10
As on 30 th August 2012

As on 30 th August 2012

  • Upload
    sorena

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

As on 30 th August 2012. Front side view. Front view. Back side view. Entrance. Basement. Ground Floor. 1 st Floor. 2 nd Floor. Construction work on 3rd Floor. - PowerPoint PPT Presentation

Citation preview

Page 1: As on 30 th  August 2012

As on 30th August 2012

Page 2: As on 30 th  August 2012

Front side view

Page 3: As on 30 th  August 2012

Front view

Page 4: As on 30 th  August 2012

Back side view

Page 5: As on 30 th  August 2012

Entrance

Page 6: As on 30 th  August 2012

Basement

Page 7: As on 30 th  August 2012

Ground Floor

Page 8: As on 30 th  August 2012

1st Floor

Page 9: As on 30 th  August 2012

2nd Floor

Page 10: As on 30 th  August 2012

Construction work on 3rd Floor