McDERMOTT PROJECT EXPERIENCE www.mcdermott.com/projects
Arthit Central Processing Platform PTT Exploration & Production Public Company Ltd
Page 1 of 1160205—10 | Imperial | © 2016 McDermott International, Inc. All Rights Reserved. The information contained herein is provided for general information purposes
only and is not intended or to be construed as a warranty, an offer, or any representation of contractual or other legal responsibility. McDermott has a policy of continuous improvement of its products and services and reserves the right to change information including specifications and processes without notice.
SERVICES
Construction, load out, precommissioning, transportation, float-over installation, and hook-up
FACILITIES
18,739 ST integratedtopsides, and 5,511 ST, 6.5 feet diameter, eight-leg jacket and associated infrastructure
LOCATION
Arthit field, Gulf of Thailand
WATER DEPTH
262 feet
YARDS
Batam Island, Indonesia
VESSELS
Intermac 650, (DB26 - previously owned)
Arthit Central Processing Platform was a major project initiative for the development of natural gas resources in the Gulf of Thailand. The seamless integration of McDermott’s worldwide capabilities and innovative float-over installation technology ensured schedule certainty of this large integrated topsides.Despite a demanding schedule and conditions, more than 5.5 million man hours were recorded without a Lost Time Incident.
Engineering: Float-over engineering design, testing and conversion of Intermac 650 transport and rapid-ballast float-over installation barge were carried out by Houston, New Orleans and Singapore offices. Construction engineering for the topsides was performed at Batam Island, with installation engineering support from Dubai.Procurement: Activities were spread throughout Asia Pacific.Construction: Fabrication of 18,739 ST integrated topsides and 5,511 ST, 6.5 feet diameter, eight-leg jacket was completed at the Batam Island fabrication facility. Installation: The deck was installed using Intermac 650 float-over technology.