REPORT TO CLIENT ASBESTOS REFURBISHMENT & SPECIFIC DEMOLITION SURVEY
WITHIN
EURN REF NO: E0048
Oakdale Primary School
On Behalf Of
Stuart Mace
Of
Hamson Barron Smith
Date of Issue: 24th February 2017
Authorised By: Reviewed By:
M C Wells D J Kelly Asbestos Consultant Asbestos Consultant
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
2
CONTENTS
CONTENTS 2
EXECUTIVE SUMMARY 3
ASBESTOS CONTAINING MATERIALS (ACM’s) 3
AREAS OF NO ACCESS 4
PRESUMED ASBESTOS 4
1. INTRODUCTION 5
2. SCOPE OF SURVEY 5
3. RESTRICTIONS AND LIMITATIONS 7
4. SURVEY FINDINGS 7
5. General Recommendations 7
5.1 Remedial Work 7
5.2 Labelling 8
5.3 Further Investigation 8
5.4 HSE Publications 8
REFERENCES 9
APPENDIX 1 - SURVEY METHODOLOGY 10
APPENDIX 2 – ASBESTOS REGISTER 15
APPENDIX 3 – NON ASBESTOS REGISTER 18
APPENDIX 4 – SURVEY PHOTOGRAPHS 20
APPENDIX 5 – SITE PLANS 33
34
APPENDIX 6 – BULK ASBESTOS CERTIFICATES OF ANALYSIS 36
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
3
EXECUTIVE SUMMARY
A Refurbishment and Specific Demolition Asbestos Survey was carried out within Oakdale Primary School, Oakdale Avenue, Stanground, Peterborough, PE2 8TD.
This survey was as comprehensive as possible taking into account accessible boxing, floors, ceilings and wall voids, electrical equipment and any other serviceable items.
See Sections 2 and 3 for further information on scope of survey and any specific restrictions and limitations.
Asbestos materials may remain undetected behind other building materials that were impossible to access without causing major damage. In the event that access is required into any areas that could not reasonably be accessed during this ‘refurbishment & demolition’ survey then access should be considered once the School is closed for a longer period of time. The scope of any additional survey work should be agreed between the client and the consultant prior to any work commencing.
At the time of survey, the premises were occupied and the services were live.
ASBESTOS CONTAINING MATERIALS (ACM’s)
All ACM’s are summarised in the table below and are fully detailed in Appendix 2 – Asbestos Register, with the breakdown of material scores and priority scores (where provisionally collected) shown in the photographs in Appendix 4.
Location Item Recommended Action Recommend Action Timetable
Store 1039 Vinyl Floor Tiles Remove Prior to Refurbishment
Store 1050 Vinyl Floor Tiles Remove Prior to Refurbishment
Store 1047 Vinyl Floor Tiles Remove Prior to Refurbishment
Store 1027 Vinyl Floor Tiles Remove Prior to Refurbishment
Store 1025 Vinyl Floor Tiles Remove Prior to Refurbishment
Store 1004 Vinyl Floor Tiles Remove Prior to Refurbishment
Store 1004 Cement Panel to Ironing Board
Remove Prior to Refurbishment
Store 1030 Vinyl Floor Tiles Remove Prior to Refurbishment
Nursery Block External Cement Downpipe Remove Prior to Demolition
Nursery Block External Cement Fascia Panels Remove Prior to Demolition
Nursery Block Garage Cement Profile Roof Remove Prior to Demolition
Recommended Actions highlighted in bold indicate that remedial work is advised as shown. Items with a Recommended Action/Action Timetable combination of Manage/Routine should be managed as per the clients Asbestos Management Policy (See Section 5.5)
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
4
AREAS OF NO ACCESS
Access into the ducts was not possible without causing significant damage without sufficient time to repair before the School reopened after the half term. Whilst we were informed that no access into the ducts should be necessary during refurbishment works, it should be noted if this were to change we will need to gain access prior to any works taking place. Pipework & Calorifiers within Boiler Room, again without causing irreparable damage to the sealed mmmf insulated pipework and too small a timescale to have replaced prior to school re-opening access was not made to check the pipes/calorifiers themselves for potential asbestos residue. We were informed once again by HBS staff on site that only the boilers were being replaced and the pipework will remain in situ with no alterations. Should the scope of works change in this area we will need to revisit site prior to refurbishment works starting.
PRESUMED ASBESTOS
LOCATION ITEM
Floor Ducts Throughout Pipe Insulation
Boiler Room Pipework & Calorifiers Insulation Residue to Pipes
It is important that the report is kept whole; Amey does not take responsibility for misinterpretations made due to individual sections or appendices of this report being distributed separately. Notes to Executive Summary (1) The duty to manage requirement in CAR 2012 Regulation 4 allows for materials to be presumed to contain asbestos. Therefore in this survey there are potentially two levels of ‘presumption’ (A) Materials Strongly Presumed to contain asbestos is materials which themselves were not sampled, but are referenced to similar materials which were sampled and found to contain asbestos. These materials are found within the Survey Asbestos Register and identified on the plans with a prefix of ‘ref’ in front of the Sample Number. Also, materials in which were known to be commonly used in the manufactured product at the time if installation such as cement sheets, gutters, flue pipes which are readily identifiable, or materials which have the appearance of asbestos but no sample has been taken, e.g. thermal insulation on a pipe where fibres are clearly visible. These materials are found within the Survey Asbestos Register in the appendices of this report with a sample code of ‘SP’ (B) Materials or areas presumed to contain asbestos are those where there is insufficient evidence to confirm that they are asbestos free e.g. where access is restricted due to excessive damage, restrictions or Health & Safety related issues. (2) For details of all surveyed materials see Appendix 2 – Asbestos Register and Appendix 3 – Non Asbestos Register.
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
5
1. INTRODUCTION
Amey undertook a Refurbishment and Specific Demolition Survey at Oakdale Primary School, Oakdale Avenue, Stanground, Peterborough, PE2 8TD. The survey was undertaken at the request of Stuart Mace of Hamson Barron Smith. The survey was carried out on 24th February 2017 by M C Wells & D J Kelly Asbestos Consultant of Amey Peterborough and is intended to aid the client in compiling an asbestos register for the removal of asbestos at the premises prior to refurbishment and demolition works. The site consists of a large single storey Primary School built circa 1970. The main construction is externally a flat roof covered with felt over brick walls. Internal walls were predominantly brick/block or plasterboard cavity wall. Flooring was a concrete slab covered with a combination of carpet tiles and vinyl floor coverings. There were also 2 pre-fabricated sectional garages. On site was a separate Nursery of brick construction under flat felt covered roof, internal walls were predominantly brick/block plaster finish walls, plasterboard ceilings with a sandtex paint finish as well as a pre-fabricated sectional Garage. Plans of the site were used to aid the surveyor in identifying locations during the survey. These are shown in Appendix 5 of this report.
2. SCOPE OF SURVEY
The scope was to undertake an Asbestos Refurbishment Survey throughout the Main School and Specific Demolition Survey to the Nursery Block, IT Suite and Garages in line with the survey specification provided by Hamson Barron Smith. However it should be noted that the scope provided was neither specific nor finalised plans at this stage, so the survey was carried out under the best interpretation of the Riba Stage 1 Report provided by Stuart Mace of Hamson Barron Smith. The purpose of the Asbestos Refurbishment and specific Demolition Survey was to locate, so far as is reasonably practicable, the presence and extent of any suspect ACM’s within the surveyed area prior to refurbishment and demolition works which are to be carried out. To achieve these objectives representative samples were collected and analysed for the presence of asbestos. Where measurements or any other dimensions are recorded within this report, they are only an estimation based on surveyor knowledge. Prior to scoping removal works these figures should be confirmed by those compiling documentation or by any preferred removal contractor prior to undertaking the work. Where widespread ACM’s such as pipe insulation debris have been identified within a large area this will be recorded as the full floor area as it is likely that the whole area will require remedial works to ensure all debris has been removed.
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
6
Man Made Mineral Fibre (MMMF) insulation may occasionally be noted during the survey to avoid potential future confusion, however extents and conditions unless otherwise specified are not part of the remit for this survey. Recommendations regarding the future management of asbestos containing materials are given in Section 5, General Recommendations. This report is designed to aid the client in achieving their duty to manage ACM’s on their property and to highlight ACM’s which could be damaged or disturbed during normal occupancy, including foreseeable maintenance and installations activities.
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
7
3. RESTRICTIONS AND LIMITATIONS
Where surveyors have faced restrictions and/or limitations during the survey they will be highlighted either as areas of no access gained or presumed asbestos as per the executive summary and Appendix 2. Where the client has placed specific restrictions or limitations on the survey scope, these are listed below:
NO SPECIFIC CLIENT RESTRICTIONS It should be noted that whilst the surveyor exercised all reasonable skill and diligence to examine all materials, we cannot guarantee that all asbestos containing materials have been located. Some materials may be well hidden within the fabric of the building or in other non-accessible areas, and may become known when the process of refurbishment and demolition is started.
4. SURVEY FINDINGS
15 samples were collected during the survey. Including any referenced samples, asbestos is present in 11 areas. All materials containing, strongly presumed or presumed to contain asbestos are detailed within the Asbestos Register (See Appendix 2) Where present, survey photographs are shown in Appendix 4. Plans of the site have been used to illustrate the report; these are shown in Appendix 5 of this report. Where present the Certificates of Analysis are given in Appendix 6.
5. General Recommendations
The following sections give general guidance on appropriate controls of ACM’s.
5.1 Remedial Work
If a building or area is programmed for demolition then ALL ACM’s must be removed. Removal of ACM’s may be the only practicable option where refurbishment is planned. Consideration should be given to reducing the score, by remedial action, for all ACM’s with a high material assessment score, i.e. 10 or more or with a medium score i.e.7-9.
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
8
Removal of ACM’s should be considered where these ACM’s are already highly damaged or likely to sustain damage due to location and occupancy of an area. Encapsulation or sealing will depend on the nature of the asbestos material and its condition and the type of protection required (taking into consideration flammability requirements). ACM’s should be sealed with a specially formulated sealant, such as “Firecheck” or “ET150”. The sealing coat must adhere firmly and the integrity of the asbestos material must be sufficient to carry the sealing coat. It is recommended that a detailed specification be compiled for these works, which should be included in any tender documentation.
5.2 Labelling
Where appropriate, ACMs should be labelled with an asbestos warning label as described in The Control of Asbestos Regulations 2012 Approved Code of Practice. Labels must be permanently fixed and care should be taken to ensure that the asbestos is not damaged during labelling. Some locations may not be suitable for labelling, e.g. public areas. In these situations, other methods of identification can be used, for example using a unique colour of paint or affixing “Permit to Work” labels.
5.3 Further Investigation
Where areas or items were not accessible to the surveyor at the time of the survey, either because of locked rooms or because to gain access would have compromised the safety of the surveyor or caused excessive damage to the fabric or décor of the building, further investigation is required. In these circumstances, it has to be presumed that ACM’s may be present in these areas until shown otherwise.
5.4 HSE Publications
Further advice on working with and managing ACM’s can be taken from the following publications issued by the HSE. Health and Safety at Work etc. Act 1974 ISBN 0 10 543774 3 L143 (Second Edition) Managing and working with asbestos Control of Asbestos Regulations 2012, Approved Code of Practice ISBN 978 0 7176 6618 8 And guidance The following guidance is relevant to work with asbestos materials. HSG53 The selection, use and maintenance of respiratory protective ISBN 0 7176 1537 5 Equipment 1998 HSG210 Asbestos essentials task manual ISBN 0 7176 1887 0 HSG213 Introduction to asbestos essentials ISBN 0 7176 1901 X
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM HBS/oakdale Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
9
HSG227 A comprehensive guide to managing asbestos in premises ISBN 0 7176 2381 5 HSG247 Asbestos: The Licensed Contractors Guide 2006 ISBN 0 7176 2874 4
REFERENCES
1. Health and Safety Executive (HSE) (2005) HSG 248 “Asbestos: The analysts’ guide for
sampling, analysis and clearance procedures”.
2. Health and Safety Executive (HSE) (2012) HSG 264 Asbestos: The Survey Guide
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 1 – Survey Methodology
10
APPENDIX 1 - SURVEY METHODOLOGY
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 1 – Survey Methodology
11
UKAS ACCREDITATION The sample analysis is carried out under UKAS accreditation ISO 17025 SURVEY AND SAMPLING The survey and sampling was carried out in accordance Amey documented in-house procedures based on Health and Safety Executive (HSE) Guidance Notes; HSG 248, “Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and HSG 264 , Asbestos The Survey Guide. ANALYSIS Samples are analysed by Life Environmental using methods based upon Health and Safety Executive (HSE) Guidance Note HSG 248 “Asbestos: The analysts’ guide for sampling, analysis and clearance procedures” and the Life Environmental documented in-house procedures. MATERIAL ASSESSMENT An assessment was made of the potential for each identified ACM to release fibres. This Material Assessment is based upon assigning scores according to the Product Type, Asbestos Type, Amount of Damage and Surface Treatment. The scores for each category are added together to give the overall Material Assessment Score. The Material Assessment score relates to the conditions at the time of survey. The overall rating can therefore change, e.g. if ACM’s are damaged or sealant degrades. Material Assessment scores range from 2 to 12; non-asbestos materials are not scored. The scores are defined as follows on the next page.
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 1 – Survey Methodology
12
Sample Variable Score Examples of Score (see notes)
Product type (or debris from product)
1 Asbestos-reinforced composites (plastics, resins, mastics, roofing felts, vinyl floor tiles, semi-rigid paints or decorative finishes, asbestos cement etc.)
2 AIB, millboards, other low density insulation boards, asbestos textiles, gaskets, ropes and woven textiles, asbestos paper and felt.
3 Thermal insulation (e.g. pipe and boiler lagging) sprayed asbestos, loose asbestos, asbestos mattresses and packing.
Extent of Damage/Deterioration
0 Good condition, no visible damage.
1 Low damage: a few scratches or surface marks, broken edges on boards, tiles etc.
2 Medium damage: significant breakage of materials or several small areas where material has been damaged revealing loose asbestos fibres.
3 High damage or delamination of materials, sprays and thermal insulation. Visible asbestos fibres.
Surface Treatment 0 Composite materials containing asbestos: reinforced plastics, resins, vinyl tiles.
1 Enclosed sprays and lagging. AIB (with exposed face painted or encapsulated) asbestos cement sheets etc.
2 Unsealed AIB, or encapsulated lagging or sprays
3 Unsealed lagging or sprays
Asbestos Type 1 Chrysotile
2 Amphibole asbestos excluding Crocidolite
3 Crocidolite
Total Score
Score Potential to release asbestos fibres
10 or more High
7-9 Medium
5-6 Low
4 or less Very Low
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 1 – Survey Methodology
13
RECOMMENDED ACTION: Based on the material assessment score and surveyor findings, a Starting point for appropriate action is recommended. Where any form of remediation is recommended i.e. repair/seal, then this is the most appropriate short term action, which may require follow up works (e.g. after repair of an ACM then labelling/inspection and management will then be required.
Inspect and Manage
Protect/Enclose
Remove
Repair
Seal/Encapsulate
RECOMMENDED ACTION PERIOD A preliminary guide by the surveyor based on material assessment
and experience. This is designed to highlight any ACMs which are considered to be in a position/condition to require immediate attention
Immediate Attention 3 Months 6 Months
9 Months 12 Months
PRIORITY ASSESSMENT The material assessment as described in the previous paragraph identifies the likelihood of fibre release from a material. The priority assessment identifies the likelihood of the material being disturbed. Materials with a high material assessment score will not necessarily be given priority for remedial action. This is based on a priority assessment consisting of a number of factors including: location and extent of material, use and occupancy of, and activities carried out within, the area where the material is present and the likelihood/frequency of maintenance activities within this area. Extract from HSG264 Asbestos: The Survey Guide 129 The priority assessment can only be carried out with detailed knowledge of all these factors. The surveyor can help in this process, by obtaining information which will contribute to the priority assessment, particularly in small or simple premises where information on occupancy and use is straightforward. However, such help must be undertaken with caution. It is the duty holder, under CAR 2012, who is required to make the risk assessment using their detailed knowledge of the activities carried out in the premises. Where Amey have collected priority assessment scores as part of this report, they should be treated as provisional given the survey team’s limited knowledge of the use and occupancy of the premises surveyed. The client or duty holder should review these provisional scores and advise on any changes required. Details on how to complete the Priority Risk Assessment can be found in HSG227 Managing Asbestos in Premises.
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 1 – Survey Methodology
14
COMBINED PRIORITY RISK ASSESSMENT The Combined Priority Risk Assessment includes the Material Risk Assessment scores and Priority Assessment scores as described above and is used to prioritise remedial action on ACM’s. The risk assessment should be carried out by the duty holder, using the information given in the survey report along with their detailed knowledge of the activities carried out within their premises. The risk assessment will form the basis of the management plan. REGISTER KEYS Sample Code: The unique number of any sample collected, or reason why no sample was
collected, is recorded in this column.
Code Description
NA No Access
A (01) Sample
Ref Cross referenced Sample
P Asbestos presumed due to surveyor unable to investigate further due to potential damage (to fabric of building or décor) or due to Health and Safety reasons
SP Strongly Presumed asbestos by visual inspection
EURN No: E0048
Oakdale Primary School
Report Type Asbestos Refurbishment & Specific Demolition Survey
Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 2 – Asbestos Register
15
APPENDIX 2 – ASBESTOS REGISTER
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 2 – Asbestos Register
16
ASBESTOS REGISTER
OAKDALE PRIMARY SCHOOL
Date of Inspection
Floor Room Number
Sample Number
Item Material Accessibility Extent Condition Material Score
Analysis Result
Recommended Action
Action Period
24/02/2017 Ground Store 1004
A04 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 7 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1004
A05 Heat Pad to Ironing Board
Asbestos Cement Easy <1 m2
Low Damage
4 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1030
A06 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1027
Ref A06 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1025
Ref A06 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1020
Ref A06 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1047
Ref A04 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1050
Ref A04 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 Ground Store 1039
Ref A04 Floor Tiles Vinyl/Thermo Floor Tiles
Easy 4 m2
Low Damage
3 Chrysotile Remove Prior to Refurbishment
24/02/2017 External Nursery Block
A11 Downpipe Asbestos Cement Easy 2 Lm Low Damage
4 Chrysotile Remove Prior to Demolition
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 2 – Asbestos Register
17
Date of Inspection
Floor Room Number
Sample Number
Item Material Accessibility Extent Condition Material Score
Analysis Result
Recommended Action
Action Period
24/02/2017 External Nursery Block
A12 Fascia Panels Asbestos Cement Moderate 22 Lm
Low Damage
4 Chrysotile Remove Prior to Demolition
24/02/2017 External Nursery Block Garage
A15 Roof Panels Asbestos Cement Moderate 14 m2
Low Damage
4 Chrysotile Remove Prior to Demolition
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 3 – Non Asbestos Register
18
APPENDIX 3 – NON ASBESTOS REGISTER
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 3 – Non Asbestos Register
19
NON-ASBESTOS REGISTER
OAKDALE PRIMARY SCHOOL
Date of Inspection
Floor Room Name
Room Number
Description
24/02/2017 Ground Classroom 3 1040 Bitumen Sink Pad (Sample No A01)
24/02/2017 Ground Classroom 2 1038 Bitumen Sink Pad (Sample No A02)
24/02/2017 Ground Classroom 1 1040 Bitumen Sink Pad (Sample No Ref A01)
24/02/2017 Ground Store 1047 Bitumen Felt around skylight (Sample No A03)
24/02/2017 Ground Classroom 5 1026 Bitumen Sink Pad (Sample No A01)
24/02/2017 Ground Classroom 4 1029 Bitumen Sink Pad (Sample No A01)
24/02/2017 Ground Classroom 6 1024 Bitumen Sink Pad (Sample No A01)
24/02/2017 Ground Classroom 7 1019 Bitumen Sink Pad (Sample No A01)
24/02/2017 External Throughout N/A Bitumen Roofing Felt (Sample No A07)
24/02/2017 External Throughout N/A Bitumen Damp Proof Course (Sample No A08)
24/02/2017 External Garage 1 N/A Cement Roof Panel (Sample No A09)
24/02/2017 External Garage 2 N/A Cement Roof Panel (Sample No A10)
24/02/2017 External Nursery Block
N/A Bitumen Damp Proof Course (Sample No A13)
24/02/2017 External Nursery Block
N/A Bitumen Roofing Felt (Sample No A14)
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
20
APPENDIX 4 – SURVEY PHOTOGRAPHS
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
21
Floor: Ground
Building/Area: Classroom 3
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Medium Damage
Location Description: Beneath Sink
Sample Number: A01
Item: Photo Number:
Acoustic Sink Pad 913 & 914
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: Ground
Building/Area: Classroom 2
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Beneath Sink
Sample Number: A02
Item: Photo Number:
Acoustic Sink Pad 921 & 922
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
22
Floor: Ground
Building/Area: Classroom 1
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Beneath Sink
Sample Number: Ref A02
Item: Photo Number:
Acoustic Sink Pad 923 & 924
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: Ground
Building/Area: Store 1047
Material: Bitumen
Extent/Amount: N/A
Damage/Condition: Medium Damage
Location Description: Roof light
Sample Number: A03
Item: Photo Number:
Felt 925 & 926
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
23
Floor: Ground
Building/Area: Store 1004
Material: Vinyl & Bitumen
Extent/Amount: 4 m2
Damage/Condition: Low Damage
Location Description: Floor
Sample Number: A04
Item: Photo Number:
Floor Tiles & Adhesive 927 & 928
Asbestos Type: Chrysotile
OVERVIEW
Notes
CLOSE-UP
Recommended Action: Remove prior to Refurbishment
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
0 Asbestos Type:
1
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
3 Priority Assessment Score: N/A Total Risk Score: 3
Floor: Ground
Building/Area: Store 1004
Material: Cement
Extent/Amount: <1 m2
Damage/Condition: Low Damage
Location Description: Ironing Board
Sample Number: A05
Item: Photo Number:
Heat Panel to Ironing Board 929 & 930
Asbestos Type: Chrysotile
Notes
OVERVIEW
CLOSE-UP
Recommended Action: Remove prior to Refurbishment
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
1 Asbestos Type:
1
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
4 Priority Assessment Score: N/A Total Risk Score: 4
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
24
Floor: Ground
Building/Area: Store 1030
Material: Vinyl & Bitumen
Extent/Amount: 4 m2
Damage/Condition: Low Damage
Location Description: Floor
Sample Number: A06
Item: Photo Number:
Floor Tiles & Adhesive 936 & 937
Asbestos Type: Chrysotile
OVERVIEW
Notes Reference to store rooms within classrooms
CLOSE-UP
Recommended Action: Remove prior to Refurbishment
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
0 Asbestos Type:
1
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
3 Priority Assessment Score: N/A Total Risk Score: 3
Floor: Ground
Building/Area: Store 1027
Material: Vinyl & Bitumen
Extent/Amount: 4 m2
Damage/Condition: Low Damage
Location Description: Floor
Sample Number: Ref A06
Item: Photo Number:
Floor Tiles & Adhesive 938 & 940
Asbestos Type: Strongly Presumed Chrysotile
Notes
OVERVIEW
CLOSE-UP
Recommended Action: Remove prior to Refurbishment
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
0 Asbestos Type:
1
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
3 Priority Assessment Score: N/A Total Risk Score: 3
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
25
Floor: Ground
Building/Area: Classroom 5
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Beneath Sink
Sample Number: Ref A01
Item: Photo Number:
Acoustic Sink Pad 941 & 942
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: Ground
Building/Area: Classroom 4
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Beneath Sink
Sample Number: Ref A01
Item: Photo Number:
Acoustic Sink Pad 943 & 944
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
26
Floor: Ground
Building/Area: Store 1025
Material: Vinyl & Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Floor
Sample Number: Ref A06
Item: Photo Number:
Floor Tiles & Adhesive 945 & 946
Asbestos Type: Strongly presumed Chrysotile
OVERVIEW
Notes
CLOSE-UP
Recommended Action: Remove prior to Refurbishment
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
0 Asbestos Type:
1
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
3 Priority Assessment Score: N/A Total Risk Score: 3
Floor: Ground
Building/Area: Classroom 6
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Beneath Sink
Sample Number: Ref A01
Item: Photo Number:
Acoustic Sink Pad 947 & 948
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
27
Floor: Ground
Building/Area: Classroom 7
Material: Bitumen
Extent/Amount: 1 Unit
Damage/Condition: Low Damage
Location Description: Beneath Sink
Sample Number: Ref A01
Item: Photo Number:
Acoustic Sink Pad 949 & 950
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: Ground
Building/Area: Store 1020
Material: Vinyl & Bitumen
Extent/Amount: 4 m2
Damage/Condition: Low Damage
Location Description: Floor
Sample Number: Ref A06
Item: Photo Number:
Floor Tiles & Adhesive 951 & 952
Asbestos Type: Strongly presumed Chrysotile
Notes
OVERVIEW
CLOSE-UP
Recommended Action: Remove prior to Refurbishment
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
28
Floor: External
Building/Area: Above Classroom 2
Material: Bitumen
Extent/Amount: 1600 m2
Damage/Condition: Low Damage
Location Description: Roof
Sample Number: A07
Item: Photo Number:
Roofing Felt 954 & 955
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample no further action required.
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: External
Building/Area: Outside Classroom 2
Material: Bitumen
Extent/Amount: N/A
Damage/Condition: Low Damage
Location Description: Low level brick wall
Sample Number: A08
Item: Photo Number:
Damp Proof Course 956 & 957
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
29
Floor: External
Building/Area: Garage 1
Material: Cement
Extent/Amount: 14 m2
Damage/Condition: Low Damage
Location Description: Roof
Sample Number: A09
Item: Photo Number:
Cement profile roof panels 958 & 959
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: Type of maintenance activity:
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: External
Building/Area: Garage 2
Material: Cement
Extent/Amount: 14 m2
Damage/Condition: Low Damage
Location Description: Roof
Sample Number: A10
Item: Photo Number:
Cement Profile roof panel 960 & 961
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: Type of maintenance activity:
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
30
Floor: External
Building/Area: Nursery Block
Material: Cement
Extent/Amount: 2 Lm
Damage/Condition: Low Damage
Location Description: Rear external wall
Sample Number: A11
Item: Photo Number:
Redundant Downpipe 970 & 971
Asbestos Type: Chrysotile
OVERVIEW
Notes
CLOSE-UP
Recommended Action: Remove prior to Demolition
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
1 Asbestos Type:
1
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
4 Priority Assessment Score: N/A Total Risk Score: 4
Floor: External
Building/Area: Nursery Block
Material: Cement
Extent/Amount: 22 Lm
Damage/Condition: Low Damage
Location Description: External Wall at High Level
Sample Number: A12
Item: Photo Number:
Fascia Panels 972 & 973
Asbestos Type: Chrysotile
Notes
OVERVIEW
CLOSE-UP
Recommended Action: Remove prior to Demolition
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
1 Asbestos Type:
1
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
4 Priority Assessment Score: N/A Total Risk Score: 4
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
31
Floor: External
Building/Area: Nursery Block
Material: Bitumen
Extent/Amount: 40 Lm
Damage/Condition: Low Damage
Location Description: Low level wall
Sample Number: A13
Item: Photo Number:
Damp Proof Course 974 & 975
Asbestos Type: NAD
OVERVIEW
Notes
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Floor: External
Building/Area: Nursery Block
Material: Bitumen
Extent/Amount: 80 m2
Damage/Condition: Low Damage
Location Description: Roof
Sample Number: A14
Item: Photo Number:
Roofing Felt 976 & 977
Asbestos Type: NAD
Notes
OVERVIEW
CLOSE-UP
Recommended Action: No Asbestos detected within sample, no further action required
Material Assessment
Product: N/A Condition/ Damage:
N/A Surface Treatment:
N/A Asbestos Type:
N/A
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
Priority Assessment
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 4 – Survey Photographs
32
Floor: External
Building/Area: Nursery Block Garage
Material: Cement
Extent/Amount: 14 m2
Damage/Condition: Low Damage
Location Description: Roof
Sample Number: A15
Item: Photo Number:
Cement Profile Roof Panels 980 & 981
Asbestos Type: Chrysotile
OVERVIEW
Notes
CLOSE-UP
Recommended Action: Remove prior to Demolition
Material Assessment
Product: 1 Condition/ Damage:
1 Surface Treatment:
1 Asbestos Type:
1
Priority Assessment
Normal occupant Activity: Not Applicable
Location: Not Applicable
Accessibility: Not Applicable
Extent/Amount: Not Applicable
Number of occupants: Not Applicable Frequency of use of area: Not Applicable
Average time area is in use: N/A Type of maintenance activity:
N/A
Frequency of maintenance activity: Not Applicable
Scores
Material Assessment Score:
N/A Priority Assessment Score: N/A Total Risk Score: 0
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Appendix 5 – Site Plans
33
APPENDIX 5 – SITE PLANS
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Appendix 5 – Site Plans
34
Site Address Oakdale Primary School Oakdale Avenue Stanground Peterborough PE2 8TD Key – Sample Numbers Red – Asbestos Containing Orange – Strongly Presumed Blue – Presumed Green – No Asbestos Detected (NAD) Purple – No Access Gained Further investigation recommended Asbestos Survey: Not for measurement purposes Client: Peterborough City Council Dwg: 1of2 Eurn No:0048
Date:24/02/2017
Scale:NTS Annotated:MW
Loft Hatch
Floor Duct
Penetration through ceiling
Penetration through wall
Amey Peterborough Nursery Lane Depot
Peterborough PE1 5BG
A01
A02 RefA02
Garage 1
A05
A04
RefA06
RefA01
RefA06
RefA01
RefA06
RefA01
RefA06
RefA01
A09
A10
A01 – Bitumen Sink Pad A02 – Bitumen Sink Pad A03 – Bitumen Felt A04 – Vinyl Floor Tiles A05 – Cement Panel (Ironing Board) A06 – Vinyl Tiles & Adhesive A07 – Roof Felt (Throughout) A08 – Bitumen Damp proof A09 – Cement Roof Panels A10 – Cement Roof Panels
A03
A07 A08
Ref A04
Ref A04
Ref A04
Pipework in ducts and Boiler room should be presumed to contain Asbestos until such
a time when the School is closed long enough to allow sufficient repairs to be made
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG Appendix 5 – Site Plans
35
Site Address Oakdale Primary School Oakdale Avenue Stanground Peterborough PE2 8TD Key – Sample Numbers Red – Asbestos Containing Orange – Strongly Presumed Blue – Presumed Green – No Asbestos Detected (NAD) Purple – No Access Gained Further investigation recommended Asbestos Survey: Not for measurement purposes Client: Peterborough City Council Dwg: 2of2 Eurn No:0048
Date:24/02/2017
Scale:NTS Annotated:DK
Loft Hatch
Floor Duct
Penetration through ceiling
Penetration through wall
Amey Peterborough Nursery Lane Depot
Peterborough PE1 5BG
A15
A11 A12 A13
A14
A11 – Cement Downpipe A12 – Cement Fascia Panels A13 – Bitumen Damp Proof A14 – Roof Felt (Throughout) A15 – Cement Roof Panels
RefA12
RefA12
Nursery Block
RefA12
Roof Top Tank Room
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane Depot, Peterborough, PE1 5BG
Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 6 Bulk Asbestos Certificates of Analysis
36
APPENDIX 6 – BULK ASBESTOS CERTIFICATES OF ANALYSIS
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane
Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 6 Bulk Asbestos Certificates of Analysis
37
EURN No: E0048
Oakdale Primary School
Report Type: Asbestos Refurbishment & Specific Demolition Survey Amey Peterborough, Nursery Lane
Depot, Peterborough, PE1 5BG Project Reference: Amey PDM Tel: 01733 425425 Date Prepared: 10/03/2017 Email: [email protected]
Appendix 6 Bulk Asbestos Certificates of Analysis
38