57
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/2288 Jabalpur, dated: 22.09.2016 To As per distribution list Sub: Minutes of 53 rd meeting of Operation and Coordination Committee of MP. The Minutes of 53 rd meeting of the Operation and Coordination Committee of MP held on 27 th August 2016 at 11.00 AM at SCADA Control Centre, MPPTCL, Nayagaon, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (K.K.Parbhakar) Member Secretary OCC SLDC, MPPTCL, Jabalpur vkbZ ,l vks : 9001-2008 ISO: 9001-2008

As per distribution list FOR... · 2016-09-22 · Email- [email protected], Indore – 452010, [email protected]. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/2288 Jabalpur, dated: 22.09.2016

To

As per distribution list

Sub: Minutes of 53rd meeting of Operation and Coordination Committee of MP.

The Minutes of 53rd meeting of the Operation and Coordination Committee of MP held on

27th August 2016 at 11.00 AM at SCADA Control Centre, MPPTCL, Nayagaon, Jabalpur has

been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(K.K.Parbhakar) Member Secretary OCC SLDC, MPPTCL, Jabalpur

vkbZ ,l vks : 9001-2008ISO: 9001-2008

Page 2: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Distribution List

1. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected]

2. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

3. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected]

4. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected]

5. The Chief Engineer (O & M:Hydel), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749.

6. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected]

7. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]

8. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]

9. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]

10. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]

11. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]

12. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected]

13. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]

14. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]

15. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected]

16. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

17. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected]

18. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

19. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

20. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old

Itarsi, Distt. Hoshangabad, Email – [email protected]

21. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :- [email protected]

22. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]

Page 3: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD AT SCADA CONTROL CENTRE, MPPTCL, NAYAGAON, JABALPUR

ON 27TH AUGUST 2016 AT 11.00 AM. The 53rd meeting of Operation & Coordination Committee of MP was held on 27th August 2016 at

SCADA Control Centre, MPPTCL, Nayagaon, Jabalpur under the Chairmanship of Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC. The list of participants is enclosed at Annexure -1.0.

Shri. S.C.Ghosh Executive Engineer SCADA Control Centre, MPPTCL, Nayagaon, Jabalpur welcomed the Chairman OCC, CE(T&C), MPPTCL and Member Secretary OCC with a bouquet of flowers and also welcomed all the participants. Thereafter he requested Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC to proceed the meeting.

Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC stated that this is the first OCC meeting of MP

being hosted by T&C, MPPTCL at SCADA Control Centre, MPPTCL, Nayagaon, Jabalpur and further requested the participants for a formal introduction. Thereafter, Chairman OCC informed the committee that in the recent regulation of CERC on DSM, the frequency band was narrowed (i.e.49.9-50.05 Hz). On implementation of DSM regulation the frequency remained out of permissible band for longer period. Now the frequency profile has been improved considerably and constituents of Regional Grid as well as State Grid in general keeping their drawal within the permissible range defined in the DSM regulation. Percentage of time frequency within the permissible range of 49.9-50.05 Hz was 74.09% for the month of June 2016 and 72.35% for the month of July 2016. It has been observed that during the rainy seasons the frequency recorded is generally on higher side, but in June 2016 & July 2016 the frequency was within operating range for higher duration which is a remarkable improvement in the system. The average frequency for the month of June 2016 was 50.00 and for the month of July 2016 was 50.01 Hz. The percentage of time frequency above 50.05 Hz has reduced in the previous months but it is still a concern as percentage of time frequency above 50.05 Hz for the month of June 2016 was 18.28 % and for the month of July 2016 was 23.65%. The percentage of time frequency below 49.9 Hz is almost minimized and was 7.63% for June 2016 & 4.00% for July 2016. The Instantaneous Maximum frequency for the month of June & July 2016 was 50.37 Hz & 50.35 Hz respectively. Instantaneous Minimum frequency for the month of June 2016 was 49.65 Hz. and for July 2016 was 49.69 Hz.

Chairman OCC stated that after implementation of CERC DSM regulation in the country, MP

generally adheres to its scheduled drawal and on very few occasions its drawal violates the deviation range specified in the regulation. MP is the most disciplined state in the Western Region in this regard. For reversal of drawal sign after every 12 time blocks, MP generally remains first or second amongst the constituents of Western Region. WRLDC presents violation data of each constituent in the OCC meetings of WRPC.

Thereafter Chairman OCC requested, Member Secretary OCC to take-up the agenda points.

ITEM NO. 1 : CONFIRMATION OF MINUTES : Member Secretary OCC informed the committee that the Minutes of 52nd meeting of Operation & Coordination Committee of MP held on 27th June 2016 at Conference Hall, SLDC, MPPTCL Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/1662 dated 01.08.2016. No Comments have been received to SLDC. Committee confirmed the minutes.

Minutes of 53rd OCCM of M.P 1

Page 4: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

ITEM NO. 2 :REVIEW OF SYSTEM OPERATION DURING THE MONTHS JUNE 2016 TO JULY 2016.

2.1 Frequency Particulars: Member Secretary OCC informed the committee that during July 2016 the system frequency was below 49.9 Hz for 4.00% of time against 7.63% of time during June 2016. The system frequency was above 50.05 Hz for 23.65% of time during July 2016 against 18.28% of time during June 2016. The system frequency was within the IEGC range of 49.9-50.05 Hz for 72.35% of the time during July 2016 against 74.09% of time during June 2016. The average monthly frequency was 50.00 Hz during June 2016 whereas it was 50.01 Hz in the month of July 2016. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of June 2016 and July 2016 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous minimum frequency

Instantaneous maximum frequency

June 2016 50.00 Hz 49.82 Hz 50.11 Hz 49.65 Hz 50.37 Hz July 2016 50.01 Hz 49.82 Hz 50.16 Hz 49.69 Hz 50.35 Hz

2.2 Operational Matters-

2.2.1 Operational Discipline : Member Secretary OCC informed the committee that system operated in terms of frequency profile for the months June 2016 and July 2016 is as given below for discussion by the committee :

Month % of time Frequency Below 49.9

Hz

% of time Frequency

above 50. 05 Hz

% of time frequency within the permissible range of 49.9-

50.05 Hz

Average monthly

frequency

No. of times frequency

dipped below 49.2 Hz

June 2016 7.63 % 18.28 % 74.09 % 50.00 Hz 0 July 2016 4.00 % 23.65 % 72.35 % 50.01 Hz 0

2.3.1 Voltage Profile: Member Secretary OCC informed the committee that during the months June 2016 and July 2016, the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid.

Sr No

Name of 400 KV

Substation

June 2016 July 2016 Max. Voltage

observed Min. Voltage

observed Max. Voltage

observed Min. Voltage

observed

Voltage KV

Date Voltage

KV Date

Voltage KV

Date Voltage

KV Date

1 Indore 423 30.06.16 396 09.06.16 424 02.07.16 399 16.07.16 2 Itarsi 418 17.06.16 390 10.06.16 422 02.07.16 394 20.07.16

3 Bina 417 28.06.16 400 01.06.16 422 06.07.16 400 13.07.16

4 Gwalior 415 28.06.16 386 25.06.16 416 01.07.16 386 20.07.16

5 Nagda 427 30.06.16 385 03.06.16 429 02.07.16 402 23.07.16 6 Satpura 424 10.06.16 402 10.06.16 431 02.07.16 403 22.07.16 7 Birsinghpur 426 30.06.16 406 03.06.16 428 02.07.16 408 02.07.16

8 ISP 429 03.06.16 405 09.06.16 432 12.07.16 407 25.07.16

Minutes of 53rd OCCM of M.P 2

Page 5: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Member Secretary OCC requested Chief Engineer (T&C), MPPTCL to investigate the low voltage occurred on 03.06.2016 at 400 KV S/s, Nagda.

2.3.2 Status of Capacitor Banks in sub-transmission system : Member Secretary OCC informed the committee that the updated information of the status of capacitor banks in sub-transmission system as on 31st July 2016 as submitted by DISCOMs is detailed below:

Chairman OCC stated that in the forthcoming rabi season the availability of capacitor banks in the

distribution network is utmost necessary for maintaining the voltages within operational range. He also informed the committee that in WZ the no. of capacitor banks healthy but not in service due to control circuit problem has increased comparatively. Further he requested all the Discoms to furnish complete information in the above format and ensure healthiness & availability of capacitor banks during ensuing rabi season.

Representative from WZ informed the committee the matter of repair of Capacitor bank not in

service due to control ckt problem will be taken up.

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: Member Secretary OCC informed the committee that the updated information of the status of Installed capacitor banks (in MVAR) in EHV transmission system as on 31.07.2016 as submitted by MPPTCL is given below:

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVA

R

1500 KVA

R

No of 100

KVAR Units

required

600 KVA

R

1200 KVA

R

600 KVA

R

1200 KVA

R

600 KVA

R

1500 KVA

R

EZ 411 163 22 - - - 30 09 0 94 0 0 0 0 0 77

CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0

WZ 637 543 382 24 14 15 15 17 91 274 4 17 - - 0 190

Voltage Class

Capacitor bank installed as on 31.07.16(MVAR)

Capacity added after Last OCC Meeting (MVAR)

Capacitor banks already covered under ADB T-V

Capacitor Bank Installed but defective

& are not repairable (No & MVAR)

220 KV 100.00 MVAR 0.00 100.00 MVAR All in Service 132 KV 1205.00 MVAR 0.00 1205.00 MVAR

33 KV 4336.50 MVAR 0.00 4336.50 MVAR Total 5641.50 MVAR 0.00 5641.50 MVAR

Minutes of 53rd OCCM of M.P 3

Page 6: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Member Secretary OCC informed the committee that a meeting was held at WRLDC on 18.04.2016 for computation of total import capability (ATC/TTC) of the beneficiaries with PSS/E software. It is necessary to model all the transmission elements of the state network including capacitor banks correctly in the PSS/E software for accurate computation of TTC/ATC of the state. MPPTCL has already been requested in the 51st OCCM of MP to submit the details of capacitor banks installed at various locations along with their capacity and healthiness to SLDC at the earliest. MPPTCL has not furnished the required details so far to the SLDC. In 52nd OCCM of MP MPPTCL has intimated that requisite details would be provided within a week time which is still awaited.

Representative from MPPTCL informed the committee that the desired data will be furnished to SLDC at

the earliest.

2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: Member Secretary OCC informed the committee that the various ongoing Transmission Schemes completed during the current financial year 2016-2017 (upto July 2016) and plan for completion of various ongoing Transmission Schemes for the Year 2016-2017 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii). 2.3.5 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: Member Secretary OCC informed the committee that the Frequency did not touch 49.20 Hz during June 2016 and July 2016. There was no df/dt operation during the same period.

(ii) Defective u/f, df/dt relays: Member Secretary OCC informed the committee that MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation. 2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders :

(i) Member Secretary OCC informed the committee that the details of DISCOM wise Power supply given to various domestic categories during the period June 2016 and July 2016 is enclosed at Annexure 2.4(i).

(ii) Group Allocation to Newly Commissioned existing EHV substations:-

Member Secretary OCC informed the committee that the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below :

SN DISCOM Region No of 33 KV feeders for which groups to

be allocated 01

EAST

Jabalpur 03 02 Sagar 00 03 Rewa 00 04 Total 03 05

WEST Indore 10

06 Ujjain 11 07 Total 21

Minutes of 53rd OCCM of M.P 4

Page 7: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

08 CENTRAL

Bhopal 18 09 Gwalior 06 10 Total 24

TOTAL Grand Total 48 Representative from West Discom informed the committee that group allocation for 7 no. feeders

has been done and 14 no. feeders group allocations are remaining. Representative from central discom informed the committee that group allocation for 6 no. feeders has been done and for remaining is under progress. Representative from East Discom informed that all 3 no. feeders for group allocation are due which will be done shortly. ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme : Member Secretary OCC informed the committee that the annual maintenance /outages of thermal generating units of MPPGCL during July’16 to August ‘16 is as under :-

POWER STATION UNIT NO. FROM TO REASON / REMARK Amarkanatk 5 15.07.16 28.08.16 Unit synchronized on 24.08.2016 at

01:19 Hrs. after COH. Satpura-II 6 01.07.16 30.07.16 Unit synchronized on 31.07.2016 at

06:25 Hrs. after AOH. Satpura –II 7 04.08.16 02.09.16 Unit synchronized on 26.08.2016 at

01:25 Hrs. after AOH. Satpura-IV 10 20.08.16 13.09.16 AOH

SGTPS-I 1 01.08.16 25.09.16 AOH

SGTPS-I 2 15.07.16 28.08.16 Unit synchronized on 24.08.2016 at 09:15 Hrs. after COH.

SGTPS-II 4 15.08.16 13.09.16 AOH

SSTPS-I 1 02.08.16 31.08.16 AOH

SSTPS-I 2 18.07.16 01.08.16 Unit synchronized on 02.08.2016 at 00:00 Hrs. after AOH.

3.2 Proposed shutdown programme of Transmission lines / Transformers : Member Secretary OCC informed the committee that the proposed shutdown of transmission elements for the period 01.09.2016 to 31.10.2016 submitted by MPPTCL is enclosed as Annexure-3.2 3.3 Long Outages of transmission elements and protections : Member Secretary OCC informed the committee that the status submitted by MPPGCL / MPPTCL are given below :

SN

Line/Transformer/Breaker/ Reactor etc. under long outage

Outage date

Reason Response from Utility

1. 220 KV Bus bar protection scheme at SGTPS Birsinghpur

Since commissioning

of 220 KV switch yard

The scheme not available

MPPGCL informed the committee that 220 KV Bus Bar Protection scheme is in service mode w.e.f 26.07.2016.

2. Main Breaker of 400 KV Nagda-Rajgarh-II 23.07.2015 Y-phase CT burst /

BKR Problem 400 KV Rajgarh II is charged from 400 KV Main Bus-I, for ensuring

Minutes of 53rd OCCM of M.P 5

Page 8: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay. 400 KV Rajgarh-I is shifted in diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II.

3.

40 MVA 132/33 KV Transformer ECE make at 132 KV Lakhnadon

06.10.2015 Internal sparking in Y Ph. HV side winding.

The defect developed in transformer and matter taken up with M/s ECE for its repair. The transformer has been shifted to ECE works for repairs and reconditioning. Repair work is completed, testing is also completed. Transformer will be commissioned by 30.09.2016 as intimated by MPPTCL.

4. 3x105 MVA, 400/220 KV ICT-I at 400 KV Indore

02.08.15 Differential protection

optd. and 33 KV tertiary PT burst

The transformer bank is out of circuit from 02.08.2015. 2 No. 105 MVA Units of these banks have failed. The complete bank has to be replaced with 1X315 MVA 3 Ph. Transformer. 315 MVA BHEL make transformer has been unloaded on plinth on 28.04.2016 and erection work is in progress. MPPTCL representative informed that the X’mer shall be commissioned by end of September 2016.

5. 315 MVA, 400/220 kV ICT-I at 400 kV S/s Bina

15.10.15 Due to Buchholtz relay alarm.

The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer has been shifted from Bina to M/s BHEL works for repairs. The order for repair has been placed and it is expected that ICT shall be received by end of October 2016 as intimated by MPPTCL.

6. 315 MVA, 400/220 KV ICT at 400 KV S/s, Julwaniya

05.01.2016

The ICT has been removed for installation at Bina 400 KV S/s and commissioned there at 16:49 Hrs. on dtd. 05.01.2016. In 52nd OCCM MPPTCL representative informed the committee that new Transformer of 315 MVA, 400/220 KV EMCO make order has been placed and it will be commissioned by the end of Jan-2017 as informed by MPPTCL.

7.

160 MVA, 220 / 132 KV X’mer BHEL make at 220 KV S/s Ratlam

12.01.2016 BHEL make Sr. No. 6005206 X’mer failed

MPPTCL informed that the X’mer was commissioned on 04.08.16.

8.

315 MVA, 400/220 KV X’mer II (TELK make) Main Breaker at 400 KV S/s Katni

03.11.2015

X’mer commissioned through bus coupler

breaker since commissioning.

It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 52nd OCCM MPPTCL informed the committee that work will be completed by the Sep-2016.

Minutes of 53rd OCCM of M.P 6

Page 9: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

9. 20 MVA, 132/33 KV transformer at 132 KV Neemuch

01.03.2016

Differential Protection optd. 20 MBA BBL make X’mer Sr. No.

1991/2 failed on 01.03.2016

The replacement of the failed transformer by another 20 MVA transformer will be carried out by September 2016 as intimated by MPPTCL.

10.

40 MVA ,132 /33 KV EMCO make X’mer Sr.No. HT-1344/11641 at 132 KV S/s Ashta

10.05.2016

Transformer failed on dated 10.05.2016 as

intimated by T&C, MPPTCL.

Internal inspection of X’mer will be done after rainy season as intimated by MPPTCL.

11.

20 MVA APEX make 132/33 KV X’mer Sr. No. T-739/45342 at 220 KV S/s Nepanagar

16.05.2016 Transformer failed on 16.05.16 as intimated

by T&C, MPPTCL.

New 50 MVA X’mer received at site and erection under progress. It is expected that transformer will be charged before 30.09.2016 as intimated by MPPTCL.

12.

12.5 MVA, 132/66/33 KV X’mer CGL make Sr. No. 23615 at 132 KV S/s Pichhore

19.05.2016

Transformer failed on 19.05.2016 as

intimated by T&C, MPPTCL.

The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd OCCM, Chairman OCC requested MPPTCL, P&D to submit the letter for removal of transformer from Asset.

13.

20 MVA, BBL Make X’mer (Sr. No.-2195/4) at 132 KV S/s Katangi.

08.07.2016 Tripped on differential indication.

X’mer is under testing and investigation. Internal inspection of X’mer shall be done after rainy season and expected by October 2016 as informed by MPPTCL.

14. 12.5MVA, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.

Not intimated X’mer failed

It has been proposed to withdraw the X’mer from system as intimated by MPPTCL. MPPTCL representative informed that this X’mer has to be taken out from T&C system availability and accordingly matter is being taken up.

15.

40 MVA, ECE Make X’mer (Sr. N0.-86020) at 132 KV S/s Shajapur.

14.06.2016 Tripped on differential indication.

X’mer is under investigation and testing. Internal Inspection of X’mer shall be done as soon as monsoon permits and is expected by end of October 2016 as informed by MPPTCL.

16.

50 MVAR Line Reactor of 400 KV Katni – Damoh Ckt at 400 KV S/s Damoh (PGCIL).

Not intimated. Tan-∂ of the bushing was not correct.

Bushing is being arranged and will be provided to PGCIL Damoh for commissioning as intimated by MPPTCL.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF June 2016 and July 2016:

Member Secretary OCC informed the committee that the details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units.

Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

Minutes of 53rd OCCM of M.P 7

Page 10: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING JUNE 2016 AND JULY 2016 : Member

Secretary OCC informed the committee that there was no major grid disturbance in MP during June 2016

and July 2016. Moreover, the Grid Disturbances and Grid Incidents in MP during these months are given in

Annexure 5.0.

5.1 SYSTEM DISTURBANCE AT 400 KV S/S INDORE ON 05.08.2016 :- Member Secretary OCC

informed the committee that at 19:24 Hrs. on 05.08.2016 multiple element tripping occurred at 400 KV S/s

Indore as bird fault occurred on B-Phase, 220 KV side, of 400/220 KV, 315 MVA ICT – IV at 400 KV S/s

Indore. Simultaneously 400 KV Indore – Hatuniya (PGCIL) Ckt, 400 KV ISP – Indore Ckt – II & 220 KV

Indore – South Zone Ckt – I also tripped at 400 KV S/s Indore.

In view of the above it has been gathered that there was delay in restoration of elements due to

non-intimation/not providing the relay indication by ISP in real time. It was also intimated by 400 KV S/s

Indore that there was problem in 3X16.67MVAR line reactor of 400 KV ISP – Indore Ckt – II at 400 KV S/s

Indore. Further while restoring 400 KV ISP – Indore Ckt – II without reactor it was requested by 400 KV S/s

Indore to charge the line from ISP HPS end and thereafter it will be synchronized from 400 KV S/s Indore

end, consequently resulting in delayed charging of the Ckt. It is to intimate that while restoring/charging of

any feeders emanating from ISP HPS when its Units are On Bar will be done from far end in view of safe &

secure grid operation, and to avoid any chances for tripping/cascade tripping of Units On-Bar at ISP HPS

(i.e., to avoid generation loss) in case the fault persisted on the tripped line. ISP is requested to ensure that

the details of tripping/indication is provided immediately to SLDC during any occurrence in real time to

avoid delay in restoration.

In view of the above it is requested to ensure that such incidence is not repeated in future and to

avoid delay in restoration of important grid element for safe & reliable grid operation.

Chairman OCC requested to provide the information at the earliest after any grid

disturbance/event to avoid delay in restoration of important grid elements and accordingly all concerns

should suitably be instructed.

5.2 MULTIPLE ELEMENT TRIPPING AT TONS HPS ON 10.07.2016:- Member Secretary OCC informed the

committee that on 10.07.2016 at 12:45 Hrs. Bus bar protection operated at 220 KV S/s, Tons and resulting in

tripping of 220 KV Tons – Kotar Ckt, 220 KV Tons – Satna & 220 KV Tons – Rewa Ckt-I. The detailed tripping

report and reason for operation of bus bar protection had submitted by MPPGCL to SLDC on 16.08.2016 after

constant perusal, due to which the detailed tripping report of the incident could not be prepared timely for onward

submission to WRLDC/WRPC. As per Indian Electricity Grid Code, tripping report of incidence is to be submitted to

WRLDC and WRPC within 24 hours.

In view of the above, it is requested that the detailed tripping report of the occurrence in prescribed

format may please be furnished to SLDC in the meeting along with following details:-

1. Nature of fault (Permanent /temporary)

2. Relay operated

3. Protection details

4. Fault clearance time

5. Feeder arrangement

Minutes of 53rd OCCM of M.P 8

Page 11: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

6. Failure of any protection if any

7. Disturbance recorder file (in .pdf format and if possible in comtrade format i.e. .cfg and .dat file) &

Event Logger file (in .pdf format). Single line diagram and relay indication, may also be furnished.

MPPGCL representative informed the committee that in future all the detailed tripping reports shall

be submitted to SLDC within stipulated time period.

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS /

TRANSMISSION ELEMENTS:- Member Secretary OCC informed the committee that the present status regarding schedule and commissioning of reactors / transmission elements is as below:-

Sr. No. 400 KV S/S Size

MVAR Implementing

Agency Expected Date of

Commissioning as intimated in last OCC

1 Bus Reactor : Nagda 125 MVAR MPPTCL Reactor has been commissioned and charged on 09.08.2016.

2 Bus Reactor : ISP 125 MVAR NHDC Price bid has to be opened and the date of commissioning will be intimated in next OCCM of M.P. Representative from NHDC informed that order for procurement has been placed on 03.08.2016 to M/s ALSTOM and within one year the work will be done.

3 Line reactor at Nagda-ISP line at Nagda end

50 MVAR MPPTCL September 2016.

4 Line Reactor on 400 kV Satpura –ISP line

50 MVAR MPPGCL MPPGCL representative informed that procurement of line reactor is under process and tender has been opened & will be made available by February-2017. In 53rd OCCM MPPGCL informed that retendering for the procurement of line reactor will be taken up in September 2016 and it is expected by end of July 2017.

5 Bus Reactor at SSTPS 125 MVAR MPPGCL Work will be carried out under PSDF as intimated by MPPGCL. Thereafter Chairman OCC intimated that procurement process can be started without waiting for PSDF approval. MPPGCL informed that by June 2017 commissioning of reactor will be done. MPPGCL representative informed the committee that NIT shall be floated in September 2016.

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL :- Member Secretary OCC informed the committee that as per Grid Code, the synchronization facility should be available at all the

Minutes of 53rd OCCM of M.P 9

Page 12: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Power Stations, 400 KV Sub-stations and 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative informed the committee that the procurement of synchronization trolley is under tendering stage. Further it was informed by chairman OCC that synchronization trolley at 400 KV S/s Indore is not in order and requires immediate attention for its proper functioning.

MPPTCL representative informed that the tender has been opened and order has been placed. Delivery

of Synchronizing trolley is expected by December 2016. 6.3 System Protection Scheme (SPS) in MADHYA PRADESH :- Member Secretary OCC informed the committee that in last meeting Chairman OCC had requested MPPTCL to submit the complete details of all SPS commissioned in MP along with load shed quantum to SLDC, so that the copy of the same could be placed in Control room of SLDC and concerned substation / power station for reference and record.

Chairman OCC requested MPPTCL to submit the details of load dropping scheme commissioned on

various ICTs within a week time. 6.4 SCHEDULING ACTIVITY BY MPPMCL ON BEHALF OF DISCOM :- Member Secretary OCC informed

the committee that SLDC has taken up the issue of round the clock functioning of MPPMCL Control Room

so that revision to schedule requisitions are made on behalf of DISCOMs as only two shifts were running

and only day ahead activities were performed by MPPMCL CR.

In 52nd OCCM CGM (PM), MPPMCL informed the committee that independent functioning from

MPPMCL Control Room shall be started from 1st August 2016. The MPPMCL has again requested to extend

the date for functioning of their Control Room and shifting their officials from SLDC Control Room for 15 days

i.e., till 15th August 2016. Accordingly SLDC vide letter no. 07-05/RPC-54/1734 dated-06.08.2016 requested

MPPMCL to arrange to shift the MPPMCL officials from SLDC Control Room to MPPMCL Control Room by

16.08.2016 positively. However the functioning from MPPMCL Control Room has not been started so far.

MPPMCL is again requested to immediately start their functioning from MPPMCL Control Room

where SLDC SCADA terminal has been provided.

MPPMCL representative informed that the independent functioning from MPPMCL Control Room

will be started by 15th September 2016.

6.5 DESYNCHRONIZATION OF TONS HPS UNITS:- Member Secretary OCC informed the committee that it has been observed that as per system requirement SLDC has instructed Tons HPS to desynchronize/stop Tons HPS units, but officials at Tons HPS has denied for desynchronization/stopping of Tons HPS units on no. of occasions.

As per Section 29 of EA-2003, IEGC Claus -5.1 (d) and Clause-3.8.3 of MPEGC, all state utilities

shall comply the instruction of SLDC for achieving the maximum economy and efficiency in the operation of the power system. Therefore it is again requested that all the state entities shall follow the instructions of SLDC as and when issued for better system operation.

Chairman OCC requested MPPGCL for following instructions of SLDC in real time operation and

also ensure necessary compliance immediately.

Minutes of 53rd OCCM of M.P 10

Page 13: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

6.6 Non furnishing of information by GCC required by SLDC:- Member Secretary OCC informed the committee that it has been observed that whenever SLDC asked Generation Control Centre to furnished the reservoir level, inflow of water and position of gates of Hydel Power Stations, GCC has never furnished the same to SLDC and SLDC has to obtain the requisite information from respective Power Station. This has resulted time consuming of SLDC officials in real time. This is the violation of MPEGC clause no. 3.8.3. Therefore, it is requested that whenever SLDC asks for providing any information to the state entities, the same should be provided to SLDC by the respective Control Room after obtaining from the site.

MPPGCL representative has ensured the committee that such type of incidences shall not be

repeated in future by the GCC. 6.7 PSS tuning of the Generators in Madhya Pradesh :- Member Secretary OCC informed the committee that WRLDC vide email dtd. 18.07.2016 intimated that it is mandatory to have proper tuning of PSS of the generators as per CERC regulation and CEA standards. As per Indian Electricity Grid code clause 5.2 K “Power system Stabilizers (PSS) in AVRs of generating units shall be got properly tunes by the respective generating unit”. It is mention here that during monsoon period, the demand is low and many of the units are under shutdown and it is very suitable period for carrying out PSS tuning at the generators. SLDC vide letter no. 07-05/RPC-27/1443 dtd 18.07.16 advised all the intra state generators to give their plans of PSS tuning activities. No information has been received from any entities in this regard. All the entities are requested to submit their plan in the meeting. JP Bina submitted the desired data for the FY 2015-2016. Chairman OCC informed that the PSS tuning of generators shall be carried out at least once in every year and requested all the intra state generators to give their plans of PSS tuning activities at the earliest to SLDC.

6.8 Frequency Response Characteristic for 25.06.2016 & 13.07.2016 :- It has been intimated by WRLDC that on 25.06.2016 at 19:45 hrs, all 400 KV lines tripped at Pirana substation,Gujarat due to heavy rain and lightning resulting in load loss of about 1050 MW (Guj - 800 MW,Mah-250 MW) in Western Region. The grid frequency increased from 49.75 Hz to 50.06 Hz. i.e., there was frequency rise of 0.3 Hz. Hence FRC for the event/duration for all generator response was calculated and is enclosed as Annexure-6.8(A). It can be gathered from the FRC that Tons HPS Unit no. # 3, ISP HPS Unit No.# 1,4&5 have responded positively and its RGMO/FGMO is in working state. Further SGTPS Unit #5 has given a negative response as its MW generation has increase as there was sudden frequency rise. Similarly on 13.07.2016 at 02:37 hrs, the test charging of 400 kV Bhachau-Varsana-I was attempted from Bhachau end. At the same time Y Ph post insulator between LA and Wave trap and R Phase wave trap post insulator flashed over at Varsana end. It led to Generation loss of around 2800 MW at UMPP CGPL Mundra and grid frequency decreased from 49.97 Hz. to 49.75 Hz. within 10 seconds and further reduced to 49.69 Hz. FRC calculated for the event/duration is enclosed as Annexure-6.8(B) It can be gathered from the FRC calculated that SGTPS Unit no.#5 and ISP HPS Unit no.# 2,3&7 has given the positive response.

As per IEGC Clause- 5.2(f) All thermal generating units of 200 MW and above and all hydro units of

10MW and above, which are synchronized with the grid, irrespective of their ownership, shall have their governors in operation at all times. Therefore it is requested to all the generators to furnish the data for existing status and settings of RGMO/FGMO to SLDC in format enclosed as Annexure-6.8(C).

Minutes of 53rd OCCM of M.P 11

Page 14: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

In view of the above all the generators are requested to examine the Frequency response of their generators during the above mentioned transients/events and take measures to ensure compliance to IEGC 5.2(f),(g),(h)&(i).

Chairman OCC requested MPPGCL, NHDC & JP Bina to submit the present status of

RGMO/FGMO to SLDC. Further he informed that in future the FRC for inter control area i.e., Discom wise FRC calculation will be done and hence all the generators are requested to ensure the healthiness and proper functioning of RGMO/FGMO.

6.9 Requirement of load details of transmission elements for reliability study using PSS/E Software:- Member Secretary OCC informed the committee that the PSS/E Software Modelling for reliability/load flow studies is being done at National level so that the grid security matters are dealt efficiently and reliably to avert grid disturbance like situations and for availing shut downs. Work for this has been undertaken at state level/regional levels throughout the country. Further the reliability studies using PSS/E software is being done at state level by SLDC for which loading details (in MW & MVAr) of 132/33 KV X’mers, 220/33 KV X’mers, 220 KV & 132 KV Railway Traction feeders and 220 KV & 132 KV Industrial feeders of M.P State Grid were requested from CE(T&C) vide letter No.-07-05/RPC-35/502 dated- 07.05.2016 for following date & time:-

1. 25th December 2015 – 11:00:00 Hrs. 2. 25th June 2015 – 13:00:00 Hrs. 3. 19th May 2016 – 23:00 Hrs.

Chairman OCC requested MPPTCL to provide the above details to SLDC in soft & hard copies within a week. 6.10 Payment of pending Revision Charges to be paid by MPPMCL:- In accordance to Levy & collection of Fee & charges by SLDC Regulation 2004 (revision –I, 2006) and SLDC tariff order for the year 2015-16 passed by MPERC, the revision charges of Rs. 3000/- per revision for scheduling of power by Long Term Open Access Customers has to be paid to SLDC.

The requisition for revision of drawal schedule of Discom is being received from MPPMCL Control Room and SLDC is revising the same accordingly since October 2015. SLDC as per MPERC order has raised the bills to MPPMCL vide letters cited under reference, towards revision of schedule sought by MPPMCL on behalf of Discoms for the period from October 2015 to April 2016 amounting to Rs. 24,60,000/-.

In this regard SLDC vide letter no. 07-05/SG-11C/5534 dtd 17.03.2016, 07-05/SG-11C/169 dtd

16.04.16, 07-05/SG-11C/584 dtd 1805.2016 and UO note no. 90 dtd 06.08.2016 requested MPPMCL to disburse the above amount in SLDC account. However the payment for revision of schedule has not been received by SLDC so far. It is again requested to deposit the same in SLDC account immediately.

MPPMCL representative informed that the payment for above mentioned pending revision charges

shall be made shortly to SLDC. ITEM NO. 7 : BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : 7.1 Black Start mock drill of Hydel stations of MPPGCL :- Member Secretary OCC informed the committee that the last black start mock drill of Gandhisagar HPS have been completed successfully on 04.04.2016 with extending supply to 132 KV S/s, Bherugarh Ratadiya & Ujjain for Simhasta 2016. The Black Start Mock Drill at Tons, Bargi & Pench was successfully completed on 08.10.15, 12.10.15 and 06.11.15 respectively. As per IEGC, Black Start Mock Drill shall be conducted in every 6 month duration.

Minutes of 53rd OCCM of M.P 12

Page 15: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

In compliance to IEGC, SLDC has proposed that the black start mock drill of all the Hydel Power stations in MP including Birsinghpur, Rajghat and Madikheda HPS shall conducted in the month of September 2016, October 2016 & November 2016. MPPGCL is requested to finalize the date in the OCC. Thereafter the procedure shall be prepared and furnished to the MPPGCL and concerned officials by MP SLDC.

MPPGCL representative agreed for conducting the Black Start Mock Drill at HPS after monsoon and

requested SLDC to provide schedule/probable dates for conducting Black Start Mock Drills. 7.2 Black Start mock drill of Indira Sagar Power Station & Omkareshwar Power Station:- Member Secretary OCC informed the committee that the black start mock drill of ISP was proposed to be conducted on 21.06.2016. Indira Sagar intimated that the black start mock drill schedule for 21.06.2016 at ISPS is not possible as the programming tool SK06 (service kit), to be used for reconfiguring some of the function blocks in the processor 70RP05, to facilitate black start procedure is not possible and requested to postpone the black start mock drill at ISPS till November 2016. ISP Vide letter No. NHDC/2/J/796/16/078 dated 25.07.2016 has intimated that programming tool SK-06(service kit) is expected to be repaired by end of August 2016 and Black Start Mock Drill at ISP HPS may be scheduled in the first week of September 2016. In view of the above ISP HPS is requested to confirm the same so that Black Start Mock Drill at ISP may be scheduled in first/second week of September 2016. The black start mock drill of Omkareshwar HPS was proposed to be conducted on 07.06.2016. Omkareshwar HPS intimated that Omkareshwar HPS has been supplied, erected & commissioned by M/s Voith Siemens Consortium. It is also intimated that most of the installed equipments like Excitation System, Governor System etc. are imported equipments and also OSP is operating machines below MDDL, thus some settings are required to be modified in Excitation System, Governor System etc. in the presence of OEM. OSP intimated that OEM has asked for two months (2) time for evaluation and providing the solution. Representative from ISP/OSP confirmed that the Black Start Mock Drill at ISP & OSP can be conducted in the first week of October 2016.

Chairman OCC stated that the dates for conducting Black Start Mock Drill at ISP & OSP will be

finalized and intimated for further needful.

ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION:

8.1 Quarterly Review of Crisis Management Plan: Member Secretary OCC informed the committee that NHDC & SLDC is submitting the quarterly crisis management report to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

However despite continuous persuasion by SLDC other state utilities i.e. MPPTCL, MPPGCL and IPPs

are not submitting the report to CEA. It is requested to submit the CMP report in prescribed format for the First quarter of 2016-17 (April-June 2016) to CEA under intimation SLDC.

8.2 Status of Physical & Cyber Security in Power Sector regarding: Member Secretary OCC informed the committee that the Status of physical & cyber security in Power Sector for the first quarter (April to June 2016) has not been received from any of the state utilities. In the past also this report is not being furnished

Minutes of 53rd OCCM of M.P 13

Page 16: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

by any of the state utilities despite constantly pursuing the same by SLDC in OCC meetings and also through correspondence.

The state entities are requested to furnish the Status of physical & cyber security in Power Sector for

First quarter of 2016-17 (April-June 2016) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai.

ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Status of AMR system installed at SLDC:

SLDC representative informed the Committee about the status of AMR data received through AMR system in the month of July 2016. He also informed that complete data of 513 meters was received through AMR system and data of 111 Nos meters (Monthly-80 & Partial – 31) was not received through AMR system. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email latest by 4th of every month for furnishing the missing data alongwith monthly JMR data. He also informed that SLDC has issued the final commissioning certificate to M/s Secure Meters Ltd. so that the AMC may be started by the firm. Further following points are discussed and resolved as under:- 1. SLDC representative requested the CE(T&C) office to organize a meeting with M/s Secure Meters Ltd

for resolving the site related issues. CE(T&C) office stated that a meeting will be arranged shorty with M/s Secure Meters Ltd. for resolving the issues.

2. SLDC representative informed that AMR facility is required at newly commissioned substation / X’mers

/ HT consumers / OACs / REGs - 88 Nos. He further informed that in earlier meetings MPPTCL has informed that modem and SIMs have been issued to the site offices, but configuration at modem and Server end is not done by M/s Secure Meters Ltd. therefore data is not being received by SLDC. MPPTCL stated that matter will be taken up with M/s Secure Meters Ltd for integration of meters with AMR Server.

3. SLDC representative apprise the Committee that Ratlam circle is not furnishing the JMR as well as

load survey data of ABT meters installed at the RE generators connected at 132KV level and above in case of data not downloaded through AMR system. The officials of Ratlam circle have informed that they have received the directives from MPPMCL that data of all the RE Generators shall be downloaded by DIscoms and furnished to concerned offices. SLDC representative requested the MPPTCL and MPPMCL to look into the matter and issue suitable instructions to field offices for furnishing the data to SLDC.

9.2 Non reporting of details of ABT meters installed on newly commissioned substations, Xmers, HT Consumers:

SLDC representative apprise that CE(T&C) office informs about the commissioning of new substation / transformer to SLDC but do not furnish the details of ABT meters installed, X’mers, as such, SLDC has to collect the required details from substations / field offices which is a time consuming process. He further informed that in the earlier OCC meetings, assurance was given by CE(T&C) office that the instructions will be issued to field offices for furnishing the details of X’mers (Sr. No.) and ABT Meter details such as Mtr Sr. No., Meter CT & PT Ratio, Equipment CT & PT ratio, MF , but the same are not being received by SLDC. CE(T&C) office assured that instructions will be issued to field offices for furnishing the required details to SLDC at the email id - [email protected].

9.3 Scheduling of power from Ratnagiri Gas and Power Private Ltd (RGPPL) to 36 Nos Railway Traction Substations -

Minutes of 53rd OCCM of M.P 14

Page 17: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

SLDC representative informed that scheduling of 200MW power from Ratnagiri Gas and Power Private Ltd (RGPPL) to 36 Nos Railway Traction Substations (TSS) in Madhya Pradesh is being done as per the directives issued by Hon’ble CERC vide order dated 05-11-2015 in petition no. 197/MP/2015 treating Railway as a deemed licensee. Further following points are discussed and resolved as under - 1. SLDC representative informed that in the 51st OCC meeting it was discussed and decided that tapping

from Interconnector-III between 132KV Chhegaon and 220KV Chhegaon substation for Railway Traction Talwadia will be removed. However, till date the tapping from Interconnector-III is not removed and Talwadia Railway Traction is still a tapped point where ABT meter is not provided at the TSS. CE(T&C), MPPTCL assured that tapping will be removed within 2-3 days.

2. SLDC representative informed that Railway has started purchasing additional power of 18MW from M/s

Jindal India Thermal Power Ltd. under short term open access w.e.f. 2nd July 2016, however, Railways is still overdrawing power from the grid and required to purchase additional power. The issue could not be discussed due to non-availability of Railway representative.

3. Chairman OCC requested the CE(P&D) office, MPPTCL to include a clause in Bulk Power

Transmission Agreement (BPTA) to be signed between MPPTCL and Railways as under – “Railway shall increase the quantum of power under long term open access as and when a new TSS is

get connected with State grid.” 9.4 Providing AMR facility for the ABT meters installed at MPPGCL :

SLDC representative informed that ABT meter data of 75 Meters out of 107 meters where AMR facility

is provided is being received through AMR system and balance 32 Nos meters are not being read through AMR system. He further informed that the list of 32 meters whose data is not being received was emailed to GCC, MPPGCL on 1st August 2016. SLDC representative requested MPPGCL to take up the matter with M/s Secure Meters Ltd for integrating the balance meters with AMR server. Chairman OCC advised the MPPGCL representative to ensure that balance meters are integrated with AMR server within 15-20 days. MPPGCL assured to do the same.

9.5 Regarding Deviation limits for Renewable Rich States:

SLDC representative informed that in the 52nd OCC meeting, the deviation limit for Discoms under Intra State ABT was discussed in accordance with CERC (Deviation Settlement Mechanism and related matters) (Third Amendment) and it was decided that since West Discom has installed capacity of wind & solar in the range of 1000MW to 3000MW, therefore the deviation limit of 200MW shall be considered only for West Discom for computation of Deviation charges. He further apprised the Committee that accordingly DSM charges of West Discoms has been computed for the month of July 2016 and DSM charges for the month of May & June 2016 shall be revised in due course of time considering the deviation limit of 200MW.

9.6 Energy Accounting and settlement of DSM charges of Discom embedded Open Access Customers connected at 33KV level.

SLDC representative informed that in accordance with Madhya Pradesh Electricity Balancing and Settlement Code (BSC) 2015 and as decided in the 48th OCC meeting that energy accounting of Discom Embedded Open Access Customers (DEOACs) shall be done by the Discom Energy Accounting Group (DEAG) of Discoms. Accordingly, SLDC has provided the training and necessary inputs to Discom officials on 11th Dec 2015 and requested the Commercial Sections of Discoms to issue necessary instructions to Discom Energy Accounting Group (DEAG) to take over the energy accounting of DEOACs from the month of April 2016.

Minutes of 53rd OCCM of M.P 15

Page 18: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

SLDC representative further apprise the Committee that East Discom & West Discom has issued the DSM charges Bill of embedded customers from the month of April 2016, but, no feedback regarding issuance of DSM Bill / energy accounting of the embedded customers from the month of April 2016 is received from Central Discom. The Central Discom representative assured to discuss the matter with DEAG and revert back shortly.

Chairman OCC clarified to Discoms that settlement DSM charges i.e. payment / receipt of DSM

charges of embedded customers is to be done by the Discoms. He further stated that the settlement of embedded customers shall not be done from the State DSM Pool Account being maintained by MPPMCL on behalf of SLDC.

9.7 Energy Accounting of Renewable Energy Generators (REGs) connected at 33KV as per the data recorded in ABT meter installed at the pooling station:

SLDC representative informed that it was discussed and decided in the 45th OCC meeting that energy

accounting of Renewable Energy Generators (REGs) shall be done as per the actual data recorded in ABT meters installed at the pooling station, SLDC has requested the commercial sections of Discoms to furnish the details of meter, modem & SIM of the pooling station, but, Central & West Discom has mainly furnished the generator wise details whereas pooling station wise details are required for the purpose of energy accounting at pooling station. He further apprise the Committee that Discom officials has informed that in case of solar generators ABT meters are installed at the generators end only and standby meter is installed at the grid substation. In such cases where there is no separate pooling station and standby meter is installed at the grid substation, the grid substation shall be considered as a pooling substation as per MPERC draft REG regulations. He requested CE (T&C) office to provide the details of ABT meter installed at the grid substation and coordinate with Wind & Solar Generators for providing AMR facility, letters to which are being issued to SE (T&C) offices. CE (T&C) office has assured to provide the same.

ITEM NO 10: SCADA/EMS RELATED ISSUES: 10.1 NON AVAILABILITY OF TELEMETRY OF IMPORTANT 132KV S/s HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS -

SLDC informed that the telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, and Captive Power Plant, is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified for integration. However, so far telemetry of only 25 Nos. S/s is integrated with SLDC SCADA/EMS system.

The issues regarding integration of telemetry of 220 KV Sirmore, 132KV Satna,132 KV Rewa, 132KV

Seoni,132KV Umariya, 132Kv Vijaypur, 132KV Khilchipur, 132KV Chanderi, 132KV Biora, 132KV Pachore, 132 KV Susner, 132KV Suasra, 132/33 KV Ratangarh, 132 KV Sailana, 132KV Sitamau was specially discussed and SLDC pointed out that the telemetry of these sub stations is pending to be commissioned for want of PLCC panels/RTU configuration. CE (T&C) representative informed that the PLCC panels for commissioning of these RTUs shall be arranged on priority basis.

SLDC further pointed out that the lack of coordination between Testing, Communication, TRANSCO

SCADA & SLDC while integration of telemetry is observed which resulted in delay in commissioning. Further, SOE verification is also pending due to non-availability of various field officers at a time at the site. MPPTCL SCADA representative further informed that delay in preparation of data base and display in

Minutes of 53rd OCCM of M.P 16

Page 19: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

SLDC/Sub-LDC is also reported. In response SLDC informed that the data base and display at SLDC is always prepared in advance. The data base and display of all RTUs which are required to be commissioned is ready and T&C officers/TRANSCO SCADA team if required may verify the same.

It was agreed that the integration of telemetry of above mentioned RTU shall be taken up in

coordinated manner on top most priority. 10.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS &

SLDC informed that the migration to new SCADA, EMS system is completed by SLDC. However, utilization of EMS system is not possible due to incomplete telemetry specially availability of Status parameters as availability of CB status is a prerequisite for successful functioning of EMS It was agreed that the work regarding telemetry discrepancy shall be completed on priority basis

SLDC further pointed out that the upgradation of RTUs at several location is required for integration of

telemetry of important renewable feeders, transformers etc. The upgradation requirement of telemetry at 220KV Badnagar S/s, 132KV Gudgaon S/s, 220KV Sarni S/S, 220KV Handia S/S, 220KV Pipariya S/S, 220KV Bairagad S/S, 132KV Madotal, 132KV Gadarwara, 220KV Shivpuri S/s, 220KV Daloda S/S was discussed in detail & following was informed by MPPTCL regarding upgradation requirement:-

(i) It was informed by MPPTCL that to meet out upgradation requirement, all at locations where D20 RTUs (Honeywell make) exists, the D20 RTUs shall be replaced with Dongfeng RTU.

(ii) Regarding Upgradation of telemetry of locations where Dongfeng RTU is available, the

same shall be taken up internally by MPPTCL (by MPPTCL T&C and SCADA team)

(iii) The locations where Chemtrol RTUs are functioning shall be decided on case to case

basis.

SLDC requested MPPTCL to arrange the upgradation of RTUs to accommodate telemetry of renewable feeders and transformers at the earliest. 10.3 PRESENT STATUS OF PROCUREENT OF RTUs BY MPPGCL:-

SLDC informed that the Telemetry of Rajghat HPS is out since more than TWO YEARS & telemetry of Bansagar-III is intermittent since last few months. Further, the matter of procurement of RTU for Rajghat HPS and Bansagar-III HPS was discussed in detail in last fifteen OCCM meetings as well as on two numbers special telemetry meetings, without any conclusive result In response, MPPGCL informed that the order for procurement of RTU is placed by MPPGCL and new RTY shall be commissioned soon.

10.4 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTING OF RTUS AS PER BACKUP SLDC REQUIREMENT:-

It was informed by SLDC that the commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is completed and the additional communication channel is required to be extended to respective control centers for testing with new SCADA/EMS system. The RTU wise progress is required to be provided by MPPTCL & MPPGCL. MPPGCL informed that the order for Modems has already been placed and processing of the case for procurement of PLCC panels is under progress, however, the exact

Minutes of 53rd OCCM of M.P 17

Page 20: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

detail of procurement case is not available with officers attending the meeting. Accordingly, CE, SLDC advised MPPGCL to inform that exact status of procurement case within a week.

MPPTCL and MPPGCL agreed to expedite the work and arrange the commissioning of alternate

channels on top most priority 10.5 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS

The long outage of telemetry of 132KV Morwa, 132KV Beohari, 132KV Seoni, Rajghat HPS, 132KV Kotma,132KV Waidhan etc. was discussed in detail. SLDC requested to look into these outages and expedite the restoration procedure for which concern officers agreed. 10.6 TELEMETRY OF RAILWAY TSS SUB STATIONS:-

The matter regarding arrangement of telemetry of railway TSS sub stations was not discussed as representative from railway was not available during the meeting. 10.7. Operationalization of ADMS system and confirmation regarding availability of remote terminals at DCC for providing ADMS information at DCC

MPPTCL informed that the ADMS system is implemented in all EHV sub stations having 33KV feeders and all three MPPTCL SCADA Control Centers. The operationalization of ADMS system is now required to be taken up. In response SLDC informed that for operationalization of ADMS availability of infrastructure at DCC for monitoring of ADMS along with completion of port preparation work is a prerequisite. The provision in this regard is already available in ADMS contract issued by CE(P&D),MPPTCL. MPPTCL informed that the arrangement of display of ADMS information in DCC through remote VDU of MPPTCL SCADA system is under progress and shall be completed shortly. Further, the preparation of reports by M/s Dongfeng Electronics Ltd is also under progress and shall be completed within fifteen days. It was decided that after completion of these two activities, operationalization of ADMS system shall be taken up. SUPPLIMENTARY MINUTES FOR 53RD OCC MEETING HELD ON 27.08.16 SA-1:- DELAYED REPORTING OF OCCURRENCE AT 220 KV S/s SIDHI:- Member Secretary OCC informed the committee that on 25.08.2016 at 12:20 Hrs. Circuit Breaker trip coil of 132 KV Sidhi – Mauganj Ckt failed/burnt at 220 KV S/s sidhi resulting in 132 KV Bus fault and tripping of all connected 132 KV feeders and transformers at 220 KV S/s Sidhi. Consequently 132 KV supply failed at 220 KV S/s Sidhi, 132 KV S/s Sidhi, 132 KV S/s Deosar & 132 KV S/s Mauganj. It has been gathered that the incident was reported after Half an Hour. Moreover some more time has been taken for providing the relay indication. Due to above the elements could be restored from 13:01 Hrs. due to which 40-50 min interruption took place at effected place.

In view of the above MPPTCL is requested to ensure that the intimation of incident and details of

tripping/indication is provided immediately to SLDC during any occurrence in real time to avoid delay in restoration of important grid element and also ensure that such incidences are not repeated in future for safe & reliable grid operation.

The above matter was discussed in the meeting and Chairman OCC requested MPPTCL for issuing

suitable instructions to the concerned for compliance.

SA-2:- FREQUENT TRIPPING OF 132 KV VSTPS – WAIDHAN CKT:- Member Secretary OCC informed the committee that it has been observed that 132 KV VSTPS – Waidhan Ckt is being tripped on transient fault frequently. On following dates the Ckt tripped as under:-

1. 19.08.2016 at 08:58 hrs.

Minutes of 53rd OCCM of M.P 18

Page 21: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

2. 21.08.2016 at 16:23 Hrs. 3. 25.08.2016 at 11:27 Hrs.

In the above matter WRLDC has also informed that NTPC has intimated that such frequent tripping

of circuit emanating from VSTPS is causing voltage dip at NTPC station.

In view of the above MPPTCL is requested for carrying out relay testing/line maintenance and to ensure the healthiness of line to avoid such frequent tripping in future.

Representative from MPPTCL informed that the above tripping occurred due to falling of tree branches in induction zone of 132 KV VSTPS – Waidhan Ckt and tree branches cutting (where ever required) is in progress. ITEM No 11 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 54th OCC meeting of Operation and Coordination Committee of MP on 22.10.2016 at Conference Hall, SLDC, MPPTCL, Jabalpur.

***********

Minutes of 53rd OCCM of M.P 19

Page 22: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Minutes of 53rd OCCM of M.P 20

Page 23: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Minutes of 53rd OCCM of M.P 21

Page 24: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

S. No. Particulars

1

1.1 Maximum Frequency 50.11 HzBetween 18.00 hrs & 19.00 Hrs on 16.06.16

50.16 HzBetween 17.00 hrs & 18.00 Hrs on 08.05.16

1.2 Minimum Frequency 49.82 HzBetween 20.00 hrs & 21.00 Hrs on 16.06.16

49.82 HzBetween 18.00 hrs & 19.00 Hrs on 14.05.16

1.3 Average Frequency 50 Hz 50.01 Hz

2

2.1 Maximum Frequency 50.37 Hz AT 14.27 HRS ON 19.06.16 50.35 Hz AT 17.31 HRS ON

18.05.16

2.2 Minimum Frequency 49.65 Hz AT 19.37 HRS ON 29.06.16 49.69 Hz AT 22.12. HRS ON

26.05.163 Percentage of time when frequency was :-

%age of time when frequency was Jun-16 Jul-16

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.13 0.1

3.6 Between 49.70 Hz and 49.9 Hz 7.50 3.9

3.7 Between 49.9 Hz and 50.05 Hz 74.09 72.35

3.8 Between 50.05 Hz AND 51.5 Hz 18.28 23.65

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Jun-16 Jul-16

Minutes of 53rd OCCM of M.P 22

Page 25: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

I

S. No.

NAME OF THE TRANSMISSION LINE / (FINANCED BY)TYPE OF

CIR CUITSROUTE

LENGTHCIRCUIT

KMS.

DATE OF COMPL- ETION

DATE OF COMMI-

SSIONING

A. 400 KV TRANSMISSION LINES

NIL 0 0

B. 220 KV TRANSMISSION LINES

1 LILO of 220 KV Katni - Satna line at PGCIL, Satna DCDS 0.7 1.40 April'16 09.04.2016

2LILO of one Ckt of 220kv DCDS Bhopal - Ashta line at 220kv S/S Mugaliya chhap. (DCDS) (2x26.459) (JICA) DCDS 26.46 52.92 June'16 18.06.2016

3LILO of 220KV line Indore 400 -Pithampur at Pithampur-II 220Kv S/s in Indore (2x6.898) (PFCIIi) DCDS 6.90 13.80 June'16 10.06.2016

C. 132 KV TRANSMISSION LINES

12nd Circuit of 132 Kv Gudgaon - Kukru Wind Power Ltd. Betul (Contributory work) 2nd ckt 22.5 22.50 Aprilo'16 07.04.2016

2LILO of one circuit of Mandideep - Hoshangabad for 132 KV Sub-Station Tamot(2x1.686) (Priority) DCDS 1.686 3.37 Aprilo'16 30.04.2016

3 2nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha line (48.30) ADB-III 2nd ckt 48.27 48.27 May'16 10.05.2016

4 132Kv 2phase 2wire S/c line from 132Kv s/s Amla to GSS Bordehi of RVNL(1x23.5) Contrib

DCSS 23.29 23.29 May'16 06.05.2016

5132Kv DCSS line from 132Kv S/s Madhotal to 11.5 MW Processing Plant of M/s Essel Jabalpur MSW Pvt.Ltd. at Kathonda Dist- Jabalpur Contrib.

DCSS 2.52 2.515 May'16 02.05.2016

62nd Ckt.of 132 KV Rewa - Mangawan line (Dist. Rewa ) (JICA) approch section of mangawan end (4x2.079+1x6.75) (JICA) (Balance work)

2nd Ckt 8.829 15.066 June'16 27.06.2016

7 132 kv DCSS Datiya- Bhander line (1x34.038)ADB-III DCSS 34.04 34.04 June'16 27.06.2016

8 132 kv DCSS Ashoknagar - Kothiya line (1x27.5+4x2.5) ADB-III

DCSS 37.50 37.50 June'16 09.06.2016

9 132 kv DCSS line from 132Kv S/s Lahar - 132Kv S/s Seondha (1x15.5) PFC-III

DCSS 16.70 16.70 June'16 24.06.2016

10 2nd ckt of Betul - Gudgaon line (1X57) ADB-III 2nd ckt 57.00 57.00 June'16 24.06.2016

11 132 kv DCDS line Panagar - Katangi (2x29.471) PFC-II DCDS 29.47 58.94 JULY'16 04.07.2016

II.

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)VOLTAGE

RATIO (KV)

No.OF X-mer & Cap.(MV

A)

EFFECTIVE

CAPACITY MVA

DATE OF COMPL-ETION

DATE OF COMMI-

SSIONING A. 400 KV SUBSTATIONS

Nil 0.00

B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1 220kv switching S/s at Nagra Dist- Ratlam Contrib.220/132

KV0.00 0 May'16 30.05.2016

2 Mugaliachhap(Bhopal) 220kv (New S/s)(1x160+40) (JICA) 220/132

KV1x160 160 June'16 20.06.2016

132KV NEW SUBSTATIONS

1 Pratappura 132 KV New S/s (1x40) ADB-III (Dist- Bhind) 132/33KV 1x40 40 April'1612.04.2016(fom 33 KV

side)2 Tamot 132kv s/s (Distt. Raisen ) 1x50MVA (Transco) 132/33KV 1x40 40 May'16 05.05.2016

3 Bhander 132kv s/s (Distt. Datia) 1x63 (ADB-II) 132/33KV 1x63 63 June'16 28.06.2016

4 Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA (ADB-III) 132/33KV 1x40 40 June'16 09.06.2016

5Katangi 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. - Jabalpur) (PFC-III)

132/33KV 1x40 40 June'16

28.06.2016from 33kV & 05.07.2016 from 132Kv

EHV SUB - STATIONS

ANNEXURE -2.3.4.i

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 31.07.2016)

EHV TRANSMISSION LINES

Minutes of 53rd OCCM of M.P 23

Page 26: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

S. No.

NAME OF THE TRANSMISSION LINECKT.KMS.

PROGRESS

IN %

Target for commis-sioning

A. 400 KV TRANSMISSION LINES1 NIL 0 0% -B. 220 KV TRANSMISSION LINES

1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2016-17

2

Upgradation of 132KV D/C Indore-II (Jaitpura) - Indore(N/Z) line on composite multi circuit monopole & LILO of one Ckt of 220kv Indore-II (Jaitpura) - Indore(400KV) line at 220kv S/S Indore(N/Z) (2x0.5+2x4+4x6.7)

35.8 31% 2018-19

3 220Kv DCDS line from Gwalior(Malanpur)- Morena (2X29.25) 58.5 23% 2016-17

4LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

66 3% 2017-18

5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37% 2017-18

6220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

34 4% 2017-18

7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16% 2017-18

8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15% 2017-18

9220Kv DCDS line from 400Kv S/s Bina to plant of M/s Bharat Oman Refinaries Ltd. Agasod, Bina (2x18.24)

36.48 99%

C. 132 KV TRANSMISSION LINES1 132kv Ichhawar -Sehore DCSS line (1x35.298) 35.298 33% 2017-182 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 79% 2016-173 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2016-174 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2016-175 132kv Jeerapur -Susner DCSS line (1x32) 32 97% 2017-186 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2016-177 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2016-178 132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x35.5) 35.5 55% 2017-189 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 9% 2016-17

10132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209)

53.209 34% 2017-18

11LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)

40 5% 2017-1812 132 kv DCSS Guna-Eshagarh line (1x72) 72 32% 2017-1813

132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32 859)

32.859 32% 2017-1814 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49% 2017-1815 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35) 35 4% 2017-1816 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18% 2017-1817

132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31 059)

31.059 3% 2017-1818

132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x50)

50 21% 2016-17

19LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

55.09 39% 2016-17

20132 kv DCSS line from 132Kv S/s Porsa - 132Kv S/s Ambah (1x23.059)

23.059 98% 2016-17

21 132 kv DCSS line Datiya - Dabra (1x30) 30 99% 2016-17

22132Kv DCDS line for LILO of both circuit of 132Kv Banmore -Morena/Hetampur DCDS line for 220Kv S/s Morena(2x0 616+2x3 122)

7.476 36% 2016-17

232nd ckt of Chhatarput- Khajuraho line upto location no. 73(1x8.31)

8.31 16%

24 2nd ckt of 132Kv Chhatarpur- Khajuraho line (1x0.5+33.2) 33.7 65% 2016-17

TRANSMISSION WORKS UNDER PROGRESS (AS ON 31.07.2016) ANNX-2.3.4.ii

Minutes of 53rd OCCM of M.P 24

Page 27: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

25 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 9% 2017-1826 2nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera line (32.46) 32.46 90% 2016-1727 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 19% 2017-18

282nd Ckt.of 132Kv DCSS Katangi tap line tapped to one ckt. Of 132Kv Balaghat-Seoni line (1x0.5+35.8)

36.3 76% 2016-17

29 132 kv DCSS line Mehgaon - Pratappura (1x28.542) 28.542 96% 2016-17

30LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by tapping )

32.6 96% 2017-18

31 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46% 2016-1732 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 28% 2018-1933 2nd ckt of 132kv Bairagarh - Shyampur line (1x0.5+4x1.9+19) 27.1 98% 2017-1834 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7% 2017-1835 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 10% 2016-1736 2nd ckt of 132kv Kukshi - Alirajpur line (1x1+36) 37 89% 2018-1937 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16% 2017-18

38LILO of 132 kv Chhegaon - Nepanagar Line at 132Kv S/s Pandhana(2x1.895) (This line is proposed in place of Chhegaon -Pandhana Estt. Sanc.no. 0121dtd.06.08.2014)

3.79 60% 2016-17

39LILO of 132 kv Manawar - Kukshi Line at 132Kv S/s Singhana(2x3 1)

6.2 60% 2016-17

40

LILO of Khargone - Julwaniya DP line(132Kv) at Talakpura (2x1.1+1x0.8)(This line is proposed in place of Julwaniya- Talakpura line Rev. Estt. Sanc.no. 0245 dtd.15.01.2016 for Rs 185 40lac )

3 48% 2017-18

41 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 41% 2017-1842 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38% 2017-1843 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 13% 2017-1844 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 10% 2017-1845 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15% 2017-1846 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 4% 2016-1747 132kv Birsinghpur -Shahdol DCSS line (1x48) 48 4% 2018-19

48132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv S/s Kishangarh (1x57.139)

57.139 57% 2016-17

49132 kv Ashoknagar - Eshagarh DCSS line (1x37) (Est.Sanc.-0281dtd. 17.03.2015 for Rs.1895.67)

37 99% 2016-17

50 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 13% 2016-1751 2nd ckt of 132kv RTS Mangliyagaon line 8.852 96%

52132Kv 2 phase 2wire line from 132Kv s/s Semri-Harchan for PS to RTS Bagra Tawa(1x4.3)

4.3 97%

Minutes of 53rd OCCM of M.P 25

Page 28: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

S.No.

NAME OF THE SUBSTATIONEFFECTIVE CAPACITY

MVA

PROGRESS

IN %

Target for commis-sioning

A. 400 KV SUBSTATIONS

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)

200 5% 2017-18

2400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer (Distt.Balaghat)

630 3% 2017-18

3Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Bhopal)

315 19% 2016-17

4Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa)

315 30% 2016-17

51x125 MVAR 400 Kv Bus Reactor at existing 400Kv S/s Nagda

0 68% 2016-17

B. a 220 KV SUBSTATIONS

1Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) (2x160+40 MVA) (1No. 160MVA Charged on 21.08.2015)

320 79% 2016-17

2Gwalior-II 220kv (New S/s)(2x160+40) (1x160 charged on31.3.2015)

160 95% 2016-17

3Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA (Distt. )

160 2% 2017-18

4Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA(Distt. )

160 9% 2017-18

5 Adampur 220/33kv S/s 2x50MVA 100 2% 2017-18

6 Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA (Distt. )

160 6% 2017-18

7Morena 220/132kv S/s 1x160 +1x63 MVA +2No.220Kv FB +4No.132Kv FB+6No.33Kv FB+BC +Capacitor Bank

160 48% 2016-17

C. 132 KV SUBSTATIONS(a) NEW SUBSTATIONS1 Rahatgarh132kv s/s (Distt.Sagar) 40 52% 2016-172 Bairad 132kv s/s(Dist.-Shivpuri ) 40 13% 2017-183 Barahi 132kv s/s (Distt.Katni) 40 11% 2017-18

4 Karapgaon 132kv s/s (Distt-Narsinghpur) 40 14% 2017-18

5 Indergarh 132kv s/s (Distt.Datia) 40 25% 2017-186 Biston 132kv s/s (Distt. ) 1x40 MVA 40 24% 2017-187 Agrod 132kv s/s (Distt.) 1x40 MVA 40 51% 2017-18

Minutes of 53rd OCCM of M.P 26

Page 29: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

8 Chhayan 132kv s/s (Distt.) 1x40 MVA 40 45% 2016-179 Teesgaon 132kv s/s (Distt.) 1x40MVA 40 16% 2016-17

10 Pandhana 132kv s/s (Distt.) 1x63 MVA 63 5% 2016-1711 Singhana 132kv s/s (Distt.) 1x40 MVA 40 33% 2016-1712 Talakpura 132kv s/s (Distt.) 1x40 MVA 40 34% 2017-1813 Waraseoni 132kv s/s (Distt.Balaghat ) 1x40 MVA 40 1% 2017-1814 Devnagar 132kv s/s (Distt. Narsighpur) ) 1x40 MVA 40 33% 2017-1815 Belkheda 132kv s/s (Distt. Jabalpur) ) 1x40 MVA 40 1% 2017-1816 Khimlasa 132kv s/s (Distt. ) 1x40 MVA 40 3% 2017-1817 Karakbel 132kv s/s (Distt. Narsinghpur) 1x40 MVA 40 17% 2017-1818 Chinaur 132kv s/s (Distt.) 1x40 MVA 40 25% 2016-1719 Kelaras 132kv s/s with 1x63 MVA (Distt. ) 63 6% 2016-1720 Narsinghgarh 132kv s/s with 1x40 MVA (Distt.) 40 2% 2016-1721 Salamatpur 132kv s/s with 1x40 MVA (Distt.) 40 25% 2016-1722 Intkhedi 132kv s/s (Distt. ) 1x63 MVA 63 61% 2017-1823 Silvani 132kv s/s with 1x40 MVA (Distt.) 40 5% 2017-1824 Udaipura 132kv s/s with 1x40 MVA (Distt.) 40 1%

25Kishangarh 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. Dewash)

40 59% 2016-17

26 Pithampur SEZ- II 132kv s/s 1x63 MVA (Distt.Dhar) 63 55% 2016-17

Minutes of 53rd OCCM of M.P 27

Page 30: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Jun-16 Jul-16 Jun-16 Jul-16

Commissinary HQ 23:48 23:47 23:35 23:32

District HQ 23:54 23:51 23:36 23:39

Tehsil HQ 23:48 23:46 23:16 23:18

Rural -Mixed 23:25 23:24 22:14 22:20

Rural -DLF 23:25 23:24 22:33 22:45

Rural -Irrigation 9:57 9:57 9:15 9:18

Jun-16 Jul-16 Jun-16 Jul-16

Commissinary HQ 23:45 23:50 23:42 23:42

District HQ 23:45 23:51 23:45 23:48

Tehsil HQ 23:35 23:42 23:34 23:36

Rural -3Phase 23:02 23:06 22:54 22:56

Rural -1Phase 23:16 23:26 23:06 23:12

Total Rural 9:39 9:41 9:37 9:39

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Minutes of 53rd OCCM of M.P 28

Page 31: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

33KV Kundali 27.07.2015 21.11.201533KV Bangaon 27.07.2015 ----

132KV Borgaon 33KV FS-II 26.02.2013 12.04.2016

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220KV Indore (Jetpura)-II 33KV PGCIL-II feeder 24.08.2014220KV Nimrani 33KV Maral Overseas 08.06.2015

33KV DLF-I 01.03.201433KV DLF-II 01.03.201433KV Exep.Panther-IV 09.07.201533KV Feeder No.2 31.12.201433KV Feeder No.3 31.12.201433KV Feeder No.4 31.12.2014

132KV Badgaon 33KV Discom Bay 29.11.2014 25.09.2015132KV Anjad 33KV Discom Bay 08.12.2014 26.11.2015

Annexure-2.4(ii)

220KV

132KV

132KV Raukhedi

132KV Chandrawatiganj

220KV Chhindwara

220KV

JABALPUR REGION

132KV

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION

Minutes of 53rd OCCM of M.P 29

Page 32: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Annexure-2.4(ii)

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220KV Barod 33KV M&B-I&II

132KV Susner 33KV Evershine 21.05.2014132KV Maxi Sudheer Project 18.02.2015

33KV Enercon-I33KV Enercon-II33KV M&B-I33KV M&B-II

132KV Ratadia 33KV Chintaman Ganesh

33KV Kachnariya33KV Lasuldiya Kelwa

132KV Sonkatch 33KV Industrial (MPAKVN)

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220 KV Betul 33 KV Industrial 13.06.2014220 KV Vidisha 33 KV ISanchi 30.01.2015

33 KV Barna 19.02.201433 KV Boras 19.02.201433 KV Nagar Palika 09.03.201433 KV Water Works 09.03.201433 KV Jatkheda-I 07.05.201433 KV Jatkheda-II 07.05.201433 KV Runaha 15.04.201533 KV Nazirabad 18.09.201533 KV Ramgarh 19.09.201533 KV Nayasamand 19.12.2015

132 KV MACT Bhopal 33 KV Bairagarh chichli-2 15.11.2014132 KV Gopalpur 33 KV AE, PHE 27.02.2015

33 KV AIIMS Hospital 29.02.201633 KV AIIMS Residence 29.02.201633 KV C-21 Mall 01.06.201633 KV Katara Hills-II 01.06.2016

Name of EHV Substation Name of 33KV feeder Date of charging of feeder

220 KV Sagalgarh 33 KV Mangrol 30.05.2014

132 KV Morena 33 KV Bagchini 02.02.2015132 KV Datia 33 KV Karapura 17.05.2014132 KV Ron 33 KV Mangarh 21.11.2013

132 KV Morar 33 KV Readymade Garment 22.08.2014

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL

132KV Agar

220 KV

132 KV Runaha

132 KV Shyampur

132 KV Bareli

132 KV

132 KV Amrawad Khurd

132 KV Biora

GWALIOR REGION

220 KV

132 KV

UJJAIN REGION

(For which group to be allocated)BHOPAL REGION

220KV

132KV

132KV Nalkheda

Minutes of 53rd OCCM of M.P 30

Page 33: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

ANNEXURE-3.2

FROM TO

1 400 kV S/s Ashta 315MVA CGL-I - 04-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work

2 400 kV S/s Ashta 315MVA CGL-I 17-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

3 400 kV S/s Ashta 315MVA X-MER - II - 05-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work

4 400 kV S/s Ashta 315MVA X-MER - II 18-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

5 400 kV S/s Ashta 400KV Line Reactor- I (BHEL) - 07-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work6 400 kV S/s Ashta 400KV Line Reactor- II (BHEL) - 14-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work7 400 kV S/s Ashta 400KV Bus Reactor (CGL) - 06-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work

8 400 kV S/s Ashta 400KV Bus Reactor (CGL) 19-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

9 400 kV S/s Ashta 400kV Satpura-Ashta CKT No.1 1 20-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

10 400 kV S/s Ashta 400kV Satpura-Ashta CKT No.2 2 21-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

11 400 kV S/s Ashta 400KV Bus Tie - 22-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

12 400 kV S/s Ashta 400KV Bus Coupler - 24-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Bay equipment maintenance and testing work

13 400 kV S/s Ashta 400KV Main Bus no. 1& CVT set No.1

- 25-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work

14 400 kV S/s Ashta 400KV Main Bus no. 2& CVT Set No.2

- 26-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work

15 400 kV S/s Ashta 400KV Aux. Bus - 27-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Maintenance and testing work

16 400KV S/s Katni 315MVA BHEL - 22-Sep-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

17 400KV S/s Katni 315MVA BHEL - 23-Sep-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

18 400KV S/s Katni 400KV Birsingpur - 1 1 04-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

19 400KV S/s Katni 400KV Birsingpur - 2 2 06-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

20 400KV S/s Katni 400KV Damoh - 10-Oct-16 09:00 Hr. 18:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

21 400KV S/s Indore 3x105MVA 400/220KV Xmer II 05-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

22 400KV S/s Indore 3x105MVA 400/220KV Xmer II 06-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

23 400KV S/s Indore 315MVA 400/220KV Xmer III 08-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

24 400KV S/s Indore 315MVA 400/220KV Xmer III 09-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

25 400KV S/s Indore 400KV Nagda 13-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

DURATION IN Hr.- MAINTENANCE WORK PROPOSED

400KV

PROPOSED SHUTDOWN PROGRAM OF 400 kV EQUIPMENT / FEEDER DURING 01-09-2016 TO 31-10-2016PERIOD OF S-

NO.NAME OF 400 KV

SUBSTATIONNAME OF EQUIPMENT/

FEEDER/LINECKT. NO. DATE

Minutes of 53rd OCCM of M.P 31

Page 34: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

FROM TODURATION IN Hr.- MAINTENANCE WORK PROPOSEDPERIOD OF S-

NO.NAME OF 400 KV

SUBSTATIONNAME OF EQUIPMENT/

FEEDER/LINECKT. NO. DATE

26 400KV S/s Indore 315MVA 400/220KV Xmer IV 16-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

27 400KV S/s Indore 315MVA 400/220KV Xmer IV 17-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

28 400KV S/s Indore 400KV ISP I 19-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

29 400KV S/s Indore 400KV ISP II 20-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

30 400KV S/s Pithampur 315MVA ICT No.I 05-Sep-16 10:00 Hr. 24:00 Hr. 14:00 Hr. For Post monsoon maintenance and testing work

31 400KV S/s Pithampur 315MVA ICT No.I 06-Sep-16 0:00 Hr. 17:00 Hr. 17:00 Hr. For Post monsoon maintenance and testing work

32 400KV S/s Pithampur 315MVA ICT No. II 08-Sep-16 10:00 Hr. 24:00 Hr. 14:00 Hr. For Post monsoon maintenance and testing work

33 400KV S/s Pithampur 315MVA ICT No. II 09-Sep-16 0:00 Hr. 17:00 Hr. 17:00 Hr. For Post monsoon maintenance and testing work

34 400KV S/s Pithampur 50MVAR REACTOR 14-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

35 400KV S/s Pithampur 50MVAR REACTOR 15-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

36 400KV S/s Pithampur 400KV PGCIL Ckt No. I 17-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

37 400KV S/s Pithampur 400KV PGCIL Ckt No. II 19-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

38 400KV S/s Pithampur 400KV SSTPH Ckt No. I 21-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

39 400KV S/s Pithampur 400KV SSTPH Ckt No. II 22-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

40 400KV S/s Bina 400KV Bina JP BPSCL - 15-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work41 400KV S/s Bina 400KV Bina- JP BPSCL 16-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work42 400KV S/s Bina 315MVA X-MER-III 26-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work43 400KV S/s Bina 315MVA X-MER-III 27-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work44 400KV S/s Bina 315MVA X-MER-II 28-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work45 400KV S/s Bina 315MVA X-MER-II 29-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work46 400KV S/s Bina 50MVAR Line Reactor I 05-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work47 400KV S/s Bina 50MVAR Line Reactor II 06-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work48 400KV S/s Bina 50MVAR Bus Reactor 07-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work49 400KV S/s Bina 400KV Bhopal I 17-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work50 400KV S/s Bina 400KV Bhopal I 18-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work51 400KV S/s Bina 400KV Bhopal II 19-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work52 400KV S/s Bina 400KV Bhopal II 20-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

53 400KV S/s Nagda 315MVA ICT-1 02-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

54 400KV S/s Nagda 315MVA ICT-1 03-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

55 400KV S/s Nagda 315MVA ICT-3 06-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

56 400KV S/s Nagda 315MVA ICT-3 07-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing workMinutes of 53rd OCCM of M.P 32

Page 35: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

FROM TODURATION IN Hr.- MAINTENANCE WORK PROPOSEDPERIOD OF S-

NO.NAME OF 400 KV

SUBSTATIONNAME OF EQUIPMENT/

FEEDER/LINECKT. NO. DATE

57 400KV S/s Nagda 315MVA ICT-4 13-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

58 400KV S/s Nagda 315MVA ICT-4 14-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Post monsoon maintenance and testing work

1 220KV S/s Sukha 220KV ICT - 1 1 04-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work2 220KV S/s Sukha 220KV ICT - 2 2 06-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

3 400KV S/s Pithampur 220KV BADNAGAR 24-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

4 400KV S/s Pithampur 220KV INDORE 26-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

5 400KV S/s Pithampur 220KV INTERCONNECTOR- I 28-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

6 400KV S/s Pithampur 220KV INTERCONNECTOR- II 29-Sep-16 10:00 Hr. 17:00 Hr. 7:00 Hr. For Post monsoon maintenance and testing work

7 220KV S/s Pithampur (Sect.-III)

220KV Int.Connector No-I 05-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

8 220KV S/s Pithampur (Sect.-III)

220KV Int.Connector No-II 07-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

9 220KV S/s Pithampur (Sect.-III)

220KV PGCIL No-I 01-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

10 220KV S/s Pithampur (Sect.-III)

220KV PGCIL No-II 03-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

11 220KV S/s Pithampur (Sect.-III)

160MVA X-mer No-I 08-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

12 220KV S/s Pithampur (Sect.-III)

160MVA X-mer No-II 13-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

13 220KV S/s Pithampur (Sect.-III)

160MVA X-mer No-III 16-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

14 220KV S/s Dhar 220KV Pithampur 28-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work15 220KV S/s Dhar 220KV PGCIL (Rajgarh) 01-Oct-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work16 220KV S/s Dhar 160MVA X-mer 26-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

17 220KV S/s Pithampur (Sect.-I)

220KV Pithampur 20-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

18 220KV S/s Pithampur (Sect.-I)

220KV Indore 23-Sep-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

19 220KV S/s Pithampur (Sect.-I)

160MVA X-mer 30-Oct-16 08:00 Hr. 17:00 Hr. 9:00 Hr. For Maintenance and testing work

20 22KV S/s Malanpur 160MVA X-mer-1 09-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

21 22KV S/s Malanpur 160MVA X-mer-2 13-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

22 220KV Mehgaon 160MVA X-mer-1 20-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

23 220KV Mehgaon 160MVA X-mer-2 24-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

24 220KV S/s Datia 160MVA X-mer 30-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Post monsoon maintenance and testing work

25 400KV S/s Bina 25MVAR Reactor-I 05-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

220KV

Minutes of 53rd OCCM of M.P 33

Page 36: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

FROM TODURATION IN Hr.- MAINTENANCE WORK PROPOSEDPERIOD OF S-

NO.NAME OF 400 KV

SUBSTATIONNAME OF EQUIPMENT/

FEEDER/LINECKT. NO. DATE

26 400KV S/s Bina 25MVAR Reactor-II 06-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work27 400KV S/s Bina 220KV BUS TRANSFER 07-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work28 400KV S/s Bina 220KV GUNA FEEDER 13-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work29 400KV S/s Bina 220KV ASHOKNAGAR FEEDER 14-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work30 400KV S/s Bina 220KV SAGAR FEEDER I 19-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work31 400KV S/s Bina 220KV SAGAR FEEDER II 20-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work32 400KV S/s Bina 220KV BINA INTERCONNECTOR I 21-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work33 400KV S/s Bina 220KV BINA INTERCONNECTOR II 22-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work34 400KV S/s Bina 220KV BUS TIE 23-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work35 400KV S/s Bina 220KV GWALIOR FEEDER 03-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work36 400KV S/s Bina 220KV DATIA FEEDER 04-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work37 400KV S/s Bina 220KV BORL FEEDER I 24-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work38 400KV S/s Bina 220KV BORL FEEDER II 25-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work39 220KV S/s Sagar 220KV BINA - I 01-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work40 220KV S/s Sagar 220KV BINA - II 02-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work41 220KV S/s Sagar 220KV PGCIL 03-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work42 220KV S/s Sagar 220KV DAMOH 05-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work43 220KV S/s Sagar 220KV Rly Traction - I 06-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work44 220KV S/s Sagar 220KV Rly Traction - II 07-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work45 220KV S/s Sagar 220/132KV 160MVA Xmer 08-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work46 220KV S/s Sagar 220/132KV 160MVA BHEL xmer 13-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work47 220KV S/s Sagar 220/132KV 100MVA Xmer 14-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work48 220KV S/s Damoh 220KV Katni - I 19-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work49 220KV S/s Damoh 220KV Sagar 05-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work50 220KV S/s Damoh 220KV PGCIL - I 20-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work51 220KV S/s Damoh 220KV PGCIL - II 22-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work52 220KV S/s Damoh 220KV Traction - I 23-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work53 220KV S/s Damoh 220KV Traction - II 27-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work54 220KV S/s Damoh 220/132KV 160MVA XmerI 01-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work55 220KV S/s Damoh 220/132KV 160MVA XmerII 02-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work56 220KV S/s Damoh 220/132KV 125MVA XMER 05-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work57 220KV S/s Damoh 220KV Tikamgrah 06-Oct-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

58 220KV S/s Chhatarpur 220/132KV 160MVA XMER AREVA 19-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

59 220KV S/s Chhatarpur 220KV Satna 20-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

60 220KV S/s Tikamgrah 220/132KV 160MVA EMCO 21-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

61 220KV S/s Tikamgrah 220/132KV 160MVA BBL 22-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

62 220KV S/s Tikamgrah 220KV MPPTCL Damoh 24-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

63 220KV S/s Tikamgrah 220KV PGCIL Damoh 26-Sep-16 09:00 Hr. 17:00 Hr. 8:00 Hr. For Maintenance and testing work

Minutes of 53rd OCCM of M.P 34

Page 37: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

A. ThermalStn. Name UNIT No. Capacity

MW June-16 July-163 120 0.00 0.004 120 0.00 0.00

PH II 240 0.00 0.005 210 145.71 59.74

PH III 210 145.71 59.74TOT 210 145.71 59.74

6 200 0.00 2.427 210 0.00 0.00

PH II 410 0.00 2.428 210 0.00 0.009 210 0.00 0.00

PH III 420 0.00 0.0010 250 77.50 6.2711 250 12.15 10.49

PH IV 500 89.65 16.76TOT 1330 89.65 19.18

1 210 46.64 0.002 210 39.94 4.79

PH I 420 86.58 4.793 210 38.66 0.004 210 48.67 0.00

PH II 420 87.32 0.005 500 296.26 276.69

PH III 500 296.26 276.69TOT 1340 470.16 281.48

1 600 0.00 0.002 600 0.00 0.00

PH1 1200 0.00 0.00

4080 705.52 360.39

B. HydelCapacity

MW June-16 July-16115.0 23.07 0.00172.0 0.17 0.0199.0 0.55 5.12

386.0 23.78 5.13193.0 11.89 2.56160.0 6.47 16.07107.0 4.31 10.7290.0 16.25 25.59

315.0 13.14 79.8020.0 2.18 8.7560.0 0.00 0.0030.0 1.62 0.5045.0 0.00 11.4622.5 0.00 5.7320.0 1.35 0.4460.0 0.00 14.75

1186.0 64.78 162.49915.0 64.07 157.37917.5 50.73 148.84

CapacityMW June-16 July-16

Indira Sagar Hydel Project 1000 122.805 148.665Omkareshwar Hydel Project 520 65.887 75.813

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

Minutes of 53rd OCCM of M.P 35

Page 38: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

S No. Source Apr-16 May-16 Jun-16 Jul-16 TotalA.

1 Thermal 1534.26 1058.71 641.73 332.22 3566.922 Hydel 71.27 73.63 49.50 146.54 340.953 Total 1605.53 1132.35 691.22 478.76 3907.87

B.1 Indira Sagar 120.81 146.45 52.97 496.81 817.042 Omkareshwar 65.89 75.81 31.09 215.83 388.623 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 5909.924 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 98.515 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 6008.436 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -266.057 Schedule From DVC ER 232.92 202.40 229.04 111.04 775.418 Schedule From Sugen 0.00 0.00 0.00 4.80 4.809 LANCO Amk 195.30 186.44 187.18 144.74 713.66

10 SASAN 988.04 886.52 921.35 834.99 3630.9011 ESSAR 0.00 0.00 0.00 0.00 0.0012 J P Nigri 278.92 323.20 295.64 250.95 1148.7113 MB Power 63.53 131.56 84.34 18.07 297.5014 JHABUA Power 0.00 20.41 3.30 0.00 23.7115 STOA Schedule other than MPPMCL 0.00 0.00 64.44 75.76 140.2016 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.0017 BARH 0.00 0.00 0.00 0.00 0.0018 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 364.6619 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 593.8220 Schedule from SEZ 0.00 0.00 0.00 0.00 0.0021 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 13.72

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00

24 Additional Power Purchase 6.53 0.00 0.00 0.00 6.5325 Energy Exchange 0.00 0.00 0.00 0.00 0.0026 Banking of Energy -145.84 -11.74 -77.54 -210.04 -445.1627 Sale of Power -321.72 -171.39 -105.78 -155.59 -754.4728 Total MP Schedule (Including Railway) 3253.22 3163.74 3477.52 2627.92 12522.4129 Total MP Drawal (Including Railway) 3205.75 3093.57 3417.72 2539.32 12256.3630 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 6.8731 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 73.2332 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 53.7533 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 3.2734 POWER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.0035 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -6.4036 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 1548.6637 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 326.98

38 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 20.37 8.23 8.07 21.17 57.83

39Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

10.35 8.46 9.39 6.14 34.35

40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 13.1141 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 13.6142 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 3.8643 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.0344 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 0.6845 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 3.4646 State Supply (Ex-Power st. Bus) 5397.37 5038.53 4767.84 4299.45 19503.1947 AVERAGE DAILY (Ex-Bus) 179.91 162.53 158.93 138.69 159.8648 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 107.1849 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 177.7550 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4281.50 4822.95 4090.97 4214.27 17409.7051 Year ((16-17)-(15-16))*100/Year (15-16) 26.06 4.47 16.55 2.02 12.0252 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 5.6453 Frequency Correction 3.92 1.95 2.34 1.38 9.5954 Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 19518.4355 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.0056 Un-Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 19518.43

ENERGY BALANCE SHEETYear : 2016 - 17

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Minutes of 53rd OCCM of M.P 36

Page 39: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

S.NO. Apr-16 May-16 Jun-16 Jul-16 Yr 16-17C.1 DEMAND MET 7984 7347 7019 6147 79842 LOAD RELIEF 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0D.1 DEMAND MET 8011 7902 7501 6903 80112 LOAD RELIEF 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0F. REGISTERED MAXIMUM 8119 8045 7501 6903 8119G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 8153H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 8153I.1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:422. District Head Quarters 23:52 23:44 23:45 23:48 23:473. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:364. Rural -Mixed 23:25 22:52 22:54 22:56 23:025. Rural -DLF 23:32 23:09 23:06 23:12 23:156. Rural -Irrigation 9:51 9:37 9:37 9:39 9:41J LOAD FACTOR % 92.33 79.51 82.87 78.80 83.38

S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Yr 16-17A. INTGRATED FREQUENCY

1 MAXIMUM 50.11 50.20 50.11 50.16 50.202 MINIMUM 49.80 49.78 49.82 49.82 49.78

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.32 50.44 50.37 50.35 50.442 MINIMUM 49.64 49.56 49.65 49.69 49.56

C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.553 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 71.534 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 7.785 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.136 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00

ENERGY BALANCE SHEET : Demand & Sypply HoursYear : 2016 - 17

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2016-17

Minutes of 53rd OCCM of M.P 37

Page 40: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPTotal IPPs Injecti

on

Total CPPs

InjectionTotal CSS DVC

ER Sugen Lanco Sasan Essar JP Nigri

MB Power

Jhabua

PowerSSP SCH to

Railway SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH TOTAL

1:00 50.00 1010 919 80 59 46 14 558 1676 2326 302 0 244 1225 0 403 117 0 138 200 0 -54 -72 0 0 18 4 4852 6529 4815 -38 0 6491 0 0 0 6494 6494

2:00 50.01 995 905 58 27 23 14 580 1608 2291 267 0 244 1224 0 399 104 0 134 200 0 -62 -19 0 0 24 4 4810 6418 4690 -119 0 6299 0 0 0 6301 6301

3:00 50.00 970 883 50 10 15 14 596 1568 2188 258 0 244 1223 0 399 97 0 136 200 0 -62 0 0 0 43 4 4730 6298 4688 -42 0 6256 0 0 0 6258 6258

4:00 50.02 959 873 51 10 17 13 570 1535 2166 295 0 240 1222 0 392 99 0 94 200 0 -73 0 0 0 44 4 4683 6218 4658 -25 0 6193 0 0 0 6193 6193

5:00 50.00 960 874 49 14 8 13 555 1512 2170 299 0 240 1222 0 392 101 0 88 200 0 -115 0 0 0 58 4 4660 6172 4631 -30 0 6142 0 0 0 6145 6145

6:00 50.02 951 866 54 27 12 13 574 1546 2163 299 0 244 1226 0 392 103 0 66 200 0 -147 0 0 0 82 4 4634 6180 4503 -130 0 6049 0 0 0 6051 6051

7:00 50.01 938 853 52 24 15 13 619 1577 2082 290 0 247 1218 0 393 100 0 65 200 0 -199 0 0 0 187 4 4587 6164 4557 -30 0 6134 0 0 0 6135 6135

8:00 50.05 937 852 56 27 15 13 716 1681 2078 287 0 252 1221 0 393 96 0 58 200 0 -210 0 0 0 158 4 4537 6217 4409 -128 0 6089 0 0 0 6089 6089

9:00 50.01 936 852 59 30 17 13 788 1760 2052 289 0 249 1220 0 393 102 0 50 200 0 -213 -15 0 0 119 4 4451 6211 4324 -127 0 6084 0 0 0 6085 6085

10:00 50.01 948 863 56 44 21 13 817 1814 2063 289 0 249 1221 0 399 107 0 52 200 0 -158 -149 0 0 81 4 4358 6173 4251 -107 0 6066 0 0 0 6067 6067

11:00 50.01 959 873 70 58 33 13 803 1850 2069 301 0 249 1224 0 395 106 0 42 200 0 -129 -215 0 0 39 4 4285 6134 4288 4 0 6138 0 0 0 6140 6140

12:00 49.99 978 890 81 62 35 13 767 1847 2132 312 0 252 1227 0 394 114 0 86 200 0 -110 -271 0 0 27 4 4367 6214 4249 -118 0 6096 0 0 0 6101 6101

13:00 49.98 968 881 74 90 40 14 730 1828 2165 308 0 252 1230 0 394 111 0 122 200 0 -100 -203 0 0 15 4 4499 6328 4483 -17 0 6311 0 0 0 6317 6317

14:00 49.99 974 887 77 103 59 14 675 1815 2237 310 0 252 1227 0 394 112 0 113 200 0 -95 -239 0 0 16 4 4533 6347 4497 -36 0 6312 0 0 0 6316 6316

15:00 49.99 979 891 82 117 67 13 642 1812 2286 319 0 252 1224 0 393 111 0 80 200 0 -86 -302 0 0 2 4 4485 6296 4505 20 0 6316 0 0 0 6321 6321

16:00 50.00 978 890 82 96 54 14 552 1687 2262 318 0 252 1231 0 379 122 0 69 200 0 -68 -247 0 0 18 4 4540 6227 4503 -37 0 6190 0 0 0 6194 6194

17:00 49.99 961 874 71 65 29 14 490 1542 2179 317 0 249 1232 0 387 112 0 66 200 0 -71 -175 0 0 57 4 4557 6099 4492 -65 0 6034 0 0 0 6039 6039

18:00 50.01 928 844 67 34 14 13 435 1406 1835 263 0 245 1234 0 391 95 0 73 200 0 -84 -39 0 0 115 4 4332 5738 4263 -69 0 5669 0 0 0 5669 5669

19:00 49.99 967 880 141 153 76 16 416 1682 1975 313 0 252 1251 0 395 116 8 129 200 0 -157 -405 0 0 107 4 4187 5869 4209 22 0 5891 0 0 0 5894 5894

20:00 49.93 1033 940 199 276 143 16 427 2002 2399 387 0 252 1233 0 397 138 24 214 197 0 -162 -455 0 0 70 4 4699 6701 4706 8 0 6708 0 0 0 6724 6724

21:00 49.95 1042 949 188 216 121 16 433 1923 2435 380 0 252 1232 0 397 136 31 231 194 0 -86 -463 0 0 63 4 4805 6728 4789 -16 0 6712 0 0 0 6722 6722

22:00 50.03 1023 931 161 147 84 17 452 1792 2389 365 0 252 1232 0 398 136 28 230 196 0 -63 -245 0 0 67 4 4990 6782 4919 -71 0 6711 0 0 0 6711 6711

23:00 50.01 1013 922 130 127 84 16 494 1773 2405 361 0 252 1230 0 399 131 12 199 197 0 -41 -115 0 0 18 4 5053 6826 5005 -49 0 6777 0 0 0 6780 6780

24:00 50.02 986 897 105 97 61 16 521 1697 2373 345 0 252 1230 0 406 129 6 120 197 0 -50 -35 0 0 22 4 4998 6695 4912 -86 0 6609 0 0 0 6610 6610

Avg. 50.00 975 887 87 80 45 14 592 1706 2197 312 0 249 1227 0 395 112 5 111 199 0 -108 -153 0 0 60 4 4610 6315 4556 -54 0 6262 0 0 0 6265 6265

00 TO 06 HRS.

50.01 974 886 57 25 20 14 572 1574 2217 287 0 242 1224 0 396 104 0 109 200 0 -86 -15 0 0 45 4 4728 6302 4664 -64 0 6238 0 0 0 6240 6240

06 TO 12 HRS.

50.01 949 864 62 41 23 13 752 1755 2079 295 0 250 1222 0 394 104 0 59 200 0 -170 -108 0 0 102 4 4431 6186 4346 -85 0 6101 0 0 0 6103 6103

12 TO 18 HRS.

49.99 965 878 75 84 44 13 587 1682 2161 306 0 251 1230 0 390 111 0 87 200 0 -84 -201 0 0 37 4 4491 6173 4457 -34 0 6139 0 0 0 6143 6143

06TO 18 HRS.

50.00 957 871 69 62 33 13 669 1718 2120 300 0 250 1226 0 392 107 0 73 200 0 -127 -155 0 0 69 4 4461 6179 4402 -59 0 6120 0 0 0 6123 6123

18 TO 24 HRS.

49.99 1011 920 154 169 95 16 457 1811 2329 359 0 252 1234 0 399 131 18 187 197 0 -93 -286 0 0 58 4 4789 6600 4757 -32 0 6568 0 0 0 6574 6574

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- June 2016

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

Minutes of 53rd OCCM of M.P 38

Page 41: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPTotal IPPs Injecti

on

Total CPPs

InjectionTotal CSS DVC

ER Sugen Lanco Sasan Essar JP Nigri

MB Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH

TOTAL

1:00 50.02 486 443 178 638 279 27 527 2091 1553 33 0 183 1079 0 306 15 0 414 214 0 -252 -71 0 0 55 3 3533 5624 3434 -99 0 5525 0 0 0 5526 5526

2:00 50.02 476 433 164 618 270 27 547 2059 1468 33 0 180 1061 0 306 17 0 390 214 0 -263 -40 0 0 63 3 3432 5491 3344 -87 0 5404 0 0 0 5405 5405

3:00 50.02 465 423 166 613 268 27 556 2053 1400 33 0 180 1065 0 312 17 0 356 214 0 -257 -31 0 0 68 3 3358 5411 3302 -56 0 5355 0 0 0 5357 5357

4:00 50.03 464 423 153 619 268 27 550 2040 1387 39 0 180 1065 0 313 15 0 351 210 0 -257 -56 0 0 67 3 3317 5357 3251 -66 0 5291 0 0 0 5291 5291

5:00 49.99 463 421 150 629 266 28 541 2035 1402 36 0 180 1065 0 313 15 0 325 210 0 -278 -33 0 0 73 3 3310 5345 3226 -84 0 5261 0 0 0 5265 5265

6:00 50.00 463 421 174 635 268 28 534 2060 1414 36 0 177 1066 0 313 15 0 292 214 0 -288 -23 0 0 75 3 3294 5354 3276 -18 0 5336 0 0 0 5338 5338

7:00 50.01 461 419 187 629 270 28 538 2071 1440 36 0 180 1087 0 313 15 0 245 217 0 -281 -42 0 0 167 3 3379 5450 3294 -85 0 5365 0 0 0 5366 5366

8:00 50.06 461 419 188 621 272 27 589 2116 1425 36 0 180 1077 0 313 15 0 244 217 0 -281 -49 0 0 153 3 3333 5448 3202 -131 0 5317 0 0 0 5318 5318

9:00 50.02 461 420 191 655 284 26 655 2230 1358 36 0 180 1090 0 314 15 0 199 214 0 -278 -85 0 0 131 3 3177 5406 3073 -103 0 5303 0 0 0 5304 5304

10:00 50.02 466 424 186 660 286 26 712 2293 1391 33 0 180 1077 0 317 15 0 176 214 0 -263 -163 0 0 108 3 3088 5381 2909 -179 0 5202 0 0 0 5203 5203

11:00 50.02 468 426 189 672 291 25 710 2313 1450 27 0 177 1079 0 319 15 0 179 214 0 -255 -380 0 0 71 3 2897 5210 2818 -79 0 5131 0 0 0 5131 5131

12:00 50.00 469 427 185 684 303 26 706 2330 1394 27 0 177 1068 0 321 15 0 235 214 0 -246 -432 0 0 39 3 2814 5144 2674 -140 0 5004 0 0 0 5006 5006

13:00 50.03 471 429 172 690 303 26 671 2292 1305 34 0 177 1079 0 326 15 0 309 214 0 -267 -505 0 0 70 3 2758 5051 2720 -39 0 5012 0 0 0 5012 5012

14:00 50.01 473 431 172 688 292 26 631 2241 1193 25 0 180 1064 0 325 15 0 298 210 0 -268 -390 0 0 87 3 2743 4984 2696 -47 0 4937 0 0 0 4939 4939

15:00 49.99 473 431 213 681 292 26 614 2257 1272 25 0 183 1050 0 325 21 0 270 210 0 -253 -491 0 0 77 3 2694 4951 2682 -12 0 4939 0 0 0 4942 4942

16:00 50.01 475 433 197 673 292 26 546 2168 1240 26 0 183 1055 0 325 21 0 349 211 0 -246 -444 0 0 90 3 2812 4980 2773 -39 0 4941 0 0 0 4942 4942

17:00 50.00 478 435 185 666 292 26 444 2049 1155 26 0 180 1026 0 325 18 0 462 211 0 -251 -304 0 0 118 3 2969 5018 2960 -10 0 5009 0 0 0 5012 5012

18:00 50.01 485 441 220 690 301 27 365 2044 1101 25 0 177 1027 0 332 18 0 572 210 0 -263 -197 0 0 140 3 3145 5190 3089 -56 0 5134 0 0 0 5135 5135

19:00 50.01 518 471 273 743 329 28 330 2173 1615 40 0 202 1118 0 343 24 0 429 210 0 -288 -409 0 0 97 3 3384 5557 3381 -2 0 5554 0 0 0 5557 5557

20:00 49.96 535 487 337 782 338 29 347 2320 1933 68 0 227 1127 0 346 63 0 382 213 0 -336 -260 0 0 50 3 3817 6136 3835 18 0 6154 0 0 0 6163 6163

21:00 49.99 541 492 302 774 350 29 390 2337 1922 70 0 212 1119 0 346 64 0 381 214 0 -341 -224 0 0 50 3 3816 6153 3743 -73 0 6080 0 3 3 6087 6087

22:00 50.03 534 486 256 718 323 29 414 2227 1844 57 0 205 1118 0 346 64 0 384 211 0 -313 -141 0 0 62 3 3839 6065 3710 -129 0 5936 0 6 6 5944 5944

23:00 50.02 509 464 248 704 311 28 453 2208 1766 53 0 204 1105 0 344 41 0 408 215 0 -249 -142 0 0 33 3 3779 5988 3660 -120 0 5868 0 0 0 5869 5869

24:00 50.04 503 457 199 679 297 27 498 2158 1589 50 0 197 1088 0 332 30 0 456 217 0 -239 -37 0 0 41 3 3727 5885 3536 -191 0 5694 0 0 0 5695 5695

Avg. 50.01 483 440 204 673 293 27 536 2174 1459 38 0 187 1077 0 324 24 0 338 213 0 -271 -206 0 0 83 3 3267 5441 3191 -76 0 5365 0 0 0 5367 5367

00 TO 06 HRS. 50.01 470 427 164 625 270 27 543 2057 1437 35 0 180 1067 0 310 15 0 355 213 0 -266 -42 0 0 67 3 3374 5430 3305 -68 0 5362 0 0 0 5364 5364

06 TO 12 HRS. 50.02 464 423 188 653 284 26 652 2225 1410 33 0 179 1080 0 316 15 0 213 215 0 -267 -192 0 0 111 3 3115 5340 2995 -120 0 5220 0 0 0 5221 5221

12 TO 18 HRS. 50.01 476 433 193 682 296 26 545 2175 1211 27 0 180 1050 0 326 18 0 377 211 0 -258 -389 0 0 97 3 2854 5029 2820 -34 0 4995 0 0 0 4997 4997

06TO 18 HRS. 50.02 470 428 190 667 290 26 598 2200 1310 30 0 179 1065 0 321 16 0 295 213 0 -263 -290 0 0 104 3 2984 5184 2907 -77 0 5108 0 0 0 5109 5109

18 TO 24 HRS. 50.01 523 476 269 733 325 28 405 2237 1778 56 0 208 1113 0 343 48 0 407 213 0 -294 -202 0 0 55 3 3727 5964 3644 -83 0 5881 0 1 1 5886 5886

TotAvl.

Act.Drl Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- July 2016

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

Minutes of 53rd OCCM of M.P 39

Page 42: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.00 2258 2211 -47 0 0 2212 2212 2039 1998 -41 0 0 1999 1999 2174 2058 -115 0 0 2059 2059 200 224

2:00 50.01 2209 2137 -73 0 0 2137 2137 1989 1940 -49 0 0 1940 1940 2147 2004 -143 0 0 2005 2005 200 218

3:00 50.00 2179 2121 -58 0 0 2122 2122 1945 1922 -23 0 0 1922 1922 2160 1993 -167 0 0 1993 1993 200 220

4:00 50.02 2183 2090 -93 0 0 2090 2090 1942 1901 -42 0 0 1901 1901 2176 1982 -194 0 0 1982 1982 200 220

5:00 50.00 2157 2071 -86 0 0 2072 2072 1895 1889 -6 0 0 1890 1890 2165 1963 -202 0 0 1964 1964 200 219

6:00 50.02 2028 1936 -92 0 0 1937 1937 1868 1870 2 0 0 1870 1870 2189 2018 -171 0 0 2019 2019 200 225

7:00 50.01 1905 1853 -51 0 0 1854 1854 1808 1831 24 0 0 1832 1832 2340 2211 -129 0 0 2212 2212 200 238

8:00 50.05 1867 1790 -78 0 0 1790 1790 1826 1856 30 0 0 1856 1856 2372 2203 -169 0 0 2203 2203 200 241

9:00 50.01 1876 1776 -99 0 0 1777 1777 1800 1837 38 0 0 1838 1838 2395 2234 -161 0 0 2235 2235 200 236

10:00 50.01 1901 1780 -122 0 0 1780 1780 1802 1805 3 0 0 1805 1805 2329 2240 -89 0 0 2240 2240 200 241

11:00 50.01 1908 1834 -74 0 0 1835 1835 1805 1800 -5 0 0 1800 1800 2272 2273 1 0 0 2273 2273 200 231

12:00 49.99 1943 1857 -86 0 0 1859 1859 1836 1780 -56 0 0 1781 1781 2259 2237 -22 0 0 2239 2239 200 222

13:00 49.98 1984 1923 -61 0 0 1925 1925 1855 1818 -37 0 0 1820 1820 2330 2358 28 0 0 2360 2360 200 212

14:00 49.99 1996 1871 -125 0 0 1872 1872 1887 1842 -45 0 0 1843 1843 2389 2388 -1 0 0 2389 2389 200 211

15:00 49.99 1925 1839 -86 0 0 1841 1841 1857 1842 -15 0 0 1843 1843 2357 2425 68 0 0 2427 2427 200 210

16:00 50.00 1933 1783 -150 0 0 1784 1784 1845 1773 -73 0 0 1774 1774 2366 2410 44 0 0 2411 2411 200 225

17:00 49.99 1855 1661 -194 0 0 1662 1662 1831 1726 -106 0 0 1727 1727 2363 2419 56 0 0 2421 2421 200 228

18:00 50.01 1758 1557 -201 0 0 1557 1557 1801 1653 -148 0 0 1653 1653 2255 2222 -33 0 0 2222 2222 200 237

19:00 49.99 1764 1774 10 0 0 1775 1775 1694 1740 46 0 0 1741 1741 2149 2129 -20 0 0 2130 2130 200 248

20:00 49.93 2131 2195 65 0 0 2200 2200 1948 2055 107 0 0 2060 2060 2162 2210 47 0 0 2215 2215 197 248

21:00 49.95 2288 2267 -21 0 0 2270 2270 2064 2067 2 0 0 2070 2070 2140 2132 -8 0 0 2136 2136 194 246

22:00 50.03 2296 2237 -59 0 0 2237 2237 2097 2062 -35 0 0 2062 2062 2137 2163 27 0 0 2163 2163 196 249

23:00 50.01 2292 2263 -29 0 0 2264 2264 2127 2095 -31 0 0 2096 2096 2187 2182 -5 0 0 2183 2183 197 236

24:00 50.02 2267 2243 -24 0 0 2243 2243 2082 2050 -32 0 0 2051 2051 2137 2088 -49 0 0 2088 2088 197 228

Avg. 50.00 2038 1961 -76 0 0 1962 1962 1902 1881 -20 0 0 1882 1882 2248 2189 -59 0 0 2190 2190 199 230

00 TO 06 HRS. 50.01 2169 2094 -75 0 0 2095 2095 1946 1920 -26 0 0 1920 1920 2169 2003 -165 0 0 2004 2004 200 221

06 TO 12 HRS. 50.01 1900 1815 -85 0 0 1816 1816 1813 1818 6 0 0 1819 1819 2328 2233 -95 0 0 2234 2234 200 235

12 TO 18 HRS. 49.99 1909 1772 -136 0 0 1773 1773 1846 1776 -70 0 0 1777 1777 2343 2370 27 0 0 2372 2372 200 220

06TO 18 HRS. 50.00 1904 1794 -111 0 0 1795 1795 1829 1797 -32 0 0 1798 1798 2336 2302 -34 0 0 2303 2303 200 227

18 TO 24 HRS. 49.99 2173 2163 -10 0 0 2165 2165 2002 2012 10 0 0 2013 2013 2152 2151 -2 0 0 2152 2152 197 242

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- June 2016

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 53rd OCCM of M.P 40

Page 43: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.02 2021 1871 -149 0 0 1871 1871 1897 1804 -92 0 0 1805 1805 1843 1630 -214 0 0 1630 1630 214 220

2:00 50.02 1961 1848 -113 0 0 1848 1848 1836 1759 -77 0 0 1759 1759 1811 1590 -222 0 0 1590 1590 214 207

3:00 50.02 1899 1830 -68 0 0 1831 1831 1761 1735 -26 0 0 1736 1736 1767 1580 -187 0 0 1580 1580 214 210

4:00 50.03 1871 1807 -64 0 0 1807 1807 1740 1715 -25 0 0 1715 1715 1761 1557 -204 0 0 1557 1557 210 211

5:00 49.99 1851 1786 -65 0 0 1787 1787 1723 1690 -33 0 0 1691 1691 1770 1569 -200 0 0 1570 1570 210 216

6:00 50.00 1787 1713 -74 0 0 1714 1714 1691 1708 17 0 0 1709 1709 1813 1701 -112 0 0 1702 1702 214 213

7:00 50.01 1678 1629 -49 0 0 1629 1629 1678 1687 9 0 0 1688 1688 1926 1825 -101 0 0 1826 1826 217 223

8:00 50.06 1670 1587 -83 0 0 1587 1587 1701 1713 12 0 0 1713 1713 1960 1796 -164 0 0 1796 1796 217 221

9:00 50.02 1627 1564 -63 0 0 1564 1564 1707 1713 5 0 0 1713 1713 1993 1798 -194 0 0 1798 1798 214 228

10:00 50.02 1626 1554 -73 0 0 1554 1554 1709 1691 -18 0 0 1691 1691 1953 1728 -225 0 0 1728 1728 214 229

11:00 50.02 1590 1556 -34 0 0 1556 1556 1657 1664 7 0 0 1664 1664 1873 1688 -185 0 0 1688 1688 214 223

12:00 50.00 1596 1545 -51 0 0 1546 1546 1616 1602 -14 0 0 1603 1603 1829 1645 -184 0 0 1645 1645 214 211

13:00 50.03 1581 1563 -18 0 0 1563 1563 1598 1590 -8 0 0 1590 1590 1825 1659 -166 0 0 1659 1659 214 200

14:00 50.01 1524 1519 -5 0 0 1519 1519 1580 1564 -17 0 0 1564 1564 1829 1662 -166 0 0 1663 1663 210 192

15:00 49.99 1474 1504 29 0 0 1505 1505 1540 1540 0 0 0 1541 1541 1790 1691 -99 0 0 1692 1692 210 204

16:00 50.01 1538 1483 -55 0 0 1484 1484 1580 1537 -43 0 0 1538 1538 1819 1708 -110 0 0 1709 1709 211 212

17:00 50.00 1513 1457 -56 0 0 1458 1458 1584 1546 -38 0 0 1547 1547 1851 1788 -63 0 0 1789 1789 211 218

18:00 50.01 1552 1499 -53 0 0 1499 1499 1611 1577 -35 0 0 1577 1577 1888 1840 -48 0 0 1841 1841 210 218

19:00 50.01 1706 1708 2 0 0 1709 1709 1616 1685 69 0 0 1686 1686 1881 1932 51 0 0 1933 1933 210 229

20:00 49.96 1988 2013 26 0 0 2016 2016 1825 1905 80 0 0 1908 1908 1926 2010 84 0 0 2013 2013 213 226

21:00 49.99 2137 2025 -111 0 3 2030 2030 1926 1920 -6 0 0 1921 1921 1885 1910 25 0 0 1912 1912 214 224

22:00 50.03 2087 1972 -115 0 2 1974 1974 1929 1889 -40 0 4 1894 1894 1850 1846 -4 0 0 1847 1847 211 229

23:00 50.02 2062 1948 -114 0 0 1948 1948 1946 1900 -45 0 0 1900 1900 1871 1789 -83 0 0 1789 1789 215 231

24:00 50.04 2022 1917 -104 0 0 1917 1917 1925 1867 -58 0 0 1867 1867 1855 1691 -164 0 0 1691 1691 217 219

Avg. 50.01 1765 1704 -61 0 0 1705 1705 1724 1708 -16 0 0 1709 1709 1857 1735 -122 0 0 1735 1735 213 217

00 TO 06 HRS. 50.01 1898 1809 -89 0 0 1810 1810 1775 1735 -39 0 0 1736 1736 1794 1605 -190 0 0 1605 1605 213 213

06 TO 12 HRS. 50.02 1631 1573 -59 0 0 1573 1573 1678 1678 0 0 0 1679 1679 1922 1747 -176 0 0 1747 1747 215 223

12 TO 18 HRS. 50.01 1531 1504 -26 0 0 1505 1505 1582 1559 -23 0 0 1559 1559 1834 1725 -109 0 0 1726 1726 211 207

06TO 18 HRS. 50.02 1581 1538 -43 0 0 1539 1539 1630 1619 -12 0 0 1619 1619 1878 1736 -142 0 0 1736 1736 213 215

18 TO 24 HRS. 50.01 2000 1931 -69 0 1 1932 1932 1861 1861 0 0 1 1863 1863 1878 1863 -15 0 0 1864 1864 213 227

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- July 2016

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Minutes of 53rd OCCM of M.P 41

Page 44: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Annexure-5 System Disturbance / System Incidence :

1. System Disturbance on 04.06.2016 at ISP HPS: On dated 04.06.2016 at around 12:15 Hrs.

M.P system was normal and frequency of National Grid was 50.06 Hz. Prior to fault Unit No # 6 of ISP HPS was on Bar. 400 KV Bus – A at ISP was under shut down/permit since 08:00 Hrs. on 04.06.2016 and 400 KV ISP – Indore Ckt – I was kept open due H/V. At around 12:19 Hrs. after completion of work on 400 KV Main Bus – A, while shifting of 400 KV ISP – Nagda Ckt from 400 KV Main Bus – B to 400 KV Main Bus – A, Bus Fault occurred at 400 KV ISP HPS. Consequently Bus Bar Protection operated, resulting in tripping 400 KV ISP – Nagda Ckt, 400 KV ISP – Sarni Ckt, 400 KV ISP – Indore Ckt – II and ISP HPS Unit No. # 6. Due to the above tripping there was no load loss in any area. There was generation loss of about 101 MW and System was normalized in due course of time.

2. System Disturbance on 19.06.2016 at 400 KV S/s Bina : On dated 19.06.2016 at around

20:00 Hrs. M.P system was normal and frequency of National Grid was 49.948 Hz. At around 20:14 Hrs. 220 KV Bina Interconnector – II tripped from both end due to transient fault. Simultaneously 220 KV Bus Bar Protection of 220 KV Main Bus – II at 400 KV S/s Bina operated due to problem LBB in logic of 220 KV Bina Interconnector – II resulting in tripping of 220 KV Bina Interconnector – II, 220 KV Bina – Shivpuri Ckt, 220 KV Bina – Guna Ckt, 220 KV Bina – Ashoknagar Ckt, 220 KV Bina – Bina (PGCIL) Ckt, 220 KV Bus Tie, 400/220 KV, 315 MVA ICT – III at 400 KV S/s Bina. Due to the above tripping there was no load loss in any area. There was generation loss of about 101 MW and System was normalized in due course of time.

3. System Disturbance on 03.07.2016 at 220 KV S/s Nepanagar: On dated 03.07.2016 at

around 07:30 Hrs. M.P system was normal and frequency of National Grid was 50.06 Hz. At around 07:36 Hrs. Y-Phase CT of 132 KV Nepanagar – Chhegaon Ckt – II burst resulting in 132 KV Bus Fault at 220 KV S/s Nepanagar and tripping of 220/132 KV, 160 MVA X’met & 220/132 KV, 3X40 MVA X’mer at 220 KV S/s Nepanagar.consequently interruption occurred at 220 KV s/s Nepanagr, 132 KV S/s Badgaon, 132 KV S/s Bahadurpur & 132 KV S/s Burhanpur. Due to the above tripping there was load loss of about 73.4MW, . There was no generation loss and System was normalized in due course of time.

4. System Disturbance on 03.07.2016 at 220 KV S/s Maihar: On dated 03.07.2016 at around

20:35 Hrs. M.P system was normal and frequency of National Grid was 50.03 Hz. Prior to fault 132 KV Amarpatan – Jhinna Ckt &132 KV Maihar – Satna Ckt was kept open for Load Management. At around 20:42 Hrs., 132 KV B-Phase CT of 220/132 KV, 160 MVA X’mer burst at 220 KV S/s Maihar. Simultaneously 132 KV Kymore – Maihar Ckt tripped due jerk. Consequently interruption occurred at 220 KV S/s Maihar, 132 KV S/s Amarpatan, 132 KV Maihar Cement, 132 KV Reliance Cement & 132 KV KJF. Due to the above tripping there was load loss of about 70MW, 21MWH in any area. There was no generation loss and System was normalized in due course of time.

Minutes of 53rd OCCM of M.P 42

Page 45: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

5. System Disturbance on 23.07.2016 at 220 KV S/s Sidhi: On dated 23.07.2016 at around 14:15 Hrs. M.P system was normal and frequency of National Grid was 49.94 Hz. At around 14:20 Hrs. LBB protection of 220 KV ATPS – Sidhi Ckt mall operated, resulting in operation of 220 KV Bus Bar Protection at 220 KV S/s Sidhi. Consequently 220 KV ATPS – Sidhi Ckt, 220 KV Sidhi – Hindalco Ckt, 220 KV Sidhi – Rewa Ckt, 220/132 KV, 160 MVA X’mer tried at 220 KV S/s Sidhi. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

6. System Disturbance on 24.07.2016 at 220 KV S/s Chhindwarah: On dated 24.07.2016 at around 21:50 Hrs. M.P system was normal and frequency of National Grid was 50.02 Hz. At around 21:55 Hrs. 132 KV PT fuse failed at 132 KV S/s Chhindwarah, resulting in tripping of 132 KV Chhindwara Interconnector – I, II & III, 132 KV Chhindwara – Umreth Ckt and 132 KV Khapaswami – Chhindwara Ckt. Due to the above tripping there was interruption at 132 KV S/s Chhindwara and load loss of about MW occurred. There was no generation loss and System was normalized in due course of time.

Minutes of 53rd OCCM of M.P 43

Page 46: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Analysis TimeFrequency (In

Hz)

Starting from25.06.2016 19:44:59Hrs. 49.76

EVENT: TrippingTripping at Pirana S/s Gujarat on 25.06.2016 at 19:45Hrs.To

25.06.2016 19:47:52Hrs. 50.06

A) GENERATION AREAS

Sr No Particulars Dimension SGTPS _5 ATPS _5 Tons HPS_2 Tons HPS_3 Bargi_1 BRS HPS Pench_1 Pench_2 ISP_1 ISP_4 ISP_5

1 Actual Net Interchange before the Event MW 473.35 210.27 106.48 104.17 35.13 19.06 71.62 70.27 99.30 104.70 104.30

2 Actual Net Interchange after the Event MW 477.78 212.28 106.48 103.93 34.66 18.06 71.62 70.27 98.80 102.70 103.30

3 Change in Net Interchange (2 - 1) MW 4.43 2.01 0.00 -0.25 -0.47 -1.00 0.00 0.00 -0.50 -2.00 -1.00

4 Generation Loss (+) / Load Throw off (-) during the Event MW 0 0 0 0 0 0 0 0 0 0 0

5 Control Area Response (4-3) MW -4.43 -2.01 0.00 0.25 0.47 1.00 0.00 0.00 0.50 2.00 1.006 Frequency before the Event HZ 49.76 49.76 49.76 49.76 49.76 49.76 49.76 49.76 49.76 49.76 49.767 Frequency after the Event HZ 50.06 50.06 50.06 50.06 50.06 50.06 50.06 50.06 50.06 50.06 50.06

8 Change in Frequency (7-6) HZ 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31

9 Frequency Response Characteristic (5 / 8) MW/HZ -14 -7 0 1 2 3 0 0 2 7 3

10 Net System Demand met before the Event MW 0 0 0 0 0 0 0 0 0 0 0

11 Internal Generation before the Event (10 - 1) MW 473 210 106 104 35 19 72 70 99 105 104

12 Ideal load response assuming 4% per Hz (0.04*Row 10) MW/Hz 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

13Ideal generator response assuming 5% droop……….40% per Hz (40% of Row 11)

MW/Hz 189.3 84.1 42.6 41.7 14.1 7.6 28.6 28.1 39.7 41.9 41.7

14 Composite ideal response (12 + 13) MW/Hz 189.3 84.1 42.6 41.7 14.1 7.6 28.6 28.1 39.7 41.9 41.7

15 Percentage ideal response (9/14) % 0.0% 0.0% 0.0% 1.9% 10.9% 42.7% 0.0% 0.0% 4.1% 15.6% 7.8%

MADHYA PRADESH:FREQUENCY RESPONSE CHARACTERISTICS

Minutes of 53rd OCCM of M.P 44

Page 47: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

Analysis TimeFrequency

(In Hz)

Starting

from

13.07.2016 02:36:59Hrs. 49.98

EVENT: TrippingTripping at UMPP CGPL on 13.07.2016 at 02:37 Hrs.To

13.07.2016 02:38:59Hrs. 49.70

A) GENERATION AREAS

Sr No Particulars Dimension SGTP_5 Pench_1 Pench_2 ISP_1 ISP_2 ISP_3 ISP_4 ISP_5 ISP_6 ISP_7 ISP_8

1 Actual Net Interchange before the Event MW 380.36 76.74 77.60 125.70 126.90 124.50 125.00 124.30 125.20 126.20 125.40

2 Actual Net Interchange after the Event MW 384.02 76.74 77.60 125.30 127.20 124.60 124.50 124.20 124.90 126.40 125.40

3 Change in Net Interchange (2 - 1) MW 3.66 0.00 0.00 -0.40 0.30 0.10 -0.50 -0.10 -0.30 0.20 0.00

4 Generation Loss (+) / Load Throw off (-) during the Event MW 0 0 0 0 0 0 0 0 0 0 0

5 Control Area Response (4-3) MW -3.66 0.00 0.00 0.40 -0.30 -0.10 0.50 0.10 0.30 -0.20 0.006 Frequency before the Event HZ 49.98 49.98 49.98 49.98 49.98 49.98 49.98 49.98 49.98 49.98 49.987 Frequency after the Event HZ 49.70 49.70 49.70 49.70 49.70 49.70 49.70 49.70 49.70 49.70 49.70

8 Change in Frequency (7-6) HZ -0.28 -0.28 -0.28 -0.28 -0.28 -0.28 -0.28 -0.28 -0.28 -0.28 -0.28

9 Frequency Response Characteristic (5 / 8) MW/HZ 13 0 0 -1 1 0 -2 0 -1 1 0

10 Net System Demand met before the Event MW 0 0 0 0 0 0 0 0 0 0 0

11 Internal Generation before the Event (10 - 1) MW 380 77 78 126 127 125 125 124 125 126 125

12 Ideal load response assuming 4% per Hz (0.04*Row 10) MW/Hz 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

13Ideal generator response assuming 5% droop……….40% per Hz (40% of Row 11)

MW/Hz 152.1 30.7 31.0 50.3 50.8 49.8 50.0 49.7 50.1 50.5 50.2

14 Composite ideal response (12 + 13) MW/Hz 152.1 30.7 31.0 50.3 50.8 49.8 50.0 49.7 50.1 50.5 50.2

15 Percentage ideal response (9/14) % 8.6% 0.0% 0.0% 0.0% 2.1% 0.7% 0.0% 0.0% 0.0% 1.4% 0.0%

MADHYA PRADESH:FREQUENCY RESPONSE CHARACTERISTICS

Minutes of 53rd OCCM of M.P 45

Page 48: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

UNIT NO. Unit-1 Unit-2 Unit-3 Unit-4 Unit-5

WHETHER RGMO IS IN SERVICE

WHETHER FGMO WITH MANUAL CONTROL IS IN

SERVICE

DROOP SETTING IN %

UPPER LOAD LIMIT SETTING IN MW

LOWER LOAD LIMIT SETTING IN MW

UNIT CAPACITY IN MW

Name of the Station:-ANNEXURE-6.11.C

Minutes of 53rd OCCM of M.P 46

Page 49: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

S.No. NAME OF SUB-STATION DATA CHANNEL ROUTE PROPOSED Status of PLCC Channel status of wideband nodePreparation of data base and display in

SLDC SCADA

Configuration of RTU by

MPPTCL (A)

1220 KV Mugaliya Chaap 220KV Muliahcap-400KV Bhopal -backup SLDC channel to be comissioned wideband node ready and tested Database ready not

known

2220 KV Sirmore 220 KV Sirmore - 220 KV Satna PLCC Panels yet to be released wideband node ready and tested

IO LISt to be provided To be confirmed

(B)

3132KV Vijaypur 132KV Vijaypur- 220 KV Sabalgarh -220 KV Shivpuri -400 KV Bina PLCC channel loop test to be done B/SLDC to Bina400 - Through, Loop

test successful.daat base and display ready

not known

4 132 KV Susner 132 KV Susner-132 KV Agar-220 KV Ujjain

5 132KV Suasra 132KV Suasra – 220 KV Badod- 220 KV Ujjain

6132 KV Jaora 132 KV Jaora – 220 KV Ratlam – 400 KV Nagda

7132/33 KV Ratangarh 132 KV Ratangarh- 220 KV Neemuch – 400 KV Nagda

8 132 KV Sailana 132 KV Sailana– 220 KV Ratlam – 400 KV Nagda

9 132KV Alot 132KV Alot – 220 KV Nagda-400 KV Nagda

10 132KV Sitamau 132 KV Sitamau – 220 KV Daloda – 400 KV Nagda

11 132 KV Kukshi 132 KV Kukshi – 220 KV Rajgarh (Dhar)-220 KV Pithampur – 400 KV Pith 400 KV I d

Telemetry Commisioned - 12 132 KV Umariya 132 KV Umariya- Birsingpur TPS -JBP 220 PLCC LINK NOT READY loop test from wideband node is to be done

13 132KV Khilchipur 132KV Khilchipur – 220 KV Rajgarh – 220 KV Sujalpur – 400 KV Bhopal

14132 KV Rewa 132 kv Rewa – 220 KV Rewa – 220 KV Satna

15132 KV Satna 132 kv Satna – 220 KV Satna

16 132 kv Boregaon 132 kv Boregaon – 220 KV Chhindwara – 220 KV Seoni (HF bypass at S i PGCIL) 220 KV J b l17 132 KV Bioara 132 KV Bioara-Pachhor-Shujalpur- 220-Bhopal-400;

18 132 KV Raisen 132 KV Raisen-Vidisha-220-Bhopal-400

19 132 KV Seoni Replacement of old RTU

20 132 KV Sironj 132 KV Sironj-400 Bina - 220 Bina-400 Bhopal

21 132 KV Petlawad 132 KV Petlawad-Rajghar(Dhar)-Indore Sub-LDC

( C)

22 132 KV Chanderi 132 KV Chanderi-400 Bina-400 Bhopal

23 132 KV Arniakala 132 KV Arniakala-Ashta-400-Bhopal-400

24 132 KV Sonkach 132 KV Sonkach-Ashta-132-Ashta-400-Bhopal-400

25 132 KV Kannod 132 KV Kannod-Handia-220-Itarsi-220

26 132KC Bercha 132KC Bercha-Shajapur-220-Shujalpur-220-Bhopal-400

27 132 KV Poliakalan 132 KV Poliakalan-Ashta-400-Bhopal-400

28 132KV Momin Barodia 132KV Momin Barodia-Shajapur-220-Shujalpur-220-Bhopal-400

29 132 KV Pachore 132 KV Pachore-Shujalpur-220-Bhopal-400

Intered Discom Stations

Important 220 KV Sub Stations

To be confirmed

o be confirme

PLCC Channel not ready wideband node ready and tested under preparation To be confirmed

LIST of 220 KV Substation, Renewable Generating Station and Inter Discom Stations.

Fore Renewable Generation Integration

Data base and display under preparation

Data base and display ready

PLCC Channel to be commissioned

Channel ready , RTU configuration issue

PLCC panels & Modems to be released

Wideband link from 220KV Ujjain to Indore 400 available

Wideband node port configured

Data base and display ready

under preparation

Minutes of 53rd OCCM of M.P 47

Page 50: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

30 132kv mandideep31 220 KV Gwalior- 232 220 KV Datia33 132 KV Ashok Nagar34 132 kv kymore35 132 KV Agar36 132KV Gadarwara37 132 KV dewas BNP S/s 38 132kv ichawar39 132kv gudgaon40 132 KV Chapda

41132 KV Delchi(Makdone )

Telemetry Commissioned

Telemetry CommissionedTelemetry Commissioned

Telemetry CommissionedTelemetry Commissioned

Telemetry Commissioned

Commissioned but out

Telemetry Commissioned

Telemetry CommissionedTelemetry CommissionedTelemetry Commissioned

Minutes of 53rd OCCM of M.P 48

Page 51: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

ANNEXURE-10.2

1 GEN 6 GT MW/MVAR 76/4 02 GEN 7 GT MW/MVAR 152/4 03 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE

1 220 KV SGTPS 3 CB TRANSIT CLOSE

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT CB FAULTY CLOSE2 400 KV KATNI 2 CB FAULTY CLOSE3 400 KV DAMOH 1 CB FAULTY CLOSE4 4004 KV DAMOH 2 CB FAULTY CLOSE

1 220 KV SIRMORE CB FAULTY CLOSE2 GEN 3 CB TRANSIT CLOSE

1 132KV BC CB FAULTY CLOSE2 132/33 TR CB OPEN CLOSE

TELEMETRY DISCRIPIENCY

1 GEN 7 MVAR N/C2 GEN 3 MVAR N/C

ISP H P S

GANDHISAGAR H P S

RAJGHAT H P S RTU OUT DEOLOAN HPS RTU OUT DUE TO COMM LINK PROBLEM

TONS H P S

SATPURA T P S

A T P S T P S

SINGHA JI S T P S

S G T P S

Minutes of 53rd OCCM of M.P 49

Page 52: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

DATA OUT FROM LONG TIME1 WAIDHAN 132KV S/S2 MORWA 132 KV S/S3 BEOHARI 132 KV S/S4 SEONI 132 KV S/S5 UMARIYA 132 KV S/S 6 SIDHI 220 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERSr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

1 220 KV INTERCONNECTOR 1 MW/MVAR N/C 115/15

1 220 KV KOTOR CB FAULTY CLOSE

1 220/132 TR 2 CB FAULTY CLOSE2 220 KV SUKHA 1 & 2 CB FAULTY CLOSE3 220 KV JBP 1 ,2 CB FAULTY CLOSE4 133/32 KV TR 2 CB,MW/MVAR/OLTC N/A5 132 KV BARMAN 2 CB,MW/MVAR N/A6 220 KV PIPARIA CB FAULTY CLOSE

1 400/200/33 KV TERTIARY REACTOR 1 & MVAR N/A

2 220 KV PGCIL 2 CB FAULTY CLOSE

1 220 KV BUS TIE CB FAULTY CLOSE

2 220 KV REWA MW/MVAR N/C3 220 KV HINDALCO MW/MVAR N/C

1 132 KV JP NIGRI CB/MW/MVAR N/C PROCESSES CONNECTION REQUIRED

1 220 KV TONS PH MW /MVAR N/C 50 /5

1 132 KV KOTMA CB N/A

2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE

3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A

1 220 KV SATPURA T P S CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED

1 220 /132 TR 1 SEC CB FAULTY CLOSE

2132/33 kv TR 63 MVA CB /MW/MVAR/OLTC N/A PROCESSES CONNECTION REQUIRED

1 132 KV VFJ 1 CB FAULTY CLOSE

1 132 KV ANUPPUR 2 CB /MW/MVAR N/A

JABALPUR220 KV S/S

KOTMA 132 KV S/S

KOTAR 220 KV S/S

BIRSINGHPUR 220 KV S/S

SATNA220 KV S/S

NARSINGHPUR 220 KV S/S

PROCESSES CONNECTION REQUIRED

BINA 400 KV S/S

CHINDWARA 220 KV S/S

PANDURNA 220 KV S/S

SIDHI 220 KV S/S

DAMOH 220 KV S/S

REWA 220 KV S/S

TIKAMGRAH 220 KV S/S

PROCESSES CONNECTION REQUIRED

ANUPPUR 220 KV S/S

Minutes of 53rd OCCM of M.P 50

Page 53: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

1

CKT I MW/MVAR /CB/SON/C

2132 KV JULWANIA-NIMRANI CKT II MW/MVAR /CB/SON/C

3 132 KV JULWANIA-ANJAD CKT MW/MVAR /CB/SON/C4 132 KV JULWANIA- I/C I MW/MVAR /CB/SON/C5 132 KV JULWANIA- I/C II MW/MVAR /CB/SON/C6 400KV BUS 2 KV N/C7 400KV BUS 2 HZ N/C

1 220/132 KV TR OLTC N/A2 132/33 KV TR OLTC N/A3 132 KV NIMRANI CB FAULTY CLOSE

1 220/132 TR 2 4*40 MVA MW Direction wrong Need to be reverse from field

1 220 KV BUS COUPLER CB FAULTY CLOSE2 220/132 KV TR 3X40MVA CB FAULTY CLOSE3 220/132 KV TR 160 MVA (SEC) CB FAULTY CLOSE

1 220kv BUS COUPLER CB FAULTY CLOSE2 132 KV CHAPDA 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 132 KV CHAPDA 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED4 132 KV SHANKARGARH 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED5 132 KV SHANKARGARH 1 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED

1 No Discrepancy

1 220 KV OSP CB FAULTY2 220/132 TR 3 P CB FAULTY3 400 KV REACTOR CB FAULTY

1 132 KV I/C 2 MW N/C 10

1 132 KV KURAWAR CB FAULTY CLOSE2 132 IC-1 MW,MVAR N/A PROCESSES CONNECTION REQUIRED2 132 IC-2 MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 220/132 KV TR (160 MVA) 2 PRI CB N/A CLOSE2 132 KV IFLS CB N/A CLOSE3 220/132 KV TR (160 MVA) 2 SECCB N/A CLOSE

1 132 KV BUS COUPLER CB FAULTY CLOSE2 132 KV GRASIM CB FAULTY CLOSE2 132 KV CAP BANK MVAR N/C

1 400 KV RAJGRAH 1 CB FAULTY CLOSE2 400 KV DEHGAON LINE REACTOMVAR N/A3 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE

1 132 KV SIDTUBE CB /MW/MVAR N/A2 132 KV INOX CKT (RE) CB /MW/MVAR N/A3 220KV ASTHA 1 CB FAULTY CLOSE4 220KV ASTHA 2 CB FAULTY CLOSE5 220KV BUS COUPLER CB FAULTY CLOSE6 220KV BUS 1 KV,HZ N/A

JULWANIA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBARWAHA 220 KV S/S

INDORE 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

CHEGAON 400 KV S/S

NEEMUCH 220 KV S/S

NAGDA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS 220 KV S/S

SHUJALPUR 220 KV S/S

BADOD 220 KV S/S

SHAJAPUR 220 KV S/S

NAGDA 400 KV S/S

JULWANIA 400 KV S/S

PROCESSES CONNECTION/ CONFIGURATION REQUIRED

PROCESSES CONNECTION REQUIRED

Minutes of 53rd OCCM of M.P 51

Page 54: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

7 132KV BUS 1 KV,HZ N/A8

1 220 KV BUSCOUPLER CB FAULTY CLOSE

1 132 KV MANAWAR 3 CB FAULTY CLOSE2 220/132 TR 1 & 2 OLTC N/A3 132/33 TR OLTC N/A

1 220/132 KV TR 2 SEC CB FAULTY CLOSE2 220KV BUSTIE CB FAULTY CLOSE3 220KV BUS COUPLER CB FAULTY CLOSE4 132 KV BUS COUPLER CB FAULTY CLOSE5 132KV JHABUA CB FAULTY CLOSE6 220/132 TR 1 &2 OLTC N/A

1 220 /132 KV TR 3 MW/MVAR N/A2 132KV KACHROD CB FAULTY CLOSE

1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR1 OLTC N/C3 132/33 TR3 OLTC N/C

1 220 KV MAXI CB OPEN CLOSE2 220/132 TR1 OLTC N/C2 220/132 TR2 OLTC N/C3 132/33 TR3 OLTC N/C

1 220/132 TR1 & TR2 OLTC N/C2 132KV BUS COUPLER CB FAULTY CLOSE

1 132KV DEPALPUR CB FAULTY CLOSE

1 132/33 KV TR2 MW,MVAR N/C

1

1 132KV BUS VOLTAGE2 33KV BUS VOLTAGE3 132KV BUS FREQUENCY4 33KV BUS FREQUENCY5 33KV PANVIHAR MW 6.6 2.34 132KV RATADIYA MW 9 125 132KV UJJAIN MW 19 15

1 BHERUGARH MVAR 6 3.82 132/33 TR1 MW 3.7 83 132/33 TR1 MVAR 1.9 5.24 132/33 TR2 MVAR 11.2 -1.65 132/33 TR1 OLTC6 132/33 TR2 OLTC

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S

UJJAIN 220 KV S/S

INDORE SZ 220KV S/S

RATLAM 220 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE)

INDORE EAST 220 KV S/S

NIMRANI 220 KV S/S

RAJGRAH (DHAR) 220 KV S/S

DESCRIPANCY IN SIMHASTH CONTROL ROOM DATA

MAXI 132 KV S/S

BHERUGARH KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDRATADIA 132 KV S/S

NOT COMING

NOT COMINGNOT COMING

INDORE NZ (JETPURA) 220KV S/S

INDORE CHAMBAL 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

RTU IS ONLINE but All the data (Analog, CB and SOE) are showing invalid.

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NOT COMINGNOT COMING

NOT COMING

Minutes of 53rd OCCM of M.P 52

Page 55: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

1 33 KV SANWER MW 3.5 6.92 33 KV SANWER MVAR 2.9 5.83 CAP BANK MVAR -33.1 -16.54 CAP BANK MVAR -33.1 -16.55 CAP BANK MVAR -33.1 -16.57 132/33 TR1 OLTC8 132/33 TR2 OLTC8 132/33 TR3 OLTC

1 132KV BUS VOLTAGE 2.3 134.9

1 CAP BANK MVAR N/C 10.66

TELEMETRY IS YET TO BE COMMISSIONED, PLCC LINK HAS ESTABLISHEDINGORIA 132 KV S/S

DEWAS BNP 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NOT COMING

NOT COMING

132 KV S/S AGAR

SANWER 132KV S/S

TELEMETRY IS YET TO BE COMMISSIONED & PLCC LINK IS ALSO TO BE ESTABLISHED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEPALPUR 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

GHOSLA 132 KV S/S

Minutes of 53rd OCCM of M.P 53

Page 56: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 132 KV RAGHOGRAH CB,MW/MVAR N/C2 132 KV MAQSUDANGRAH CB,MW/MVAR N/C3 220 KV BUS TIE CB FAULTY OPEN4 220/132 KV TR S 2 MW /MVAR /CB N/C PROCESSES CONNECTION REQUIRED5 220 KV BUS MAIN BUS 1 & 2 VOLTAGE N/C

1 400 KV SATPURA-1 CB FAULTY CLOSE2 400 KV BUS 2 VOLTAGE/FREQ N/C

1 220/132 KV TR(160 MVA) 2 MW N/C2 220/132 KV TR(160 MVA) 2 PRI CB FAULTY3 220/132 KV TR(160 MVA) 2 SEC CB FAULTY4 132 KV SATAWAR MW/MVAR /CB N/A5 132 KV GOPALPUR MW/MVAR /CB N/A6 132 KV Khategaon. MW/MVAR /CB7 132 KV SULTANPUR MW/MVAR /CB N/A8 132 KV NASRULAGANJ MW/MVAR

1 220 KV BPL MW /MVAR N/C

1 132/33 KV TR CB FAULTY CLOSE2 132 KVBUSCOUPLER CB FAULTY CLOSE3 220 KV BUS COUPLER CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY2 220/132 TR 3(160MVA 2) CB OLTC PROCESSES CONNECTION REQUIRED

1 BPL400-BDTL 765 1 & 2 TIE CB N/A CLOSE2 400 KV DAMOH PG 1 CB FAULTY3 80 MVAR REACTOR CB N/A CLOSE4 400/220 ICT 1 & 3 CB N/A CLOSE

1 220 BUS TRANSFER CB FAULTY CLOSE2 220 KV SARNI PH 1 CB,MW/MVAR FAULTY3 220 KV BETUL CB,MW/MVAR FAULTY4 220 KV SARNI PH 2 CB,MW/MVAR/OLTC N/A5 220 KV PANDURNA CB,MW/MVAR N/A6 220/132 KV TR 2 CB N/A

2301 132 KV LALGHATI 2 CB FAULTY CLOSE2 132 KV BHOPAL CB,MW/MVAR N/A3 220/132 KV TR 1 CB FAULTY CLOSE4 220/132 KV TR 2 CB,MW/MVAR FAULTY5 132/33 KV TR 4 CB,MW/MVAR/OLTC N/A6 132 Kv Runaha-1 CB,MW/MVAR7 132 Kv Runaha-2 CB,MW/MVAR

1 132/33 KV TR PRI CB OPEN CLOSE2 132 KV I / C 2 CB FAULTY CLOSE

1 220 KV BUS FREQUENCY N/A10

1 132 KV DATIA CB FAULTY CLOSE2 132 KV RAJGHAT CB FAULTY CLOSE3 132/33 KV TR NGEF CB FAULTY CLOSE

1 132 KV P & G CB /MW/MVAR N/A2 220 KV HASANGABAD MW/MVAR N/A

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDASTHA 132 KV S/S

MALANPUR 220 KV S/S

PICHORE 132 KV S/S

MANDIDEEP 220 KV S/S

GWALIOR 220 KV S/S

BHOPAL 400 KV S/S

SARNI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBAIRAGRAH 220 KV S/S

PROCESSES CONNECTION REQUIRED

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDVIDHISHA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGUNA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

RAJGRAH (B) 220 KV S/S

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDASHTA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDHANDIA 220 KV S/S

Minutes of 53rd OCCM of M.P 54

Page 57: As per distribution list FOR... · 2016-09-22 · Email- deepesh.sankwa@suzlon.com, Indore – 452010, Badree.hirve@suzlon.com. MINUTES FOR 53RD MEETING OF OPERATION & COORDINATION

1 132/33 TR 4 CB FAULTY CLOSE

1 132 KV GADARWARA CB TRANSIT CLOSE2 220 KV CHICHLI MW /MVAR /CB 0 110/103 220/132 KV TR 2 (160 MVA) CB,MW/MVAR/OLTC N/A PROCESSES CONNECTION REQUIRED

1 220/132 KV TR MW/MVAR 0/0 40/10

1 220/132 KV TR 2 MW/MVAR/CB N/A PROCESSES CONNECTION REQUIRED

ALL CB FAULTY EXCEPT HANDIA1 ITARSI 220 KV S/S

PIPARIA 220 KV S/S

BETUL 220 KV S/S

SHIVPURI 220 KV S/S

HARDA 132 KV S/S

Minutes of 53rd OCCM of M.P 55