ASBUs Overview

Embed Size (px)

Citation preview

  • 8/13/2019 ASBUs Overview

    1/32

    International Civil Aviation Organization

    Overview of the

    Block Upgrades Concept

    Tai Feng

    Air Navigation Commissioner

    International Civil Aviation Organization

  • 8/13/2019 ASBUs Overview

    2/32

    2

    Our Collective Challenge

    Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    3/32

    3

    Developing

    Tomorrows Aviation System

    Global framework is needed to ensure:

    Safety is maintained and enhanced

    ATM improvement programmes are harmonized

    Barriers to future efficiency and environmental gains areremoved, at reasonable cost

    Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    4/32

    4

    Developing

    Tomorrows Aviation System

    Investment certainty is required for:

    Operators

    Infrastructure providers

    Equipment manufacturers

    Regulatory approval process must be outlined

    Support States in introduction of significant changes

    Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    5/32

    5

    Developing

    Tomorrows Aviation System

    ICAO developed 4-step plan

    Setting the stage for global interoperability

    Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    6/32

    6

    Step 1Get Harmonization on the Global Agenda

    ICAO Future Systems Symposium (2008)

    Convened Standards Organization Roundtable (2009)

    Established working agreements with Standards

    Organizations on shared work programmes

    Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    7/327

    Step 2Block Upgrades

    Define aviation system block upgrades

    For interoperability purposes

    Independent of when and where specific ATM

    improvement programmes are introduced

    Preparatory Workshop for AN-Conf/12

    Why is this approach proposed?

  • 8/13/2019 ASBUs Overview

    8/32

    The Reality of Our System Today

    8Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    9/32

    A Team Effort

    9Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    10/32

    What is a Block Upgrade?

    10Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    11/32

    Canada

    We Can Benefit From What Is

    Already Out There

    Australia

    India

    China

    Russia

    11Preparatory Workshop for AN-Conf/12

    Brazil

  • 8/13/2019 ASBUs Overview

    12/32

  • 8/13/2019 ASBUs Overview

    13/32

    A Block is Made Up of Modules

    13Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    14/32

    So a Block is Scalableto Meet Regional or Local Needs

    14Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    15/32

    Modules are Grouped in

    4 Performance Improvement Areas

    15Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    16/32

    Airport Operations

    16Preparatory Workshop for AN-Conf/12

    Gl b ll I bl

  • 8/13/2019 ASBUs Overview

    17/32

    Globally Interoperable

    Systems & Data

    17Preparatory Workshop for AN-Conf/12

    O i C i

  • 8/13/2019 ASBUs Overview

    18/32

    Optimum Capacity

    & Flexible Flights

    18Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    19/32

    Efficient Flight Path

    19Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    20/32

    Lets Focus on Block 1

    20Preparatory Workshop for AN-Conf/12

    Bl k 1 M d l f

  • 8/13/2019 ASBUs Overview

    21/32

    Block 1 Modules for:Airport Operations

    NAV

    Equip.

    A-SMGCS

    Wake

    Vortex

    A-CDM

    Remote

    Tower

    A/D

    MAN

    21Preparatory Workshop for AN-Conf/12

    Bl k 1 M d l f

  • 8/13/2019 ASBUs Overview

    22/32

    Block 1 Modules for:Globally Interoperable Systems & Data

    FF-ICE

    1

    DigitalATM

    Info

    SWIM

    22Preparatory Workshop for AN-Conf/12

    Bl k 1 M d l f

  • 8/13/2019 ASBUs Overview

    23/32

    Block 1 Modules for:Optimum Capacity & Flexible Flights

    Interval

    Mgmt

    In Trail

    ADS

    CDM

    + FLTPlanning

    WX

    Info

    Dynamic

    ATSRouting

    23Preparatory Workshop for AN-Conf/12

    Bl k 1 M d l f

  • 8/13/2019 ASBUs Overview

    24/32

    Block 1 Modules for:Efficient Flight Path

    OPDs

    Synch/

    4D

    TRAD

    RPAs

    24Preparatory Workshop for AN-Conf/12

    Th d B M d l

  • 8/13/2019 ASBUs Overview

    25/32

    Threads Between Modules

    and Across Blocks

    Airport Operations

    Improved

    Approach &

    Departure

    Management

    through

    Integration

    Block 1

    Improved

    Traffic Flow

    through

    Runway

    Metering

    Block 0 Block 2

    Linked

    AMAN/

    DMAN

    Block 3

    Integrated

    AMAN/

    DMAN/

    SMAN

    25Preparatory Workshop for AN-Conf/12

    Th d B M d l

  • 8/13/2019 ASBUs Overview

    26/32

    Globally Interoperable Systems & DataThrough Global SWIM

    IncreasedInteroperability,

    Efficiency &

    Capacity

    through

    Ground-Ground

    Integration

    Block 0 Block 2

    ImprovedCoordination

    through multi-

    centre Ground-

    Ground

    integration:

    (FF-ICE/1

    &

    Flight Object,

    SWIM)

    Block 3

    ImprovedOperational

    Performance

    through the

    introduction of

    Full FF-ICE

    Block 1

    IncreasedInteroperability,

    Efficiency &

    Capacity

    through FF-

    ICE/1

    application

    before

    Departure

    Threads Between Modules

    and Across Blocks

    26Preparatory Workshop for AN-Conf/12

    Th d B t M d l

  • 8/13/2019 ASBUs Overview

    27/32

    Optimum Capacity & Flexible FlightsThrough Global Collaborative ATM

    ImprovedFlow

    Performance

    through

    Planning

    Based on a

    Network-

    Wide View

    Block 0 Block 2

    Increased UserInvolvement in

    the Dynamic

    Utilisation of

    the Network

    Block 3

    Traffic

    Complexity

    Management

    Block 1

    EnhancedFlow

    Performance

    through

    Network

    Operational

    Planning

    Threads Between Modules

    and Across Blocks

    27Preparatory Workshop for AN-Conf/12

    Th d B t M d l

  • 8/13/2019 ASBUs Overview

    28/32

    Efficient Flight PathThrough Trajectory-based Operations

    Improved

    Flexibility &

    Efficiency in

    Descent

    Profiles

    (CDOs)

    Block 0 Block 2

    Optimised

    Arrivals in

    Dense Airspace

    Block 3

    Full 4D

    Trajectory

    based

    Operations

    Block 1

    Improved

    Flexibility &

    Efficiency in

    Descent

    Profiles

    (OPDs)

    Threads Between Modules

    and Across Blocks

    28Preparatory Workshop for AN-Conf/12

    St 3

  • 8/13/2019 ASBUs Overview

    29/32

    29

    Step 3Global Rollout & Feedback at GANIS

    Held Global Air Navigation Industry Symposium

    September 2011

    Over 500 participants from Industry, States and

    international organizations Platform to enable feedback

    Industry voice is critical in our planning

    Essential preparation for AN-Conf/12

    Preparatory Workshop for AN-Conf/12

    Step 3

  • 8/13/2019 ASBUs Overview

    30/32

    30

    Step 3

    What Happened Post-GANIS?

    Collected feedback on the Working Document Until 17 October 2011

    Technical Team generated Edition 2 (version 3) of theWorking Document

    Week of 24th

    October 2011 Edition 2 released for further feedback

    December 2011

    Proposed revision of Global Air Navigation Plan (GANP) Include technical roadmaps for CNS/AIM, based on ASBUs

    concept Internal reviewMay 2012

    Public consultation30 June 2012

    Proposed GANP content will be discussed at AN-Conf/12 19-30 November 2012

    Preparatory Workshop for AN-Conf/12

  • 8/13/2019 ASBUs Overview

    31/32

  • 8/13/2019 ASBUs Overview

    32/32

    www.icao.int/anconf12

    http://www.icao.int/anconf12http://www.icao.int/anconf12http://www.icao.int/anconf12