As of Oct, 2020
Subsidiaries of TTCL Public Company Limited
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
1
About TTCL Group
TTCL is the engineering contractor who specializes in design and engineering, procurement of equipment and materials, and construction of turnkey project for industrial and process plants including related facilities.
In 1997, TTCL expanded its activities to ASIAN countries including Vietnam, Malaysia, Cambodia, Myanmar and Bangladesh. To facilitate its strength, TTCL has set up an engineering company in Vietnam, namely TTCL – Viet Nam corporation, to serve the demand for process plants design and construction there.
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
2
TTCL Group Structure
TTCL is proud to be the first successful Thai company who has proved its competence and competitiveness to any other leading foreign companies.
TTCL PUBLIC COMPANY LTD.
CONSTRUCTION GROUP
TTCL MALAYSIA (TTML).
TTCL MYANMAR ENG&CONST (TTMEC).
TTCL VIETNAM (TVC)
EPC GROUP ENERGY DEVELOPMENT GROUP
GLOBAL NEW ENERGY (GNE)
BIO NATURAL ENERGY (BNE)
NAVANAKORN ELECTRIC (NNE)
SIAM SOLAR POWER (SSP)
TTCL POWER HOLDINGS (TTPHD)
TOYO THAI-US (TT US)
TTCL QATAR (TT QA)
TTCL PHILIPPINES (TT PH)
TOYO THAI POWER MYANMAR (TTPMC)
TTCL GAS POWER (TTGP)
TTCL SOLAR POWER (TTSP)
TTCL COAL POWER (TTCP)
TTCL NEW ENERY (TTNE)
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
3
Established by ITD and
Toyo Engineering
First entry into international
project constructing
fertilizer plant and
establishment of subsidiary in
Vietnam.
Won Ethane cracker and downstream polyethylene plants (LDPE
& LLDPE) with value
over 15 Billion baht.
1996 1997 1985 2003
2007 2008 2009 2010
2011 2012
2013 2014
2015
Conversion from
Private Company into Public Company
Initial public
offering ("IPO") in the Stock
Exchange of Thailand
Established subsidiaries in Malaysia
(TTML), Myanmar
(TTMC), and USA (TTUS)
+ Formed Singapore holding to
support Power plant
businesses (TTPHD)
+ International ISO 14001 recognition
Changed Company
name from Toyo-Thai
Corporation PLC. to
TTCL PLC.
+ Sojitz Corporation invested in
TTCL + TTCL has entered into Russia and
NIS Countries
2018
Engineering Design
Plant Construction
Procument of Machinery and Equipment
Power Business And Energy
Key Corporate Milestones
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
4
Major Experiences
Thailand ‘18 Ethylene Expansion ‘15 LLDPE & Hexene-1 ‘14 Power Plant ‘13 PBS ‘12 MMA & TMAA ‘11 SSBR ‘11 Butiene-1 and Butadiene ‘11 Photovoltaic Electric ’10 Epichlorohydrin ‘09 1,6 Hexanediol ‘08 Hydrogen Peroxide ‘08 Bisphenol-A ‘07 Methyl Methacrylate Phase II ‘06 LLDPE ‘06 LDPE ‘06 Ethane Cracker
Malaysia
‘14 OSBL for Steam Cracker Complex
‘12 Photovoltaic Electric ‘11 Rare Earth ‘09 Bio-Pellet (FS) ‘98 OXO (Engineering)
Bangladesh
‘04 DAP USA
‘17 Chlor-Alkali ‘13 CO2 Capture ‘07 VCM & Chlor-Alkali ‘05 Chlor-Alkai
Indonesia ‘10 VCM & Chlor-Alkali (FS)
Qatar
‘13 Desalination ‘15 Desalination
Spain
‘11 Chlor-Alkali ‘18 Full Cycle Zinc Oxide (TVC)
Philippines
‘11 PE Expansion
UAE
’10 DTEC
Myanmar
‘12 Power Plant ‘97 Aviation Fueling ‘18 Denko Thilawa (TVC)
China
’06 MDA/UAT ’04 MMDI ’03 Polymer
Lao ‘15 KCl
Timor Leste ‘18 Petrochem (FEED) ‘13 Refinery (FEED)
‘18 LLDPE ‘12 Ammonium Nitrate ‘11 DAP2 ’10 Ethanol ’05 Dun Quat Refinery (Engineering) ‘97 NPK Fertilizer
Vietnam
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
5
TTCL Vietnam Corporation Limited (TVC), known as Toyo-Vietnam
Corporation Limited, the First All-Round Engineering Company in
Vietnam, was established in 1997 by TTCL Public Company Limited,
formerly Toyo-Thai Corporation Public Company Limited, a leading
international engineering company in Thailand.
About TTCL Vietnam
First batches
were dispatched to TTCL Thailand
for on-job-training.
Company establishment.
The first contract – Procter & Gamble Vietnam project.
1997 1996 1999 2001 2004 2005 2014
2015 2017
Company obtained
ISO 9001:1998 Certificate
The first EPCM
contract for Procter &
Gamlbe, in Binh Duong
There are many EPC & EPCM
projects in many field (Amway,
Dow Chemical, United Pharma,
PVFCCo, UFC-85 …)
Toyo – Vietnam
Corporation Limited officially
renamed TTCL VietNam
corporation limited.
Company obtained OHSAS
18001: 2007 Certificate.
The first EPC contract: + Bio & Renewable Energy: Mui Ne solar Power Plant + Myanmar Market: Denko Petrochemical in Thilawa Industrial Zone Myanmar
2018
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
6
Teamwork and Dedication is the foundation of everything we
build. TVC is very proud of having built up a human resource with
technical excellence and a professional, self-motivated teamwork
spirit.
Manpower Resource
We have created and maintained a working
environment and company culture where every
individual feels valued and can contribute to his
maximum potential to achieve shared business
objectives. This results in greater dedication,
commitment and productivity.
Board of Directors (BOD)
1. Mr. H. Iriya - Chairman of TVC/ President & CEO of TTCL
2. Mrs. Bui Boi Hai (General Director)
4. Mr. Ho Dac Tuan (Deputy General Director 2)
3. Mr. Y Kobe (Deputy General Director 1)
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
7
Manpower Resource
BUSINESS DEVELOPMENT (JPN) Mr. URABE KAZUOKI
SENIOR GENERAL MANAGER
BOARD OF DIRECTOR TTCL PUBLIC COMPANY LTD.
DEPUTY GENERAL DIRECTOR 1
Mr. Y. KOBE
GENERAL DIRECTOR Mrs. BUI BOI HAI
DEPUTY GENERAL DIRECTOR 2
Mr. HO DAC TUAN
E.P.C OPERATION MANAGEMENT Mr. NGUYEN VAN LANH
SENIOR GENERAL MANAGER
FINANCIAL & ACCOUNT MGR’ Mrs. D.T. THANH CHAU -S.G.M
ADMIN & HR DEPARTMENT MGR’ Mrs. D. MY PHUOC –D.M
CORPORATED C.F.O Mrs. D.T. THANH CHAU
SENIOR GENERAL MANAGER
HA TIEN ENRGY CORP - Produce: Black Pellet - Location: Lot A2, Hoai Tan IC, Hoai Nhon Dist,
Binh Dinh Province, Vietnam
HATIENCO DIRECTOR
Mr. TRAN THIEN PHUC
PROJECT EXECUTION DIVISION Mr. NGUYEN VAN LANH S.GENERAL MANAGER
PROCUREMENT DIVISION Mrs. N.M.THUY TIEN
S.GENERAL MANAGER
PROCUREMENT & LOGISTIC DEPARTMENT MGR’
Ms. P.T.P.HONG.QUE -D.M
CONTRACT & LEGAL SECTION
FORMALITY SECTION
PROJECT EXECUTION DIVISION Mr. PHAM VAN NGHIEP
DEPUTY GENERAL MANAGER
CORPORATED QA/QC & HSE Mrs. N.M .THUY TIEN
SENIOR GENERAL MANAGER
QA/QC & HSE DIVISION Mr. LUU VAN BA
DEPUTY GENERAL MANAGER
QHSE DEPARMENT MGR’ Mr. TRAN DUC DUOC -D.M
QA/QC DEPARMENT MGR’ Mr. HO VAN MAN -D.D.M
HSE DEPARMENT MGR’ Mrs. T.L.THU.TRANG -D.D.M
PROJECT EXECUTION DIVISION MGR’
Mrs. D.T.MAI PHUONG -D.M
CONSTDEPARTMENT MGR’ Mr. PHAM VAN NGHIEP -D.M
COMMISSIONING SECTION Mr. N.D.TRUONG SON -D.D.M
SALE & BUSINESS DEVELOPMENT
SECTION
PROPOSAL DIVISION Ms. T.T.THUY.NGA
SECTION CHIEF
SALE & BUSINESS DEVELOPMENT DIV Mrs. NGUYEN HONG HANH
GENERAL MANAGER
ENGINEERING DIVISION Mr. LE BA HUNG
GENERAL MANAGER
ENGINEERING DIVISION Mr. VU PHUONG TUNG
DEPUTY GENERAL MANAGER 1 (PIPING & MECHANICAL DEPT)
PLANNING & PIPING DEPARTMENT
ME & MA DEPARTMENT
ENGINEERING DIVISION Mr. LUU VAN BA
DEPUTY GENERAL MANAGER 2 (ELECTRICAL, CIVIL DEPT) CIVIL DEPARTMENT
ELECT DEPARTMENT
IT SECTION CHIEF
DRAFTMAN SECTION CHIEF
ENGINEERING DIVISION Mr. T.H.NHAT.LINH
DEPUTY GENERAL MANAGER 3 (INSTRUMENT,PROCESS, IT, DRAFT
SECTION)
PROCESS DEPARTMENT
INST & CONTROL DEPARTMENT
TVC's manpower resource covers all design and engineering from process, instrument and control, electrical, layout and piping, fire fighting, mechanical equiment, HVAC, civil and structure, to procurement, project and construction management including safety and quality assurance.
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
8
Manpower Resource
Section Man Power
Board of Management 6
Engineering Division 141
Process 16
Civil, Structural & Architectural 27
Mechanical Equipment & HVAC
24
Electrical 26
Instrumentation 20
Planning & Piping 26
IT 2
Proposal/Project & Procurement Div.
115
Project & Construction (*) 79
Procurement 13
Quality Control 13
HSSE 10
Sales & Admin & Others 18
TOTAL OF MAN POWER 280
Engineering Division
Process 16
Civil 27
Me & HVAC 24Electrical
26
Instru 20
Piping 26
IT 2
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
9
2018, 2,196,778
2017, 1,957,853
2019, 3,066,420
Total safety Man-hours worked in last 3 years:
Plan Daily inspection plan
Job plan for HSSE
Do Daily inspection
Executive management contractor’s daily activity
Check Job control for dangerous work
Daily HSSE activity of contractor
Action Daily Report
Education or meeting with work team
HSSE Control
HSSE Performance
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
10
EPC / EPCM / DESIGN & BUILD PROJECT & CONSTRUCTION MANAGEMENT (PMC SERVICES) DESIGN & ENGINEERING / PERMITTING FORMALITY TURNAROUND SERVICES
The field of plant Engineering, Procurement and Construction service covers to
Our Services
Chemical & Petrochemical Oil and Gas Fertilizer
Pharmaceutical Food &
Beverage
Infrastructure & Utilities
Bio & Renewable
Energy
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
11
TTCL VietNam has been certified for :
• Quality Management System in accordance with ISO 9001: 2015
• Environmental Management System in accordance with ISO 14001: 2015
• Occupational Health and Safety Management System in accordance with ISO 45001: 2018
by DNV GL Business Assurance Vietnam Co., LTD.
Our Certificates
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
12
Certification achieved
LEED Certified Ver.4 for Warehouse of CP Paper Corporation Project
Tetra Pak Binh Duong - Support building LEED Gold certificate
Dap No.2 Vinachem project Taking – Over Certificate
Customer Satisfaction Assessment
Customer satisfaction survey – Mr. James
Ammonium Nitrate Plant Project Taking – Over Certificate
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
13
COMPETITIVE STRENGTHS
Strong in-house engineering and project management with all specialties
experienced in execution of integrated engineering services, permitting services,
Design & Build, EPC / EPCM contracts for Oil & Gas, Chemical, Petrochemical,
Pharmaceutical, Food processing plant projects both green field and brown field
Familiar with International Management System (Quality, HSSE,
Project and Construction Management), International Codes & Standards (NFPA, FM Global, GMP,
LEED, ASME, API, ...) and local regulation.
Sufficient software for engineering design, 3D Modelling and project
management (ACAD, Cadworx, PDMS, BIM, Revit, Etap, Stad Pro, PV Elite,
Primavera, Microsoft project,…etc) and facilities (Plotter A0, Color printer,
Scanner, Video Conference, 1200 m² working area, meeting room)
Experience with worldwide procurement network and local knowledge including
mobilization and coordination of qualified local resources
Continuous improvement on professional capability thru
collaboration with Mother Company (TTCL Public Co. Ltd.),
international and reputable partners (Process licensors, Vendors, SeerPharma, Toyo
Engineering Corp...) and big clients
Competitive Strengths
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
14
Software name License Major used fuction
ENGINEERING
AutoCAD Autodesk 2D drawing
PDMS Aveva Datacentric, multi-disciplinary design environment for full 3D modeling of process plant
CADWorx Plant Intergraph Plant design automation
AutoCAD Plant 3D Autodesk Plant design automation
Naviswork Autodesk 3D plant navigator
Revit Autodesk 3D model
Micro station Bentley Drafting system
Plant Design System (PDS)
Intergraph Intelligent computer-aided design/engineering (CAD/CAE) application for plant design, construction, and operations
Smart Plant 3D Intergraph Intelligent 3D plant design solutions
SmartSketch Intergraph Drafting system
Smart Plant Review Intergraph 3D plant navigator
SYSTEM Major used fuction
PMI® GLOBAL STANDARD PROJECT MANAGEMENT for manage the Scope, Schedule, Cost, Quality, Resource, Communication, Risk, Procurement, Stakeholder included the Change Management for all.
Engineering design software
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
15
Software name License Major used fuction
PROCESS
HTRI HTRI Design and rating of heat exchangers
PROII AVEVA Process simulation, Design and operational analysis
Visual Flare AVEVA Flare system simulation
DYNSIM AVEVA Dynamic process simulation
INPLANT AVEVA Hydraulic calculation for pipe net work
PIPEPHASE AVEVA Oil and Gas pipe network simulation
AspenOne AVEVA Process simulation
Breeze AERMOD AVEVA Steady-state Gaussian air dispersion model
SoundPlan SoundPLAN GmbH
Noise modeling simulation
SmartPlant P&ID Intergraph Develop and manage P&IDs
AutoCAD P&ID Autodesk designers and engineers quickly create and edit P&IDs
PIPING
Pipenet Sunrise Fire fighting hydraulic calculation
CAESAR II Intergraph Piping stress analysis
AUSE KMC/TTCL AutoCAD assisting software
AutoPLANT SPECGEN EDA 2D Isometric drawing and material take-off
Engineering design software
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
16
Software name License Major used fuction
PIPING
TOP B/M TTCL Piping material take-off
MECHANICAL
PV Elite COADE Pressure Vessel/ Shell & tube heat exchanger Strength Calculation
TANK COADE Design and analysis of aboveground oil storage tanks in accordance with API 650 and API 653
FE/Pipe PRG Finite Element Analysis for cylinder, head & nozzle
INSTRUMENT
INSTRU CALC Gulf Publishing co.
Instrument engineering software for sizing of control valve, safety valve, pressure relief devices and flow elements.
Intools SmartPlant Instrumentation
Intergraph Instrumentation systems engineering, design and maintenance
ISA datasheet TTCL Datasheet form for field instrument
SIZEMASTER Farris Sizing of safety valve
LADDER CMH Ladder diagram
ELECTRICAL
PSAF-Flow Cyme Internat'l Inc.
Power System Analysis Framework Load flow study
PSAF-MOTOR START PSAF- FAULT
Cyme Internat'l Inc.
Motor starting time calculation Short circuit calculation
Engineering design software
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
17
Engineering design software
Software name License Major used fuction
ELECTRICAL
Smart Plant Electrical Intergraph Electrical distribution network design and management
ETAP Operation Tech, Inc. The most comprehensive analysis platform for the design, simulation, and operation of generation, distribution, and industrial power systems
Calculux By Vendor Illumination Calculation for Lighting System
Luxicon By Vendor Illumination Calculation for Lighting System
Pvsyst ISE University of Geneva
Software package for the study, sizing, simulation and data analysis of complete PV system
PV*SOL premium Valentin Software GmbH
Dynamic Simulation Program for all PV Systems inclusive 3D visualization
CIVIL
ArchiCAD Graphisoft AEC industry design professionals
Staad Pro Bentley Design reinforced concrete and steel structure
StruCAD AceCad software Ltd
Steel fabrication and joint detail arrangement drawing and bill of material take-off
Tekla Structures Tekla Structural design Structural building information modeling (BIM)system
Microfeap II (Dos version)
A.I.T 2D structural analysis
GRASP A.I.T 2D structural analysis
GEAR A.I.T General engineering assistance and reference
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
18
Chemical & Petrochemical
Oil & Gas
High Profile Clients
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
19
Fertilizer
Pharmaceutical & Medical - Food & Beverage
High Profile Clients
Infrastructure & Utilities Bio - Renewable energy
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
20
As of Oct, 2020
Project Experiences
EXPERIENCES AND CLIENTS
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
21
Project Name Client Locaction Project period Description Capacity Scope Features Process Licensor
LLDPE Plant Project – TTCL Underground Piping Work Package TTCL Public Company Limited / Long Son Petrochemicals Co., Ltd. Long Son Commune, Vung Tau, Ba Ria-Vung Tau Province, Vietnam (49 months) Linear Low Density Polyethylene (LLDPE) 500,000 metric tons of LLDPE based on 8,000 operating hours per calendar year. EPCC Lump Sum (TTCL Thai) Raw Material & Ethylene Purification and H2 Booster system area, T2 Supply area, Reaction system area, Vent Recovery system area, Degassing & Pelletizing system area, Pellet Silo & Bagging Machine system area, Utility Univation Technologies
Project Experiences
Raw material & Ethylene
Purification and H2
T2 Supply area Reaction
system area
Degassing & Pelletizing
system area
Vent Recovery system area
Pellet Silo area
Bagging Machine system area
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
22
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
AMMONIUM NITRATE PLANT PROJECT Vinacomin – Mining Chemical Industry Holding Co., Ltd. Thai Tho IZ, Thai Thuy Dist, Thai Binh Province, Vietnam Jun’2012 – Dec’2014 (30 months) Ammonium Nitrate 200,000 TPY As above EPC Turn – key Lump Sum (Consortium with TTCL Public) Thyssenkrupp Uhde GMBH
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
UFC85/ Formaldehyde Plant Project PetroVietnam Fertilizer and Chemicals Corp. Phu My 1 IZ, Ba Ria Vung Tau Province, Vietnam Apr’2014 - Nov‘2015 (19 months) UFC85 15,000 TPY and Formaldehyde 37% 25,000 TPY As above EPC Turn – key Lump Sum Haldor Topsoe (Denmark)
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
23
Project Experiences
Project Name Client Locaction Project period Description Capacity Scope Features
LPG System Upgrading Project Total Vietnam Limited Go Dau IZ, Dong Nai Province, Vietnam May’2017 – Jan’2018 (8 months) Upgrade 12 Bullet tanks and 1 Spare Tank with Pumps, pipes, Valves modification, Scada automation control and Fire Gas Detector to meet Total Global standard. As above EPC Total Global standard.
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
DI – Ammonium Phosphate (DAP) Plant Project DAP 2 – Vinachem JSC 32 ha, Tang Loong IZ, Lao Cai Province, Vietnam Jan’2012- Oct’2014 (28 months) Di –Ammonium Phosphate (DAP) 330,000 MTPY (Base case) As above EPC Turn – Key Lump Sum (Consortium with TTCL Public) Monsanto Enviro – Chem System , Inc .( MECS) S.A.SNC –Lavalin N.V. & Prayon Technologies/ INCRO S.A
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
24
Project Name Client Locaction Project period Description Capacity Scope
Mui Ne Solar Power Project Duc Thanh - Mui Ne JSC Phan Thiet, Binh Thuan Province, Viet Nam. Aug’2018 - May’2019 (09 months) Capacity of 40 MWp, total area of 36 hectares, stretching over 4 km As above EPC
Project Name Client Locaction Project period Description Capacity Scope
Solar Roof Top Project CP Paper Corporation – Phung Vinh Hung HCMC, Vietnam Feb’2019 – Apr’2019 (03 months) ~ 350 m² As above EPCM
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
25
As of Oct, 2020
Project Experiences
EXPERIENCES AND CLIENTS
OIL & GAS
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
26
Oil & Gas
Project Name Client Locaction Project period Description Capacity Scope
Thi Vai LNG Receiving Terminal Expansion Project PetroVietnam Gas JSC (PV Gas) Cai Mep IZ, Ba Ria – Vung Tau Province, Vietnam Oct’2020 – Mar’2021 (6 months) 160,000 m³ LNG storage tank Increase the gas send-out capacity of Terminal to 3 MMTPA As above Basic Design and Cost Estimation Prepare the EPC Invitation to Bid (ITB)
Project Name Client Locaction Project period Description Capacity Scope
PV Gas Thi Vai Terminal - LPG Storage Re –Arrangement Project PetroVietnam Gas JSC (PV Gas) Cai Mep IZ, Ba Ria – Vung Tau Province, Vietnam Aug’2020 – Dec’2020 (4 months) 3 spherical tank with the capacity 2,000m3/ tank 6,000 m3
Soil investigation, basic design and cost estimation
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
27
Project Experiences
Project Name Client Locaction Project period Description Capacity Scope
LPG Refrigerared Storage System Projet Itochu Corporation/ Itochu And PetroVietnam Gas JSC (PV Gas) Cai Mep IZ, Ba Ria – Vung Tau Province, Vietnam Jun’2008 – Jul’2008 (1 month) Estimated about 100,000 m3 include 02 LPG refrigerated tanks of 30,000 ton per each. As above Basic Design & Cost Estimation
Project Name Client Locaction Project period Description Capacity Scope
PVGAS FAST TRACK 100,000M3 LNG TERMINAL FEED PROJECT Tokyo Gas Engineering Co., Ltd/ PetroVietnam Gas JSC (PV Gas) Cai Mep IZ, Ba Ria – Vung Tau Province, Vietnam Mar’2012 – May’2012 (3 months) PVGas Fast Track 100,000 m3 LNG Terminal FEED Project As above FEED Engineering.
Oil & Gas
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
28
Project Name Client Locaction Project period Description Capacity Scope
Shwe Lin Pan (SLP) Depot Project Denko Petrochemical Management Co., Limited Shwe lin pan Industrial Zone, Hilang District, Yagon City, the Republic of the Union of Myanmar 12 months Engineering, Procurement and Construction a Shwe Lin Pan (SLP) Deport with capacity 10,000m3 fuel storage (included future 5,000m3) to import fuel products from barge and export to truck or barge. Storage fuel products are normal diesel (HSD), premium diesel (PD), gasoline 92 (G92), gasoline (G95), gasoline 97 (G97) 10,000m3 storage for Gasoline and Diesel EPC Turnkey.
Project Experiences Oil & Gas
Project Name Client Locaction Project period Description Capacity Scope
Denko Thilawa Oil Storage Tank Terminal Project Denko Petrochemical Management Co., Ltd. 10 ha, Thilawa Industrial ZoneMyanmar Jun‘2018 – Nov’2019 (18 months) 135,000 m³ fuel storage to import and export the fuel product which are normal diesel (HSD), premium diesel (PD), gasoline 92 (G92) gasoline 95(G95) As above EPC
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
29
Project Name Client Locaction Project period Description
Capacity Scope
Long Son – New Air Sepration Plant Project Vietnam Japan Gas Joint Stock Company Ba Ria Vung Tau Province, Vietnam Jul’2020 to July’2021(12 months) Total Area: 19,368 m2
Nitrogen: 12,500 Nm3/h (equivalent 135,000 tons annual) Oxygen: 8,500 Nm3/h (equivalent 105,000 tons annual) Argon: 280 Nm3/h Nm3/h (equivalent 4,300 tons annual).
As above Equipment Installation & Piping Installation Work
Project Name Client Locaction Project period Description Capacity Scope
Long Son – New Air Sepration Plant Project Vietnam Japan Gas Joint Stock Company Ba Ria Vung Tau Province, Vietnam Nov’2019 to Apr’2021 (16 months) Long Son Air Separation Plant is developed to manufacture and distribute high quality gas such as Nitrogen, Oxygen, and Argon for industrial purposes, especially for Long Son Petrochemicals Complex, Vietnam N/A EPC.
Project Experiences Oil & Gas
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
30
Project Experiences Oil & Gas
Project Name Client Locaction Project period Description Capacity Scope
Hot Oil Boiler Project Van Phong Petroleum Terminal Petrolimex Installation No.03 Joint Stock Company Dec’2010 – Jul’2011 (7 months) Hot Oil Boiler system to supply hot oil to Van Phong Petroleum Terminal N/A EPC
Project Name Client Locaction Project period Description Capacity Scope
Natural Gas Conversion Project Japan Vietnam Fertilizer Co.,Ltd Go Dau IZ, Dong Nai Province, Vietnam Dec’2010 – Jul’2011 (7 months) Natural gas pipeline and conversion of fuel oil burners (Boiler & Furnace) N/A EPC.
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
31
Project Experiences Oil & Gas
Project Name Client Locaction Project period Description Capacity Scope
PM3- Ca Mau Gas Pipeline Project J.P. Kenny/ Vietsovpetro Ca Mau Province, Vietnam Jul’2005 – May’2008 (29 months) Ca Mau gas pipeline project. N/A Engineering design
Project Name Client Locaction Project period Description Capacity Scope
Bio Ethanol Plant Project The Orient Bio-Fuels Co.,Ltd (PV Oil & Itochu) Binh Phuoc Province, Vietnam Apr’2010 – Mar’2012 (23 months) 300,000 little/day Bio Ethanol plant As above Commissioning (Consortium with TTCL Public)
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
32
Project Experiences
EXPERIENCES AND CLIENTS
As of Oct, 2020
CHEMICAL & PETROCHEMICAL
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
33
Chemical & Petrochemical
Project Name Client Locaction Project period Description Capacity Scope
Bulk Delivery System Project AGC Chemicals Vietnam Co.,Ltd Cai Mep IZ, Phu My Town, Ba Ria - Vung Tau Province, Viet Nam. 10 Months Build the Bulk Delivery System to achieve feeding rate of 21 MT/hr Polyvinyl Chloride (PVC) from the process. PVC is kept in hoppers before loading to bulk tankers; the loading rate is 24MT/hr, the return pneumatic conveying system with PVC transfer rate 21MT/hr, On-stream time shall be 24 hrs per day, and other facilities modification according to the project requirement PVC is kept in hoppers (240 MT) before loading to bulk tankers; the loading rate is 24MT/hr EPC & Commissioning.
Project Name Client Locaction Project period Description Capacity Scope Features
Green Field Project Jotun Paints Vietnam Co.Ltd 10 ha, Hiep Phuoc IZ, HCMC, Vietnam Apr‘2018 - Apr‘2021 (36 months) Water – Based paint 85 mill litter per year & 10,000 TPY Power Coating As above EPCM LEED Silver Certificate, Solar Rooftop
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
34
Project Name Client Locaction Project period Description Capacity Scope
Pekn Resin Manufacture Factory Plant Project JCEM Viet Nam Co., Ltd. Hoa Lac Hi – Tech Zone, Thach Hoa Commune, Thach That District, Hanoi city, Vietnam Dec‘2018 - Sep‘2020 (22 months) Investment in UV resistible and weather durable Polyeste plant in producing artificial quartz stone and other composite materials As above EPCM.
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
DNS Chlor Alkali Project Dai Ngan Son Service Trading Manufacturing Co.,Ltd. Tien Giang Province, Vietnam May‘2018 - Sep‘2019 (16 months) 54,000 t/y NaOH (as NaOH 100%) 32,000 t/y HCL (As 100% Cl2) 7,166 t/y NaClO As above EPCM Asahi Kasei (Japan)
Project Experiences Chemical &
Petrochemical
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
35
Project Experiences Chemical &
Petrochemical
Project Name Client Locaction Project period Description Capacity Scope
Hai Phong Terminal Project Top Solvent Vietnam (ThaiOil) Dinh Vu IZ, Hai Phong Province, Vietnam Jul‘2017 - Sep‘2018 (15 months) Total project area is 28000m2, phase 1 is 8,000 m³ Solvent storage and process filling system, warehouse, office building and utilities. As above PMC
Project Name Client Locaction Project period Description Capacity Scope
AICA Laminates Vietnam Factory Project AICA Laminates Viet Nam/ Soltec Viet Nam Company Road 2, Nhon Trach 3 IZ - Phase 2, Long Tho Commune, Nhon Trach District, Dong Nai Province, Vietnam May’2018 – Apr’2019 (12 months) Fabrication Tank & Procesing Control system As above EPC
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
36
Project Name Client Locaction Project period Description Capacity Scope
Hot DE – Mineralized Water Charge System Project AGC Chemical Vietnam Co., Ltd Ba Ria - Vung Tau Province, Viet Nam. Nov‘2015 - Apr‘2016 (05 months) Engineering and construction of Hot Demineralized Water Charge System to increase capacity of the factory from 100,000 TPY to 152,000 TPY. As above EPC Lump Sum
Project Name Client Locaction Project period Description Capacity Scope
Huntsman Vip Project Huntsman (Singarpore) Pte Ltd Amata IZ, Dong Nai Province, Vietnam Jul‘2017 - Jun‘2018 (11 months) Engineering design, Procurement and Construction Management services for Project VIP N/A EPCM
Project Experiences Chemical &
Petrochemical
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
37
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
Vietnam Recycling Plant Project Zinc Oxide Corporation VN Phu My 3 IZ, Ba Ria Vung Tau Province, Vietnam May‘2017 - Jul‘2017 (02 months) Basic design for the project of recycling plant to recover zinc and iron from the waste dust collected from the gas cleaning systems of Electric Arc Furnaces of steel mills 100.000 TPY (EAFD) Basic Engineering Zincox Resources Ltd. (ZINCOX,UK)
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
Spanish Full Cycle ZINC Oxide Project Zincox Resources Ltd. (ZINCOX,UK) Port of Castellon, Western of Spain Nov‘2018 – May’2019 Basic engineering design, material take off, 3D modeling for Zinc oxide recycling plant from Electrical Arc Furnaces Dust (EAFD) 100.000 TPY (EAFD) Basic Engineering Zincox Resources Ltd. (ZINCOX,UK)
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
Taiyo Koko Recycle Plant Project Toyo Engineering & Construction Sdn Bhd./ Taiyo Koko Company LTD Nghi Son, Thanh Hoa Province, Vietnam Mar’2016 - May’2016 (3 months) Feed of Vanadium & Molybdenum reconery plan from de – 50x spent catalyst. Treating capacity 7000 T/Y FEED Taiyo Koko Company LTD
Project Experiences Chemical &
Petrochemical
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
38
Project Name Client Locaction Project period Description Capacity Scope
ICI Paints Plant Project ICI Paints Vietnam (AKZO NOBEL) My Phuoc 2 IZ, Binh Duong rovince, Vietnam Nov’2005 – Sep’2007 (22 months) ICI Emulsion & Sovent Paint Factory N/A EPCM
Project Name Client Locaction Project period Description Capacity Scope
Vietnam Emulsion Plant Project ROHM & HAAS (Dow Chemical) Nhon Trach No.3 IZ, Dong Nai Province, Vietnam Nov’2010 – May’2012 (18 months) Vietnam Emulsion Plant 25.000 MT per year. EPCM
Project Experiences Chemical &
Petrochemical
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
39
Project Name Client Locaction Project period Description Capacity Scope
Calcium Carbonate Power Project Surint Omya Vietnam. Go Dau IZ, Dong Nai Province, Vietnam Sep‘2005 – Jun’2006 (10 months) Calcium Carbonate Powder Plant N/A E & C
Project Experiences Chemical &
Petrochemical
Project Name Client Locaction Project period Description Capacity Scope
Tower & Vessel VTN-P Project VTN- P Petrochemical JV Co., Ltd Can Tho Province, Vietnam Oct’2003 – Jul’2004 (09 months) Supply pressure vessels and technology towers N/A Engineering & Equipment Supply
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
40
EXPERIENCES AND CLIENTS
As of Oct, 2020
FERTILIZERS
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
41
Project Name Client Locaction Project period Description Capacity Scope
FEED Camau Compound NPK Fertilizer Plant 300kta Project PVCFC (PETROVIETNAM Ca Mau Fertilizer Joint Stock Company) Ca Mau Province, Vietnam 103 calendar days from effective date 300 MTPY(45.5TPH,1000TPD) for NPK grade 20-20-15 or 16-16-8, molten urea based As above FEED
Project Experiences Fertilizers
Project Name Client Locaction Project period Description Capacity Scope Process Licensor
Rock Salt Exploitation & Processing Plant Project Vinachem/ Vilachemsalt Khammouane, Laos Aug’2015- Nov’2018 (40 months) Potash (KCL95%) 320,000TPY NaCl( NaCl 98%) ≤ 300,000 TPY As above EPC Turn – Key Lump Sum (Consortium with TTCL Public) K-UTEC AG Salt Technologies (KUTEC)
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
42
Project Name Client Locaction Project period Description Capacity Scope
NPK FERTILIZER 100,000 TPY PRODUCTION LINE PROJECT Baconco Company Limited Phu My 1 IZ, Ba Ria Vung Tau Province, Vietnam Nov’2013- Jul’2014 ( 8 months) 100,000 TPY NPK Fertilizer As above EPC Turn – Key Lump Sum
Project Experiences Fertilizers
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
43
EXPERIENCES AND CLIENTS
As of Oct, 2020
PHARMACEUTICAL FOOD & BEVERAGE
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
44
Project Name Client Locaction Project period Description Capacity Scope Features
TETRA PAK BINH DUONG PROJECT Tetra Pak Vietnam JSC VSIP 2A, Binh Duong Province, Vietnam Jan’2017 – June’2018 (18 months) Capacity of 12 billion packages / year and construction area of 34,950m2, on an area of 100,000 m2. 12 billion packages / year EPCM 5 Chillers of total capacity 2750 ton and 24 Big AHUs. Project to comply with FM Global and this is 1st project in Viet Nam to comply with LEED Gold version 4
Project Name Client Locaction Project period Description Scope Features
UNITED INTERNATIONAL PHARMA PROJECT United International Pharma VSIP II, Binh Duong Province, Vietnam Sep’2010- Jan’2012 (12 months) Product: Non – Sterile solid and liquid dosage Standard: GMP- WHO/PICS, ISO 14000, OHSAS 18001 GMP-Pics Consultant: Seer - Pharma (Singapore) EPC for the whole plant (except process equipment) 200 clean rooms,class100 000 clean panels demountable wall panel, walk-able ceiling, Epoxy self leveling floor
Pharmaceutical - Food & Beverage Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
45
Project Name Client Locaction Project period Description Capacity Project Standard Scope Features
Chicken Meat Processing Plant Project Koyu & Unitek Co,. Ltd Lot C8, Long Binh IP, Long Binh Ward, Dong Nai Province, Vietnam Jul’2016- Feb’2017 (7 months) Chicken meat with the capacity of 10,000 ton product/ year As above HACCP (Hygiene clean room) EPC (Except process equipment) About 20 hygiene clean room following HACCP
Project Name Client Locaction Project period Description Project Standard Scope Features
Amway Nutrition Manufacturing Facility Project Amway Vietnam VSIP IIA, Binh Duong Province, Vietnam Nov’2013- Nov’2014 (12 months) Vitamin, mineral and nutritional supplemental food (phase 1) GMP/ FM Gobal EPC for the whole plant (except process equipment) 55 Clean rooms Class 100 000, clean panels walk-able ceiling, PU coated heat resistance floor
Pharmaceutical - Food & Beverage Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
46
Project Name Client Locaction Project period Description Capacity Scope
Crystalline Lens Factory Project Medical Devices & Biomaterial Plant J.S.Co ( MEDEP) 1 ha, Saigon Hi-Tech Park HCMC, Vietnam Jul’2017- Apr’2018 (10 months) Product: Hydrophobic & hydrophilic intraocular lenses Standard: ISO 13485( Process), ISO 14644 (Cleanroom), ISO 8573 (Compressed Air), ASTM D1193 (Purifield water) Process Consultant: Ocular Technology Inc., USA about 32 clean rooms class 9/8/7 following ISO 14644 EPC (Except process equipment)
Project Name Client Locaction Project period Description Capacity Scope Features Process Licensor
Manufacturing Surgical Sutures Nano Coated Project Medical Devices & Biomaterial Plant J.S.Co ( MEDEP) Lot 1 -4B -2.1 N3 street, Long Thanh My Ward, Dist.9, HCMC, Vietnam Oct’2018- May’2019 (7 months) Surgical sutures coated with silver nano material for medical purpose with the capacity of 2 million meters/ year About 25 clean rooms class 7/8/9 following ISO 14644 EPC (Except process equipment) ISO 14644 , ISO 8573 From Japan
Pharmaceutical - Food & Beverage
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
47
Project Name Client Locaction Project period Description Capacity Scope
New Unilever Food Factory Projects Unilever Vietnam Tay Bac – Cu Chi IZ, HCMC, Vietnam Oct’2010 - Oct’2011 (12 months) N/A N/A PMC Service
Project Name Client Locaction Project period Description Capacity Scope
Masan Brewery HG Beer Factory Project Masan Brewery HG Beer Company .Ltd Can Tho City, Vietnam May’2015- Feb’2016 (9 months) Area: 14.5 ha 100 million liters / year PMC Service
Project Name Client Locaction Project period Description Capacity Scope
New Home Care Liquid Plant (Phase 1.2.3….) Unilever Vietnam. Tay Bac – Cu Chi IZ, HCMC, Vietnam 2010 Calcium Carbonate Powder PlantFactory project of liquid household care products (phase 1, 2, 3) and VIM factory N/A Engineering Service
Pharmaceutical - Food & Beverage Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
48
Project Name Client Locaction Project period Description Scope
Chilli Sauce Project Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong Province, Vietnam Mar’2017- Dec’2017 (10 months) N/A E& CM
Pharmaceutical - Food & Beverage
Project Name Client Locaction Project period Description Scope
Coca – Cola Beverages Plant Extension Project Coca Cola Vietnam Da Nang City, Vietnam Apr’2016 - Dec’2016 (09 months) Area: 4800 m2
EPCM
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
49
EXPERIENCES AND CLIENTS
As of Oct, 2020
INFRASTRUCTURE & UTILITIES
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
50
Project Name Client Locaction Project period Description Capacity Scope
Warehouse Extension Project USG Boral Vietnam Hiep Phuoc I, HCMC, Viet Nam. May’2018 - Apr’2019 5,000 m² N/A EPC
Project Name Client Locaction Project period Description Capacity Scope Features
The CP Paper Corporation Project CP Paper Corporation Le Minh Xuan 3 IZ, HCMC, Vietnam May’2018 - Apr’2019 (12 months) Project total area is 38,000m2 including the warehouse is nearly 20,000m2 and office building 3 floors is 800m2 construction area. As above EPCM LEED Silver Certificate
Infrastructure & Utilities Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
51
Project Name Client Locaction Project period Description Capacity Scope
Bamboo Lobp Project Shell Vietnam Go Dau IZ, Long Thanh, Dong Nai Province, Viet Nam. Apr’2016 – Nov’2016 (08 months) Re-organize and expand the current plant As above EPC Lump Sum
Project Name Client Locaction Project period Description Capacity Scope
EUROFIN OFFICE & LABORATORY BULDING PROJECT Eurofins Sac Ky Hai Dang Saigon HiTech Park, Dist 9 ,HCMC, Vietnam Jun’2016 - Feb’2017 (09 months) N/A N/A EPC
Infrastructure & Utilities Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
52
Project Name Client Locaction Project period Description Capacity Scope Features
Cold Storage Warehouse Project New land VJ JSC Binh Duong Province, Vietnam Dec’2015 - Jun’2016 (08 months) Project total area is 23,000 m² including construction area is nearly 17,000 m² As above EPCM Frozen storage-40°C, -20°C Chilled storage 0°C, 5°C with 20 import/ export dock
Infrastructure & Utilities Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
53
EXPERIENCES AND CLIENTS
As of Oct, 2020
BIO – RENEWABLE ENERGY
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
54
Project Name Client Locaction Project period Description Capacity Scope
Solar Rooftop Coats Phong Phu Project Solar Power Utility Company (SPUC) 48 Tang Nhon Phu Street, Tang Nhon Phu B Ward, District 9, HCMC, Viet Nam. Aug’2016 - Nov’2017 (16 months) 4 building roofs with an area approximate 4000m2, including: Raw material warehouse, Office, Dyehouse, QA building Nearly 500KWp EPC
Project Name Client Locaction Project period Description Capacity Scope Features Process Licensor
Black Pellet Pilot Plant Project Ha Tien Energy Corporation (“HATIECO”) Lot A2, Hoai Tan IC, Hoai Nhon Dist, Binh Dinh Province, Vietnam Jun’2020 – Sep’2020 (3 months) Addition of a torrefaction unit to transform white pellet of existing production plant into black pellet, the best biomass fuel for co-firing. And send back hot flue gas in the process to the existing wood chip dryer for heat recovery. 15,000 ton/year Black Pellet Product EPC Biomass thermal upgrading technology by Direct Torrefaction Rotary Reactor. Utilize the gasified biomass from torrefaction as fuel for furnace to provide heat back to the reactor. TSI (USA)
Bio – Renewable Energy Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
55
EXPERIENCES AND CLIENTS
As of Oct, 2020
TURNAROUND SERVICES
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
56
Project Name Client Locaction Project period Description Capacity Scope
NPK Fertilizer Granulator Renewal Project Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai Province, Viet Nam. Aug’2016 - Nov’2017 (16 months) Replace the M122 granulator Keeping factory capacity of 350000 TPY Turnaround Service
Project Name Client Locaction Project period Description Capacity Scope
3rd Turnaround Project AGC Chemicals Vietnam Co., Ltd Cai Mep IZ, Ba Ria Vung Tau Province, Vietnam Oct’2014 - Dec’2014 (03 months) Mechanical, Electrical, Instrumentation and associated turnaround works As above Turnaround Service
Turnaround Service Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
57
Name of Owner (Client) Location Project Description Service Year A. CHEMICAL & PETROCHEMICAL
Accredo Asia Phase 2 Project VSip II-A, Tan Uyen Town, Binh Duong Province, Vietnam
Accredo Asia Phase 2 Project E,
Permitting 2020
TTCL Public Company Limited / Long Son Petrochemicals Co., Ltd.
Long Son Commune, Vung Tau, Ba Ria-Vung Tau Province, Vietnam
LLDPE Plant Project – TTCL Underground Piping Work Package
C 2020
AGC Chemicals Vietnam Co., Ltd. (ACVN)
Cai Mep IZ, Tan Thanh District, Ba Ria – Vung Tau Province, Vietnam
Bulk Delivery System Project – Package 1
E.P.C 2019-2020
Mitsubishi Corporation (MC) Phu My 3 SIP, Ba Ria Vung Tau, Vietnam Mitsubishi Chlor Alkali/ VCM Complex Project
E 2019
TTCL Public Co., Ltd./ Long Sơn
Petrochemicals Co., Ltd. Long Son, Ba Ria – Vung Tau, Vietnam LLDPE Plant Project Consultant 2019
Japan Chemical Engineering & Machinery Vietnam (JCEM)/ A&A Green Phoenix Group Joint Stock Company (PHENIKAA)
Hoa Lac High Industrial Zone, Thach That, Ha Noi
PEKN Resin Manufacture Factory Plant Project
EPCM 2018-2020
Zincox Resources Ltd. (ZINCOX, UK) Port of Castellon, Western of Spain, Spain Spanish Full Cycle Zinc Project E 2019
Jotun Paints Vietnam Ltd. Hiep Phuoc IZ – Nha Be District - HCMC Jotun Vietnam – Greenfield project EPCM 2018-2020
Dow Chemical (Rohm & Hass) Nhon Trach IZ No.3, Dong Nai, Vietnam Vietnam Capacity Expansion Project E.P.C 2018
Dai Ngan Son Service Trading Manufacturing Co. Ltd.
Tien Giang Province, Vietnam Chlor Alkali plant project EPCM 2018
Top Solvent Vietnam (Thaioil) Dinh Vu IZ, Hai Phong, Vietnam Haiphong Terminal Project PMC 2017
Huntsman (Singapore) Pte Ltd. Amata IZ, Dong Nai province VIP Project EPCM 2017
Zinc Oxide Corporation Vietnam J.S Ltd. Phu My 3 Specialized IZ, Ba Ria, Vung Tau
Vietnam Recycling Plant Project E 2017
Vietnam Lubricants & Chemicals JS (VILUBE)
Hiep Phuoc - Nha Be District, HCMC Vilube Plant Development Project EPCM 2017
Dow Chemical (Rohm & Hass) Nhon Trach IZ No.3, Dong Nai, Vietnam Dong Nai High Pressure Project E.P.C 2016
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Bamboo LOBP Project E.P.C 2016
Toyo Engineering & Construction Sdn Bhd. / Taiyo Koko Company Limited
Nghi Son, Thanh Hoa , Vietnam Taiyo Koko Recycle Plant Project FEED 2016
AGC Chemicals Vietnam Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam Hot Demineralized Water Charge System
E.P.C 2015
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
58
Name of Owner (Client) Location Project Description Service Year PetroVietnam Fertilizer & Chemical Corporation (PVFCCo)
Phu My IZ, Baria – Vung Tau, Vietnam UFC85/Formaldehyde Plant project E.P.C 2014
Vinacomin-Mining Chemical Industry Holding Co., Ltd
Thai Binh, Vietnam 200,000 TPY Ammonium Nitrate plant
E.P.C 2012
Top Solvent Vietnam Go Dau IZ, Dong Nai, Vietnam Top Solvent & Shell separation project
E 2012
PetroVietnam Fertilizer & Chemical Corporation (PVFCCo)
Phu My IZ, Baria – Vung Tau, Vietnam Glyphosate Project FS 2012
Shell Vietnam Ltd. GoDau IZ, Dong Nai Province VII Dissolving Unit Project E &
Construction Consultant
2010
Dow Chemical (Rohm & Hass) Nhon Trach IZ No.3, Dong Nai, Vietnam Vietnam Emulsion Plant EPCM 2010
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Gantry Extension E.P.C 2007
Vopak & AP Petrochemical Co. Ltd. Nhon Trach, Dong Nai, Vietnam
26,000m3 Tank Farm Terminal (19 storage tanks, total capacity 26,000m3)
Basic Engineering
Cost Estimation
2006
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Polymer Modified Bitumen (PMB) Project
FEED & E 2006
Exxon Mobil Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam Fire Water System (Piping, Pumping system and Storage Tank 1000m3)
E.P.C 2006
Shell Vietnam Ltd. Dinh Vu IZ, Hai Phong City, Vietnam Shell Bitumen Depot E 2006
Shell Vietnam Ltd. Go Dau IZ, Dong Nai, Vietnam New Chemical Storage Tank FEED & E 2006
ICI Paints Vietnam (Holdings) Pte. Ltd. My Phuoc IZ, Binh Duong, Vietnam ICI Emulsion & Solvent Paint Factory Project
EPCM 2005
Surint Omya Vietnam Go Dau IZ, Dong Nai, Vietnam Calcium Carbonate Powder Plant E 2005
B. OIL & GAS
PV Gas JSC
Renovation Plant & Re-arrangement LPG Storage Tanks Project (Investigation, basic design and cost estimation)
Renovation Plant & Re-arrangement LPG Storage Tanks Project
E 2020
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
59
Name of Owner (Client) Location Project Description Service Year
Vietnam Japan Gas Joint Stock Company (VJG)
Long Son Commune, Vung Tau, Ba Ria-Vung Tau Province
Long Son- New Air Separation Plant Project. Equipment Installation & Piping Installation Work
E.P.C 2019-2020
Denko Petrochemical Management Company Limted
Shwe Lin Pan, Hlaing Thar Yar Township, Yangon, Myanmar
Shwe Lin Pan (SLP) Depot Project E.P.C 2020
Vietnam Japan Gas Joint Stock Company (VJG)
Long Son Commune, Vung Tau, Ba Ria-Vung Tau Province
Long Son- New Air Separation Plant Project
E.P.C 2019-2020
Denko Petrochemical Management Co., Ltd.
Thilawa, Yangon, Myanmar Denko Thilawa Oil Storage Tank Terminal Project
E.P.C 2018-2019
Total Vietnam Limited Go Dau IZ, Dong Nai, Vietnam LPG System Upgrading Project E.P.C 2017
Posco Engineering Co., Ltd / Tokyo Gas Engineering Co., Ltd
Ba Ria – Vung Tau, Vietnam PVGas Fast Track LNG Terminal FEED Project
FEED 2012
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam Natural gas pipeline and conversion of fuel oil burners (Boiler & Furnace)
E.P.C 2010
Penjico / Van Phong Petroleum Terminal VanPhong Bay, Nha Trang, Vietnam Hot Oil Boiler system -Van Phong Petroleum Terminal project
E.P.C 2010
Orient Bio-Fuels Co., Ltd. Binh Phuoc, Vietnam 300,000 little/day Bio-Ethanol plant E.P.C 2010
PetroVietnam Gas Investment & Construction (PV Gas-D)
Ca Mau, Vietnam Train 2 for Gas Supply to Camau Fertilizer Plant
E 2009
Orient Bio-Fuels Co., Ltd. Binh Phuoc, Vietnam 300,000 little/day Bio-Ethanol Plant FS 2009
PVGas-South Dung Quat, Quang Ngai, Vietnam Verification Dung Quat LPG terminal E 2009
PVGas-South Ba Ria – Vung Tau, Vietnam Verification CNG stations E 2009
PetroVietnam Gas Corporation Nhon Trach, Dong Nai, Vietnam Gas supply Train for Nhon Trach 2 Power Plant
FEED 2009
PetroVietnam Gas Corporation Hiep Phuoc – HCMC Civil work for Phu My – Ho Chi Minh City Gas Pipeline Project
E 2008
Itochu /PV Gas Baria-Vungtau, Vietnam LPG Refrigerated Storage tanks FS & E 2008
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
60
Name of Owner (Client) Location Project Description Service Year Saigon Gas Holdings Corporation Cai Mep IZ, Baria-Vungtau, Vietnam Thi Vai LPG Tank Farm project FS & E 2007
J.P Kenny Pty Ltd. / Vietsov Petro Ca Mau, Vietnam PM3 – Ca Mau Gas Pipeline E 2005
VTN-P Petrochemical JV. Co. Ltd. Can Tho, Vietnam Supply of pressure vessels and towers for petrochemical plant
E.P.C 2003
C. FERTILIZER Japan Vietnam Fertilizer Company (JVF)
Go Dau IZ, Long Thanh, Dong Nai, Vietnam
Reinforced Concrete Structure Repairing Project
E.P.C 2019
Japan Vietnam Fertilizer Company (JVF)
Go Dau IZ, Long Thanh, Dong Nai, Vietnam
Replacement of Granulator Project E.P.C 2017
VINACHEM / VILACHEMSALT Khammouane, Lao Rock Salt Exploitation & Processing Plant E.P.C 2015
Baconco Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam
100,000 TPY NPK Fertilizer E.P.C 2013
DAP-2 VINACHEM JSC. Lao Cai, Vietnam 330,000 TPY Diammonium Phosphate Fertilizer Plant
E.P.C 2012
Baconco Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam
Dust Exhaust System of NPK Fertilizer Plant E.P.C 2008
PetroVietnam Fertilizer & Chemical Corporation (PVFCCo)
Phu My IZ, Baria – Vung Tau, Vietnam
NPK Fertilizer Plant FS 2008
PetroVietnam Fertilizer & Chemical Corporation (PVFCCo)
Phu My IZ, Baria – Vung Tau, Vietnam
SA Fertilizer Plant FS 2008
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Raw Material Section extension including facility
E.P.C 2007
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Product warehouse extension including facility
E.P.C 2006
Baconco Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam
Dust Exhaust System of NPK Fertilizer Plant E.P.C 2000
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam 350,000TPY NPK Compound Fertilizer Plant
E.P.C (Under TTCL
Public Co. Ltd)
1997
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
61
Name of Owner (Client) Location Project Description Service Year D. PHARMACEUTICAL – FOOD & BEVERAGE
Bayer Vietnam Limited Company Loc An IZ, Binh Son, Long Thanh, Dong Nai Province, Vietnam
Production Supply New Site Project EPCM 2020-2021
Phu Yen Food Technology Co., Ltd. North East, Song Cau Industrial Zone – Phase 2, Phu Yen Province, Vietnam
Phu Yen Food Factory Complex Project E 2020
Medical Devices and Biomaterial Plant Joint Stock (MEDEP JSC.)
Saigon High Tech Park, District 9, HCMC Infrastructure Surgical Suture Project E.P.C 2018
Glomed Pharmaceutical Company Ltd. (Abbott)
VSIP-1 Binh Duong Province HVAC Remediation and R&D project E 2017
Medical Devices and Biomaterial Plant Joint Stock (MEDEP JSC.)
Saigon High Tech Park, District 9, HCMC Crystalline Lens Factory Project E.P.C 2016
Amway Vietnam Company Limited VSIP-2A , Binh Duong, Vietnam Nutrition Food Manufacturing Plant Design &
Build 2013
United International Pharma Company Ltd.
VSIP-2, Binh Duong, Vietnam Pharmaceutical Factory Project Design &
Build 2010
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam Chilly Sauce project E & CM 2017
Tetra Pak Vietnam JSC VSIP 2A, Binh Duong, Vietnam Tetra Pak SE Asia Project EPCM 2017
Koyu & Unitek Co., Ltd. Bien Hoa – Dong Nai New Chicken Meat Processing Plant Project
E.P.C 2016
Masan Phu Quoc Phu Quoc – Kien Giang Nam Ngu Factory Project E & CM 2016
Coca-Cola Beverages Vietnam Company Limited
Lien Chieu District, Da Nang City, Vietnam Coca-Cola Beverages Plant extension project
EPCM 2016
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam R&D building and Soy Sauce factory E & CM 2016
Masan Brewery HG Company Ltd. Hau Giang, Vietnam Masan Brewery HG Beer Factory PMC 2015
One More Limited (VITAL) Pnom Penh, Cambodia Instant Noodle Factory E & CM 2015
Suntory PepsiCo Vietnam Beverage Co., Ltd.
Can Tho, Vietnam Suntory PepsiCo Can Tho Distribution Center
PMC 2014
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam Masan Food factory project E & CM 2014
Vietnam Brewery Limited HCMC, Vietnam VBLHCMC Brewery Extension Extension Phase 4 –Step 2 and Phase 5
E 2010
Unilever Vietnam Tay Bac–Cu Chi IZ, HCMC, Vietnam New Unilever Food Factory PMC 2010
Masan Food Corporation Tan Dong Hiep B IZ, Binh Duong, Vietnam Masan Food factory complex PMC 2010
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
62
Name of Owner (Client) Location Project Description Service Year
P&G Indochina Dong An IP, Binh Duong Province Tanzanite Facilities and Untilities Design Project
E 2017
Kimberly-Clark Vietnam Limited VSIP-1, Binh Duong, Vietnam Infrastructure Expansion EPCM 2012
Unilever Vietnam Tay Bac–Cu Chi IZ, HCMC, Vietnam New Homecare Liquid (Phase 1, 2, 3) and VIM Plant
E & Services
2010
Procter & Gamble Indochina Dong An IZ, Binh Duong, Vietnam Facility engineering projects E 2005-2013
Lever Vietnam (Unilever) Tay Bac–Cu Chi IZ, HCMC, Vietnam Skincare Migration Project E 2005
Procter & Gamble Co., Ltd. Dong An IZ, Binh Duong, Vietnam Increase capacity of Detergent Factory (VTCI Project)
E.P.C 2004
Procter & Gamble Co.Ltd Dong An IZ, Binh Duong, Vietnam Robinhood Project E 1999
E. BIO – RENEWABLE ENERGY
TTCL Group Hoai Tan IC, Hoai Tan Com., Hoai Nhon Dist., Binh Dinh Province, Vietnam
Black Pellet Pilot Plant Project E.P.C 2020
Solar Power Utility Company (SPUC) Tang Nhon Phu B Ward, District 9, HCMC, Vietnam
Solar Rooftop Coats Phong Phu Project E.P.C 2019
Duc Thanh – Mui Ne Joint Stock Company (PACIFICO)
Binh Thuan Province, Vietnam 40MWp Mui Ne Solar Power Plant Project
E.P.C 2018-2019
Phung Vinh Hung Paper JSC LMX3 IP, Binh Chanh, HCM, Vietnam Paper Warehouse PVH Project EPCM 2018 F. INFRASTRUCTURE & UTILITY
AICA Laminates Vietnam/ Soltec Vietnam Company
Nhon Trach 3 IZ, Nhon Trach District, Dong Nai Province, Vietnam
AICA Laminates Vietnam Factory Project
E.P.C 2018-2019
USG Boral Vietnam Hiep Phuoc IZ, Nha Be Dist., HCMC Warehouse Extention Project E.P.C 2018
EUROFINS Saigon High Tech Park, District 9, HCMC New Office & Laboratory Building project
E.P.C 2016
New Land Company Limited Binh An IP, Di An District, Binh Duong Province, Vietnam
Warehouse Project (13,000m2 cool storage and cold storage)
EPCM 2015
ON Semiconductor Binh Duong VSIP-1, Binh Duong, Vietnam HVAC/Exhaust and Fire Protection Upgrade Project
E & Service 2015
Yueh Chaeng Canned Food Co.Ltd Long An, Vietnam Cold Storage 400 Ton E.P.C 2003
Yueh Chaeng Canned Food Co.Ltd Long An, Vietnam Plant Utilities Building and Revamping E.P.C 2003
Project Experiences
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
63
Name of Owner (Client) Location Project Description Service Year H. TURNAROUND SERVICE Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Fertilizer Granulator Renewal Project E.P.C 2016
AGC Chemicals Vietnam Co. Ltd. Phu My IZ, Baria – Vung Tau, Vietnam
Mechanical, Electrical, Instrumentation and associated turnaround works
Turnaround
2014
Japan Vietnam Fertilizer Company Go Dau IZ, Dong Nai, Vietnam NPK Fertilizer Dryer Renewal Project E.P.C 2012
Project Experiences
E: Engineering P: Procurement C: Construction FS: Feasibility Study FEED: Front-End Engineering Design CM: Construction Management PMC: Project & Construction Management EPCM: Engineering, Procurement and Construction Management
TTCL VIETNAM CORPORATION.,LTD 11th floor, Centre Point Building ,
106 Nguyen Van Troi Street, Ward 8,
Phu Nhuan District, Ho Chi Minh City, VN
Mr. Ho Dac Tuan (+84) (0) 764501711
Mr. Kazuoki Urabe (+84) (0) 902575009
Tel : (+84-28) 39977118
Fax : (+84-28) 39977086
http:// www.ttcl-vn.com
Emai : [email protected]
TTCL VIET NAM CORPORATION LIMITED www.ttcl-vn.com | | The Leading Integrated EPC Contractor in Vietnam
64