  • ComAp, spol. s r.o. Svtova 7, 180 00 Praha 8, Czech Republic Tel.: +420 266 790 611, Fax: +420 266 316 647 E-mail: [email protected], www.comap.cz

    PLC Sites installed

    Application Sheet

    May 2004 Prague, Czech Republic Copyright 2004 ComAp s.r.o.

  • National Grid Didcot power station, Great Britain Mains 1 Mains 2

    BTB MC

    B2

    GC

    B2

    GC

    B1

    MC

    B1

    Load 1 Load 2

    BTB Bus Tie Breaker

    MCB Mains Circuit Breaker GCB Genset Circuit Breaker

    Genset 1 Genset 2

    In normal state, when both mains are OK, BTB is open and each load is powered from corresponding mains.

    In case of one mains failure system closes BTB and both loads are powered from the healthy mains.

    If the mains return, BTB opens and corresponding MCB will close. When both mains fail, the system opens BTB and starts both gensets to power each load

    separately.

    If both mains fail and one of gensets is unable to power its load, system starts the healthy genset, connects its load and after a short period closes BTB to connect second load.

    When one of the mains returns, the corresponding genset synchronizes, closes its MCB, transfers load to the mains, opens GCB, cools down the engine and stops it. The system goes then to the

    state with one mains failure described above.

    Used technology: 2x InteliSys (IS 2.7, SPtM), 1x Mitsubishi PLC

    AS02 2

  • Baxter Bohumil, medicine production plant, Czech Republic

    AS02 3

    Mains

    Genset 1 Genset 2

    MC

    B1

    GC

    B1

    GC

    B2

    MC

    B2

    BTB

    Load 2 Prior 1

    Load 2 Prior 3

    Load 2 Prior 2

    Load 1 Prior 1

    Load 1 Prior 3

    Load 1 Prior 2

    Comap system

    BTB Bus Tie Breaker MCB Mains Circuit Breaker GCB Genset Circuit Breaker

    (actions taken by external control system are described in italics)

    In normal state, when mains are OK, BTB is closed and both loads are powered from both mains

    branches simultaneously.

    When mains fail, BTB opens, external plant control system disconnects load with lower priority and gensets start, powering each load separately.

    When the mains return (both branches), gen-sets synchronize to the mains (each by its own InteliMains), transfer load to mains, disconnect GCBs, cool down and stop the engines.

    If one of gensets is unable to start, external plant control systems disconnects all except essential systems, BTB closes and the healthy genset powers load.

    If the mains return, the healthy genset synchronizes to the mains (using the InteliMains) and system returns to normal state.

    When the failing genset is repaired (mains still failed), the system synchronizes it to the running genset, closes its GCB and opens BTB, which enables the external plant control system to

    reconnect some systems.

    Used technology: 2x InteliMains (IM 5.0), 2xInteliGen (IG 5.5, MINT), 1x Mitsubishi PLC

    National Grid Didcot power station, Great BritainBaxter Bohumil, medicine production plant, Czech Republic