heads Up When H negative:

√ α → -2°, MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

H +1850 ↓.

SE OPS 3SRB SEP

SERC – ITEM 6 (∗)Failed ME SHUTDN pb (two) – push When H > 70K: ABORT – ITEM 2 (∗), 4 (∗)ABORT RTLS ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB)

√ CONT REGION

TRAJ

TRAJ

TRAJ

G51

2 OUT FIRSTANY SE TAL

STUCK MINTHROTTLE+ 1 ENG OUT

MAX THROT – ITEM 4 (∗)√ TAL Site

ABORT TALGo to TAL (FB)

G51G50

SRB SEP

3 OUT FIRST SERC – ITEM 6 (∗)ME SHUTDN pb (three) – push ADI (two) – REF

√ CONT REGION

TRAJ

TRAJ

3 OUT SECONDME SHUTDN pb (three) – push ADI (two) – REF

√ CONT REGION TRAJ

18.4K

3 OUT BLANKME SHUTDN pb (three) – push Go to TAL ----MECO---- (FB)

AOA-S

ORANGE√ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

From 2 OUT Only

√ β → 0° (±3°)√ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

YELLOW√ α → -2°If unable √ α → 125°

RED

GREENWhen EAS < 25 or incr:

√ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

BLUE Pc < 50 + 2 sec:

√ ET SEP √ Roll Heads Up (& Yaw if MM601) √ MM602 Go to CONT ENTRY (CC)

BFS

SRB SEP

√ SERC ON Failed ME SHUTDN pb (two) – push MAX THROT – ITEM 4 (∗)ABORT TAL DUMP – ITEM 6 (∗), 7 (∗)

If STUCK DROOP DRP 1 EO - ITEM 7 (ENA)

√ DROOP ALT If Overbright and flashing (<265K): Go to 2 OUT SECOND When MPS PRPLT = 2% Man THROT, Pc → 67% Man MECO @ CO mark Go to TAL ----MECO---- (FB)

TRAJ

G51

TRAJ

2 OUT DROOP

BFS

G51

TRAJ

MAN THROT, MAX THROT – ITEM 4 (∗)CSS,ABORT RTLSADI (two) – REF Push to θ = 90°, Fly roll, yaw needles When θCMD ≥ 90°: P, R/Y AUTO THROT AUTO When θ ≥ 100°: ADI (two) LVLH; Go to RTLS (FB)

G51

25.1K

2 OUT SECOND√ SERC ON

ABORT – ITEM 2 (∗), 4 (∗)ABORT RTLS Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB)

√ CONT REGION TRAJ

G51

TRAJTRAJ

1 2/3 TAL

3+37 3+35 3+48

ZZA(4) MRN(3) FMI(29)

STUCK TAL

1 2/3 DROOP2+32

STUCK FIRST 1 2/3 PTM

STUCK DROOP STUCK RTLS

1 2/3 RTLS2+39

STUCK DROOP

3+211 2/3 NEG RTN

Generic version ofASC-30a,31a,32a/114/A/C

Page 63: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-35 ASC/114/FIN A

Page 64: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-36 ASC/114/FIN A

RTLS CONTINGENCY

Generic version ofASC-30,31,32a/116/A/B

~ MECO – 10sec

3 OUT BLANKME SHUTDN pb (three) – push Go to RTLS ---MECO--- (FB)

3 OUT COLORME SHUTDN pb (three) – push

√ CONT REGION TRAJ

ORANGE√ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

EAS = 9 EAS = 25

√ β → 0° (±3°)√ ET SEP √ Pitch MNVR √ MM602 Go to CONT ENTRY (CC)

YELLOW√ α → -2°If unable

√ α → 125°(ADI flip)

REDGREENWhen EAS < 25 or incr:

√ ET SEP √ MNVR (ADI): Pre PPA (REF) – Roll, Yaw Heads Up

PPA to Vrel 0 (REF) – Yaw to , Roll to φ =0°

Post Vrel 0 (√ LVLH) – Pitch Dn √ MM602 Go to CONT ENTRY (CC)

RTLS

FINE COUNT

2 OUT BLANK √ SERC ON

Failed ME SHUTDN pb (two) – push Go to RTLS (FB)

TRAJ

2 OUT COLOR √ CONT REGION, If NOT Overbright

CSS √ SERC ON ABORT – ITEM 2 (∗), 4 (∗)

P, R/Y AUTO Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB)

√ CONT REGION TRAJ

TRAJTRAJ

G51

TRAJ

High Inclination51.6°

Generic version ofASC-30b,31b,32b/114/A/C

ADI (two) – REF √ θ → 100°√ Roll Heads Up When EAS > 10 & incr:

√ Pitch Dn @ 3 or † 8°/sec

√ MECO, ET SEP √ Pitch to MM602 Go to CONT ENTRY (CC)

YELLOW √ ADI (two) – LVLH When EAS > 10 & incr:

√ Pitch Dn @ 5°/sec√ MECO, ET SEP

√ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

ORANGE ADI (two) – LVLH √ Pitch Dn to α = -2°√ MECO, ET SEP √ Pitch Up √ MM602Go to CONT ENTRY (CC)

GREEN

H +1450 ↓.

∼ Vrel 0 – 10 sec EAS = 20

BLUE√ θ → 0°√ Roll Heads Up When H negative:

√ α → -2°√ MECO, ET SEP

√ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

† Automated Yellow uses 8 °/sec Pitch Dn

H +100 ↑.

Post PPA & Vrel < 3.2k

Automated CSS requiredCSS required

Page 65: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-37 ASC/114/FIN A

RTLSCONTINGENCY

CONT ENTRY / MM602 INH ECAL/BDA – ITEM 1 (INH)

Before NZ HoldRHC/PNL TRIM – ENA If M < 5,

√ AIL/RUD TRIM If M < 3, S/B = 65%

Expect 20° ≤ α ≤ 58°

After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – DeployMonitor – M / αM2 → 1: θ = 0° by M = 1.0

√ Air Data Incorp Air Data ASAP

Select UHF – G T/R

When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M > 8 6 4 2 1 α 32 26 20 15 12

Generic version ofASC-30b,31b,32b/114/A/C

√ ADI (two) – LVLH √ H → +400 (θmax = 75°) AT FINE COUNT:

√ Pitch Dn to α = -2°√ MECO, ET SEP

√ Pitch Up √ MM602 Go to RTLS ---MECO--- (FB)

RED

TRAJ

.

Automated

Page 66: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-38 ASC/114/FIN A

ASC-9a/114/A/C

ZZA TAL REDESIGNATION (114 OCFR4 CYC)

Page 67: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-39 ASC/114/FIN A

1st EO VI (KFPS) 5.6 5.8 6.0 6.2 6.4 6.6 6.8

CHERRY POINT (7) 6.7 - 7.0 6.7 - 7.2 6.8 - 7.3 6.8 - 7.4 6.9 - 7.5 6.9 - 7.6

OTIS ANGB (16) 10.3 - 11.1 10.3 - 11.2 10.2 - 11.3 10.2 - 11.5 10.2 - 11.6 10.2 - 11.6 1st EO VI (KFPS) 7.0 7.2 7.4 7.6 7.8 8.0 8.2

CHERRY POINT (7) 7.0 - 7.7 7.2 - 7.8 7.4 - 7.9 7.6 - 7.9 7.8 - 8.0 8.0 - 8.0

GABRESKI (15) 10.5 - 10.7 10.4 - 10.8 10.3 - 11.0

OTIS ANGB (16) 10.2 - 11.7 10.2 - 11.8 10.2 - 11.9 10.2 - 12.0 10.2 - 12.1 10.2 - 12.1 10.3 - 12.2 1st EO VI (KFPS) 8.4 8.6 8.8 9.0 9.2 9.4 9.6

OCEANA NAS (8) 8.6 - 9.0 8.8 - 9.1 9.0 - 9.2 9.2 - 9.3

WALLOPS (9) 9.4 - 9.6 9.2 - 9.7 9.4 - 9.8 9.6 - 9.8

GABRESKI (15) 10.3 - 11.1 10.3 - 11.2 10.3 - 11.3 10.4 - 11.3 10.4 - 11.4 10.4 - 11.5 10.4 - 11.5

OTIS ANGB (16) 10.3 - 12.3 10.3 - 12.3 10.3 - 12.4 10.4 - 12.4 10.4 - 12.5 10.5 - 12.6 10.5 - 12.6

PEASE INT’L (17) 11.3 - 11.7 11.3 - 11.9 11.3 - 12.0 11.3 - 12.1 11.3 - 12.2 11.3 - 12.2 11.3 - 12.3 1st EO VI (KFPS) 9.8 10.0 10.2 10.4 10.6 10.8 11.0

WALLOPS (9) 9.8 - 9.9

GABRESKI (15) 10.4 - 11.6 10.5 - 11.7 10.5 - 11.7 10.5 - 11.8 10.6 - 11.8 10.8 - 11.9 11.0 - 11.9

OTIS ANGB (16) 10.5 - 12.7 10.5 - 12.7 10.6 - 12.8 10.6 - 12.8 10.7 - 12.9 10.8 - 12.9 11.0 - 12.9

PEASE INT’L (17) 11.3 - 12.4 11.4 - 12.5 11.4 - 12.5 11.5 -12.6 11.5 - 12.6 11.5 - 12.7 11.5 - 12.7 1st EO VI (KFPS) 11.2 11.4 11.6 11.8 12.0 12.2 12.4

GABRESKI (15) 11.2 - 12.0 11.4 -12.0 11.6 - 12.1 11.8 - 12.2 12.0 - 12.2 12.2 - 12.3

OTIS ANGB (16) 11.2 - 13.0 11.4 - 13.0 11.6 - 13.1 11.8 - 13.1 12.0 - 13.2 12.2 - 13.2 12.4 - 13.2

PEASE INT’L (17) 11.5 - 12.8 11.5 - 12.8 11.6 - 12.9 11.8 - 12.9 12.0 - 13.0 12.2 - 13.0 12.4 - 13.0 1st EO VI (KFPS) 12.6 12.8 13.0 13.2 13.4 13.6 13.8

OTIS ANGB (16) 12.6 - 13.3 12.8 - 13.3 13.0 - 13.4 13.2 - 13.4 13.4 - 13.4

PEASE INT’L (17) 12.6 - 13.1 12.8 - 13.1 13.0 - 13.1

ASC-9b/114/A/C

ECAL – ZZA or MRN or FMI PRIME TAL

Page 68: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-40 ASC/114/FIN A

ASC-10a/114/A/C

MRN TAL REDESIGNATION (114 OCFR4 CYC)

Page 69: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-41 ASC/114/FIN A

1st EO VI (KFPS) 5.6 5.8 6.0 6.2 6.4 6.6 6.8

CHERRY POINT (7) 6.7 - 7.0 6.7 - 7.2 6.8 - 7.3 6.8 - 7.4 6.9 - 7.5 6.9 - 7.6

OTIS ANGB (16) 10.3 - 11.1 10.3 - 11.2 10.2 - 11.3 10.2 - 11.5 10.2 - 11.6 10.2 - 11.6 1st EO VI (KFPS) 7.0 7.2 7.4 7.6 7.8 8.0 8.2

CHERRY POINT (7) 7.0 - 7.7 7.2 - 7.8 7.4 - 7.9 7.6 - 7.9 7.8 - 8.0 8.0 - 8.0

GABRESKI (15) 10.5 - 10.7 10.4 - 10.8 10.3 - 11.0

OTIS ANGB (16) 10.2 - 11.7 10.2 - 11.8 10.2 - 11.9 10.2 - 12.0 10.2 - 12.1 10.2 - 12.1 10.3 - 12.2 1st EO VI (KFPS) 8.4 8.6 8.8 9.0 9.2 9.4 9.6

OCEANA NAS (8) 8.6 - 9.0 8.8 - 9.1 9.0 - 9.2 9.2 - 9.3

WALLOPS (9) 9.4 - 9.6 9.2 - 9.7 9.4 - 9.8 9.6 - 9.8

GABRESKI (15) 10.3 - 11.1 10.3 - 11.2 10.3 - 11.3 10.4 - 11.3 10.4 - 11.4 10.4 - 11.5 10.4 - 11.5

OTIS ANGB (16) 10.3 - 12.3 10.3 - 12.3 10.3 - 12.4 10.4 - 12.4 10.4 - 12.5 10.5 - 12.6 10.5 - 12.6

PEASE INT’L (17) 11.3 - 11.7 11.3 - 11.9 11.3 - 12.0 11.3 - 12.1 11.3 - 12.2 11.3 - 12.2 11.3 - 12.3 1st EO VI (KFPS) 9.8 10.0 10.2 10.4 10.6 10.8 11.0

WALLOPS (9) 9.8 - 9.9

GABRESKI (15) 10.4 - 11.6 10.5 - 11.7 10.5 - 11.7 10.5 - 11.8 10.6 - 11.8 10.8 - 11.9 11.0 - 11.9

OTIS ANGB (16) 10.5 - 12.7 10.5 - 12.7 10.6 - 12.8 10.6 - 12.8 10.7 - 12.9 10.8 - 12.9 11.0 - 12.9

PEASE INT’L (17) 11.3 - 12.4 11.4 - 12.5 11.4 - 12.5 11.5 -12.6 11.5 - 12.6 11.5 - 12.7 11.5 - 12.7 1st EO VI (KFPS) 11.2 11.4 11.6 11.8 12.0 12.2 12.4

GABRESKI (15) 11.2 - 12.0 11.4 -12.0 11.6 - 12.1 11.8 - 12.2 12.0 - 12.2 12.2 - 12.3

OTIS ANGB (16) 11.2 - 13.0 11.4 - 13.0 11.6 - 13.1 11.8 - 13.1 12.0 - 13.2 12.2 - 13.2 12.4 - 13.2

PEASE INT’L (17) 11.5 - 12.8 11.5 - 12.8 11.6 - 12.9 11.8 - 12.9 12.0 - 13.0 12.2 - 13.0 12.4 - 13.0 1st EO VI (KFPS) 12.6 12.8 13.0 13.2 13.4 13.6 13.8

OTIS ANGB (16) 12.6 - 13.3 12.8 - 13.3 13.0 - 13.4 13.2 - 13.4 13.4 - 13.4

PEASE INT’L (17) 12.6 - 13.1 12.8 - 13.1 13.0 - 13.1

ASC-10b/114/A/C

ECAL – ZZA or MRN or FMI PRIME TAL

Page 70: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-42 ASC/114/FIN A

ASC-12a/114/A/C

FMI TAL REDESIGNATION (114 OCFR4 CYC)

Page 71: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 2-43 ASC/114/FIN A

1st EO VI (KFPS) 5.6 5.8 6.0 6.2 6.4 6.6 6.8

CHERRY POINT (7) 6.7 - 7.0 6.7 - 7.2 6.8 - 7.3 6.8 - 7.4 6.9 - 7.5 6.9 - 7.6

OTIS ANGB (16) 10.3 - 11.1 10.3 - 11.2 10.2 - 11.3 10.2 - 11.5 10.2 - 11.6 10.2 - 11.6 1st EO VI (KFPS) 7.0 7.2 7.4 7.6 7.8 8.0 8.2

CHERRY POINT (7) 7.0 - 7.7 7.2 - 7.8 7.4 - 7.9 7.6 - 7.9 7.8 - 8.0 8.0 - 8.0

GABRESKI (15) 10.5 - 10.7 10.4 - 10.8 10.3 - 11.0

OTIS ANGB (16) 10.2 - 11.7 10.2 - 11.8 10.2 - 11.9 10.2 - 12.0 10.2 - 12.1 10.2 - 12.1 10.3 - 12.2 1st EO VI (KFPS) 8.4 8.6 8.8 9.0 9.2 9.4 9.6

OCEANA NAS (8) 8.6 - 9.0 8.8 - 9.1 9.0 - 9.2 9.2 - 9.3

WALLOPS (9) 9.4 - 9.6 9.2 - 9.7 9.4 - 9.8 9.6 - 9.8

GABRESKI (15) 10.3 - 11.1 10.3 - 11.2 10.3 - 11.3 10.4 - 11.3 10.4 - 11.4 10.4 - 11.5 10.4 - 11.5

OTIS ANGB (16) 10.3 - 12.3 10.3 - 12.3 10.3 - 12.4 10.4 - 12.4 10.4 - 12.5 10.5 - 12.6 10.5 - 12.6

PEASE INT’L (17) 11.3 - 11.7 11.3 - 11.9 11.3 - 12.0 11.3 - 12.1 11.3 - 12.2 11.3 - 12.2 11.3 - 12.3 1st EO VI (KFPS) 9.8 10.0 10.2 10.4 10.6 10.8 11.0

WALLOPS (9) 9.8 - 9.9

GABRESKI (15) 10.4 - 11.6 10.5 - 11.7 10.5 - 11.7 10.5 - 11.8 10.6 - 11.8 10.8 - 11.9 11.0 - 11.9

OTIS ANGB (16) 10.5 - 12.7 10.5 - 12.7 10.6 - 12.8 10.6 - 12.8 10.7 - 12.9 10.8 - 12.9 11.0 - 12.9

PEASE INT’L (17) 11.3 - 12.4 11.4 - 12.5 11.4 - 12.5 11.5 -12.6 11.5 - 12.6 11.5 - 12.7 11.5 - 12.7 1st EO VI (KFPS) 11.2 11.4 11.6 11.8 12.0 12.2 12.4

GABRESKI (15) 11.2 - 12.0 11.4 -12.0 11.6 - 12.1 11.8 - 12.2 12.0 - 12.2 12.2 - 12.3

OTIS ANGB (16) 11.2 - 13.0 11.4 - 13.0 11.6 - 13.1 11.8 - 13.1 12.0 - 13.2 12.2 - 13.2 12.4 - 13.2

PEASE INT’L (17) 11.5 - 12.8 11.5 - 12.8 11.6 - 12.9 11.8 - 12.9 12.0 - 13.0 12.2 - 13.0 12.4 - 13.0 1st EO VI (KFPS) 12.6 12.8 13.0 13.2 13.4 13.6 13.8

OTIS ANGB (16) 12.6 - 13.3 12.8 - 13.3 13.0 - 13.4 13.2 - 13.4 13.4 - 13.4

PEASE INT’L (17) 12.6 - 13.1 12.8 - 13.1 13.0 - 13.1

ASC-12b/114/A/C

ECAL – ZZA or MRN or FMI PRIME TAL

Page 72: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NO

T F

LOW

N

2-44 A

SC

/114/FIN

A

Page 73: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-1 ASC/114/FIN A

POST OMS 1 BURN PROCEDURES

PO

ST

O

MS

1

Page 74: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-2 ASC/114/FIN A

1: GNC OMS 1 MNVR EXEC 2: GNC OMS 1 MNVR EXEC 3: BFS, GNC SYS SUMM 2

ET PHOTO MANEUVER/MPS DUMP

**

If OMS 1 Burn performed, go to POST BURN STATUS

**

B √MCC, ADI – REF

If NO-GO for Photo Pitch Mnvr, go to MPS DUMP complete; do not pitch

**********

If Feedline Fail: √MCC GO for +X and Pitch Mnvr

At MECO + 6 min: (14:23 Nom) ET SEP – SEP

At MM104 + 2 sec +X xlation for 11 sec

At OMS 1 TIG: (16:05 Nom) Pitch up at 2°/sec until ET in O/H window (P~100°)

Go to MPS DUMP complete

**********

MPS DUMP start (MECO + 2:03) (10:26 Nom)

C At OMS 1 TIG + 0 sec: (MECO + 2:03) C3 DAP – INRTL: R (DISC), P (PULSE), Y (DISC),

Orbiter pitches up

Control pitch rate 2°/sec max (P down – accel)

* If no pitch rate, go to MPS DUMP complete * When ET in O/H window (MS call or P ~125°):

P – DISC Adjust pitch photo att as reqd for MS

P MPS DUMP complete F4 √BDY FLP pb – lt off (MECO + 4 min) (12:24 Nom)

****

C If no pitch rate, P – DISC Pitch up at 2°/sec until ET in O/H window (P ~100°)

****

PO

ST

O

MS

1

Page 75: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-3 ASC/114/FIN A

1: GNC OMS 1 MNVR EXEC 2: GNC OMS 1 MNVR EXEC 3: BFS, GNC SYS SUMM 2

C POST BURN STATUS

NOMINAL OMS 1 TIG TO MCC :

**********

C ALPHA MANAGEMENT (if reqd)

If underspeed (ATO or AOA-S) OMS 1 and Post OMS 1 HP ≤ 75 nm: Maneuver to LVLH R000, P340, Y000 (maintain LVLH P = 0 ± 20)

After 10 min: Maneuver to LVLH P = 340

After 10 min: Maneuver to Burn Attitude

**********

R4 HYD MPS/TVC ISOL VLV (1,2,3; 5 sec interval) – CL (hold each 5 sec, tb-CL)

B F6,F8 FLT CNTLR PWR (two) – OFF C3 DAP – AUTO

IF AOA

If two Freon Loops ↓ or two H2O Loops ↓: Go to SYS AOA

Otherwise, go to AOA

***

If no comm and MPS dump complete: HYD MN PUMP PRESS (three) – LO (MA)

***

P APU/HYD SHUTDN

√MCC R2 √APU AUTO SHTDN (three) – ENA

BLR PWR (three) – OFF BLR N2 SPLY (three) – OFF APU OPER (1,2,3; 5 sec interval) – OFF (MA) APU FU TK VLV (three) – CL √Shutdn (HYD PRESS < 200) APU CNTLR PWR (three) – OFF

√HYD MN PUMP PRESS (three) – NORM

Page 76: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-4 ASC/114/FIN A

1: GNC OMS 1 MNVR EXEC 2: GNC OMS 1 MNVR EXEC 3: BFS, GNC SYS SUMM 2

TAIL ONLY CONTROL (√MCC) 2: GNC 23 RCS CRT2 OVRD FWD RCS MANF STATs 1,2,3,4 – CL FES & HEATER ACTIVATION C L1 FLASH EVAP CNTLR PRI A – ON L2 FLASH EVAP FDLN HTR (two) – 1 P R1 O2 TK1,2 HTRS B (two) – AUTO

H2 TK1,2 HTRS B (two) – AUTO MS1 A12 APU HTR TK/FU LN/H2O SYS 1A,2A,3A (three) –

AUTO AC BUS SNSR R1 AC BUS SNSR (three) – OFF (1 sec),

then AUTO TRIP MAJOR MODE CHANGE CRT1 GNC, OPS 105 PRO 1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC

3: BFS, GNC OMS 2 MNVR EXEC

Page 77: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-5 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

B OMS 2 BURN SETUP

√OMS 2 TARGETING, Flip Book CRT1 TRIM LOAD – ITEM 6 +0.4 -5.7 +5.7 EXEC

*******

For single eng burn (good eng): TRIM LOAD LY – ITEM 7 +5.2 EXEC TRIM LOAD RY – ITEM 8 -5.2 EXEC OMS L – ITEM 2 EXEC OMS R – ITEM 3 EXEC

For RCS burn: RCS SEL – ITEM 4 EXEC

*******

NOTE

Onboard computed TIG may vary slightly but is acceptable

√Targets, OMS TARGETS

LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

CRT3 √BFS TGT

Page 78: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-6 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

P MPS PWRDN/ISOL R2 MPS ENG PWR L (two) – OFF

MPS ENG PWR CTR (two) – OFF MPS ENG PWR R (two) – OFF MPS He ISOL (six) – GPC MPS PNEU He ISOL – GPC √He I’CNCT (three) – GPC

NOTE

Expect multiple MAs for MPS He P as regs bleed down

MPS GH2 INERTING R4 MPS H2 PRESS LINE VENT – OP

(Start watch) After 1 min:

MPS H2 PRESS LINE VENT – GND

Page 79: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-7 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

P ET UMBILICAL DOOR CLOSURE

* If Feedline fail, √MCC before closure *

WARNING ET CTRLINE LATCHES must be stowed prior to L,R DR closure to prevent door drive damage

NOTE

Double times for single motor operation R2 ET UMB DR

MODE – GPC/MAN CTRLINE LAT – STO

√After 6 sec, CTRLINE LAT tb – STO

* * *

If CTRLINE LAT does not stow within 12 sec: CTRLINE LAT – GND

√MCC

***

CTRLINE LAT – GND L,R DR (two) – CL (tb-bp)

√After 24 sec, L,R DR tb (two) – CL

* * *

If doors do not close within 48 sec: L,R DR (two) – OFF

√MCC

***

L,R DR (two) – OFF L,R LAT (two) – LAT (tb-bp)

√After 6 sec, L,R LAT tb (two) – LAT

* * *

If doors do not latch within 12 sec: L,R LAT (two) – OFF

√MCC

***

L,R LAT (two) – OFF MODE – GPC

Page 80: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

3-8 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

OMS BURN PREP

****

For single eng burn/No PROP failures:

XFEED failed eng PROP to good eng

****

P O8 L,R OMS

√He PRESS/VAP ISOL A (two) – GPC He PRESS/VAP ISOL B (two) – CL

√TK ISOL (four) – GPC (tb-OP) √XFEED (four) – GPC (tb-CL)

B Wedge Install OMS 2/ORBIT OMS BURN and

OMS 2 BURN MONITOR Cue Cards (F6,F8)

If FRCS reqd, Go to OPS 1 RCS BURN (Cue Card)

OMS 2 BURN ATTITUDE MNVR B F6,F8 √ADI ATT (two) – INRTL

ADI RATE (two) – 1 C Mnvr to OMS 2 Burn Attitude

3: BFS, GNC SYS SUMM 2 B SEAT SAFING AND ADJUSTMENT

Adjust Back Angle TIG-5 B Go to OMS 2/ORBIT OMS BURN

(Cue Card)

Page 81: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 4-1 ASC/114/FIN A

OMS 2 BURN CARDS

OM

S 2

Page 82: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 4-2 ASC/114/FIN A

OMS 2 BURN MONITOR OMS TEMP*

FU IN P ≥ OMS ENG FAIL

≤ OMS PRPLT FAIL or No FU IN P

OMS PC* & OMS ↓ (BFS: √accel) ENG VLV 1 or 2 < 70 or OX IN P > 227

OMS ENG FAIL

OX IN P ≤ 227 or No OX IN P

OMS PRPLT FAIL

OMS OX/FU TK P (√ENG IN P) OX/FU LOW He PRESS/VAP ISOL (two) – OP

If aff TK P not incr: He PRESS/VAP ISOL (two) – CL At PC < 72 or OMS TEMP or HP > 85 :

OMS PRPLT FAIL

OX & FU HIGH He PRESS/VAP ISOL (two) – CL Cycle He A(B) to maintain TK P 234-284

OMS He TK P LOW (√ OMS/MPS )

At He P < 640 or QTY ≤ 41: If HP < 85 : OMS XFEED from good OMS At HP > 85 : OMS PRPLT FAIL

OMS N2 REG P HIGH or LOW OMS ENG – ARM

OMS N2 TK P LOW (√ OMS/MPS )

At N2 TK P < 470: OMS ENG – ARM

OMS GMBL PRI fail L(R) OMS GMBL – SEC (twice)

SEC fail If high RCS usage: OMS ENG FAIL

GPC 1(4) & aff GPC PWR – OFF Burning OMS aff If SEC GMBL avail:

aff MDM FF 1(4) – OFF,ON L(R) OMS GMBL – SEC (twice)

SEC GMBL lost If high RCS usage: OMS ENG FAIL

2 FAs lost √MAN SHUTDN

I/O ERROR FA 1(4) L(R) OMS GMBL – SEC

I/O RESET (if recov: BFS I/O RESET) If high RCS usage: OMS ENG FAIL

2 FAs lost √MAN SHUTDN

BCE STRG D I/O RESET (if recov: >>)

1(4) If high RCS usage: L(R) OMS GMBL – SEC (twice)

I/O ERROR PCM OI PCMMU PWR – 2(1)

*If XFD, BLDN, or sensor fail, monitor ENG IN P for off-nominal performance

L R 225 220

205 204

ASC-5a/114/A,O/B

OM

S 2

Page 83: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 4-3 ASC/114/FIN A

OMS 2/ORBIT OMS BURNS

√MM105/202(302) Enter TGO +5 sec (2 eng) or TGO +10 sec (1 eng)

√BURN ATT (INRTL) then REF, pb – push √ENG SEL √DAP TRANS – NORM (MM202) CNTL PWR (two) – ON √DAP – AUTO(PASS)/DISC

√GMBL TRIM 2 engine: P = +0.4 LY = -5.7 RY = +5.7 1 engine: P = +0.4 LY = +5.2 RY = -5.2

L,R OMS He PRESS/VAP ISOL A (two) – OP . . . Wait 2 sec . . . L,R OMS He PRESS/VAP ISOL B (two) – GPC (OP for SE

burn) TIG-2 SEL OMS ENG(s) – ARM/PRESS (√P VLVs OP)

If P VLV CL: Aff OMS ENG – OFF

WARNING Do not burn aff engine if:

OMS N2 TK P < 470(564) (NONCRIT BURN) He TK P < 640 FU ENG IN P < 216(244) OX ENG IN P < 151(244)

∆VTOT: OMS XFEED RETURN (Planned Single

Engine) -:15 EXEC

If OMS ENG Pc MSG and non critical burn: Aff ENG – OFF If Leaking OMS PROP, burn RCS +X TIG - 15 sec to

OMS IGN + 1 sec :00 TIG; start watch (√Pc, ∆VTOT, ENG VLVs)

* * * * * * * * * * * * * * * * * * * *

OMS PRPLT FAIL: HP < 85 (CONTINUE BURN):

Failed OMS ENG – OFF √XFEED (two) – CL TK ISOL (two) – CL He PRESS (two) – CL

HP > 85 (STOP BURN): OMS ENG (two) – OFF

√Failed OMS XFEED (two) – CL TK ISOL (two) – CL He PRESS (two) – CL

OMS ENG FAIL: ASCENT or CRIT O/O (Continue Burn) Failed ENG – OFF OMS XFEED at → 1/2 ∆VTOT

at FAIL RCS COMPLETION: (Hp < 85 or CRIT O/O)

Interconnect to either OMS that was ENG FAIL THC +X (Hp = 85 ) Post burn, AFT RCS RECONFIG

* * * * * * * * * * * * * * * * * * * *

CUTOFF +:02 OMS ENG(s) – OFF (if < 3 IMU, at ) Trim Residuals:

ASC-6a/114/A,O/B

GPC OP CL ORB BURN A B

OMS 2 TAIL ONLY CNTL Orbit VGO X < 0.2 fps VGO Y,Z < 2 fps

VGO X < +0.2 fps All axes < 0.2 fps

:

Page 84: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 4-4 ASC/114/FIN A

OPS 1 RCS BURN

AFT RCS √RCS BURN CONFIG:

OMS TK ISOL (all) – OP L(R) OMS XFEED (two) – OP R(L) OMS XFEED (two) – CL AFT L,R RCS XFEED (four) – OP AFT L,R RCS TK ISOL (six) – CL

TIG-2 L,R OMS He PRESS/VAP ISOL A – OP

. . . Wait 2 sec . . . L,R OMS He PRESS/VAP ISOL B – OP

√MM105 CNTLR PWR (two) – ON

√BURN ATT (INRTL) then REF, pb – push √RCS SEL DAP: INRTL/DISC

:00 + X Maintain PITCH ATT ERR ± 3° Monitor OMS data Monitor ∆VTOT

CUTOFF Release THC CNTLR PWR (two) – OFF

FWD RCS FRCS BURN PREP Load DUMMY target for FRCS attitude

RCS SEL – ITEM 4 EXEC TIG @ TTA = 2:00 or as reqd ∆VX = - 2.1 (ITEM 19) ∆VY = 0 (ITEM 20) ∆VZ = +1.0 (ITEM 21) LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

TIG-10 Auto Mnvr to ATT When in attitude:

ADI ATT – REF (push) Load External ∆V Burn Target

∆VX = +80 ∆VY = 0 ∆VZ = 0 LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

√VGOX = negative √VGOY = 0 √VGOZ = + 21 ± 2 √REF ball – 0,0,0

NOTE

Error needles invalid during burn Burn time = ~2X TGO TGT Hp = 85 for ASCENT

-:30 CNTLR PWR (two) – ON DAP: INRTL/DISC

:00 -X CUTOFF CUR HP = TGT HP , release THC

CNTLR PWR (two) – OFF ASC-6b/114/A,O/B

OMS TK switch at 1/2 ∆VTOT (If reqd)

Page 85: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

5-1 ASC/114/FIN A

POST OMS 2 BURN PROCEDURES

PO

ST

O

MS

2

Page 86: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

5-2 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC SYS SUMM 2

C POST BURN STATUS

NOMINAL ∆TIG

:

B F6,F8 FLT CNTLR PWR (two) – OFF C3 √DAP: AUTO C OMS TVC GMBL CHECK CRT1 SECONDARY CHECK

Perform SEC L,R then PRI L,R GMBL CK P OMS/RCS POST BURN RECONFIG O7 AFT L,R RCS

He PRESS A (two) – GPC (tb-OP) He PRESS B (two) – CL (tb-CL) TK ISOL (six) – OP (tb-OP)

√MANF ISOL 1,2,3,4 (eight) – GPC (tb-OP) XFEED (four) – CL (tb-CL)

O8 FWD RCS He PRESS A – GPC (tb-OP) He PRESS B – CL (tb-CL) TK ISOL (two) – OP (tb-OP)

√MANF ISOL 1,2,3,4 (four) – GPC (tb-OP) L,R OMS

He PRESS/VAP ISOL (four) – CL TK ISOL (four) – OP (tb-OP) XFEED (four) – CL (tb-CL)

PO

ST

O

MS

2

Page 87: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

5-3 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC SYS SUMM 2

MAJOR MODE CHANGE CRT1 GNC, OPS 106 PRO 1: GNC OMS 2 MNVR COAST 2: GNC OMS 2 MNVR COAST B C4A, Stow ASC PKT (Helmet Bag) R3A Unstow ORBIT Cue Cards & ORB PKT

***

If ATO, √MCC for procedure changes If Rev 3 deorbit reqd, go to CONT DEORB, LAUNCH DAY ORBIT 3

***

Go to POST INSERT, POST INSERTION

Page 88: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

5-4 ASC/114/FIN A

This Page Intentionally Blank

Page 89: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-1 ASC/114/FIN A

AOA PADS

AO

A

PA

DS

Page 90: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-2 ASC/114/FIN A

DIRECT INSERTION AOA DEL PAD DEORBIT

( )

OMS ENG FAIL XFEED QTY CUE %L %R

9 1

5 3

BURN CUE CARD:

PRPLT

FRCS: DUMP TO % (USE TIME AS CUE) OX FU

ENTRY / LANDING

EI - 5 MM303 INRTL ATT (6-30) R P Y

MM304 PREBANK (ENT MNVR Cue Card) L R

. ALTM SET (6-34)

: : CLG INIT

. EXPECTED AIL TRIM L R

VREL 1ST REVERSAL

. XCG AT TD

/ LAND SITE RWY 50K

/ 38K

/ 28Kdeg MLS L

R

OVHD

STRT TAC / 20K

/ ∆T MACH < 1 TO HAC 12KMAX Nz Nz LIMIT WINDS:

. / 7K. : (ENT MNVR Cue Card)

/

AIMPOINT

3K

SPEEDBRAKE

/ 1K

% @ 3K NOM

CLOSE-IN

NOM

S.F.

REMARKS:

/ SURFACE

4 8 FLIP ∆V

TOT AFT QTY 2 (%)

TOT AFT QTY 1 (%)

1 9 AFT ∆V

/ A N B/U SITE

∆T HAC INIT TO H = 20K

:

AO

A

PA

DS

Page 91: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-3 ASC/114/FIN A

W/OMS 1 AOA DEL PAD DEORBIT

( )

OMS ENG FAIL XFEED QTY CUE %L %R

9 1 TOT AFT QTY 1 (%)

5 3 TOT AFT QTY 2 (%)

= 4 2

2 0

1 0 ( )

OR STEEP

SHALLOW FLIP HP = + + TGT HP ( ∆HP

(REDES SITE) ∆HP (PRI SITE)

FLIP ∆V 2

)

= 0 1 ( ) AFT HP = + TGT HP ( AFT ∆V

2 )

BURN CUE CARD:

PRPLT

/ A N B/U SITE

FRCS: DUMP TO % (USE TIME AS CUE) OX FU

ENTRY / LANDING

EI - 5 MM303 INRTL ATT (6-30) R P Y

MM304 PREBANK (ENT MNVR Cue Card) L R

. ALTM SET (6-34)

: : CLG INIT

. EXPECTED AIL TRIM L R

VREL 1ST REVERSAL

. XCG AT TD

/ LAND SITE RWY 50K

/ 38K

/ 28Kdeg MLS L

R

OVHD

STRT TAC / 20K

/ ∆T MACH < 1 TO HAC 12KMAX Nz Nz LIMIT WINDS:

. / 7K. : (ENT MNVR Cue Card)

/

AIMPOINT

3K

SPEEDBRAKE

/ 1K

% @ 3K NOM

CLOSE-IN

NOM

S.F.

REMARKS:

/ SURFACE

∆T HAC INIT TO H = 20K

:

Page 92: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

DEORBIT MNVR PAD

( )

( ) .

( ) .

( ) .

.

:

( ) .

.

.

( )

/ : : .

( ) .

( ) .

( ) .

1 OMS BOTH

2

3

4 RCS SEL

6

TRIM LOAD

5 TV ROLL

7

8

9

10

TGT PEG 4

16

24 R

25 P

26 Y

BURN ATT

X VGO

Y VGO

Z VGO

TGT

HP HA

∆VTOT

TGO

NOTES

L

R

P

LY

RY

WT

TIG

HT

15 C2

14 C1

RCS I’CNCT:

L OMS → RCS

R OMS → RCS

NONE

:

REI

TXX

17 θT

18 PRPLT

6-4

AS

C/114/F

IN A

Page 93: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-5 ASC/114/FIN A

BURN CARD OMS PRPLT PAD DEORBIT BURN (1 ENG)

OMS XFEED RETURN at ∆VTOT =

DEORBIT BURN (RCS)

RCS I’CNCT TK SW at ∆VTOT =

OMS PRPLT LOW: ∆VTOT =

UNBALANCED PRPLT DEORBIT BURN

INITIAL CONFIG:

While feeding 2 OMS from 1 POD: OMS PRPLT FAIL:

Interconnect OMS to RCS

THC + X for :

If (XFEED) ENG ‘↓’

When OMS QTY:

5%: OMS TK ISOL (two) – OP

4%: OMS TK ISOL (two) – CL

If (STRAIGHT FEED) ENG ‘↓’ OMS ENG FAIL:

At ∆VTOT =

TK ISOL (two) – OP

TK ISOL (two) – CL Return to 2 ENG, 2 POD FLOW:

At ∆VTOT = TK ISOLs – OP

OMS ENG FAIL: (XFEED CUE)

OMS QTY %L or %R

DEORBIT BURN (MIXED XFEED)

FEED FROM GOOD POD: At ∆VTOT =

OMS He PRESS (two) – OP OMS TK ISOL (two) – OP OMS XFEED (two) – OP

Secure OMS

OMS PRPLT LOW: AFT RCS RECONFIG at ∆VTOT =

OMS ENG FAIL: OMS He PRESS (two) – OP OMS TK ISOL (two) – OP OMS XFEED (two) – CL

Secure OMS

Secure OMS

or at %

TK ISOLs – CL

or at %

or at %

Page 94: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-6 ASC/114/FIN A

This Page Intentionally Blank

Page 95: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-7 ASC/114/FIN A

AOA PROCEDURES

AO

A

Page 96: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-8 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

P HYD DEPRESS R4 √HYD MPS/TVC ISOL VLV (three) – CL R2 √APU SPEED SEL (three) – NORM

√AUTO SHTDN (three) – ENA HYD MN PUMP PRESS (three) – LO (MA)

FES & HEATER ACTIVATION C L2 FLASH EVAP FDLN HTR (two) – 1 P R1 O2 TK1,2 HTRS B (two) – AUTO

H2 TK1,2 HTRS B (two) – AUTO MS1 A12 APU HTR TK/FU LN/H2O SYS 1A,2A,3A (three) –

AUTO AC BUS SNSR R1 AC BUS SNSR (three) – OFF (1 sec),

then AUTO TRIP MAJOR MODE CHANGE CRT1 GNC, OPS 105 PRO

Select any AOA I TGT (3-12) to set AOA flag, but do not load until OPS 3

AO

A

Page 97: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-9 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

NOTE

Manually entered tgt data will be carried over to OPS 3 except: PASS, BFS ITEMS 5 and 18 (ILL ENTRY). Transition to OPS 3 NLT TIG-10 min

C4F, Stow ASC PKT R3A Stow ASCENT Cue Cards R3F Unstow ENT PKT F6,F8 Install AOA DEORBIT BURN and DEORBIT

BURN MONITOR Cue Cards (R3A)

IF APUs SHUTDN:

WARNING Ice in W/B Steam Vent may cause loss of APU/HYD

P W/B STEAM VENT HTR ACT

3: BFS, SM SYS SUMM 2

√APU OIL IN TEMP (three) < 230 degF √OUT TEMP (three) < 230 degF

NOTE

If any temp > 230, wait until temp < 230 in aff system

R2 √BLR CNTLR/HTR (three) – A

BLR PWR (three) – ON BLR N2 SPLY (three) – ON

Page 98: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-10 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

P MPS ISOL R2 MPS He ISOL (six) – GPC

MPS PNEU He ISOL – GPC √He I’CNCT (three) – GPC

NOTE

Expect multiple MAs for MPS He P as regs bleed down

MPS GH2 INERTING R4 MPS H2 PRESS LINE VENT – OP

(Start watch) After 1 min:

MPS H2 PRESS LINE VENT – GND

Page 99: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-11 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

P ET UMBILICAL DOOR CLOSURE

* If Feedline fail, √MCC before closure * WARNING

ET CTRLINE LATCHES must be stowed prior to L,R DR closure to prevent door drive damage

****

If ET Doors will not manually close and latch, prior to OPS 3 transition:

2: GNC 51 OVERRIDE ET UMB DR CLOSE – ITEM 40(30) EXEC

****

NOTE Double times for single motor operation

R2 ET UMB DR

MODE – GPC/MAN CTRLINE LAT – STO

√After 6 sec, CTRLINE LAT tb – STO

* * *

If CTRLINE LAT does not stow within 12 sec: CTRLINE LAT – GND

√MCC

***

CTRLINE LAT – GND L,R DR (two) – CL (tb-bp)

√After 24 sec, L,R DR tb (two) – CL

***

If doors do not close within 48 sec: L,R DR (two) – OFF

√MCC

***

L,R DR (two) – OFF L,R LAT (two) – LAT (tb-bp)

√After 6 sec, L,R LAT tb (two) – LAT

***

If doors do not latch within 12 sec: L,R LAT (two) – OFF

√MCC

***

L,R LAT (two) – OFF MODE – GPC

Page 100: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-12 ASC/114/FIN A

1: GNC OMS 2 MNVR EXEC 2: GNC OMS 2 MNVR EXEC 3: BFS, GNC OMS 2 MNVR EXEC

RECONFIG DPS FOR ENTRY

CAUTION If recovering string(s) due to failed GPC(s), all FCS CH(s) to AUTO prior to OPS 301 PRO

CRT1 GNC, OPS 301 PRO (√DAP) CRT3 BFS, GNC, OPS 301 PRO CRT1 GNC, OPS 302 PRO 1: GNC 50 HORIZ SIT 2: GNC DEORB MNVR EXEC

3: BFS, GNC DEORB MNVR EXEC

√RWY Selection AOA RWY OPTIONS

ALL INCLINATIONS

SITE RWY TACANS ITEM 5 MLS

1 KSC 15 KSC 33 TTS 59Y OMN 73 8

6

42 NOR 17 NOR 23

SNG 121Y HMN 92 6 6

43 NOR 05 NOR 35

SNG 121Y HMN 92 – –

44 EDW 15 EDW 18L

EDW 111 LHS 21 – –

45 EDW 22 EDW 04

EDW 111 LHS 21 8/† 6

† MSBLS Jr. Channel 8 – Requires Uplink

Page 101: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-13 ASC/114/FIN A

1: GNC 50 HORIZ SIT 2: GNC DEORB MNVR EXEC 3: BFS, GNC DEORB MNVR EXEC

1: GNC DEORB MNVR EXEC B OMS 2 BURN SETUP CRT1 √Or enter Target (steep or shallow based on ∆V

capability) from OMS TARGETS or MCC

TRIM LOAD – ITEM 6 +0.4 -5.7 +5.7 EXEC

*******

For single eng burn (good eng): TRIM LOAD LY – ITEM 7 +5.2 EXEC TRIM LOAD RY – ITEM 8 -5.2 EXEC OMS L – ITEM 2 EXEC OMS R – ITEM 3 EXEC

For RCS burn: RCS SEL – ITEM 4 EXEC

*******

NOTE

Onboard computed TIG and θt may vary slightly and are acceptable if REI is correct

LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

CRT3 √BFS TGT

Fill in AOA DEORBIT BURN CARDS from AOA DEL PAD, 6-2 or 6-3

Page 102: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-14 ASC/114/FIN A

1: GNC DEORB MNVR EXEC 2: GNC DEORB MNVR EXEC 3: BFS, GNC DEORB MNVR EXEC

C OMS TVC GMBL CHECK

(Perform during S-band AOS) CRT1 SECONDARY CHECK

Perform SEC L,R then PRI L,R GMBL CK

**

If down arrow(s) or M(s): Select good GMBL

**

SEAT ADJUSTMENT

Adjust Back Angle P OMS BURN PREP

**

For single eng burn/No PROP failures: XFEED failed eng PROP to good eng

**

O8 L,R OMS

√He PRESS/VAP ISOL A (two) – GPC He PRESS/VAP ISOL B (two) – CL

√TK ISOL (four) – GPC (tb-OP) √XFEED (four) – GPC (tb-CL)

RCS BURN PREP (I’CNCT OMS to RCS) P O8 L,R OMS

He PRESS/VAP ISOL (four) – CL TK ISOL (four) – OP (tb-OP)

L OMS XFEED (two) – OP (tb-OP) R OMS XFEED (two) – CL (tb-CL)

O7 AFT L,R RCS XFEED (four) – OP (tb-OP) TK ISOL (six) – CL (tb-CL)

Page 103: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-15 ASC/114/FIN A

1: GNC DEORB MNVR EXEC 2: GNC DEORB MNVR EXEC 3: BFS, DEORB MNVR EXEC

OMS BURN TIG ADJUST (if reqd) CRTX LOAD – ITEM 22 EXEC

TIMER – ITEM 23 EXEC

Determine ∆TIG (if REI – REF > 50) from OMS TARGETS

CRTX Enter new TIG

LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

Repeat until ∆RANGE < 50

CRT3 √BFS TGT MNVR TO DEORBIT BURN ATTITUDE B F6,F8 √ADI ATT (two) – INRTL

√ERR (two) – 5 √RATE (two) – 5

C Mnvr to Deorbit Burn Attitude

(√ADI ATT with CRT BURN ATT)

3: BFS, GNC SYS SUMM 2 TIG-5 B R3A Go to AOA DEORBIT BURN (Cue Card)

Page 104: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-16 ASC/114/FIN A

This Page Intentionally Blank

Page 105: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-17 ASC/114/FIN A

AOA DEORBIT BURN AND DEORBIT BURN MONITOR CARDS

DE

OR

BIT

C

AR

DS

Page 106: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-18 ASC/114/FIN A

DEORBIT BURN MONITOR

DE

OR

BIT

C

AR

DS

Page 107: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-19 ASC/114/FIN A

This Page Intentionally Blank

Page 108: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-20 ASC/114/FIN A

AOA DEORBIT BURN (2 ENG)

√MM302 √OMS BOTH Enter TGO + 5 sec

√TRIM: P +0.4, LY -5.7, RY +5.7 L,R OMS He PRESS/VAP ISOL A (two) – GPC B (two) – OP

√DAP – AUTO(PASS)/DISC ADI – LVLH(REF)/HI/MED FLT CNTLR PWR (two) – ON

TIG-2 OMS ENG (two) – ARM/PRESS - :15 EXEC - :15 If OMS AFT QTY < 11%, THC +X to OMS IGN + 1 sec :00 Start watch (√Pc, ∆VTOT, ENG VLVs)

* * * * * * * * * * * * * * * * * * * * * * * * * *

OMS PRPLT FAIL (CONTINUE BURN): Failed OMS ENG – OFF ITEM 18 +0 EXEC When good OMS QTY:

5%: L, R OMS XFEED (four) – OP 4%: Good OMS TK ISOL (two) – CL If OMS Pc < 80 or OMS TEMP, OMS ENG – OFF

√ADI – LVLH, center needles RCS COMPLETION

OMS ENG FAIL: Failed OMS ENG – OFF OMS XFEED at 1/2 ∆VTOT at fail or OMS QTY

2nd OMS FAIL (ENG or PRPLT): Failed OMS ENG – OFF If PRPLT FAIL:

Secure aff OMS ITEM 18 +0 EXEC

√ADI – LVLH, center needles Interconnect good OMS to RCS

THC +X (√OMS% vs RCS Burn Time) RCS I’CNCT TK SW (N/A for OMS PRPLT FAIL)

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG

RCS COMPLETION

* * * * * * * * * * * * * * * * * * * * * * * * * *

ASC-8a/A/E

%L or

%R

HINGE

Page 109: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-21 ASC/114/FIN A

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

RCS COMPLETION: If DIRECT INSERTION:

THC +X to ∆VTOT = 0 or TOT AFT QTY 1 THC +X to FLIP ∆V or At AFT QTY 1 TOT AFT QTY 2 if CUR ∆VTOT: FRCS COMPLETION

FLIP ∆V

AFT ∆V

TGT ∆V

If W/OMS 1:

THC +X to TGT HP or TOT AFT QTY 1

THC +X to FLIP HP or At AFT QTY 1 TOT AFT QTY 2 if CUR HP: FRCS COMPLETION

FLIP HP

AFT HP

TGT HP

FRCS COMPLETION:

Mnvr to -X Att (pitch up at 3°/sec to VGOz = +1/4 ∆VTOT) THC -X to ∆VTOT = 0 or FRCS depletion (JETS FAIL OFF)

%

4 8

1 9

0 0

%

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CUTOFF + :02 OMS ENG(s) – OFF (If < 3 IMU, at )

* AFT RCS RECONFIG if INTERCONNECT * Trim X,Z residuals < 2 fps (< 0.5 fps if shallow)

ASC-8aa/114/A/B

HINGE

FRCS COMPLETION

THC +X to TGT ∆V

5 3 % then

FRCS COMPLETION

THC +X to TGT HP

5 3 % then

:

Page 110: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-22 ASC/114/FIN A

AOA DEORBIT BURN (1 ENG)

√MM302 √OMS L or R √OMS BURN CONFIG (L or R XFEED)

Enter TGO + 10 sec √TRIM: P +0.4, LY +5.2, RY -5.2

L,R OMS He PRESS/VAP ISOL A (two) – OP . . . Wait 2 sec . . . B (two) – OP

√DAP – AUTO(PASS)/DISC ADI – LVLH(REF)/HI/MED FLT CNTLR PWR (two) – ON

TIG-2 Good OMS ENG – ARM/PRESS TIG-2:15 EXEC TIG-2:15 If OMS AFT QTY < 11%, THC +X to OMS IGN + 1 sec TIG-2:00 Start watch (√Pc, ∆VTOT, ENG VLVs)

OMS XFEED RETURN at ∆VTOT =

L,R OMS TK ISOL (four) – OP L,R OMS XFEED (four) – CL

* * * * * * * * * * * * * * * * * * * *

OMS PRPLT FAIL (CONTINUE BURN): OMS ENG – OFF ITEM 18 +0 EXEC Secure aff OMS

√ADI – LVLH, center needles Interconnect good OMS to RCS

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG

RCS COMPLETION OMS ENG FAIL (CONTINUE BURN):

OMS ENG – OFF √ADI – LVLH, center needles

Interconnect good OMS to RCS THC +X (√OMS% vs RCS Burn Time) RCS I’CNCT TK SW

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG

RCS COMPLETION RCS +X JET FAIL OFF:

ITEM 18 +0 EXEC G23 Resel jet

* * * * * * * * * * * * * * * * * * * *

ASC-8b/A/B

or at

%

HINGE

Page 111: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-23 ASC/114/FIN A

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

RCS COMPLETION: If DIRECT INSERTION:

THC +X to ∆VTOT = 0 or TOT AFT QTY 1 THC +X to FLIP ∆V or At AFT QTY 1 TOT AFT QTY 2 if CUR ∆VTOT: FRCS COMPLETION

FLIP ∆V

AFT ∆V

TGT ∆V

If W/OMS 1:

THC +X to TGT HP or TOT AFT QTY 1

THC +X to FLIP HP or At AFT QTY 1 TOT AFT QTY 2 if CUR HP: FRCS COMPLETION

FLIP HP

AFT HP

TGT HP

FRCS COMPLETION:

Mnvr to -X Att (pitch up at 3°/sec to VGOz = +1/4 ∆VTOT) THC -X to ∆VTOT = 0 or FRCS depletion (JETS FAIL OFF)

%

4 8

1 9

0 0

%

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CUTOFF + :02 OMS ENG – OFF (If < 3 IMU, at )

* AFT RCS RECONFIG if INTERCONNECT * Trim X,Z residuals < 2 fps (< 0.5 fps if shallow)

ASC-8bb/114/A/B

HINGE

FRCS COMPLETION

THC +X to TGT ∆V

5 3 % then

FRCS COMPLETION

THC +X to TGT HP

5 3 % then

:

Page 112: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-24 ASC/114/FIN A

HINGE

AOA DEORBIT BURN (RCS)

√MM302 √RCS SEL √RCS BURN CONFIG (L OMS I’CNCT)

L,R OMS He PRESS/VAP ISOL A (two) – OP . . . Wait 2 sec . . . B (two) – OP

√DAP – INRTL/DISC

ADI – LVLH(REF)/MED/MED FLT CNTLR PWR (two) – ON

TIG THC +X

Maintain PITCH ATT ERR ± 3° Monitor ∆VTOT

RCS I’CNCT TK SW at ∆VTOT = R OMS XFEED (two) – OP L OMS XFEED (two) – CL

OMS PRPLT LOW

AFT RCS RECONFIG AT ∆VTOT = RCS COMPLETION

* * * * * * * * * * *

OMS PRPLT FAIL (MULTIPLE JETS FAIL OFF): Secure aff OMS ITEM 18 +0 EXEC

G23 Resel jets Interconnect good OMS to RCS

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG RCS COMPLETION

RCS +X JET FAIL OFF: ITEM 18 +0 EXEC

G23 Resel jets

* * * * * * * * * * *

ASC-7a/A/B

Page 113: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-25 ASC/114/FIN A

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

RCS COMPLETION: If DIRECT INSERTION:

THC +X to ∆VTOT = 0 or TOT AFT QTY 1 THC +X to FLIP ∆V or At AFT QTY 1 TOT AFT QTY 2 if CUR ∆VTOT: FRCS COMPLETION

FLIP ∆V

AFT ∆V

TGT ∆V

If W/OMS 1:

THC +X to TGT HP or TOT AFT QTY 1

THC +X to FLIP HP or At AFT QTY 1 TOT AFT QTY 2 if CUR HP: FRCS COMPLETION

FLIP HP

AFT HP

TGT HP

FRCS COMPLETION:

Mnvr to -X Att (pitch up at 3°/sec to VGOz = +1/4 ∆VTOT) THC -X to ∆VTOT = 0 or FRCS depletion (JETS FAIL OFF)

%

4 8

1 9

0 0

%

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CUTOFF: VGOx = 0, release THC AFT RCS RECONFIG Trim Inplane X,Z residuals < 2 fps (< 0.5 fps if shallow)

ASC-7aa/114/A/B

HINGE

FRCS COMPLETION

THC +X to TGT ∆V

5 3 % then

FRCS COMPLETION

THC +X to TGT HP

5 3 % then

Page 114: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-26 ASC/114/FIN A

This Page Intentionally Blank

Page 115: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-27 ASC/114/FIN A

AOA POST DEORBIT BURN

PO

ST

D/O

B

UR

N

Page 116: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-28 ASC/114/FIN A

1: GNC DEORB MNVR EXEC 2: GNC DEORB MNVR EXEC 3: BFS, GNC SYS SUMM 2

B F6,F8 FLT CNTLR PWR (two) – OFF C3 √DAP: AUTO P OMS/RCS POST BURN RECONFIG

IF I’CNCT Perform I’CNCT RETURN (ENT PKT, RCS)

O7 AFT L,R RCS

√He PRESS (four) – OP (tb-OP) √TK ISOL (six) – GPC (tb-OP)

MANF ISOL 1,2,3,4 (eight) – OP (tb-OP) √XFEED (four) – GPC (tb-CL)

O8 FWD RCS

TK ISOL (two) – OP (tb-OP) L,R OMS

He PRESS/VAP ISOL (four) – CL TK ISOL (four) – OP (tb-OP)

**

If OMS PRPLT FAIL: √Aff TK ISOL (two) – CL

**

XFEED (four) – CL (tb-CL)

Determine Prebank Determine ∆HP (CUR HP -TGT HP)

Use RECOVERY PREBANK TABLES Record Prebank on ENTRY MANEUVERS Cue Card

PO

ST

D/O

B

UR

N

Page 117: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-29 ASC/114/FIN A

1: GNC DEORB MNVR EXEC 2: GNC DEORB MNVR EXEC 3: BFS, GNC SYS SUMM 2

C POST BURN STATUS

NOMINAL ∆TIG

:

P CRT2 GNC, OPS 303 PRO 1: GNC DEORB MNVR COAST 2: GNC DEORB MNVR COAST

Page 118: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-30 ASC/114/FIN A

1: GNC DEORB MNVR COAST 2: GNC DEORB MNVR COAST 3: BFS, GNC SYS SUMM 2

C CRT1 √Uplinked INRTL EI-5 MM303 ATT with DEL PAD

*****

If no Deorbit TGT uplink, enter INRTL EI-5 MM303 ATT from DEL PAD:

R – ITEM 24 + __ __ __ __ __ __ P – ITEM 25 + __ __ __ __ __ __ Y – ITEM 26 + __ __ __ __ __ __

*****

Mnvr to EI-5 ATT – ITEM 27 EXEC

***

If UNDERBURN or no DEL PAD, manually mnvr to LVLH R001, Y358, P per table below

***

TIME to EI (min)

LVLH PITCH (deg)

20

15

10

5

339343347351355359

37

1115192327313539

Page 119: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-31 ASC/114/FIN A

1: GNC DEORB MNVR COAST 2: GNC DEORB MNVR COAST 3: BFS, GNC SYS SUMM 2

C OMS GMBL PWRDN (PASS ONLY) CRT1 Verify GMBL positions:

L R P +5.9 +5.9 Y +6.4 -6.4

GMBL OFF – ITEM 32 EXEC GMBL OFF – ITEM 33 EXEC

1: GNC 53 CONTROLS 2: BFS, GNC SYS SUMM 2

3: GNC DEORB MNVR COAST C SECONDARY ACTUATOR CHECK

(IF TIME PERMITS) NOTE

If port does not bypass during check, bypass affected port after check:

SEC ACT BYPASS – ITEM 8 +X X EXEC If affected port still does not bypass:

SEC ACT RESET – ITEM 9 +X X EXEC R2 1. HYD MN PUMP PRESS (one) – NORM CRT3 2. SURF DRIVE ON, ITEM 39 EXEC (*), wait at

least 5 sec SPI √SPI: Stop drive test when elevon posns within

+12° to -27°: SURF DRIVE OFF, ITEM 40 EXEC (*)

CRT1 3. √POS STIM ENA, ITEM 7 – (no *) C3 4. √FCS CH 1,2,3,4 – AUTO CRT1 5. SEC ACT CK, CH 1 – ITEM 1 EXEC (*)

SEC ACT CK START – ITEM 5 EXEC (*) 6. √All CH 1 ports bypass ‘↓’

STOP – ITEM 6 EXEC (*) C3 7. FCS CH 1 – ORIDE CRT1 √All CH 1 ports reset no ‘↓’ C3 FCS CH 1 – AUTO 8. Repeat steps 5 thru 7 for CH 2,3,4 R2 9. HYD MN PUMP PRESS (three) – LO

Page 120: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-32 ASC/114/FIN A

1: GNC 53 CONTROLS 2: BFS, GNC SYS SUMM 2 3: GNC DEORB MNVR COAST

1: GNC 23 RCS 2: GNC DEORB MNVR COAST

3: BFS, GNC SYS SUMM 2 P FRCS DUMP

Determine FWD RCS ‘DUMP TO %’ using lowest of OX or FU qty (calculator or DEL PAD)

FOUR JET DUMP: FRCS PRPLT TO BE DUMPED (%)

0:00

1:57

60

0:09

0 10 20 30 40 50

0:27 0:45 1:03 1:21 1:39 1:48 1:30 1:12 0:54 0:36 0:18

10090807060

3:00 2:42 2:24 2:06 1:48 2:52 2:33 2:15

TIME FROM DUMP INITIATION (M:S)

NOTE During dump, disregard FRCS qty

Page 121: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-33 ASC/114/FIN A

1: GNC 23 RCS 2: GNC DEORB MNVR COAST 3: BFS, GNC SYS SUMM 2

TWO JET DUMP: FRCS PRPLT TO BE DUMPED (%)

0:00

3:50

60

0:18

0 10 20 30 40 50

0:53 1:28 2:04 2:39 3:15 3:32 2:56 2:21 1:46 1:11 0:35

10090807060

5:54 5:18 4:43 4:08 3:32 5:36 5:01 4:25

TIME FROM DUMP INITIATION (M:S)

NOTE During dump, disregard FRCS qty

CRT2 FWD RCS ARM – ITEM 36 EXEC

FWD RCS DUMP – ITEM 37 EXEC (Start watch) When dump time achieved:

FWD RCS OFF – ITEM 38 EXEC 1: GNC DEORB MNVR COAST

Page 122: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-34 ASC/114/FIN A

1: GNC DEORB MNVR COAST 2: GNC DEORB MNVR COAST 3: BFS, GNC SYS SUMM 2

2: GNC 50 HORIZ SIT

3: BFS, GNC 50 HORIZ SIT HORIZ SIT CONFIG

ALTM – ITEM 9 + .

PASS ITEM BFS ITEM PTI LAND SITE (AOA DEL PAD) RWY (AOA DEL PAD)

INH √1 √41 √3 √4

√41 √3 √4

TAC (per AOA RWY) √5 √5 RA blank √46 TAEM TGT G&N OVHD √6 blank HSI blank blank XEP NEP √7 NEP √7 AIM (AOA DEL PAD)

NOM √8 (or CLSE)

NOM √8 or (CLSE)

SPDBK NOM √39 TAC INH √20 INH √20 GPS INH √43 INH √43 DRAG H AUT √22 AUT √22 ADTA H INH √26 INH √26 ADTA TO G&C INH √29 AUT √28 TAC DELTA √35 DES any failed TACANS √ √ AIF_G INH √48

**

If BFS engaged: Set HSD BFS ITEMS to PASS Config

**

Page 123: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-35 ASC/114/FIN A

1: GNC DEORB MNVR COAST 2: GNC 50 HORIZ SIT 3: BFS, GNC 50 HORIZ SIT

ENTRY SW CHECK B F6,F8 Stow AOA DEORBIT BURN Cue Cards (R3A) R3A Install ENTRY Cue Cards

NOTE If NAVAIDS ‘OFF’ due to PKT C/L PWRDN, switch ‘ON’ per pwrdn procedure

P O7 √TACAN MODE (three) – GPC

√ANT SEL (three) – AUTO TACAN CH (three) – (EDW) – (KSC) – (NOR)

O8 √RADAR ALTM (two) – ON MLS (three) – ON (PASS) √CH (three) – 8 – 6

I/O RESET

C L2 √CAB RELIEF (two) – ENA (tb-ENA) √ANTISKID – ON √NWS – 1 √ENTRY MODE – AUTO

3: GNC 51 OVERRIDE √ROLL MODE – AUTO

B L2,C3 √SBTC (two) – full fwd C3 √SRB SEP – AUTO

√ET SEP – AUTO F6,F8 √AIR DATA (two) – NAV

√ADI ERR (two) – 5 √RATE (two) – 5 √HSI SEL MODE (two) – ENTRY

C F6 √SOURCE (two) – NAV, 1 P F8 √SOURCE (two) – NAV, 2 B F3 √TRIM RHC/PNL (two) – INH

√PNL (two) – ON F6,F8 √RADAR ALTM (two) – 1(C), 2(P)

111 059Y 121Y

EDW 22 KSC 15 KSC 33 EDW 04 NOR 17 NOR 23

Page 124: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-36 ASC/114/FIN A

1: GNC DEORB MNVR COAST 2: GNC 50 HORIZ SIT 3: GNC 51 OVERRIDE

***

If APUs shut down: Perform APU RESTART (ENT PKT, APU/HYD)

***

PRE EI CHECKLIST

**********

If less than four PASS GPCs, config FCS CHs so that each GPC cmd equals number of CHs. See table on POST OPS 3/GRTLS TRANSITION RESTRING (Cue Card)

GNC 53 CONTROLS

Config SURF FBK (See table on POST OPS 3/GRTLS TRANSITION RESTRING (Cue Card)

**********

2: GNC DEORB MNVR COAST

3: BFS, GNC DEORB MNVR COAST B F6,F8 FLT CNTLR PWR (two) – ON P If SECONDARY ACTUATOR CHECK

performed: R2 HYD MN PUMP PRESS (one) – NORM

Go to ENTRY MANEUVERS (Cue Card)

Page 125: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-37 ASC/114/FIN A

OMS FAILURE

OM

S

FA

ILU

RE

Page 126: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MS ONLY 6-38 ASC/114/FIN A

If two FA MDMs lost

MDMs Preburn: ENG – OFF

During burn: MAN SHUTDN

1,2 1,3 1,4

LEFT (TVC) RIGHT (IGN) LEFT (IGN)

BOTH LEFT RIGHT

2,3 2,4 3,4

LEFT (IGN) RIGHT (IGN) RIGHT (TVC)

RIGHT LEFT BOTH

ASC-5b/A,O,E/I

Left OMS Pri TVC

OMS FAILURES

LEFT OMS

RIGHT OMS

Left OMS Sec TVC

Left OMS Ignition

MNA (ALC1) CNTLAB1 †

FA3 *

MNB (ALC2) CNTLAB2 †

FA2

MNA (APC1) FF1 FA1

MNB (APC2) FF2 FA2

MNB (ALC2) CNTLAB2 †

FA1

MNA (ALC1) CNTLAB1 †

FA4

† If CNTL AB1 or AB2 (CA1 or CA2) failed and ign path still exists at OMS fail, assume L(R) OMS ↓ is PRPLT FAIL

* If L(R) Pc failed high during burn, or FA3(4) failed, at L(R) OMS fail, no guidance downmode after L(R) OMS ENG switch OFF (TGO slow, ADI needles in error, 6 ft/s underburn)

Right OMS Pri TVC

Right OMS Sec TVC

Right OMS Ignition

MNC (ALC3) CNTLCA1 †

FA4 *

MNA (ALC1) CNTLCA2 †

FA2

MNC (APC3) FF4 FA4 *

MNA (APC1) FF3 FA3

MNA (ALC1) CNTLCA2 †

FA1

MNC (ALC3) CNTLCA1 †

FA3

OM

S

FA

ILU

RE

Page 127: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-39 ASC/114/FIN A

OMS/RCS ∆V

OM

S/

RC

S ∆

V

Page 128: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

6-40 ASC/114/FIN A

OMS He PRESS/∆V/BURN TIME

OMS% GAGE

OMS He Press

OMS ∆V

RCS ∆V

RCS BURN MIN:SEC

95.6 95 90 85

4800 4780 4580 4380

478 475 449 423

393 391 370 349

14:39 14:34 13:45 12:57

80 75 70 65

4180 3980 3780 3580

398 372 346 320

328 306 285 264

12:09 11:21 10:33 09:45

60 55 50 45

3380 3180 2980 2780

294 268 241 215

242 221 200 178

08:57 08:09 07:21 06:32

40 35 30 25

2580 2380 2180 1980

189 162 136 109

156 135 113 191

05:44 04:56 04:08 03:20

20 15 10 15

1780 1580 1380 1180

183 156 129 122

169 147 125 122

02:32 01:43 00:54 00:04

OMS-2/AOA ∆V

ARCS ∆V fps = 0.7 x [L% + R% – AFT QTY 1]

FRCS ∆V fps = 0.8 x FRCS %

OMS ∆V fps = 5.1 x OMS %

NOTE: Uses assumed vehicle weight of 256,123 lb

OM

S/

RC

S ∆

V

Page 129: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-1 ASC/114/FIN A

OMS TARGETS, COMM COVERAGE, LAND SITES

OM

S

TG

TS

Page 130: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-2 ASC/114/FIN A

OM

S

TG

TS

Page 131: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-3 ASC/114/FIN A

Page 132: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-4 ASC/114/FIN A

Page 133: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-5 ASC/114/FIN A

CO

MM

C

OV

ER

Page 134: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-6 ASC/114/FIN A

COMMUNICATION COVERAGE – (TAL/RTLS)

W L P

CO

MM

C

OV

ER

RTLS

MODE ST – STDN SG – SGLS **UHF available

T D R S - E

TAL

0:00

10:00

20:00

WOW

NOTE: 1 NHS/WLP coverage only on high inclinations

2 ET blocks coverage until vehicle upright 3 Tower UHF installed at all TAL sites

M I L

L/O

MECO N H S

30:00

40:00

T O W E R

0:00

10:00

20:00 WOW

L/O

T D R S - E

M I L

(ST)

(SG) (ST)

*

*

2

2

1

3

(ST) 1

*

Page 135: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-7 ASC/114/FIN A

COMMUNICATION COVERAGE – (AOA to KSC )

W L P 10:00

LA

ND

S

ITE

~

1:10:00

(SG)

NOMINAL OMS 2

Go to POST INSERTION (TIG+5)

Vacuum Inerting Term (TIG-5)

N H S

T D R S - W

20:00

MECO

1:00:00

50:00

40:00

30:00

Off-Nominal TIGs

∼AOA EI Exit Blackout at M = 12.2

Nominal Timeline

(ST)

MODE ST - STDN SG - SGLS ** UHF available

ATO/1 and MIN HP/2 after ATO/1

(SG)

D G S

OMS TVC GIMBAL CK (During AOS)

APU Shutdn (BF lt off)

OAOA-S/3 after OAOA/4

OAOA/4 after OAOA/4

AOA/8 after NOM ASC (149 > HA + HP > 115)

T C S

(SG)

AOA-S/7 after ATO/1

T D R S - E

T D R S - Z

AOA-S/9 after NOM ASC (149 > HA + HP > 115)

AOA-S/5 after AOA-S/5

AOA/6 after ATO/1

*

Page 136: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-8 ASC/114/FIN A

LA

ND

S

ITE

Page 137: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-9 ASC/114/FIN A

Page 138: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

7-10 ASC/114/FIN A

Page 139: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-1 ASC/114/FIN A

WEATHER PADS

WEATHER

PADS

Page 140: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-2 ASC/114/FIN A

This Page Intentionally Blank

WEATHER

PADS

Page 141: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-3 ASC/114/FIN A

CONUS TERMINAL FORECASTS RTLS – ORB ↓ RTLS ACL pg 1-10

DEORB ORBIT SITE LDG

GMT SKY VIS/WX T/TD (°F)

WIND (MAG) ALTM DA REMARKS

RTLS

AOA (1)

AOA (2)

UPPER WINDS FORECAST (SFC=MAG, OTHER LEVELS=TRUE) FIRST DAY PLS

ALT RTLS AOA (1) AOA (2) AOA (3) ORB: ______ DEORB: ______

50K / / / / /

38K / / / / /

28K / / / / /

20K / / / / /

12K / / / / /

7K / / / / /

3K / / / / /

1K / / / / /

SFC / / / / /

Page 142: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-4 ASC/114/FIN A

TAL ( ) data to ACL FB 2-14 TAL/CONUS TERMINAL FORECASTS DEORB ORBIT SITE LDG

GMT SKY VIS/WX T/TD (°F)

WIND (MAG) ALTM DA REMARKS

TAL (1)

TAL (2)

TAL (3)

UPPER WINDS FORECAST (SFC=MAG, OTHER LEVELS=TRUE)

ALT TAL (1) TAL (2) TAL (3)

50K / / /

38K / / /

28K / / /

20K / / /

12K / / /

7K / / /

3K / / /

1K / / /

SFC / / /

Page 143: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-5 ASC/114/FIN A

ELS TERMINAL FORECASTS (Site Generated)

SITE ID LDG GMT SKY VIS/WX WIND

(TRUE) ALTM REMARKS

Page 144: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-6 ASC/114/FIN A

ELS TERMINAL FORECASTS (Site Generated) (Cont)

SITE ID LDG GMT SKY VIS/WX WIND

(TRUE) ALTM REMARKS

Page 145: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-7 ASC/114/FIN A

BLOCK 1 TRAJECTORY MESSAGE

OOP TIG WINDOW DEORB ORB

APPROX TIG SITE/RWY

MAX RATES (1st STAGE) NOTE: IGNORE ATTITUDE ERRORS DURING LOAD RELIEF ROLL _________°/sec at ___________ PITCH _________°/sec at ___________ YAW _________°/sec TRAJECTORY LOFTING (2nd STAGE) LOFTED/DEPRESSED ___________ K ft at VI __________ K fps

OPEN CLOSE

MISCELLANEOUS NOTAMS:

Page 146: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

8-8 ASC/114/FIN A

This Page Intentionally Blank

Page 147: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 9-1 ASC/114/FIN A

SWITCH LIST FOR HANDOVER INGRESS

FWD L5 ........................... 9-3 L side OVHD

Flood.................... 9-3 L4 ........................... 9-3 L1 ........................... 9-3 L2 ........................... 9-3 S1........................... 9-4 F1 ........................... 9-4 F2 ........................... 9-4 F6U(HUD) .............. 9-4 F3 ........................... 9-4 F8U(HUD) .............. 9-4 F4 ........................... 9-4 F6 ........................... 9-4 F7 ........................... 9-5 F8 ........................... 9-5 F9 ........................... 9-5 R1........................... 9-5 R2........................... 9-5 R4........................... 9-6 R6........................... 9-6 R side OVHD

Flood.................... 9-6 C2........................... 9-6 C3........................... 9-6 C5........................... 9-7 S2........................... 9-7 C6........................... 9-7 C7........................... 9-7 O1........................... 9-7 O2........................... 9-7 O3........................... 9-7 O5........................... 9-7 O6........................... 9-7 O7........................... 9-8 O8........................... 9-8 O9........................... 9-8 O13......................... 9-9 O14......................... 9-9 O15......................... 9-9 O16......................... 9-9 O17......................... 9-10 O19......................... 9-10

MIDDECK ML86B .................... 9-11 ML85E .................... 9-13 SORG ..................... 9-13 MO13Q ................... 9-13 ML31C .................... 9-13 ML26C .................... 9-13 ML18F .................... 9-13 ML30N .................... 9-13 MA73C.................... 9-13 MO10W .................. 9-14 WCS ....................... 9-14 MO30F.................... 9-14 MO32M................... 9-14 MO39M................... 9-14 MO42F.................... 9-14 MO51F.................... 9-15 MO58F.................... 9-15 MO52J .................... 9-15 MO69M................... 9-15 MD44F.................... 9-15 MIDDECK

FLOOR................. 9-15 MO63P ................... 9-15 MIDDECK EXPERIMENTS MIDDECK (TEPC) .. 9-16 AIRLOCK AW18A ................... 9-17 AW18D ................... 9-17 AW18H ................... 9-17 AW82B ................... 9-17 AW82D ................... 9-17 AW82H ................... 9-17 TW58T.................... 9-17 A/L IN HATCH ........ 9-17 A/L OUT HATCH .... 9-17 SH HATCH ............. 9-17 EXT A/L UPPER

HATCH................. 9-17 TNL ADP

HATCH................. 9-17

AFT R12L ...................... 9-18 R11U...................... 9-18 R11L ...................... 9-18 R10 ........................ 9-18 R13U...................... 9-18 R13L ...................... 9-19 A1U ........................ 9-19 A1L......................... 9-19 A1R ........................ 9-20 AFT MDU ............... 9-20 A6U ........................ 9-20 A6L......................... 9-20 A2........................... 9-21 A7U ........................ 9-21 A7L......................... 9-21 A4........................... 9-21 A8U ........................ 9-22 A8L......................... 9-22 A3........................... 9-22 L9 ........................... 9-23 L10L ....................... 9-23 L10U ...................... 9-24 L11U ...................... 9-24 L12UL .................... 9-24 L12UR.................... 9-24 L12LL ..................... 9-24 L12LR .................... 9-24 L12L ....................... 9-24 R12 ........................ 9-24 A15......................... 9-25 A14......................... 9-25 A13......................... 9-25 A12......................... 9-25 A11......................... 9-26 R14 ........................ 9-26 HARDWARE

C/W...................... 9-27 MEDS CONFIG

FOR INGRESS.... 9-28

SW

LIS

T

Page 148: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 9-2 ASC/114/FIN A

NOTES

• HANDOVER from LCC occurs at SRB Ignition (LCC to MCC Handover)

• INGRESS denotes switch status prior to beginning of PRE-INGRESS SW RECONFIGURATION (at T-3:00 (hold)) if different than HANDOVER

• - - - - - - denotes physical break in panel structure

• Radiator flow valve, indicated by *, is in full radiator flow position and unpowered to allow maximum radiator flow capability if required

• Radiator isolation valve, indicated by ****, is configured in radiator flow and unpowered

• Talkbacks on panels L2, R11, R13, A6, and ML31C indicated by ** are bp because cbs on ML86B, A6, and O16 open. Position of valves indicated below:

L2: O2 EMER – CL R11L: SPLY H2O DUMP ISOL VLV – CL SPLY H2O DUMP VLV – CL SPLY H2O GALLEY SPLY VLV – CL R13L: MMU GN2 SPLY ISOL VLV A – CL MMU GN2 SPLY ISOL VLV B – CL A6L: VEST DEP VLV SYS 1 VENT ISOL – CL VEST DEP VLV SYS 1 VENT – CL VEST DEP VLV SYS 2 VENT ISOL – CL VEST DEP VLV SYS 2 VENT – CL ML31C: WASTE H2O DUMP ISOL VLV – CL WASTE H2O DUMP VLV – CL VAC VENT ISOL VLV CNTL – CL

• Before turning OI PCMMU PWR switch on C3, indicated by ***, to OFF, notify LCC so gnd power can be connected; also notify LCC before turning it to 1 after crew ingress

• All unspecified/unlabeled switches – dn (2 position)/ctr (3 position), tb – bp, cb – op, rotaries – full counterclockwise

• PL RETEN PL SEL switch on panel A6U will nominally be 1 for deployable payload missions using only a single PL SEL position but will be MON until PRE-INGRESS SW CONFIG. All other missions will be in MON (Flt Rule A10-281)

• Circuit Breaker snapring color codes: { R } – Red – open all times { G } – Green – open on orbit only { Y } – Yellow – open ascent, closed per procedure { O } – Orange – open orbit thru entry { } – Blank (no ring) – always closed or as required

• STS-114 options affecting switch list: 1) OV103 2) GMTLO 3) Orbit incln = 51.6° 4) Payload: MPLM, ESP2, two APCUs 5) Crew size of 7 6) Installed: TK CRYO sets (5), SORG, Ku Ant, GN2 (6), External Airlock (ISS),

RMS, OBSS, OIU, VPU, WVS, DTV 7) Options N/R: RCRS

• Changes are with respect to STS-114 Switch List as published in FIN 3

SW

LIS

T

Page 149: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-3 ASC/114/FIN A

L5 L COMM PWR – ON OFF L side OVHD Flood – BRT L4: All cbs – cl { } except: L4:B All cbs – op { Y } L4:D All cbs – cl { O } L4:E All cbs – cl { O } L4:F cb AC1 H2O LOOP PUMP 1 A/2 (three) – op { R } cl L4:J cb AC3 SIG CONDR (two) – op { Y } L4:N cb AC2 ΦC RAD ISOL A – cl { } L4 cb AC3 ΦC RAD ISOL B – cl { } L4:P blank cbs (three) – op { R } L4:Q cb AC1 ΦC LTG INST OS – op { Y } cb AC2 ΦC LTG NUMERIC OS – op { Y } cb AC3 LTG (three) – op { Y } L1 HUM SEP A – OFF HUM SEP B – ON CAB TEMP sel – COOL CAB TEMP CNTLR – OFF CAB FAN A – ON CAB FAN B – OFF IMU FAN A,C (two) – OFF IMU FAN B – ON H2O PUMP LOOP 1 (two) – OFF,B H2O PUMP LOOP 2 – ON H2O LOOP BYP MAN (two) – ctr H2O LOOP BYP MODE (two) – MAN

L1 AV BAY 1,3 FAN A (two) – OFF AV BAY 1,3 FAN B (two) – ON AV BAY 2 FAN A – ON AV BAY 2 FAN B – OFF FLOW PROP VLV LOOP (two) – ctr (tb-ICH) FREON PUMP LOOP (two) – B RAD CNTLR OUT TEMP – NORM RAD CNTLR LOOP (two) – OFF* RAD BYP VLV MAN SEL (two) – ctr (tb-BYP) RAD BYP VLV MODE (two) – MAN NH3 CNTLR A – OFF NH3 CNTLR B – PRI/GPC H2O ALT PRESS – CL FLASH EVAP CNTLR PRI A – GPC FLASH EVAP CNTLR PRI B – OFF FLASH EVAP CNTLR SEC (two) – A SPLY,OFF HI LOAD EVAP – ENA TOP EVAP HTR NOZ (two) – A AUTO TOP EVAP HTR DUCT sel – A HI LOAD DUCT HTR sel – A FIRE SUPPR AV BAY (three) – SAFE FIRE SUPPR AV BAY pb (three) – lt off SMOKE DETN lts (ten) – off SMOKE DETN SNSR – dn SMOKE DETN CKT TEST – OFF L2 CAB RELIEF (two) – ctr (tb-ENA) CAB VENT (two) – ctr (tb-CL)

Page 150: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-4 ASC/114/FIN A

L2 FLASH EVAP FDLN HTR SPLY (two) – OFF 2 ANTISKID – ON NWS – 1 BDY FLP – AUTO/OFF ENTRY MODE – AUTO TRIM R,P,Y (three) – ctr FREON ISOL MODE – OFF FREON ISOL LOOP 1,2 (two) – ctr **** SBTC – full forward O2 SYS SPLY (two) – ctr (tb-OP) O2 EMER – ctr (tb-bp)** O2 XOVR SYS (two) – OP N2 SYS (four) – ctr (tb-OP) O2/N2 CNTLR VLV SYS 1 – OP O2/N2 CNTLR VLV SYS 2 – CL PPO2 SNSR/VLV – NORM S1 CDR SEAT PWR BUS SEL – AC2 (up) CDR SEAT CONTR (two) – ctr F1 DC UTIL PWR MNB – OFF AC UTIL PWR AC1 – OFF F2 All pb lts off except: BDY FLP pb – AUTO lt off SPDBK/THROT pb – AUTO lt off PITCH pb – AUTO lt off ROLL/YAW pb – AUTO lt off F6U L HUD MODE – NORM L MAN BRT sel – mid range L HUD BRT – as reqd

F3 L HUD PWR – OFF L TRIM RHC/PNL – INH L TRIM PNL – ON NWS FAIL lt – off ANTISKID FAIL lt – off R TRIM RHC/PNL – INH R TRIM PNL – ON R HUD PWR – OFF DRAG CHUTE pb (six) – lt off F8U R HUD MODE – NORM R MAN BRT sel – mid range R HUD BRT – as reqd F4 All pb lts off except: BDY FLP pb – AUTO lt off SPDBK/THROT pb – AUTO lt off PITCH pb – AUTO lt off ROLL/YAW pb – AUTO lt off F6 BFC – right HUD DATA BUS – 1 MDU PWR (two) – ON MDU BRT sel (two) – as reqd LDG GEAR pb (two) – lt off LDG GEAR tb (three) – UP HSI SEL MODE – ENTRY HSI SEL SOURCE (two) – NAV,1 RDR ALTM – 1 FLT CNTLR PWR – ON ADI ATT – REF ADI ERR – MED ADI RATE – MED

Page 151: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-5 ASC/114/FIN A

F6 ABORT MODE – OFF ABORT pb – lt off RCS CMD lts (three) – off RANGE SAFE ARM lt – off AIR DATA – NAV F7 MDU PWR (five) – ON MDU BRT sel (five) – as reqd MN ENG STAT lts (six) – off C/W matrix lts – off all off except HYD PRESS F8 HUD DATA BUS – 4 MDU PWR (two) – ON MDU BRT sel (two) – as reqd LDG GEAR pb (two) – lt off LDG GEAR tb (three) – UP HSI SEL MODE – ENTRY HSI SEL SOURCE (two) – NAV,2 FLT CNTLR PWR – ON RAD ALTM – 2 ADI ATT – REF ADI ERR – MED ADI RATE – MED AIR DATA – NAV F9 AC Volts sel – as reqd DC Volt/Amp sel – VOLTS MNB R1 CNTL BUS PWR (three) – dn ESS BUS SOURCE MN (three) – ON ESS BUS SOURCE FC (three) – ON OFF FC/MN BUS (three) – ctr (tb-ON) MN BUS TIE (three) – ctr (tb-OFF) PL CAB – OFF PL PRI MNC – ctr (tb-OFF)

R1 PL PRI MNB,FC3 (two) – ctr (tb-OFF) PL AUX – OFF PL AFT MNB – OFF PL AFT MNC – OFF INV PWR (three) – ctr (tb-ON) INV/AC BUS (three) – ctr (tb-ON) cb AC CONTR (nine) – op { } AC BUS SNSR (three) – MON R1 (CRYO) O2 MANF VLV (two) – ctr (tb-OP) O2 TK1,2 HTRS A (two) – AUTO O2 TK1,2 HTRS B (two) – OFF O2 TK1,2 HTRS RESET/TEST (two) – ctr O2 TK3 HTRS (two) – OFF O2 TK3 HTRS RESET/TEST – ctr FC REAC (three) – ctr FC REAC tb (six) – OP FC (three) – ctr FC RDY tb (three) – gray FC COOL PUMP ∆P tb (three) – gray H2 MANF VLV (two) – ctr (tb-OP) H2 TK1,2 HTRS A (two) – AUTO H2 TK1,2 HTRS B (two) – OFF H2 TK3 HTRS (two) – OFF R2 MPS PRPLT DUMP (two) – GPC MPS ENG PWR (six) – ON MPS He ISOL (six) – OP GPC MPS PNEU L ENG He XOVR – GPC MPS PNEU He ISOL – OP GPC MPS LH2 ULL PRESS – AUTO MPS He I’CNCT (three) – GPC

Page 152: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-6 ASC/114/FIN A

R2 APU/HYD RDY tb (three) – bp APU OPER (three) – START/RUN OFF APU SPEED SEL (three) – NORM HYD MN PUMP PRESS (three) – NORM cb APU FU TK VLV ENA (six) – cl { } op HYD CIRC PUMP (three) – OFF GPC APU CNTLR PWR (three) – ON OFF APU FUEL TK VLV (three) – OP CL APU AUTO SHUTDN (three) – ENA BLR CNTLR/HTR (three) – A BLR PWR (three) – ON BLR N2 SPLY (three) – ON OFF ET UMB DR MODE – GPC ET UMB DR CTRLINE LAT – GND (tb-bp) ET UMB L,R DR (two) – OFF (tb-OP) ET UMB L,R LAT (two) – OFF (tb-REL) R4 HYD BRAKE HTR (three) – OFF HYD BRAKE ISOL VLV (three) – GPC (tb-CL) HYD MPS/TVC ISOL VLV (three) – ctr (tb-OP) HYD LG/NWS HYD SYS – AUTO 1/2 HYD LG EXTEND ISOL VLV – GPC (tb-CL) MPS ENG CNTLR HTR (three) – OFF MPS MANF PRESS (two) – GPC MPS FILL/DRAIN (four) – GND MPS H2 PRESS LINE VENT – GND MPS LO2 PREVLV (three) – GPC MPS LH2 PREVLV (three) – GPC MPS FDLN RLF ISOL (two) – GPC R6 R COMM PWR – ON OFF R side OVHD Flood – BRT

C2 IDP/CRT PWR (three) – ON IDP/CRT MAJ FUNC (three) – GNC IDP/CRT SEL (two) – as reqd EVENT TIMER MODE – DN EVENT TIMER CNTL – ctr TIMER SET pb (four) – 0900 TIMER – ctr C3 OMS ENG (two) – ARM/PRESS OFF BFC CRT DISP – ON OFF BFC CRT SEL – 3+1 FCS CH (four) – AUTO BDY FLP – AUTO/OFF AIR DATA PROBE STO (two) – INH MN ENG LIMIT SHUTDN – AUTO TRIM R,P,Y (three) – ctr SBTC – full forward DAP – all off SRB SEP – AUTO ET SEP – AUTO AUD CTR – 1 OI PCMMU PWR – 1 OFF *** OI PCMMU FORMAT – GPC S-BD PM CNTL – CMD S-BD PM ANT sel – GPC AIR DATA PROBE (two) – STOW FC REAC VLV (three) – dn cb FC REAC VLV CL ENA (three) – op { R } UPLK – ENA MSTR MADS PWR – ON C/W MEM – ctr C/W MODE – NORM

Page 153: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-7 ASC/114/FIN A

C3 RTG PUMP (OV103,4 – no SH) – PRI RTG SHORT ENA (two) (OV104 – no SH) – DSBL RTG SHORT SHORT (two) (OV104 – no SH) – OFF PL SAFING (four) (OV103 – no SH) – SAFE PL SAFING (five) (OV105 – no SH) – SAFE SH FIRE SUPPR ARM (two) (SH only) – SAFE SH FIRE SUPPR DISCH (two) (SH only) – NO-OP H2O LN HTR (SH only) – OFF EMER LTG – OFF/ON C5 DIRECT O2 vlv – CL S2 PL SEAT PWR BUS SEL – AC3 (dn) PL SEAT CONTR (two) – ctr C6 LEH O2 vlv (four) – OP C7 LEH O2 SPLY vlv (two) – OP O1 COAS – OFF AIR TEMP sel – CAB HX OUT H2O PUMP OUT PRESS sel – LOOP 2 FREON sel – LOOP 1 O2/N2 FLOW sel – SYS 1 O2 PPO2 sel – SNSR A O2 CRYO O2 HTR ASSY TEMP sel – TK1 1 CRYO O2/H2 sel – TK1 FC STACK TEMP sel – 1 O3 RCS/OMS PRESS sel – RCS He X 10 RCS/OMS PRPLT QTY sel – OMS FUEL MSN TIME – MET

O5 L AUD TACAN ID (two) – OFF,1 L AUD VOX SENS sel – as reqd L AUD A/G (two) – T/R L AUD A/A – T/R L AUD ICOM (two) – T/R L AUD PWR – AUD/TONE L AUD CNTL sel – NORM L AUD XMIT/ICOM MODE sel – as reqd (PTT/VOX

recommended) L AUD VOL pb (five) – as reqd L AUD VOL TACAN pb – 5 L AUD PAGE – dn O6 LTG PNL sel (two) – OFF – (1/4 brt if night launch) LTG INST L/CTR sel – OFF – (1/4 brt if night launch) LTG INST OVHD sel – as reqd – (1/4 brt if night launch) LTG L GLRSHLD FLOOD sel (two) – VAR, as reqd L SEAT/CTR CNSL FLOOD sel (two) – OFF,BRT S TRK DR CNTL (two) – OFF S TRK DR POS tb (two) – CL S TRK PWR (two) – OFF UHF SPLX/EVA XMIT FREQ – 259.7/414.2 UHF SPLX/EVA PWR AMP – ON UHF SPLX SQUELCH – ON UHF EVA STRING – 1 UHF ENCRYPT – ON UHF MODE – SPLX

Page 154: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-8 ASC/114/FIN A

O6 ANNUN LAMP TEST – ctr ANNUN BUS SEL ACA 1 – MNA ANNUN BUS SEL ACA 2/3 – MNB ANNUN INTEN sel (two) – BRT,MED MTU – AUTO INT DISP PROC (four) – dn MDM PL1,2 (two) – ON MDM PL3 – OFF MDM FA (four) – ON MDM FF (four) – ON GPC PWR (five) – ON GPC OUTPUT 1,2,3,4 (four) – NORM (tb-gray) GPC OUTPUT 5 – B/U NORM (tb-bp) IPL SOURCE – OFF GPC MODE 1,2,3,4 (four) – RUN (tb-RUN) GPC MODE 5 – RUN STBY (tb-RUN) O7 TACAN MODE sel (three) – GPC OFF TACAN ANT SEL (three) – AUTO as is TACAN CH pb/tw (three) – 059Y as is AFT L RCS He PRESS (two) – OP (tb-OP) AFT L RCS TK ISOL (three) – GPC (tb-OP) AFT L RCS MANF ISOL (five) – GPC (tb-OP) AFT L RCS XFEED (two) – GPC (tb-CL) MSTR RCS XFEED – OFF AFT R RCS He PRESS (two) – OP (tb-OP) AFT R RCS TK ISOL (three) – GPC (tb-OP) AFT R RCS MANF ISOL (five) – GPC (tb-OP) AFT R RCS XFEED (two) – GPC (tb-CL)

O8 RADAR ALTM (two) – ON OFF MLS (three) – OFF MLS CH pb/tw (three) – 6 R SEAT/CTR CNSL FLOOD sel (two) – OFF,BRT LTG PNL R sel (three) – OFF – (1/4 brt if night launch) LTG PNL NUMERIC sel – BRT – (1/4 brt if night launch) LTG R GLRSHLD FLOOD sel (two) – VAR, as reqd OMS KIT He PRESS/VAP ISOL (two) – CL OMS KIT TK ISOL (two) – CL (tb-bp) L OMS He PRESS/VAP ISOL (two) – GPC L OMS TK ISOL (two) – GPC (tb-OP) L OMS XFEED A – GPC (tb-CL) L OMS XFEED B – GPC (tb-CL) (tb-OP) R OMS He PRESS/VAP ISOL (two) – GPC R OMS TK ISOL (two) – GPC (tb-OP) R OMS XFEED (two) – GPC (tb-CL) FWD RCS He PRESS (two) – OP (tb-OP) FWD RCS TK ISOL (two) – GPC (tb-OP) FWD RCS MANF ISOL (five) – GPC (tb-OP) ANNUN LAMP TEST – ctr O9 R AUD PWR – AUD/TONE R AUD A/G (two) – T/R R AUD A/A – T/R R AUD ICOM (two) – T/R R AUD VOX SENS sel – as reqd R AUD TACAN ID (two) – OFF, as reqd

Page 155: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-9 ASC/114/FIN A

O9 R AUD PAGE – dn R AUD VOL pb (five) – as reqd R AUD VOL TACAN pb – 5 R AUD XMIT/ICOM MODE sel – as reqd (PTT/VOX

recommended) R AUD CNTL sel – NORM O13: All cbs – cl { } except: O13:A,C,E cb ESS MN CONTR (three) – cl { } op O14:A BRAKES MNA – ON RGA 1 – ON IMU 1 – ON FC1 CNTLR – ON O14:B,C,D,E All cbs – cl { } except: O14:B cb MNA MNC CONTR – cl { } op O14:C cb MNA RAD ISOL CONTR – cl { } O14:D cb MNA GPS PRE AMPL UC (OV103,5) – op { R } cb MNA GPS PRE AMPL LC (OV103,5) – cl { } O14 cb MNA GPS 1 PRE AMPL (two)(OV104) – op { R } cb MNA CAB VENT – cl { O } cb MNA CAB VENT ISOL – cl { O } O14:E cb MNA ADTA 1 – cl { G } cb MNA ACCEL 1 – cl { G } cb MNA DDU AFT – op { Y } O14:F MMU 1 – ON RJDA 1A L2/R2 LOGIC – ON RJDA 1A L2/R2 DRIVER – ON OFF RJDA 2A L4/R4 LOGIC – ON RJDA 2A L4/R4 DRIVER – ON OFF RJDF 1B F1 LOGIC – ON RJDF 1B F1 DRIVER – ON OFF

O14:F L OMS ENG VLV – ON OFF ASA 1 – ON O15:A BRAKES MNB – ON RGA (two) – ON IMU 2 – ON FC2 CNTLR – ON O15:B,C,D,E All cbs – cl { } except: O15:B cb MNB MNA CONTR – cl { } op O15:C cb MNB UTIL PWR F1/MO13Q – op { Y } O15:E cb MNB ADTA 2 – cl { G } cb MNB ACCEL 2 – cl { G } cb MNB DDU R – cl { G } O15:F MMU 2 – ON RJDA 1B L1/L5/R1 LOGIC – ON RJDA 1B L1/R1 DRIVER – ON OFF RJDF 1A F2 LOGIC – ON RJDF 1A F2 DRIVER – ON OFF ASA 2 – ON ACCEL 4 – ON O16:A BRAKES MNC – ON RGA 3 – ON IMU 3 – ON FC3 CNTLR – ON O16:B,C,D,E All cbs – cl { } except: O16:B cb MNC MNB CONTR – cl { } op O16:D cb MNC GPS PRE AMPL UC (OV103,5) – cl { } cb MNC GPS PRE AMPL LC (OV103,5) – op { R } O16 cb MNC GPS 3 PRE AMPL (two)(OV104) – op { R } cb MNC O2 EMER – op { R }

Page 156: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FWD FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-10 ASC/114/FIN A

O16:E cb MNC ADTA 3,4 (two) – cl { G } cb MNC DDU R – cl { G } cb MNC DDU AFT – op { Y } O16:F RJDA 2B L3/R3/R5 LOGIC – ON RJDA 2B L3/R3 DRIVER – ON OFF RJDF 2A F3 LOGIC – ON RJDF 2A F3 DRIVER – ON OFF RJDF 2B F4/F5 LOGIC – ON RJDF 2B F4 DRIVER – ON OFF R OMS ENG VLV – ON OFF ASA 3,4 (two) – ON ACCEL 3 – ON RJD MANF L5/F5/R5/DRIVER – OFF O17:A ATVC (four) – ON O17:B EIU (three) – ON O17:C SIG CONDR FREON A – AC2 SIG CONDR FREON B – AC3 SIG CONDR OL 1/2 – ON SIG CONDR OR 1/2 – ON O17:D SIG CONDR OA 1/2/3 – ON MDM OA 1/2/3 – ON MEC (two) – ON O19 TV PWR – ON OFF DC UTIL PWR MNA – ON COAS PWR – OFF

Page 157: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MIDDECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-11 ASC/114/FIN A

ML86B:A cb MNA SPLY H2O TKA INLET – cl { } cb MNA SPLY H2O TKB OUTLET – cl { } cb MNA WASTE H2O DUMP VLV/NOZ HTR – op { Y } cb MNA H2O LINE HTR A – op { Y } cb MNB SPLY H2O TKB INLET – cl { } cb MNB SPLY H2O TKC OUTLET – cl { } cb MNB SPLY H2O DUMP ISOL – op { Y } cb MNB SPLY H2O B SPLY ISOL VLV – cl { } cb MNB H2O LINE HTR B – op { Y } cb MNC SPLY H2O TKA OUTLET – cl { } cb MNC SPLY H2O TKC INLET – cl { } cb MNC SPLY H2O DUMP VLV/NOZ HTR – op { Y } cb MNC SPLY H2O XOVR VLV – cl { } cb MNC SPLY H2O GALLEY SPLY – op { Y } ML86B:B cb MNA WASTE H2O TK1 VLV – cl { } cb MNA SPLY H2O TKD OUTLET – cl { } cb MNA WASTE H2O DUMP ISOL – op { Y } cb MNA VAC VENT ISOL VLV – op { Y } cb MNA WCS CNTLR – op { Y } cb MNA GALLEY OVEN – op { Y } cb MNB WASTE H2O TK1 DRAIN – cl { } cb MNB SPLY H2O TKD INLET – cl { } cb MNB VAC VENT NOZ HTR – op { Y } cb MNB VAC VENT ISOL VLV – op { Y } cb MNB WCS CNTLR – op { Y } cb MNB GALLEY H2O HTR – op { Y } ML86B:C cb MNA EXT ARLK HTR LINE ZN1 – op { Y } cb MNA EXT ARLK HTR LINE ZN2 – op { Y } cb MNA EXT ARLK HTR STRUC – op { Y }

ML86B:C cb MNA EXT ARLK HTR VEST – op { Y } cb MNB EXT ARLK HTR LINE ZN1 – op { Y } cb MNB EXT ARLK HTR LINE ZN2 – op { Y } cb MNB EXT ARLK HTR H2O S/O VLV – cl { } cb MNB EXT ARLK HTR STRUC – op { Y } cb MNB EXT ARLK HTR VEST – op { Y } cb MNC EXT ARLK HTR LINE ZN1 – op { Y } cb MNC EXT ARLK HTR LINE ZN2 – op { Y } ML86B:D cb MNA PYRO JETT SYS A KU ANT – op { R } cb MNA STBD RMS – op { R } cb MNA MMU GN2 SPLY ISOL VLV A – op { Y } cb MNA MMU PORT HTR A – op { R } cb MNA MMU STBD HTR A – op { R } cb MNB PYRO JETT SYS A PORT RMS – op { R } cb MNB MMU GN2 SPLY ISOL VLV B – op { R } cb MNB MMU PORT HTR B – op { R } cb MNB MMU STBD HTR B – op { R } cb MNC PYRO JETT SYS B KU ANT – op { R } cb MNC PYRO JETT SYS B PORT RMS – op { R } cb MNC PYRO JETT SYS B STBD RMS – op { R } ML86B:E cb MNA EMU 2 H2O SPLY – op { Y } cb MNA EMU 2 H2O WASTE – op { Y } cb MNA FC PCM – op cl { Y } cb MNA CO2 SYS 1 CNTLR (OV104,5) – op { R } cb MNA FLOOD TNL ADAPT 2 – op { R } – (op { Y } if

SH flown)

Page 158: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MIDDECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-12 ASC/114/FIN A

ML86B:E cb MNB MAR 1 – op { Y } cb MNB MAR 2 – cl { } cb MNB SEAT L – cl { } cb MNB SEAT R – cl { } cb MNB CO2 COM INSTR (OV104,5) – op { R } cb MNB FLOOD TNL ADAPT 3 – op { R } – (op { Y } if SH flown) cb MNC EMU 1 H2O SPLY – op { Y } cb MNC EMU 1 H2O WASTE – op { Y } cb MNC SEAT L – cl { } cb MNC SEAT R – cl { } cb MNC CO2 SYS 2 CNTLR (OV104,5) – op { R } cb MNC FLOOD TNL ADAPT 4 – op { R } – (op { Y } if SH flown) ML86B:F cb MNA FLOODS MIDDECK 1/8 – cl { } WMC/MO13Q – op { Y } AIRLK 1 – op { Y } MIDDECK 9 – op { Y } cb MNA CRYO O2 HTR TK3 SNSR 1 – cl { } cb MNA CRYO O2 HTR TK5 SNSR 1 – op { R } – (cl { } if

TK5 flown) cb MNB FLOODS MIDDECK 2/6 – cl { } cb MNB FLOODS BUNK 2/4 – op { Y } cb MNB FLOODS MIDDECK 10 – op { Y } cb MNB FLOODS AIRLK 3 – op { Y } cb MNB CRYO O2 HTR TK3 SNSR 2 – cl { } cb MNB CRYO O2 HTR TK4 SNSR 1 – op { R } – (cl { } if

TK4 flown)

ML86B:F cb MNC FLOODS MIDDECK 5/7 – cl { } cb MNC FLOODS MIDDECK 3/4/MO13Q – cl { } cb MNC FLOODS BUNK 1/3 – op { Y } cb MNC FLOODS AIRLK 4 – op { Y } cb MNC CRYO O2 HTR TK5 SNSR 2 – op { R } – (cl { } if

TK5 flown) cb MNC CRYO O2 HTR TK4 SNSR 2 – op { R } – (cl { } if

TK4 flown) ML86B:G cb ESS 1BC FLOOD AIRLK 2 – op { Y } cb ESS 1BC FLOOD TNL ADAPT 1 – op { R } – (op { Y } if

SH flown) cb ESS 1BC CRYO CNTLR TK4 (two) – op { R } – (cl { } if

TK4 flown) cb ESS 1BC CRYO QTY TK4 (two) – op { R } – (cl { } if

TK4 flown) cb ESS 2CA CRYO CNTLR TK5 (two) – op { R } – (cl { } if

TK5 flown) cb ESS 2CA CRYO QTY TK5 (two) – op { R } – (cl { } if

TK5 flown) cb ESS 3AB CRYO CNTLR TK3 (two) – cl { } cb ESS 3AB CRYO QTY TK3 (two) – cl { }

Page 159: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MIDDECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-13 ASC/114/FIN A

ML85E (MUP – if reqd) AC S1 – OFF cb AC CB1 – op { Y } DC 10 AMP MNB S2 – OFF DC 10 AMP MNB S3 – OFF DC 10 AMP MNB S4 – OFF DC 10 AMP MNB S5 – ON cb DC 10 AMP MNB CB2 – op { Y } cb DC 10 AMP MNB CB3 – op { Y } cb DC 10 AMP MNB CB4 – op { Y } cb DC 10 AMP MNB CB5 – cl { } PUMPS S6 – OFF cb PUMPS (two) – op { Y } SORG (NOTE: Panel deleted if Galley not flown) OVEN FAN – OFF H2O HOT(COLD) pb (two) – lt off H2O VOL sel – as reqd MV2 – as reqd REHYD STA Lever – CL, latched OVEN/RHS – OFF H2O HTR (two) – OFF AUX PORT – cap installed TEST PORT 4 – cap installed ELECT TEST PORT – cap installed OVEN DOOR – CL MO13Q MIDDECK FLOODS 1,2,3,5,7 (five) – OFF MIDDECK FLOODS 9,10 (two) – OFF MIDDECK FLOODS 4,6,8 (three) – ON MIDDECK FLOODS MO13Q LTG – OFF

MO13Q AIRLK FAN (two) – OFF H2O S/O VLV – ctr (tb-OP) AIRLK 2 – OFF/ON TNL ADAPT 1 – OFF/ON DC UTIL PWR MNB – OFF AC UTIL PWR AC3 – OFF ML31C WASTE H2O TK1 DRAIN VLV – ctr (tb-OP) WASTE H2O TK1 VLV – ctr (tb-OP) WASTE H2O DUMP ISOL VLV – ctr (tb-bp)** WASTE H2O DUMP VLV – ctr (tb-bp)** WASTE H2O DUMP VLV ENA/NOZ HTR – OFF SPLY H2O TKD INLET – ctr (tb-OP) SPLY H2O TKD OUTLET – ctr (tb-OP) VAC VENT ISOL VLV BUS SEL – MNA VAC VENT ISOL VLV CNTL – ctr (tb-bp)** VAC VENT NOZ HTR – OFF ML26C SPLY H2O GN2 TKA SPLY vlv – CL SPLY H2O GN2 TK VENT vlv – VENT ML18F EMER LTG – ON/OFF WMC FLOOD – OFF ML30N Neg Press Relief vlv cap (two) – installed/seated MA73C:A,B MCA LOGIC MNA (four) – ON MCA LOGIC MNB (six) – ON MCA LOGIC MNC (four) – ON MA73C:C,D All cbs – cl { } MA73C:E All cbs – op { Y } except: cb AC2 PL 3Φ – op { Y } cb AC3 PL 3Φ – op { Y }

Page 160: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MIDDECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-14 ASC/114/FIN A

MA73C:F cb AC1 RMS PRI ΦA – op { Y } – (op { R } if no RMS flown) cb AC1 MAR 3Φ – op { Y } cb AC1 OPS INST HYD ACTR ΦC – cl { } cb AC2 RMS B/U ΦA – op { Y } – (op { R } if no RMS flown) cb AC2 L SEAT 3Φ – cl { } cb AC2 OPS INST HYD ACTR ΦC – cl { } cb AC3 L SEAT 3Φ – cl { } MA73C:G cb ARLK TNL FAN (six) – op { R } – (op { Y } if SH flown or

ISS docking mission) cb AC2 R SEAT 3Φ – cl { } cb AC3 GALLEY FAN (three) – op { Y } cb AC3 R SEAT 3Φ – cl { } cb blank switch – dn MA73C:H,I All cbs – cl { } MA73C:I AFT POD VLV LOGIC (three) – ON MO10W 14.7 CAB REG INLET vlv (two) – CL PPO2 CNTLR (two) – NORM O2 REG INLET vlv (two) – CL H2O TK N2 REG INLET vlv (two) – OP PL N2 vlv (two) – CL O2 EMER vlv – CL N2 XOVR vlv – CL H2O TK N2 ISOL vlv (two) – OP PL O2 vlv (two) – CL

WCS AUTO INHIBIT/AUTO – AUTO COMMODE CNTL – DN/OFF MODE – AUTO VAC VLV – CL FAN BYP (two) – OFF FAN SEP – OFF HOSE BLOCK – SEP 1 COMPACTOR ANGLE – ~0 or < 10% MO30F DC UTIL PWR MNC – ON MO32M LEH O2 5 vlv – CL (OP if seat 5 flown) LEH O2 6 vlv – CL (OP if seat 6 flown) MO39M MIDDECK COMM CCU PWR – ON OFF MO42F MIDDECK SPKR AUD PWR – AUD/TONE MIDDECK SPKR AUD A/G (two) – T/R MIDDECK SPKR AUD A/A – T/R MIDDECK SPKR AUD ICOM (two) – T/R MIDDECK SPKR AUD VOX SENS sel – as reqd MIDDECK SPKR AUD MSTR SPKR VOL sel – as reqd MIDDECK SPKR AUD PAGE – dn MIDDECK SPKR AUD VOL pb (five) – as reqd MIDDECK SPKR AUD XMIT/ICOM MODE sel – as reqd

(PTT/PTT recommended) MIDDECK AUD PWR TONES – ACCU/BYP MIDDECK AUD PWR SPKR PWR – OFF GPC MEM DUMP sel – OFF BYP TONE VOL – as reqd

Page 161: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MIDDECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-15 ASC/114/FIN A

MO51F (CO2 RMVL SYS (RCRS) – OV104,5) CNTLR lts (four) – off MNA – OFF AC1 – ctr CNTLR 1 MODE – ctr COM INSTR – OFF MNC – OFF AC3 – ctr CNTLR 2 MODE – ctr All cbs (six) (OV104,5) – op { R } MO58F TV PWR – OFF MO52J DC UTIL PWR MNA – ON AC UTIL PWR AC1 – OFF MSTR ALARM pb – lt off MO69M LEH O2 7 vlv – CL (OP if seat 7 flown) LEH O2 8 vlv – CL MD44F CAB TEMP CNTL LINK – PRI ACT (pinned) CAB TEMP CNTL vlv – FULL COOL (ccw by using AUTO TEMP

CNTLR 1) CAB TEMP CNTL SEC ACT – FULL HEAT (cw by using AUTO TEMP

CNTLR 2)

MIDDECK FLOOR EMU O2 ISOL VLV – CL CAB PURGE VLV – CL CAB PURGE ISOL VLV – CL MO63P (OV103,4 only) cb CB2/J2 – op { Y } cb CB3/J3 – op { Y } cb CB4/J4 – op { Y } cb CB5/J5 – op { Y } cb CB6/J6 – op { Y } cb RLY PWR – op { Y } J2 – OFF J3 – OFF J4 – OFF J5 – OFF J6 – OFF Left select – 10A Right select – 10A

Page 162: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

MIDDECK EXPERIMENTS SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-16 ASC/114/FIN A

MIDDECK (TEPC) SW-1 – OFF

Page 163: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AIRLOCK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-17 ASC/114/FIN A

AW18A LTG FLOOD 1,3,4 (three) – OFF LTG FLOOD 2 – ON/OFF AW18D AIRLK AUD PWR – OFF AIRLK AUD A/G 1 – T/R AIRLK AUD A/G 2 – RCV AIRLK AUD A/A – T/R AIRLK AUD ICOM (two) – T/R AIRLK AUD PAGE – dn AIRLK AUD VOL pb (five) – as reqd AIRLK AUD CNTL – NORM AIRLK AUD VOX SENS sel – as reqd AIRLK AUD MSTR VOL 1 sel – MAX AIRLK AUD XMIT/ICOM MODE sel – PTT/VOX AIRLK AUD MSTR VOL 2 sel – MAX AW18H PWR/BATT CHGR EMU BUS SEL (two) – OFF PWR/BATT CHGR EMU MODE (two) – OFF PWR/BATT CHGR EMU INPUT – EMU 1 AW82B AIRLK DEPRESS vlv – CL AIRLK DEPRESS vlv cap – installed O2 vlv (two) – CL AW82D EMU H2O (four) – ctr (tb-CL) CCU PWR (two) – OFF AW82H EMU H2O SPLY WASTE reg (two) – REGULATING TW58T (NOTE: Panel deleted if SH not flown) TNL LTG FLOOD 1 – ON/OFF TNL LTG FLOOD 2,3,4 (three) – OFF TNL ADP PL ISOL VLV – CL TNL ADP PL ISOL VLV cap – installed

TW58T TNL FAN – OFF cb TNL FAN – op {Y} – (op {R} if SH flown) TNL LIGHT – OFF AIRLOCK INNER HATCH Actuator Handle – LAT Lock Lever – LOCK Equal vlv (two) – NORM Equal vlv cap (two) – installed AIRLOCK OUTER HATCH (if SH-C HATCH) Actuator Handle – LAT Lock Lever – LOCK Equal vlv (two) – OFF Equal vlv cap (two) – installed SH HATCH (D HATCH) (if SH flown) Actuator Handle – LAT Lock Lever – LOCK Equal vlv (two) – OFF Equal vlv cap (two) – installed EXT AIRLOCK UPPER HATCH (if EXT A/L flown) Actuator Handle – LAT Lock Lever – LOCK Equal vlv (two) – OFF Equal vlv cap (two) – installed TUNNEL ADAPTER HATCH (if flown) Actuator Handle – LAT Lock Lever – LOCK Equal vlv (two) – OFF Equal vlv cap (two) – installed

Page 164: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-18 ASC/114/FIN A

R12L NOTE: Panel may be blank if no PL requirement (See 9-23 or 9-24) R11U FC GPC PURGE SEQ – dn (tb-bp) FC PURGE HTR – GPC FC PURGE VLVS (three) – GPC FC STARTUP HTR (three) – ENA FC H2O LINE HTR – A AUTO FC H2O RELIEF HTR – A AUTO MDU PWR – ON MDU BRT sel – as reqd R11L IDP/CRT4 PWR – ON IDP/CRT4 MAJ FUNC – SM ENCRYPTOR – NORM MS AUD CNTL – NORM SPLY H2O TKA INLET – ctr (tb-OP) SPLY H2O TKA OUTLET – ctr (tb-CL) SPLY H2O TKB INLET – ctr (tb-OP) SPLY H2O TKB OUTLET – ctr (tb-OP) SPLY H2O TKC INLET – ctr (tb-OP) SPLY H2O TKC OUTLET – ctr (tb-OP) SPLY H2O DUMP ISOL VLV – ctr (tb-bp)** SPLY H2O DUMP VLV – ctr (tb-bp)** SPLY H2O DUMP VLV ENA/NOZ HTR – OFF SPLY H2O XOVR VLV – ctr (tb-CL) SPLY H2O GALLEY SPLY VLV – ctr (tb-bp)** SPLY H2O B SPLY ISOL VLV – ctr (tb-OP)

R10 MS AUD PWR – AUD/TONE MS AUD A/G (two) – T/R MS AUD A/A – T/R MS AUD ICOM (two) – T/R MS AUD VOX SENS sel – as reqd MS AUD PAGE – dn MS AUD VOL pb (five) – as reqd MS AUD XMIT/ICOM MODE sel – as reqd (PTT/VOX

recommended) MS LTG PNL sel – OFF MS LTG FLOOD sel (two) – ON,BRT – (OFF,BRT if

night launch) BIOMED CH 1 sel – MIDDECK CTR BIOMED CH 2 sel – MIDDECK R R13U C/W TONE VOL (two) – as is C/W PARAM STATUS – ctr C/W MEM – ctr C/W LAMP TEST – ctr C/W PARAM SEL pb (three) – 120 C/W LIMIT SET VALUE pb (three) – 000 C/W LIMIT SET LIMIT – LOWER C/W LIMIT SET FUNC – ctr C/W PARAM – ctr

Page 165: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-19 ASC/114/FIN A

R13L PL BAY DR SYS (two) – DSBL PL BAY MECH PWR SYS (two) – OFF PL BAY DR – STOP (tb-as is) RAD LAT CNTL (two) – OFF (tb-LAT) RAD CNTL (two) – OFF (tb-STO) KU ANT DIRECT STO – OFF KU ANT – GND (tb-STO) MMU GN2 SPLY ISOL VLV (two) – ctr (tb-bp)** A1U SLEW AZM – ctr SLEW ELEV – ctr SLEW RATE – SLOW SIG STRENGTH sel – S-BD PM KU tb (three) – bp KU sel (two) – MAN SLEW,dn KU PWR – OFF KU MODE – RDR PASSIVE KU RADAR OUTPUT – HI KU CNTL – CMD KU SIG PROC HDR – TV KU SIG PROC LDR – MMU 2 TAGS – CLEAR

A1L S-BD PL CNTL – CMD S-BD PL ANT POLAR – L CIRC S-BD PL XMTR PWR – LO S-BD PL CH SEL INTRG 1,2 tw (six) – 910,910 S-BD PL FREQ SWEEP – OFF S-BD PL MOD – OFF S-BD PL PWR SYS – OFF S-BD PL PWR SEL – PSP S-BD PL PSP CMD OUTPUT – PL UMB PL DATA INTLVR PWR – ON S-BD PM ANT SW ELEC – 1 S-BD PM PRE AMPL – 1 S-BD PM PWR AMPL STBY – 1 S-BD PM PWR AMPL OPER – 1 S-BD PM MODE sel – STDN HI S-BD PM XPNDR – 1 NSP DATA RATE XMIT – HI NSP DATA RATE RCV – HI NSP UPLK DATA – S-BD NSP CODING XMIT – OFF NSP CODING RCV – ON NSP PWR – 1 NSP ENCRYPTION PWR – ON NSP ENCRYPTION MODE – SEL NSP ENCRYPTION SEL – RCV

Page 166: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-20 ASC/114/FIN A

A1R S-BD FM CNTL – CMD S-BD FM ANT – GPC S-BD FM PWR – 1 S-BD FM DATA SOURCE sel – ME AUD CTR VOICE RCD SEL CH 1 sel – ICOM A AUD CTR VOICE RCD SEL CH 2 sel – ICOM B AUD CTR DOCK RING (seven) – OFF AUD CTR SL (seven) – OFF AUD CTR UHF A/G (two) – OFF AUD CTR UHF A/A – OFF AUD CTR PL BAY OUTLETS ICOM (two) – OFF AFT MDU MDU PWR – OFF MDU BRT sel – as reqd A6U DAP – all off SENSE: -Z FLT CNTLR PWR – OFF Unused rotary sw – full ccw ADI ATT – INRTL ADI ERR – MED ADI RATE – MED OS LTG FLOOD sel (two) – ON,BRT OS LTG PNL sel – OFF OS LTG INST sel – OFF OS LTG NUMERIC sel – OFF ANNUN BUS SEL – OFF ANNUN LAMP TEST – ctr ANNUN INTEN sel (two) – VAR,MED EVENT TIMER SET pb (four) – as reqd EVENT TIMER MODE – UP EVENT TIMER CNTL – ctr EVENT TIMER – ctr

A6U PL RETEN LOGIC PWR (two) – OFF PL RETEN PL SEL – MON PL RETEN LAT (five) – OFF (tb-bp) PL RETEN RDY tb (five) – bp A6L (DSP) cb ESS SYS PWR CNTL (two) – op { Y } cb DEP (four) – op { Y } cb DOCK LT (four) – op { Y } cb MN LOG (six) – op { Y } cb PMA 2/3 GRP 1 HOOKS SYS A (two) – op { R } cb PMA 2/3 GRP 1 HOOKS SYS B (two) – op { R } cb PMA 2/3 GRP 2 HOOKS SYS A (two) – op { R } cb PMA 2/3 GRP 2 HOOKS SYS B (two) – op { R } SYS PWR (two) – ctr (tb-OFF) PMA 2/3 HOOKS (two) – ctr (tb-bp) PYRO PWR (two) – OFF PSU PWR (two) – OFF VEST DEP VLV (four) – ctr (tb-bp)** LTS (four) – OFF

Page 167: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-21 ASC/114/FIN A

A2 DIGI-DIS SEL – EL/AZ X-PNTR SCALE – X10 A7U MSTR ALARM pb – lt off PL BAY FLOOD (eight) – OFF PORT RMS LIGHT – OFF PORT RMS CAMR – ELBOW WIRELESS VIDEO (two) – OFF TV CAMR PWR (five) – ctr (tb-OFF) TV PWR CNTL – CMD TV PWR CONTR UNIT – OFF TV DNLK – ENA TV SYNC – NORM VID IN pb (thirteen) – lt off VID OUT pb (eight) – lt off CAMR CMD PAN/TILT – LO RATE CAMR CMD FOCUS – ctr CAMR CMD ZOOM – ctr CAMR CMD IRIS – ctr CAMR CMD TILT – ctr CAMR CMD PAN – ctr CAMR CMD MENU pb (three) – lt off CAMR CMD MODE pb (three) – lt off

A7L (APDS CNTL PNL) CNTL PNL PWR (three) – OFF HTRS/DCU PWR (three) – OFF APDS PWR (three) – OFF (lt off) STATUS lts (thirty-six) – off PYROS (three) – OFF (lt off) PYRO CIRC PROT OFF lts (two) – off A6L cb MADS PWR MNB – cl { } MADS RCDR PWR – PCM/WB ENA MADS RCDR PB FWD – CMD MADS STRAIN GAGE – PCM ENA MADS WB/ACIP PCM – CMD MADS PCM – CMD MADS PCM RCD MODE – SAMPLE MADS FDM CNTL – DATA MADS FDM MAN CALBR sel – DC 0 ACIP HTR – OFF A4 MSN TIMER sel – MET

Page 168: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-22 ASC/114/FIN A

A8U (This panel may be replaced or deleted if RMS not flown) RMS Mode lts (twelve) – off BRAKES – ON (tb-OFF) SAFING – AUTO (tb-bp) MODE sel – TEST AUTO SEQ – ctr AUTO SEQ lts (two) – off S/W STOP tb – gray C/W TONE VOL – as reqd C/W lts (eleven) – off MSTR ALARM pb – lt off RATE MIN tb – OFF RATE HOLD tb – OFF RATE SCALE tb – gray EE MODE – OFF EE MAN CONTR – ctr EE tb (six) – bp B/U JOINT sel – SY B/U PL REL – OFF B/U DR – ctr PARAM sel – PORT TEMP LTG ANNUN/NUM sel (two) – VAR,LO LTG PNL/INST sel – OFF JOINT sel – CRIT TEMP SINGLE/DIRECT DR – ctr SHDLR BRACE REL – ctr (tb-bp)

A8L (This panel may be deleted if RMS not flown) STBD RMS – OFF (tb-STO) – (OFF (tb-bp) if no MPMs present) STBD RMS RETEN LAT – OFF (tb-LAT) – (OFF (tb-bp) if no MRLs present) STBD RMS HTR (two) – OFF STBD RMS R-F-L tb (three) – gray – (bp if no RMS/OBSS flown) RMS SEL – OFF RMS PWR – OFF PORT RMS – OFF (tb-STO) – (OFF (tb-bp) if no

MPMs present) PORT RMS HTR (two) – OFF PORT RMS RETEN LAT – OFF (tb-LAT) – (OFF (tb-bp) if no

MRLs present) PORT RMS R-F-L tb (three) – gray – (bp if no RMS flown) RMS RHC RATE – VERN A3 MON CONTRAST (two) – ctr MON BRT (two) – ctr MON COLOR (two) – as reqd MON TINT (two) – as reqd MON FUNCTION (two) – ctr MON PWR (two) – OFF

Page 169: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-23 ASC/114/FIN A

L9 PS FLOOD sel (two) – ON,BRT – (OFF,BRT if night launch) PS AUD PWR – AUD/TONE PS AUD A/G (two) – T/R PS AUD A/A – T/R PS AUD ICOM (two) – T/R PS AUD VOX SENS sel – as reqd PS AUD PAGE – dn PS AUD VOL pb (five) – as reqd PS AUD XMIT/ICOM MODE sel – as reqd (PTT/VOX

recommended) L10L (MUX) Verify all lts off VTR/CC PWR – 0 (dn) RATE SEL (three) – 1 MUX BYPASS – ACT MUX/VTR/CC PWR – 0 (dn) L10L (VIP) Verify all lts off PWR – 0 (dn) ATU – REC CCTV VIDEO IN – J3 L10L (VTR) Verify all lts off ON/STANDBY lt – off PHONE LEVEL – midrange AUDIO INPUT LEVEL CH-1 – 4 AUDIO INPUT LEVEL CH-2 – 6

L10L COUNTER SEL – TAPE REMAIN AUDIO MON – CH 1/2 TIMER – OFF REMOTE/LOCAL – LOCAL

PTT/PTT

Page 170: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK PAYLOADS SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-24 ASC/114/FIN A

L10U (AVIU) SYNC/VIDEO – VIDEO HI-Z/75 – HI-Z PWR SELECT – HI L11U (PDIP 2) MPLM DATA – OIU (ctr) DC PWR 1 – OFF DC PWR 2 – OFF L12UL SSP-1 (APCU/MPLM) Verify all tbs bp APCU 1 CONV – OFF APCU 1 OUTPUT RLY – OP APCU 2 CONV – OFF APCU 2 OUTPUT RLY – OP cb SW PWR 1 – op cb PDIP 1 PWR 2/KuBAND RLY – op MPLM CHAN 1 HTR PWR – OFF MPLM CHAN 2 HTR PWR – OFF L12UR SSP-1 (TCS/ODS) Verify all tbs bp TCS PWR – OFF cb SW PWR 2 – op cb X1/X2 SW PDIP 1 PWR 1 – op ODS CONN MATE X1 TLM PWR – OFF ODS CONN MATE X2 TLM PWR – OFF OIU PWR – OFF

L12LL SSP-2 (MPLM) MPLM KEEL CAM PWR – OFF MPLM KEEL CAM HTR/ILLUM PWR – OFF cb SW PWR 3 – op cb PDIP 2 PWR 2/MPLM RLY – op C/L CAM PWR – OFF L12LR SSP-2 (PDIP 2) cb PDIP 2 PWR 1 – op L12L (PDIP 1) Ku BAND RATE – OFF DC PWR 1 – OFF DC PWR 2 – OFF R12 (VPU/OPP) VPU PWR – OFF R12 (OPP) cb OBSS SW PWR CB1 – op { Y } OBSS SW PWR – OFF R12 (OBSS) RSC PWR – OFF ITVC ENA – OFF SPEE PWR – OFF

Page 171: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-25 ASC/114/FIN A

A15: (All Veh) PS COMM CCU PWR – OFF ON DC UTIL PWR MNC – OFF AC UTIL PWR AC3 – OFF A15:A CRYO TK5 HTRS (four) – OFF CRYO TK5 HTRS O2 RESET/TEST – ctr A15: (OV104,5) A15:B cb PPCA CONT PWR (two) – op { R } A15:C PALLET PWR (two) – ctr (tb-OFF) PALLET HTRS (two) – OFF A15:D,E, PALLET HTRS (sixteen) – OFF A15 F,G PALLET HTRS O2 RESET/TEST (four) – ctr A15:H,I, cb PALLET ESS (sixteen) – op { R } A15:J,K cb PALLET HTR SNSR (eight) – op { R } A14 RCS/OMS HTR FWD RCS – OFF RCS/OMS HTR L POD (two) – A OFF, B OFF RCS/OMS HTR R POD (two) – A OFF, B OFF RCS/OMS HTR OMS KIT – OFF RCS/OMS HTR OMS CRSFD LINES (two) – A AUTO,

B AUTO RCS/OMS HTR FWD RCS JET (five) – AUTO RCS/OMS HTR AFT RCS JET (five) – AUTO A14 PYRO (twelve) – SAFE RMS LAT – SAFE

A13 OS AUD MSTR SPKR VOL sel – as reqd OS AUD SPKR PWR – OFF GPS PRE AMPL UC (OV103,5) – MNC GPS PRE AMPL LC (OV103,5) – MNA GPS PRE AMPL (two) (OV104) – ON GPS PWR – ON OFF GPS/SIGI PWR (OV103,5) – OFF blank sw (OV104) – dn GPS ENCRYPT – NORM GPS/SIGI ENCRYPT (OV103,5) – NORM blank sw (OV104) – dn A12 APU HTR GAS GEN/FUEL PUMP (three) – OFF APU HTR LUBE OIL LINE (three) – OFF APU HTR TK/FU LINE/H2O SYS (six) – OFF LG ARM/DN RESET – dn FC3 STRUCT RTN – ctr (tb-ON) HYD HTR RUD SPD BK A – OFF HYD HTR RUD SPD BK B – AUTO HYD HTR BDY FLP A – AUTO HYD HTR BDY FLP B – OFF HYD HTR ELEV A – AUTO HYD HTR ELEV B – OFF HYD HTR AFT FUS A – AUTO HYD HTR AFT FUS B – OFF HYD CIRC PUMP PWR 1 – MNA HYD CIRC PUMP PWR 2 – MNB HYD CIRC PUMP PWR 3 – MNC

Page 172: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

AFT FLIGHT DECK SWITCH LIST FOR HANDOVER INGRESS

NOT FLOWN 9-26 ASC/114/FIN A

A11 CRYO TK4 HTR (four) – OFF CRYO TK4 HTR O2 RESET/TEST – ctr MS COMM CCU PWR – ON OFF DC UTIL PWR MNC – ON A11 (OV105) PALLET HTRS C,D (two) – OFF PALLET TK10 HTRS (four) – OFF PALLET TK10 HTRS O2 RESET/TEST – ctr PALLET TK11 HTRS (four) – OFF PALLET TK11 HTRS O2 RESET/TEST – ctr PALLET TK12 HTRS (four) – OFF PALLET TK12 HTRS O2 RESET/TEST – ctr PALLET TK13 HTRS (four) – OFF PALLET TK13 HTRS O2 RESET/TEST – ctr A11 (OV104) CRYO TK SEL (eight) – ctr All cbs (104,5) – op { R } R14: All cbs – cl { } except: R14:B cb MNA PALLET DSC 1A/2B – op { R } cb MNA PALLET DSC 3A – op { R } cb MNB PALLET DSC 1B – op { R } cb MNB PALLET DSC 4B – op { R } cb MNC PALLET DSC 2A – op { R } cb MNC PALLET DSC 3B/4A – op { R }

R14:C cb MNA UHF EVA – op { Y } cb MNB KU ELEC – op { Y } cb MNB KU ANT HTR – op { Y } cb MNB KU CABLE HTR – op { R } cb MNC UHF EVA – op { Y } cb MNC KU SIG PROC – op { Y } R14:D All cbs – op { Y } except: cb MNB VPU – op { Y } cb MNC TV CAB – cl { } R14:E cb MNA D CAMR (three) – op { Y } cb MNB RMS CAMR (three) – op { Y } – (op { R } if no

PORT RMS flown) R14:F cb ESS 1BC LDG GEAR ARM/DN RESET – op { R }

Page 173: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 9-27 ASC/114/FIN A

HARDWARE CAUTION & WARNING CONFIGURATION UPPER LIMIT CHANGE TO 4 CABIN PRESS 7 OMS TK P OX-L 17 OMS TK P FU-L 37 OMS TK P OX-R 39 MPS He Reg 1A P 47 OMS TK P FU-R 49 MPS He Reg 2A P 55 CAB FAN ∆P 59 MPS He Reg 3A P 65 PPO2 #1 74 CABIN FAN ∆P 75 PPCO2 #2 79 MANF P LH2 85 ARS FAN ∆P 95 CAB TOTAL PRESS 107 FREON LOOP 1 EVAP OUT T 117 FREON LOOP 2 EVAP OUT T

3.85 V/15.40 psia (OV103) 3.90 V/15.53 psia (OV104) 3.85 V/15.35 psia (OV105) 3.60 V/288 psi (OV103,4) 3.70 V/296 psi (OV105) 3.60 V/288 psi 3.60 V/288 psi 4.00 V/816.3 psia (OV103) 4.10 V/815.5 psia (OV104) 4.10 V/808.4 psia (OV105) 3.60 V/288 psi 4.00 V/810.6 psia (OV103) 4.10 V/814.6 psia (OV105) 4.85 V/0.2" H2O (if SH flown) 4.00 V/811.5 psia (OV105) 2.30 V/2.7 psi (if SH flown) 4.25 V/6.80" H2O 3.80 V/7.6 mmHg (if SH flown) 3.25 V/65 psi 4.85 V/0.2" H2O (if SH flown) 1.55 V/13.8 psi (if SH flown) 4.30 V/115.2 °F 4.30 V/115.2 °F

LOWER LIMIT CHANGE TO 4 CABIN PRESS 39 MPS He Reg 1A P 49 MPS He Reg 2A P 59 MPS He Reg 3A P 74 CABIN FAN ∆P 106 FREON FLOW 1 116 FREON FLOW 2

3.45 V/13.80 psia (OV103) 3.45 V/13.74 psia (OV104) 3.45 V/13.76 psia (OV105) 3.30 V/676.0 psia (OV103) 3.45 V/678.7 psia (OV105) 3.35 V/679.9 psia (OV103) 3.45 V/684.6 psia (OV105) 3.35 V/680.0 psia (OV105) 2.60 V/4.16" H2O 0.80 V/1186 lb/hr 0.80 V/1186 lb/hr

INHIBIT 8 APU 1 EGT 18 APU 2 EGT 28 APU 3 EGT 30 CRYO O2 P TK4/5 (if TK4 and TK5 not flown) 40 CRYO O2 P TK5 (unless OV103,4,5 and TK5 flown) 55 CAB FAN ∆P (if SH flown) 61 CRYO O2 HTR1 TK4 (if TK4 and TK5 not flown) 65 PPO2 (if SH flown) 71 CRYO O2 HTR2 TK4 (if TK4 and TK5 not flown) 75 PPCO2 (if SH flown) 77 OMS PBK OXID TK ULL P 80 CRYO H2 P TK4/5 (if TK4 and TK5 not flown) 81 CRYO O2 HTR1 TK5 (unless OV103,4,5 and TK5 flown) 85 ARS FAN ∆P (if SH flown unpowered) 87 OMS PBK FUEL TK ULL P 90 CRYO H2 ∆P TK5 (unless OV103,4,5 and TK5 flown) 95 CAB TOTAL PRESS (if SH flown)

Page 174: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

NOT FLOWN 9-28 ASC/114/FIN A

MEDS CONFIGURATION FOR INGRESS

MDU View Angle

Port Config

Selected Port

Flight Critical

Bus Display Edgekey

Menu

CRT1 positive auto primary 3 DPS DPS

CRT2 positive auto primary 4 DPS DPS

CRT3 positive auto primary 4 DPS DPS

CRT4 negative auto primary 1 DPS DPS

CDR1 positive auto primary 4 OMS/MPS FLT INST

CDR2 positive auto primary 3 A/E PFD DATA BUS

MFD1 positive auto primary 3 HYD/APU SUBSYS STATUS

MFD2 positive auto primary 4 OMS/MPS SUBSYS STATUS

PLT1 positive auto primary 4 A/E PFD DATA BUS

PLT2 positive auto primary 4 HYD/APU FLT INST

AFD1 negative auto n/a n/a n/a n/a

Page 175: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY 10-1 ASC/114/FIN A

CUE CARD CONFIG

CU

E C

AR

D

CO

NF

IG

Page 176: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-2 ASC/114/FIN A

HOOK VELCRO

SHIM

HOOK VELCRO

SHIM

HOOK VELCRO 10 ASCENT 10

ENTRY 10

ASC-1a/A,E/D

ASC-1b/A,E/D

5 5

1

5

1

ADI ERROR/RATE SWITCH

TOP

TOP BACK OF ‘ADI ERROR/RATE SWITCH’

HOOK VELCRO

1

R α/g Y 25 5/1.25 2.5 25 2/1.25 2.5 10 1/0.50 2.5

CUT OUT

CUT OUT

CU

E C

AR

D

CO

NF

IG

Page 177: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-3 ASC/114/FIN A

TOP

TOP BACK OF ‘ASCENT/ENTRY SPEC’

HOOK VELCRO

SHIM

HOOK VELCRO

SHIM

ASC-2b/A,E/C

ASCENT/ENTRY SPEC PASS

NO.

ASC-2a/A,E/E BFS

NO.

GPC MEMORY IMU ALIGN (301) STRK/COAS CNTL (301) RCS (OPS 3) HORIZ SIT OVERRIDE ENT CONTROL (OPS 3) GPS STATUS

0 21 22 23 50 51 53 55

BFS MEMORY GNC

HORIZ SIT OVERRIDE GPS STATUS

SM PL BAY DOORS

0

50 51 55

63

Page 178: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-4 ASC/114/FIN A

HOOK VELCRO

HOOK VELCRO

TOP BACK OF ‘SPEED BRAKE CMD’

TOP

ASC-3b/A,E/C

ASC-3a/A,E/D

ALIGN SBTC TRAILING EDGE FULL FORWARD

SPEEDBRAKE CMD VS

SBTC TRAILING EDGE

15

20

30

40

50

60

70

80

90

(reduced copy)

Page 179: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY (A)CC 10-5 ASC/114/FIN A

(A)CC 10-5 (FQ)

NOTE: Velcro type and location requirements are as follows: CDR and PLT card – Use pile Velcro on all four corners and both sides (These cards are attached to the hook Velcro on the CDR and PLT wedge). MS card – Use hook Velcro on all four corners and both sides (These cards are attached to the pile Velcro on the Orbiter wall)

ASC-30a/114/A/C

TOP High Inclination 51.6°

CONT ENTRY / MM602 INH ECAL/BDA – ITEM 1 (INH) Before NZ Hold RHC/PNL TRIM – ENA If M < 5, √ AIL/RUD TRIM If M < 3, S/B = 65% Expect 20° ≤ α ≤ 58° After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – Deploy Monitor – M / α M2 → 1: θ = 0° by M = 1.0 √ Air Data Incorp Air Data ASAP Select UHF – G T/R When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M >12 9 6 3 1 α 40 35 26 18 12

CONTINGENCYABORT

GREEN √ θ → 100° (or 0° → 100°) √ Roll Heads Up When EAS > 10 and incr: √ Pitch Dn @ 3°/sec √ MECO, ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

BLUE POST SRB SEP: √ θ → 0°, Roll Heads Up When H negative: √ α → -2°, MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

H +1850 ↓ .

SE OPS 3 SRB SEP

. SERC – ITEM 6 (∗) Failed ME SHUTDN pb (two) – push When H > 70K: ABORT – ITEM 2 (∗), 4 (∗) ABORT RTLS ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB) √ CONT REGION

TRAJ

TRAJ

TRAJ

G51

2 OUT FIRST ANY SE TAL

STUCK MIN THROTTLE + 1 ENG OUT

MAX THROT – ITEM 4 (∗) √ TAL Site ABORT TAL Go to TAL (FB)

G51 G50

SRB SEP

3 OUT FIRST . SERC – ITEM 6 (∗) ME SHUTDN pb (three) – push ADI (two) – REF √ CONT REGION

TRAJ

TRAJ

3 OUT SECOND ME SHUTDN pb (three) – push ADI (two) – REF √ CONT REGION TRAJ

18.4K

3 OUT BLANK ME SHUTDN pb (three) – push Go to TAL ----MECO---- (FB)

AOA-S

ORANGE √ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

From 2 OUT Only

√ β → 0° (±3°) √ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

YELLOW √ α → -2° If unable √ α → 125°

RED

GREEN When EAS < 25 or incr: √ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

BLUE Pc < 50 + 2 sec: √ ET SEP √ Roll Heads Up (& Yaw if MM601) √ MM602 Go to CONT ENTRY (CC)

BFS

SRB SEP

PILE VEL- CRO

PILE VEL- CRO

PILE VEL- CRO

PILE VEL- CRO

. √ SERC ON Failed ME SHUTDN pb (two) – push MAX THROT – ITEM 4 (∗) ABORT TAL DUMP – ITEM 6 (∗), 7 (∗)

If STUCK DROOP DRP 1 EO - ITEM 7 (ENA) √ DROOP ALT If Overbright and flashing (<265K): Go to 2 OUT SECOND . When MPS PRPLT = 2% Man THROT, Pc → 67% Man MECO @ CO mark Go to TAL ----MECO---- (FB)

TRAJ

G51

TRAJ

2 OUT DROOP

BFS

G51

TRAJ

MAN THROT, MAX THROT – ITEM 4 (∗) CSS, ABORT RTLS ADI (two) – REF Push to θ = 90°, Fly roll, yaw needles When θCMD ≥ 90°: P, R/Y AUTO THROT AUTO When θ ≥ 100°: ADI (two) LVLH; Go to RTLS (FB)

G51

25.1K CDR

ASC-30a/114/A/C

2 OUT SECOND . √ SERC ON ABORT – ITEM 2 (∗), 4 (∗) ABORT RTLS Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB) √ CONT REGION TRAJ

G51

TRAJTRAJ

1 2/3 TAL

3+37 3+35 3+48

ZZA(4) MRN(3) FMI(29)

STUCK TAL

1 2/3 DROOP 2+32

STUCK FIRST 1 2/3 PTM

STUCK DROOP STUCK RTLS

1 2/3 RTLS 2+39

STUCK DROOP

3+21 1 2/3 NEG RTN

(reduced copy) CDR

Page 180: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY (A)CC 10-6 ASC/114/FIN A

(A)CC 10-6 (FQ)

Generic version ofASC-30,31,32a/116/A/B

RTLS CONTINGENCY

RT L S

~ MECO – 10sec

3 OUT BLANK ME SHUTDN pb (three) – push Go to RTLS ---MECO--- (FB)

3 OUT COLOR ME SHUTDN pb (three) – push √ CONT REGION TRAJ

CONT ENTRY / MM602 . INH ECAL/BDA – ITEM 1 (INH) Before NZ Hold RHC/PNL TRIM – ENA If M < 5, √ AIL/RUD TRIM If M < 3, S/B = 65% Expect 20° ≤ α ≤ 58° After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – Deploy Monitor – M / α M2 → 1: θ = 0° by M = 1.0 √ Air Data Incorp Air Data ASAP Select UHF – G T/R When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M > 8 6 4 2 1 α 32 26 20 15 12

FINE COUNT

2 OUT BLANK . √ SERC ON Failed ME SHUTDN pb (two) – push Go to RTLS (FB)

TRAJ

2 OUT COLOR . √ CONT REGION, If NOT Overbright

CSS √ SERC ON ABORT – ITEM 2 (∗), 4 (∗)

P, R/Y AUTO Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB)

√ CONT REGION TRAJ

TRAJ TRAJ

G51

TRAJ

ORANGE √ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

EAS = 9 EAS = 25

√ β → 0° (±3°) √ ET SEP √ Pitch MNVR √ MM602 Go to CONT ENTRY (CC)

YELLOW √ α → -2° If unable

√ α → 125° (ADI flip)

RED GREEN When EAS < 25 or incr: √ ET SEP √ MNVR (ADI): Pre PPA (REF) – Roll, Yaw Heads Up

PPA to Vrel 0 (REF) – Yaw to , Roll to φ =0°

Post Vrel 0 (√ LVLH) – Pitch Dn √ MM602 Go to CONT ENTRY (CC)

PILE VEL- CRO

PILE VEL- CRO

PILE VEL- CRO

High Inclination 51.6°

PILE VEL- CRO

CDR

ADI (two) – REF √ θ → 100° √ Roll Heads Up When EAS > 10 & incr: √ Pitch Dn @ 3 or

† 8°/sec

√ MECO, ET SEP √ Pitch to MM602 Go to CONT ENTRY (CC)

YELLOW √ ADI (two) – LVLH When EAS > 10 & incr: √ Pitch Dn @ 5°/sec √ MECO, ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

ORANGE ADI (two) – LVLH √ Pitch Dn to α = -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

GREEN

H +1450 ↓ .

∼ Vrel 0 – 10 sec EAS = 20

BLUE √ θ → 0° √ Roll Heads Up When H negative: √ α → -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

√ ADI (two) – LVLH √ H → +400 (θmax = 75°) AT FINE COUNT: √ Pitch Dn to α = -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to RTLS ---MECO--- (FB)

RED

TRAJ

† Automated Yellow uses 8 °/sec Pitch Dn

H +100 ↑ .

.

Post PPA & Vrel < 3.2k

Automated Automated CSS required CSS required

ASC-30b/114/A/C

ASC-30b/114/A/C

NOTE: Velcro type and location requirements are as follows: CDR and PLT card – Use pile Velcro on all four corners and both sides (These cards are attached to the hook Velcro on the CDR and PLT wedge). MS card – Use hook Velcro on all four corners and both sides (These cards are attached to the pile Velcro on the Orbiter wall)

(reduced copy) (reduced copy) CDR

Page 181: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY (B)CC 10-5 ASC/114/FIN A

(B)CC 10-5 (FQ)

NOTE: Velcro type and location requirements are as follows: CDR and PLT card – Use pile Velcro on all four corners and both sides (These cards are attached to the hook Velcro on the CDR and PLT wedge). MS card – Use hook Velcro on all four corners and both sides (These cards are attached to the pile Velcro on the Orbiter wall)

ASC-31a/114/A/C

TOP High Inclination 51.6°

CONT ENTRY / MM602 INH ECAL/BDA – ITEM 1 (INH) Before NZ Hold RHC/PNL TRIM – ENA If M < 5, √ AIL/RUD TRIM If M < 3, S/B = 65% Expect 20° ≤ α ≤ 58° After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – Deploy Monitor – M / α M2 → 1: θ = 0° by M = 1.0 √ Air Data Incorp Air Data ASAP Select UHF – G T/R When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M >12 9 6 3 1 α 40 35 26 18 12

CONTINGENCYABORT

GREEN √ θ → 100° (or 0° → 100°) √ Roll Heads Up When EAS > 10 and incr: √ Pitch Dn @ 3°/sec √ MECO, ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

BLUE POST SRB SEP: √ θ → 0°, Roll Heads Up When H negative: √ α → -2°, MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

H +1850 ↓ .

SE OPS 3 SRB SEP

SERC – ITEM 6 (∗) Failed ME SHUTDN pb (two) – push When H > 70K: ABORT – ITEM 2 (∗), 4 (∗) ABORT RTLS ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB) √ CONT REGION

TRAJ

TRAJ

TRAJ

G51

2 OUT FIRST ANY SE TAL

STUCK MIN THROTTLE + 1 ENG OUT

. MAX THROT – ITEM 4 (∗) √ TAL Site ABORT TAL Go to TAL (FB)

G51 G50

SRB SEP

3 OUT FIRST SERC – ITEM 6 (∗) ME SHUTDN pb (three) – push ADI (two) – REF √ CONT REGION

TRAJ

TRAJ

3 OUT SECOND ME SHUTDN pb (three) – push ADI (two) – REF √ CONT REGION TRAJ

18.4K

3 OUT BLANK ME SHUTDN pb (three) – push Go to TAL ----MECO---- (FB)

AOA-S

ORANGE √ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

From 2 OUT Only

√ β → 0° (±3°) √ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

YELLOW √ α → -2° If unable √ α → 125°

RED

GREEN When EAS < 25 or incr: √ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

BLUE Pc < 50 + 2 sec: √ ET SEP √ Roll Heads Up (& Yaw if MM601) √ MM602 Go to CONT ENTRY (CC)

BFS

SRB SEP

PILE VEL- CRO

PILE VEL- CRO

PILE VEL- CRO

PILE VEL- CRO

√ SERC ON Failed ME SHUTDN pb (two) – push MAX THROT – ITEM 4 (∗) ABORT TAL DUMP – ITEM 6 (∗), 7 (∗)

If STUCK DROOP DRP 1 EO - ITEM 7 (ENA) √ DROOP ALT If Overbright and flashing (<265K): Go to 2 OUT SECOND . When MPS PRPLT = 2% Man THROT, Pc → 67% Man MECO @ CO mark Go to TAL ----MECO---- (FB)

TRAJ

G51

TRAJ

2 OUT DROOP

BFS

G51

TRAJ

MAN THROT, MAX THROT – ITEM 4 (∗) CSS, ABORT RTLS ADI (two) – REF Push to θ = 90°, Fly roll, yaw needles When θCMD ≥ 90°: P, R/Y AUTO THROT AUTO When θ ≥ 100°: ADI (two) LVLH; Go to RTLS (FB)

G51

25.1K PLT

ASC-31a/114/A/C

2 OUT SECOND √ SERC ON ABORT – ITEM 2 (∗), 4 (∗) ABORT RTLS Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB) √ CONT REGION TRAJ

G51

TRAJTRAJ

1 2/3 TAL

3+37 3+35 3+48

ZZA(4) MRN(3) FMI(29)

STUCK TAL

1 2/3 DROOP 2+32

STUCK FIRST 1 2/3 PTM

STUCK DROOP STUCK RTLS

1 2/3 RTLS 2+39

STUCK DROOP

3+21 1 2/3 NEG RTN

(reduced copy) PLT

Page 182: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY (B)CC 10-6 ASC/114/FIN A

(B)CC 10-6 (FQ)

Generic version ofASC-30,31,32a/116/A/B

RTLS CONTINGENCY

RT L S

~ MECO – 10sec

3 OUT BLANK ME SHUTDN pb (three) – push Go to RTLS ---MECO--- (FB)

3 OUT COLOR ME SHUTDN pb (three) – push √ CONT REGION TRAJ

CONT ENTRY / MM602 INH ECAL/BDA – ITEM 1 (INH) Before NZ Hold RHC/PNL TRIM – ENA If M < 5, √ AIL/RUD TRIM If M < 3, S/B = 65% Expect 20° ≤ α ≤ 58° After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – Deploy Monitor – M / α M2 → 1: θ = 0° by M = 1.0 √ Air Data Incorp Air Data ASAP Select UHF – G T/R When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M > 8 6 4 2 1 α 32 26 20 15 12

FINE COUNT

2 OUT BLANK √ SERC ON Failed ME SHUTDN pb (two) – push Go to RTLS (FB)

TRAJ

2 OUT COLOR √ CONT REGION, If NOT Overbright

CSS √ SERC ON ABORT – ITEM 2 (∗), 4 (∗)

P, R/Y AUTO Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB)

√ CONT REGION TRAJ

TRAJ TRAJ

G51

TRAJ

ORANGE √ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

EAS = 9 EAS = 25

√ β → 0° (±3°) √ ET SEP √ Pitch MNVR √ MM602 Go to CONT ENTRY (CC)

YELLOW √ α → -2° If unable

√ α → 125° (ADI flip)

RED GREEN When EAS < 25 or incr: √ ET SEP √ MNVR (ADI): Pre PPA (REF) – Roll, Yaw Heads Up

PPA to Vrel 0 (REF) – Yaw to , Roll to φ =0°

Post Vrel 0 (√ LVLH) – Pitch Dn √ MM602 Go to CONT ENTRY (CC)

PILE VEL- CRO

PILE VEL- CRO

PILE VEL- CRO

High Inclination 51.6°

PILE VEL- CRO

PLT

ASC-31b/114/A/C

ASC-31b/114/A/C

ADI (two) – REF √ θ → 100° √ Roll Heads Up When EAS > 10 & incr: √ Pitch Dn @ 3 or

† 8°/sec

√ MECO, ET SEP √ Pitch to MM602 Go to CONT ENTRY (CC)

YELLOW √ ADI (two) – LVLH When EAS > 10 & incr: √ Pitch Dn @ 5°/sec √ MECO, ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

ORANGE ADI (two) – LVLH √ Pitch Dn to α = -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

GREEN

H +1450 ↓ .

∼ Vrel 0 – 10 sec EAS = 20

BLUE √ θ → 0° √ Roll Heads Up When H negative: √ α → -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

√ ADI (two) – LVLH √ H → +400 (θmax = 75°) AT FINE COUNT: √ Pitch Dn to α = -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to RTLS ---MECO--- (FB)

RED

TRAJ

† Automated Yellow uses 8 °/sec Pitch Dn

H +100 ↑ .

.

Post PPA & Vrel < 3.2k

Automated Automated CSS required CSS required

NOTE: Velcro type and location requirements are as follows: CDR and PLT card – Use pile Velcro on all four corners and both sides (These cards are attached to the hook Velcro on the CDR and PLT wedge). MS card – Use hook Velcro on all four corners and both sides (These cards are attached to the pile Velcro on the Orbiter wall)

PLT(reduced copy)

Page 183: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY (C)CC 10-5 ASC/114/FIN A

(C)CC 10-5 (FQ)

NOTE: Velcro type and location requirements are as follows: CDR and PLT card – Use pile Velcro on all four corners and both sides (These cards are attached to the hook Velcro on the CDR and PLT wedge). MS card – Use hook Velcro on all four corners and both sides (These cards are attached to the pile Velcro on the Orbiter wall)

ASC-32a/114/A/C

TOP High Inclination 51.6°

CONT ENTRY / MM602 INH ECAL/BDA – ITEM 1 (INH) Before NZ Hold RHC/PNL TRIM – ENA If M < 5, √ AIL/RUD TRIM If M < 3, S/B = 65% Expect 20° ≤ α ≤ 58° After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – Deploy Monitor – M / α M2 → 1: θ = 0° by M = 1.0 √ Air Data Incorp Air Data ASAP Select UHF – G T/R When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M >12 9 6 3 1 α 40 35 26 18 12

CONTINGENCYABORT

GREEN √ θ → 100° (or 0° → 100°) √ Roll Heads Up When EAS > 10 and incr: √ Pitch Dn @ 3°/sec √ MECO, ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

BLUE POST SRB SEP: √ θ → 0°, Roll Heads Up When H negative: √ α → -2°, MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.

H +1850 ↓ .

SE OPS 3 SRB SEP

SERC – ITEM 6 (∗) Failed ME SHUTDN pb (two) – push When H > 70K: ABORT – ITEM 2 (∗), 4 (∗) ABORT RTLS ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB) √ CONT REGION

TRAJ

TRAJ

TRAJ

G51

2 OUT FIRST ANY SE TAL

STUCK MIN THROTTLE + 1 ENG OUT

MAX THROT – ITEM 4 (∗) √ TAL Site ABORT TAL Go to TAL (FB)

G51 G50

SRB SEP

3 OUT FIRST SERC – ITEM 6 (∗) ME SHUTDN pb (three) – push ADI (two) – REF √ CONT REGION

TRAJ

TRAJ

3 OUT SECOND ME SHUTDN pb (three) – push ADI (two) – REF √ CONT REGION TRAJ

18.4K

3 OUT BLANK ME SHUTDN pb (three) – push Go to TAL ----MECO---- (FB)

AOA-S

ORANGE √ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn, then Up √ MM602 Go to ECAL ENTRY (FB)

From 2 OUT Only

√ β → 0° (±3°) √ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

YELLOW √ α → -2° If unable √ α → 125°

RED

GREEN When EAS < 25 or incr: √ ET SEP √ Roll, Yaw Heads Up √ MM602 Go to ECAL ENTRY (FB)

BLUE Pc < 50 + 2 sec: √ ET SEP √ Roll Heads Up (& Yaw if MM601) √ MM602 Go to CONT ENTRY (CC)

BFS

SRB SEP

HOOK VEL- CRO

HOOK VEL- CRO

HOOK VEL- CRO

HOOK VEL- CRO

√ SERC ON Failed ME SHUTDN pb (two) – push MAX THROT – ITEM 4 (∗) ABORT TAL DUMP – ITEM 6 (∗), 7 (∗)

If STUCK DROOP DRP 1 EO - ITEM 7 (ENA) √ DROOP ALT If Overbright and flashing (<265K): Go to 2 OUT SECOND . When MPS PRPLT = 2% Man THROT, Pc → 67% Man MECO @ CO mark Go to TAL ----MECO---- (FB)

TRAJ

G51

TRAJ

2 OUT DROOP

BFS

G51

TRAJ

MAN THROT, MAX THROT – ITEM 4 (∗) CSS, ABORT RTLS ADI (two) – REF Push to θ = 90°, Fly roll, yaw needles When θCMD ≥ 90°: P, R/Y AUTO THROT AUTO When θ ≥ 100°: ADI (two) LVLH; Go to RTLS (FB)

G51

25.1K MS

ASC-32a/114/A/C

2 OUT SECOND √ SERC ON ABORT – ITEM 2 (∗), 4 (∗) ABORT RTLS Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB) √ CONT REGION TRAJ

G51

TRAJTRAJ

1 2/3 TAL

3+37 3+35 3+48

ZZA(4) MRN(3) FMI(29)

STUCK TAL

1 2/3 DROOP 2+32

STUCK FIRST 1 2/3 PTM

STUCK DROOP STUCK RTLS

1 2/3 RTLS 2+39

STUCK DROOP

3+21 1 2/3 NEG RTN

(reduced copy) MS

Page 184: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY (C)CC 10-6 ASC/114/FIN A

(C)CC 10-6 (FQ)

Generic version ofASC-30,31,32a/116/A/B

RTLS CONTINGENCY

RT L S

~ MECO – 10sec

3 OUT BLANK ME SHUTDN pb (three) – push Go to RTLS ---MECO--- (FB)

3 OUT COLOR ME SHUTDN pb (three) – push √ CONT REGION TRAJ

CONT ENTRY / MM602 INH ECAL/BDA – ITEM 1 (INH) Before NZ Hold RHC/PNL TRIM – ENA If M < 5, √ AIL/RUD TRIM If M < 3, S/B = 65% Expect 20° ≤ α ≤ 58° After NZ Hold (and Nz < 2g) M ≤ 5, ADTA PROBES – Deploy Monitor – M / α M2 → 1: θ = 0° by M = 1.0 √ Air Data Incorp Air Data ASAP Select UHF – G T/R When M < 1.0 Go to BAILOUT (FB)

VERT SIT

G50

M > 8 6 4 2 1 α 32 26 20 15 12

FINE COUNT

2 OUT BLANK √ SERC ON Failed ME SHUTDN pb (two) – push Go to RTLS (FB)

TRAJ

2 OUT COLOR √ CONT REGION, If NOT Overbright

CSS √ SERC ON ABORT – ITEM 2 (∗), 4 (∗)

P, R/Y AUTO Failed ME SHUTDN pb (two) – push ADI (two) – REF If Yaw → MAX THROT – ITEM 4 Go to POWERED ECAL (FB)

√ CONT REGION TRAJ

TRAJ TRAJ

G51

TRAJ

ORANGE √ Pitch Dn @ 3°/sec √ ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

EAS = 9 EAS = 25

√ β → 0° (±3°) √ ET SEP √ Pitch MNVR √ MM602 Go to CONT ENTRY (CC)

YELLOW √ α → -2° If unable

√ α → 125° (ADI flip)

RED GREEN When EAS < 25 or incr: √ ET SEP √ MNVR (ADI): Pre PPA (REF) – Roll, Yaw Heads Up

PPA to Vrel 0 (REF) – Yaw to , Roll to φ =0°

Post Vrel 0 (√ LVLH) – Pitch Dn √ MM602 Go to CONT ENTRY (CC)

HOOK VEL- CRO

HOOK VEL- CRO

HOOK VEL- CRO

High Inclination 51.6°

HOOK VEL- CRO

MS

ASC-32b/114/A/C

ASC-32b/114/A/C

ADI (two) – REF √ θ → 100° √ Roll Heads Up When EAS > 10 & incr: √ Pitch Dn @ 3 or

† 8°/sec

√ MECO, ET SEP √ Pitch to MM602 Go to CONT ENTRY (CC)

YELLOW √ ADI (two) – LVLH When EAS > 10 & incr: √ Pitch Dn @ 5°/sec √ MECO, ET SEP √ Pitch Dn √ MM602 Go to CONT ENTRY (CC)

ORANGE ADI (two) – LVLH √ Pitch Dn to α = -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

GREEN

H +1450 ↓ .

∼ Vrel 0 – 10 sec EAS = 20

BLUE √ θ → 0° √ Roll Heads Up When H negative: √ α → -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to CONT ENTRY (CC)

.√ ADI (two) – LVLH √ H → +400 (θmax = 75°) AT FINE COUNT: √ Pitch Dn to α = -2° √ MECO, ET SEP √ Pitch Up √ MM602 Go to RTLS ---MECO--- (FB)

RED

TRAJ

† Automated Yellow uses 8 °/sec Pitch Dn

H +100 ↑ .

.

Post PPA & Vrel < 3.2k

Automated Automated CSS required CSS required

NOTE: Velcro type and location requirements are as follows: CDR and PLT card – Use pile Velcro on all four corners and both sides (These cards are attached to the hook Velcro on the CDR and PLT wedge). MS card – Use hook Velcro on all four corners and both sides (These cards are attached to the pile Velcro on the Orbiter wall)

MS

Page 185: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-7 ASC/114/FIN A

OMS 2 BURN

MONITOR OMS TEMP*

FU IN P ≥ OMS ENG FAIL

≤ OMS PRPLT FAIL or No FU IN P

OMS PC* & OMS ↓ (BFS: √accel) ENG VLV 1 or 2 < 70 or OX IN P > 227

OMS ENG FAIL

OX IN P ≤ 227 or No OX IN P

OMS PRPLT FAIL

OMS OX/FU TK P (√ENG IN P) OX/FU LOW He PRESS/VAP ISOL (two) – OP

If aff TK P not incr: He PRESS/VAP ISOL (two) – CL At PC < 72 or OMS TEMP or HP > 85 :

OMS PRPLT FAIL

OX & FU HIGH He PRESS/VAP ISOL (two) – CL Cycle He A(B) to maintain TK P 234-284

OMS He TK P LOW (√ OMS/MPS )

At He P < 640 or QTY ≤ 41: If HP < 85 : OMS XFEED from good OMS At HP > 85 : OMS PRPLT FAIL

OMS N2 REG P HIGH or LOW OMS ENG – ARM

OMS N2 TK P LOW (√ OMS/MPS )

At N2 TK P < 470: OMS ENG – ARM

OMS GMBL PRI fail L(R) OMS GMBL – SEC (twice)

SEC fail If high RCS usage: OMS ENG FAIL

GPC 1(4) & aff GPC PWR – OFF Burning OMS aff If SEC GMBL avail:

aff MDM FF 1(4) – OFF,ON L(R) OMS GMBL – SEC (twice)

SEC GMBL lost If high RCS usage: OMS ENG FAIL

2 FAs lost √MAN SHUTDN

I/O ERROR FA 1(4) L(R) OMS GMBL – SEC

I/O RESET (if recov: BFS I/O RESET) If high RCS usage: OMS ENG FAIL

2 FAs lost √MAN SHUTDN

BCE STRG D I/O RESET (if recov: >>)

1(4) If high RCS usage: L(R) OMS GMBL – SEC (twice)

I/O ERROR PCM OI PCMMU PWR – 2(1)

*If XFD, BLDN, or sensor fail, monitor ENG IN P for off-nominal performance

TOP

HOOK VELCRO

HOOK VELCRO

L R 225 220

205 204

ASC-5a/114/A,O/B

(reduced copy)

Page 186: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-8 ASC/114/FIN A

If two FA MDMs lost

MDMs Preburn: ENG – OFF

During burn: MAN SHUTDN

1,2 1,3 1,4

LEFT (TVC) RIGHT (IGN) LEFT (IGN)

BOTH LEFT RIGHT

2,3 2,4 3,4

LEFT (IGN) RIGHT (IGN) RIGHT (TVC)

RIGHT LEFT BOTH

TOP BACK OF ‘OMS BURN MONITOR’

HOOK VELCRO

HOOK VELCRO

ASC-5b/A,O,E/I

Left OMS Pri TVC

OMS FAILURES

LEFT OMS

RIGHT OMS

Left OMS Sec TVC

Left OMS Ignition

MNA (ALC1) CNTLAB1 †

FA3 *

MNB (ALC2) CNTLAB2 †

FA2

MNA (APC1) FF1 FA1

MNB (APC2) FF2 FA2

MNB (ALC2) CNTLAB2 †

FA1

MNA (ALC1) CNTLAB1 †

FA4

† If CNTL AB1 or AB2 (CA1 or CA2) failed and ign path still exists at OMS fail, assume L(R) OMS ↓ is PRPLT FAIL

* If L(R) Pc failed high during burn, or FA3(4) failed, at L(R) OMS fail, no guidance downmode after L(R) OMS ENG switch OFF (TGO slow, ADI needles in error, 6 ft/s underburn)

Right OMS Pri TVC

Right OMS Sec TVC

Right OMS Ignition

MNC (ALC3) CNTLCA1 †

FA4 *

MNA (ALC1) CNTLCA2 †

FA2

MNC (APC3) FF4 FA4 *

MNA (APC1) FF3 FA3

MNA (ALC1) CNTLCA2 †

FA1

MNC (ALC3) CNTLCA1 †

FA3

(reduced copy)

Page 187: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-9 ASC/114/FIN A

OMS 2/ ORBIT OMS

BURNS √MM105/202(302) Enter TGO +5 sec (2 eng) or TGO +10 sec (1 eng)

√BURN ATT (INRTL) then REF, pb – push √ENG SEL √DAP TRANS – NORM (MM202) CNTL PWR (two) – ON √DAP – AUTO(PASS)/DISC

√GMBL TRIM 2 engine: P = +0.4 LY = -5.7 RY = +5.7 1 engine: P = +0.4 LY = +5.2 RY = -5.2

L,R OMS He PRESS/VAP ISOL A (two) – OP . . . Wait 2 sec . . . L,R OMS He PRESS/VAP ISOL B (two) – GPC (OP for SE

burn) TIG-2 SEL OMS ENG(s) – ARM/PRESS (√P VLVs OP)

If P VLV CL: Aff OMS ENG – OFF

WARNING Do not burn aff engine if:

OMS N2 TK P < 470(564) (NONCRIT BURN) He TK P < 640 FU ENG IN P < 216(244) OX ENG IN P < 151(244)

∆VTOT: OMS XFEED RETURN (Planned Single

Engine) -:15 EXEC

If OMS ENG Pc MSG and non critical burn: Aff ENG – OFF If Leaking OMS PROP, burn RCS +X TIG - 15 sec to

OMS IGN + 1 sec :00 TIG; start watch (√Pc, ∆VTOT, ENG VLVs)

* * * * * * * * * * * * * * * * * * * *

OMS PRPLT FAIL: HP < 85 (CONTINUE BURN):

Failed OMS ENG – OFF √XFEED (two) – CL TK ISOL (two) – CL He PRESS (two) – CL

HP > 85 (STOP BURN): OMS ENG (two) – OFF

√Failed OMS XFEED (two) – CL TK ISOL (two) – CL He PRESS (two) – CL

OMS ENG FAIL: ASCENT or CRIT O/O (Continue Burn) Failed ENG – OFF OMS XFEED at → 1/2 ∆VTOT

at FAIL RCS COMPLETION: (Hp < 85 or CRIT O/O)

Interconnect to either OMS that was ENG FAIL THC +X (Hp = 85 ) Post burn, AFT RCS RECONFIG

* * * * * * * * * * * * * * * * * * * *

CUTOFF +:02 OMS ENG(s) – OFF (if < 3 IMU, at ) Trim Residuals:

TOP

ASC-6a/114/A,O/B

HOOK VELCRO

HOOK VELCRO

GPC OP CL ORB BURN A B

OMS 2 TAIL ONLY CNTL Orbit VGO X < 0.2 fps VGO Y,Z < 2 fps

VGO X < +0.2 fps All axes < 0.2 fps

:

(reduced copy)

Page 188: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-10 ASC/114/FIN A

OPS 1 RCS BURN

AFT RCS √RCS BURN CONFIG:

OMS TK ISOL (all) – OP L(R) OMS XFEED (two) – OP R(L) OMS XFEED (two) – CL AFT L,R RCS XFEED (four) – OP AFT L,R RCS TK ISOL (six) – CL

TIG-2 L,R OMS He PRESS/VAP ISOL A – OP

. . . Wait 2 sec . . . L,R OMS He PRESS/VAP ISOL B – OP

√MM105 CNTLR PWR (two) – ON

√BURN ATT (INRTL) then REF, pb – push √RCS SEL DAP: INRTL/DISC

:00 + X Maintain PITCH ATT ERR ± 3° Monitor OMS data Monitor ∆VTOT

CUTOFF Release THC CNTLR PWR (two) – OFF

FWD RCS FRCS BURN PREP Load DUMMY target for FRCS attitude

RCS SEL – ITEM 4 EXEC TIG @ TTA = 2:00 or as reqd ∆VX = - 2.1 (ITEM 19) ∆VY = 0 (ITEM 20) ∆VZ = +1.0 (ITEM 21) LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

TIG-10 Auto Mnvr to ATT When in attitude:

ADI ATT – REF (push) Load External ∆V Burn Target

∆VX = +80 ∆VY = 0 ∆VZ = 0 LOAD – ITEM 22 EXEC TIMER – ITEM 23 EXEC

√VGOX = negative √VGOY = 0 √VGOZ = + 21 ± 2 √REF ball – 0,0,0

NOTE

Error needles invalid during burn Burn time = ~2X TGO TGT Hp = 85 for ASCENT

-:30 CNTLR PWR (two) – ON DAP: INRTL/DISC

:00 -X CUTOFF CUR HP = TGT HP , release THC

CNTLR PWR (two) – OFF

TOP BACK OF ‘OMS2/ORBIT OMS BURNS’

ASC-6b/114/A,O/B

HOOK VELCRO

HOOK VELCRO

OMS TK switch at 1/2 ∆VTOT (If reqd)

(reduced copy)

Page 189: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-11 ASC/114/FIN A

TOP

TOP BACK OF ‘ASCENT

ADI-NOMINAL’

HOOK VELCRO

HOOK VELCRO

(reduced copy)

Page 190: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-12 ASC/114/FIN A

AOA DEORBIT

BURN (2 ENG)

√MM302 √OMS BOTH Enter TGO + 5 sec

√TRIM: P +0.4, LY -5.7, RY +5.7 L,R OMS He PRESS/VAP ISOL A (two) – GPC B (two) – OP

√DAP – AUTO(PASS)/DISC ADI – LVLH(REF)/HI/MED FLT CNTLR PWR (two) – ON

TIG-2 OMS ENG (two) – ARM/PRESS - :15 EXEC - :15 If OMS AFT QTY < 11%, THC +X to OMS IGN + 1 sec :00 Start watch (√Pc, ∆VTOT, ENG VLVs)

* * * * * * * * * * * * * * * * * * * * * * * * * *

OMS PRPLT FAIL (CONTINUE BURN): Failed OMS ENG – OFF ITEM 18 +0 EXEC When good OMS QTY:

5%: L, R OMS XFEED (four) – OP 4%: Good OMS TK ISOL (two) – CL If OMS Pc < 80 or OMS TEMP, OMS ENG – OFF

√ADI – LVLH, center needles RCS COMPLETION

OMS ENG FAIL: Failed OMS ENG – OFF OMS XFEED at 1/2 ∆VTOT at fail or OMS QTY

2nd OMS FAIL (ENG or PRPLT): Failed OMS ENG – OFF If PRPLT FAIL:

Secure aff OMS ITEM 18 +0 EXEC

√ADI – LVLH, center needles Interconnect good OMS to RCS

THC +X (√OMS% vs RCS Burn Time) RCS I’CNCT TK SW (N/A for OMS PRPLT FAIL)

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG

RCS COMPLETION

* * * * * * * * * * * * * * * * * * * * * * * * * *

TOP

ASC-8a/A/E

HOOK VELCRO

HOOK VELCRO

%L or

%R

HINGE

(reduced copy)

Page 191: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-13 ASC/114/FIN A

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

RCS COMPLETION: If DIRECT INSERTION:

THC +X to ∆VTOT = 0 or TOT AFT QTY 1 THC +X to FLIP ∆V or At AFT QTY 1 TOT AFT QTY 2 if CUR ∆VTOT: FRCS COMPLETION

FLIP ∆V

AFT ∆V

TGT ∆V

If W/OMS 1:

THC +X to TGT HP or TOT AFT QTY 1

THC +X to FLIP HP or At AFT QTY 1 TOT AFT QTY 2 if CUR HP: FRCS COMPLETION

FLIP HP

AFT HP

TGT HP

FRCS COMPLETION:

Mnvr to -X Att (pitch up at 3°/sec to VGOz = +1/4 ∆VTOT) THC -X to ∆VTOT = 0 or FRCS depletion (JETS FAIL OFF)

%

4 8

1 9

0 0

%

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CUTOFF + :02 OMS ENG(s) – OFF (If < 3 IMU, at )

* AFT RCS RECONFIG if INTERCONNECT * Trim X,Z residuals < 2 fps (< 0.5 fps if shallow)

TOP HINGED AT BOTTOM OF

‘AOA DEORBIT BURN (2 ENG)’

ASC-8aa/114/A/B

HINGE

FRCS COMPLETION

THC +X to TGT ∆V

5 3 % then

FRCS COMPLETION

THC +X to TGT HP

5 3 % then

:

(reduced copy)

Page 192: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-14 ASC/114/FIN A

AOA DEORBIT

BURN (1 ENG)

√MM302 √OMS L or R √OMS BURN CONFIG (L or R XFEED)

Enter TGO + 10 sec √TRIM: P +0.4, LY +5.2, RY -5.2

L,R OMS He PRESS/VAP ISOL A (two) – OP . . . Wait 2 sec . . . B (two) – OP

√DAP – AUTO(PASS)/DISC ADI – LVLH(REF)/HI/MED FLT CNTLR PWR (two) – ON

TIG-2 Good OMS ENG – ARM/PRESS TIG-2:15 EXEC TIG-2:15 If OMS AFT QTY < 11%, THC +X to OMS IGN + 1 sec TIG-2:00 Start watch (√Pc, ∆VTOT, ENG VLVs)

OMS XFEED RETURN at ∆VTOT =

L,R OMS TK ISOL (four) – OP L,R OMS XFEED (four) – CL

* * * * * * * * * * * * * * * * * * * *

OMS PRPLT FAIL (CONTINUE BURN): OMS ENG – OFF ITEM 18 +0 EXEC Secure aff OMS

√ADI – LVLH, center needles Interconnect good OMS to RCS

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG

RCS COMPLETION OMS ENG FAIL (CONTINUE BURN):

OMS ENG – OFF √ADI – LVLH, center needles

Interconnect good OMS to RCS THC +X (√OMS% vs RCS Burn Time) RCS I’CNCT TK SW

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG

RCS COMPLETION RCS +X JET FAIL OFF:

ITEM 18 +0 EXEC G23 Resel jet

* * * * * * * * * * * * * * * * * * * *

TOP BACK OF ‘AOA DEORBIT BURN (2 ENG)’

ASC-8b/A/B

HOOK VELCRO

HOOK VELCRO

or at

%

HINGE

(reduced copy)

Page 193: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-15 ASC/114/FIN A

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

RCS COMPLETION: If DIRECT INSERTION:

THC +X to ∆VTOT = 0 or TOT AFT QTY 1 THC +X to FLIP ∆V or At AFT QTY 1 TOT AFT QTY 2 if CUR ∆VTOT: FRCS COMPLETION

FLIP ∆V

AFT ∆V

TGT ∆V

If W/OMS 1:

THC +X to TGT HP or TOT AFT QTY 1

THC +X to FLIP HP or At AFT QTY 1 TOT AFT QTY 2 if CUR HP: FRCS COMPLETION

FLIP HP

AFT HP

TGT HP

FRCS COMPLETION:

Mnvr to -X Att (pitch up at 3°/sec to VGOz = +1/4 ∆VTOT) THC -X to ∆VTOT = 0 or FRCS depletion (JETS FAIL OFF)

%

4 8

1 9

0 0

%

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CUTOFF + :02 OMS ENG – OFF (If < 3 IMU, at )

* AFT RCS RECONFIG if INTERCONNECT * Trim X,Z residuals < 2 fps (< 0.5 fps if shallow)

TOP HINGED AT BOTTOM OF

‘AOA DEORBIT BURN (1 ENG)’

ASC-8bb/114/A/B

HINGE

FRCS COMPLETION

THC +X to TGT ∆V

5 3 % then

FRCS COMPLETION

THC +X to TGT HP

5 3 % then

:

(reduced copy)

Page 194: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-16 ASC/114/FIN A

HINGE

AOA DEORBIT

BURN (RCS)

√MM302 √RCS SEL √RCS BURN CONFIG (L OMS I’CNCT)

L,R OMS He PRESS/VAP ISOL A (two) – OP . . . Wait 2 sec . . . B (two) – OP

√DAP – INRTL/DISC

ADI – LVLH(REF)/MED/MED FLT CNTLR PWR (two) – ON

TIG THC +X

Maintain PITCH ATT ERR ± 3° Monitor ∆VTOT

RCS I’CNCT TK SW at ∆VTOT = R OMS XFEED (two) – OP L OMS XFEED (two) – CL

OMS PRPLT LOW

AFT RCS RECONFIG AT ∆VTOT = RCS COMPLETION

* * * * * * * * * * *

OMS PRPLT FAIL (MULTIPLE JETS FAIL OFF): Secure aff OMS ITEM 18 +0 EXEC

G23 Resel jets Interconnect good OMS to RCS

THC +X (√OMS% vs RCS Burn Time) AFT RCS RECONFIG RCS COMPLETION

RCS +X JET FAIL OFF: ITEM 18 +0 EXEC

G23 Resel jets

* * * * * * * * * * *

TOP

ASC-7a/A/B

(reduced copy)

Page 195: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-17 ASC/114/FIN A

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

RCS COMPLETION: If DIRECT INSERTION:

THC +X to ∆VTOT = 0 or TOT AFT QTY 1 THC +X to FLIP ∆V or At AFT QTY 1 TOT AFT QTY 2 if CUR ∆VTOT: FRCS COMPLETION

FLIP ∆V

AFT ∆V

TGT ∆V

If W/OMS 1:

THC +X to TGT HP or TOT AFT QTY 1

THC +X to FLIP HP or At AFT QTY 1 TOT AFT QTY 2 if CUR HP: FRCS COMPLETION

FLIP HP

AFT HP

TGT HP

FRCS COMPLETION:

Mnvr to -X Att (pitch up at 3°/sec to VGOz = +1/4 ∆VTOT) THC -X to ∆VTOT = 0 or FRCS depletion (JETS FAIL OFF)

%

4 8

1 9

0 0

%

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

CUTOFF: VGOx = 0, release THC AFT RCS RECONFIG Trim Inplane X,Z residuals < 2 fps (< 0.5 fps if shallow)

TOP HINGED AT BOTTOM OF

’AOA DEORBIT BURN (RCS)’

ASC-7aa/114/A/B

HINGE

FRCS COMPLETION

THC +X to TGT ∆V

5 3 % then

FRCS COMPLETION

THC +X to TGT HP

5 3 % then

(reduced copy)

Page 196: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-18 ASC/114/FIN A

TOP BACK OF ‘AOA DEORBIT BURN (RCS)’

ASC-7b/A/B

HOOK VELCRO

HOOK VELCRO

HINGE

(reduced copy)

Page 197: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-19 ASC/114/FIN A

TOP HINGED AT BOTTOM OF

BACK OF ’AOA DEORBIT BURN (RCS)’

ASC-7bb/A/B

HINGE

(reduced copy)

Page 198: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-20 ASC/114/FIN A

TOP

ASC-9a/114/A/C

PILE VELCRO

PILE VELCRO

HOOK VELCRO

PILE VELCRO

PILE VELCRO

HOOK VELCRO

ZZA TAL REDESIGNATION (114 OCFR4 CYC)

(reduced copy)

Page 199: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-21 ASC/114/FIN A

1st EO VI (KFPS) 5.6 5.8 6.0 6.2 6.4 6.6 6.8

CHERRY POINT (7) 6.7 - 7.0 6.7 - 7.2 6.8 - 7.3 6.8 - 7.4 6.9 - 7.5 6.9 - 7.6

OTIS ANGB (16) 10.3 - 11.1 10.3 - 11.2 10.2 - 11.3 10.2 - 11.5 10.2 - 11.6 10.2 - 11.6 1st EO VI (KFPS) 7.0 7.2 7.4 7.6 7.8 8.0 8.2

CHERRY POINT (7) 7.0 - 7.7 7.2 - 7.8 7.4 - 7.9 7.6 - 7.9 7.8 - 8.0 8.0 - 8.0

GABRESKI (15) 10.5 - 10.7 10.4 - 10.8 10.3 - 11.0

OTIS ANGB (16) 10.2 - 11.7 10.2 - 11.8 10.2 - 11.9 10.2 - 12.0 10.2 - 12.1 10.2 - 12.1 10.3 - 12.2 1st EO VI (KFPS) 8.4 8.6 8.8 9.0 9.2 9.4 9.6

OCEANA NAS (8) 8.6 - 9.0 8.8 - 9.1 9.0 - 9.2 9.2 - 9.3

WALLOPS (9) 9.4 - 9.6 9.2 - 9.7 9.4 - 9.8 9.6 - 9.8

GABRESKI (15) 10.3 - 11.1 10.3 - 11.2 10.3 - 11.3 10.4 - 11.3 10.4 - 11.4 10.4 - 11.5 10.4 - 11.5

OTIS ANGB (16) 10.3 - 12.3 10.3 - 12.3 10.3 - 12.4 10.4 - 12.4 10.4 - 12.5 10.5 - 12.6 10.5 - 12.6

PEASE INT’L (17) 11.3 - 11.7 11.3 - 11.9 11.3 - 12.0 11.3 - 12.1 11.3 - 12.2 11.3 - 12.2 11.3 - 12.3 1st EO VI (KFPS) 9.8 10.0 10.2 10.4 10.6 10.8 11.0

WALLOPS (9) 9.8 - 9.9

GABRESKI (15) 10.4 - 11.6 10.5 - 11.7 10.5 - 11.7 10.5 - 11.8 10.6 - 11.8 10.8 - 11.9 11.0 - 11.9

OTIS ANGB (16) 10.5 - 12.7 10.5 - 12.7 10.6 - 12.8 10.6 - 12.8 10.7 - 12.9 10.8 - 12.9 11.0 - 12.9

PEASE INT’L (17) 11.3 - 12.4 11.4 - 12.5 11.4 - 12.5 11.5 -12.6 11.5 - 12.6 11.5 - 12.7 11.5 - 12.7 1st EO VI (KFPS) 11.2 11.4 11.6 11.8 12.0 12.2 12.4

GABRESKI (15) 11.2 - 12.0 11.4 -12.0 11.6 - 12.1 11.8 - 12.2 12.0 - 12.2 12.2 - 12.3

OTIS ANGB (16) 11.2 - 13.0 11.4 - 13.0 11.6 - 13.1 11.8 - 13.1 12.0 - 13.2 12.2 - 13.2 12.4 - 13.2

PEASE INT’L (17) 11.5 - 12.8 11.5 - 12.8 11.6 - 12.9 11.8 - 12.9 12.0 - 13.0 12.2 - 13.0 12.4 - 13.0 1st EO VI (KFPS) 12.6 12.8 13.0 13.2 13.4 13.6 13.8

OTIS ANGB (16) 12.6 - 13.3 12.8 - 13.3 13.0 - 13.4 13.2 - 13.4 13.4 - 13.4

PEASE INT’L (17) 12.6 - 13.1 12.8 - 13.1 13.0 - 13.1

TOP BACK OF ‘ZZA TAL REDESIGNATION’

ASC-9b/114/A/C

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

ECAL – ZZA or MRN or FMI PRIME TAL

(reduced copy)

Page 200: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-22 ASC/114/FIN A

TOP

ASC-10a/114/A/C

PILE VELCRO

PILE VELCRO

HOOK VELCRO

PILE VELCRO

PILE VELCRO

HOOK VELCRO

MRN TAL REDESIGNATION (114 OCFR4 CYC)

(reduced copy)

Page 201: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-23 ASC/114/FIN A

1st EO VI (KFPS) 5.6 5.8 6.0 6.2 6.4 6.6 6.8

CHERRY POINT (7) 6.7 - 7.0 6.7 - 7.2 6.8 - 7.3 6.8 - 7.4 6.9 - 7.5 6.9 - 7.6

OTIS ANGB (16) 10.3 - 11.1 10.3 - 11.2 10.2 - 11.3 10.2 - 11.5 10.2 - 11.6 10.2 - 11.6 1st EO VI (KFPS) 7.0 7.2 7.4 7.6 7.8 8.0 8.2

CHERRY POINT (7) 7.0 - 7.7 7.2 - 7.8 7.4 - 7.9 7.6 - 7.9 7.8 - 8.0 8.0 - 8.0

GABRESKI (15) 10.5 - 10.7 10.4 - 10.8 10.3 - 11.0

OTIS ANGB (16) 10.2 - 11.7 10.2 - 11.8 10.2 - 11.9 10.2 - 12.0 10.2 - 12.1 10.2 - 12.1 10.3 - 12.2 1st EO VI (KFPS) 8.4 8.6 8.8 9.0 9.2 9.4 9.6

OCEANA NAS (8) 8.6 - 9.0 8.8 - 9.1 9.0 - 9.2 9.2 - 9.3

WALLOPS (9) 9.4 - 9.6 9.2 - 9.7 9.4 - 9.8 9.6 - 9.8

GABRESKI (15) 10.3 - 11.1 10.3 - 11.2 10.3 - 11.3 10.4 - 11.3 10.4 - 11.4 10.4 - 11.5 10.4 - 11.5

OTIS ANGB (16) 10.3 - 12.3 10.3 - 12.3 10.3 - 12.4 10.4 - 12.4 10.4 - 12.5 10.5 - 12.6 10.5 - 12.6

PEASE INT’L (17) 11.3 - 11.7 11.3 - 11.9 11.3 - 12.0 11.3 - 12.1 11.3 - 12.2 11.3 - 12.2 11.3 - 12.3 1st EO VI (KFPS) 9.8 10.0 10.2 10.4 10.6 10.8 11.0

WALLOPS (9) 9.8 - 9.9

GABRESKI (15) 10.4 - 11.6 10.5 - 11.7 10.5 - 11.7 10.5 - 11.8 10.6 - 11.8 10.8 - 11.9 11.0 - 11.9

OTIS ANGB (16) 10.5 - 12.7 10.5 - 12.7 10.6 - 12.8 10.6 - 12.8 10.7 - 12.9 10.8 - 12.9 11.0 - 12.9

PEASE INT’L (17) 11.3 - 12.4 11.4 - 12.5 11.4 - 12.5 11.5 -12.6 11.5 - 12.6 11.5 - 12.7 11.5 - 12.7 1st EO VI (KFPS) 11.2 11.4 11.6 11.8 12.0 12.2 12.4

GABRESKI (15) 11.2 - 12.0 11.4 -12.0 11.6 - 12.1 11.8 - 12.2 12.0 - 12.2 12.2 - 12.3

OTIS ANGB (16) 11.2 - 13.0 11.4 - 13.0 11.6 - 13.1 11.8 - 13.1 12.0 - 13.2 12.2 - 13.2 12.4 - 13.2

PEASE INT’L (17) 11.5 - 12.8 11.5 - 12.8 11.6 - 12.9 11.8 - 12.9 12.0 - 13.0 12.2 - 13.0 12.4 - 13.0 1st EO VI (KFPS) 12.6 12.8 13.0 13.2 13.4 13.6 13.8

OTIS ANGB (16) 12.6 - 13.3 12.8 - 13.3 13.0 - 13.4 13.2 - 13.4 13.4 - 13.4

PEASE INT’L (17) 12.6 - 13.1 12.8 - 13.1 13.0 - 13.1

TOP BACK OF ‘MRN TAL REDESIGNATION’

ASC-10b/114/A/C

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

ECAL – ZZA or MRN or FMI PRIME TAL

(reduced copy)

Page 202: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-24 ASC/114/FIN A

TOP

ASC-12a/114/A/C

PILE VELCRO

PILE VELCRO

HOOK VELCRO

PILE VELCRO

PILE VELCRO

HOOK VELCRO

FMI TAL REDESIGNATION (114 OCFR4 CYC)

(reduced copy)

Page 203: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-25 ASC/114/FIN A

1st EO VI (KFPS) 5.6 5.8 6.0 6.2 6.4 6.6 6.8

CHERRY POINT (7) 6.7 - 7.0 6.7 - 7.2 6.8 - 7.3 6.8 - 7.4 6.9 - 7.5 6.9 - 7.6

OTIS ANGB (16) 10.3 - 11.1 10.3 - 11.2 10.2 - 11.3 10.2 - 11.5 10.2 - 11.6 10.2 - 11.6 1st EO VI (KFPS) 7.0 7.2 7.4 7.6 7.8 8.0 8.2

CHERRY POINT (7) 7.0 - 7.7 7.2 - 7.8 7.4 - 7.9 7.6 - 7.9 7.8 - 8.0 8.0 - 8.0

GABRESKI (15) 10.5 - 10.7 10.4 - 10.8 10.3 - 11.0

OTIS ANGB (16) 10.2 - 11.7 10.2 - 11.8 10.2 - 11.9 10.2 - 12.0 10.2 - 12.1 10.2 - 12.1 10.3 - 12.2 1st EO VI (KFPS) 8.4 8.6 8.8 9.0 9.2 9.4 9.6

OCEANA NAS (8) 8.6 - 9.0 8.8 - 9.1 9.0 - 9.2 9.2 - 9.3

WALLOPS (9) 9.4 - 9.6 9.2 - 9.7 9.4 - 9.8 9.6 - 9.8

GABRESKI (15) 10.3 - 11.1 10.3 - 11.2 10.3 - 11.3 10.4 - 11.3 10.4 - 11.4 10.4 - 11.5 10.4 - 11.5

OTIS ANGB (16) 10.3 - 12.3 10.3 - 12.3 10.3 - 12.4 10.4 - 12.4 10.4 - 12.5 10.5 - 12.6 10.5 - 12.6

PEASE INT’L (17) 11.3 - 11.7 11.3 - 11.9 11.3 - 12.0 11.3 - 12.1 11.3 - 12.2 11.3 - 12.2 11.3 - 12.3 1st EO VI (KFPS) 9.8 10.0 10.2 10.4 10.6 10.8 11.0

WALLOPS (9) 9.8 - 9.9

GABRESKI (15) 10.4 - 11.6 10.5 - 11.7 10.5 - 11.7 10.5 - 11.8 10.6 - 11.8 10.8 - 11.9 11.0 - 11.9

OTIS ANGB (16) 10.5 - 12.7 10.5 - 12.7 10.6 - 12.8 10.6 - 12.8 10.7 - 12.9 10.8 - 12.9 11.0 - 12.9

PEASE INT’L (17) 11.3 - 12.4 11.4 - 12.5 11.4 - 12.5 11.5 -12.6 11.5 - 12.6 11.5 - 12.7 11.5 - 12.7 1st EO VI (KFPS) 11.2 11.4 11.6 11.8 12.0 12.2 12.4

GABRESKI (15) 11.2 - 12.0 11.4 -12.0 11.6 - 12.1 11.8 - 12.2 12.0 - 12.2 12.2 - 12.3

OTIS ANGB (16) 11.2 - 13.0 11.4 - 13.0 11.6 - 13.1 11.8 - 13.1 12.0 - 13.2 12.2 - 13.2 12.4 - 13.2

PEASE INT’L (17) 11.5 - 12.8 11.5 - 12.8 11.6 - 12.9 11.8 - 12.9 12.0 - 13.0 12.2 - 13.0 12.4 - 13.0 1st EO VI (KFPS) 12.6 12.8 13.0 13.2 13.4 13.6 13.8

OTIS ANGB (16) 12.6 - 13.3 12.8 - 13.3 13.0 - 13.4 13.2 - 13.4 13.4 - 13.4

PEASE INT’L (17) 12.6 - 13.1 12.8 - 13.1 13.0 - 13.1

TOP BACK OF ‘FMI TAL REDESIGNATION’

ASC-12b/114/A/C

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

ECAL – ZZA or MRN or FMI PRIME TAL

(reduced copy)

Page 204: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-26 ASC/114/FIN A

TAL

MIN 1 2 3 4 5 6 8 7

RTLS ATO NOM MECO 25.82

2 ENG TAL 5.8

NEG RET 8.1

PTM 17.6

PTA 10.6

1 EO

SE OPS 3 12.1

SE ZZA 14.3

SE PTM 19.0

2 EO

3 OUT FIRST 3 OUT SECOND (ECAL) TAL N SRB SEP 18.4 K 25.1 K 3 EO

ASCENT/ABORT SUMMARY (114 OCFR4 CYC)

(Vi in Kfps)

NOM 2 OUT FIRST 2 OUT SECOND (ECAL) DRP TAL

ASC-11a/114/A/C

ASC-11b/A/C

HOOK

TOP BACK OF ‘ASCENT/ABORT SUMMARY’

TOP

(reduced copy)

Page 205: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-27 ASC/114/FIN A

TOP

EMERGENCY EGRESS

ASC-15a/A,E/G

PRELAUNCH MODE 1

TABS – RELEASE

VISOR – CLOSE / LOCK

LES O2 – ON

GREEN APPLE – PULL

KNEEBOARDS – REMOVE

COOLING – DISCONNECT

RESTRAINT – RELEASE

PARACHUTE (four) – RELEASE

COMM – DISCONNECT

LES O2 – DISCONNECT

EGRESS SEAT

HATCH – OPEN MANUALLY

SLIDEWIRE BASKETS

POST LANDING MODE 5

TABS – RELEASE

VISOR – CLOSE / LOCK

LES O2 – ON

GREEN APPLE – PULL

KNEEBOARDS – REMOVE

COOLING – DISCONNECT

RESTRAINT – RELEASE

PARACHUTE (four) – RELEASE

COMM – DISCONNECT

(G-SUIT CLIP – PULL)

LES O2 – DISCONNECT

PLT – EMER PWR DOWN

EGRESS SEAT

SLIDE/ESCAPE PANEL

BAILOUT MODE 8

REPORT POSITION

√MACH < 1.0

P, R/Y – CSS

OPS 305/603 PRO (if reqd)

SB – AUTO; BF – AUTO

FLY 185-195 KEAS, Φ = 0° ABORT MODE – ATO

ABORT PBI – PUSH

P,R/Y – AUTO

FLT CNTLR PWR (two) – OFF

~50K FT

TABS – RELEASE

VISOR – CLOSE / LOCK

LES O2 – ON

GREEN APPLE – PULL

~40K FT

MS3 – VENT CABIN

CDR,PLT SEATS – LOWER

KNEEBOARDS – REMOVE

COOLING – DISCONNECT

RESTRAINT – RELEASE

D-RING – UNCOVER

~30K FT

MS3 – JETTISON HATCH

COMM – DISCONNECT

(G-SUIT CLIP – PULL)

LES O2 – DISCONNECT

EGRESS SEAT

POLE – DEPLOY

D-RING – HOOK UP

BAILOUT

(reduced copy)

Page 206: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-28 ASC/114/FIN A

TOP BACK OF ‘EMERGENCY EGRESS’

ASC-15b/A,E/D

HOOK VELCRO

(reduced copy)

Page 207: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-29 ASC/114/FIN A

TOP

ASC-16b/A,E/C

HOOK VELCRO

ASC-16a/A,E/D

TOP BACK OF ‘ESCAPE PANEL EGRESS’

CLEAR WINDOW

√TABS / VISOR / GREEN APPLE

PULL PANEL JETT HANDLE

PRYBAR/VENT – IF REQD

PLT – EMERGENCY POWERDOWN

DEPLOY & ATTACH SKY GENIE

EGRESS

ESCAPE PANEL EGRESS

(reduced copy)

Page 208: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-30 ASC/114/FIN A

GPC/FCS CHANNEL CONFIGURATION

TOP

GPC

G P C

G P C

G P C

G P C

ASC-17a/ A,O,E/B

Delay 2 sec between each switch throw (AUTO � ORIDE)

TOP BACK OF ‘GPC’

ASC-17b/ A,O,E/B

Fabrication Notes 1. Cut to exact outside edge 2. Cover GPC boxes with Scotch tape

HOOK VELCRO

(reduced copy)

Page 209: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-31 ASC/114/FIN A

OV103 ONLY

PANEL R14 - OV103 ONLY

ASC-18a/A,O,E/G

(reduced copy)

Page 210: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-32 ASC/114/FIN A

TOP BACK OF ‘PANEL R14 - OV103 ONLY’

ASC-18b/A,O,E/C

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

HOOK VELCRO

(reduced copy)

Page 211: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY CC 10-33 ASC/114/FIN A

LOC/BREAK-UP

BEFORE ‘GO AT THROTTLEUP’ • GREEN APPLE • JETTISON HATCH • BAILOUT • PULL RIP CORD

‘GO AT THROTTLEUP’ TO SRB SEP • GREEN APPLE • VENT • ‘G’ SPIKE • JETTISON HATCH √ ALT/SUIT • BAILOUT (BELOW 40 K) • PULL RIP CORD

AFTER SRB SEP √ TABS/VISOR/GREEN APPLE • GO TO MIDDECK • VENT • ‘G’ SPIKE • JETTISON HATCH √ ALT/SUIT • BAILOUT (BELOW 40 K) • PULL RIP CORD

NOTE: This crew kneeboard card is optional and has no back facing

ASC-21a/A/C

TOP

(reduced copy)

Page 212: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-34 A

SC

/114/FIN

A

(reduced copy)

Page 213: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-35 A

SC

/114/FIN

A

(reduced copy)

Page 214: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-36 A

SC

/114/FIN

A

(reduced copy)

Page 215: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-37 A

SC

/114/FIN

A

(reduced copy)

Page 216: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-38 A

SC

/114/FIN

A

(reduced copy)

Page 217: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-39 A

SC

/114/FIN

A

(reduced copy)

Page 218: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-40 A

SC

/114/FIN

A

(reduced copy)

Page 219: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FA

B U

SE

ON

LY

CC

10-41 A

SC

/114/FIN

A

(reduced copy)

Page 220: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

FAB USE ONLY 10-42 ASC/114/FIN A

This Page Intentionally Blank

Page 221: Ascent Checklist - NASA Ascent Checklist STS-114 Mission Operations Directorate Flight Design and Dynamics Division Final, Rev A January 25, 2005 National Aeronautics and Space Administration

Flight Cover (trim bottom to expose tabs)

JSC-48005-114 FINAL, REV A

ASCENT CHECKLIST

STS

114