94
Art Of The P&ID 1 Ford, Bacon & Davis, LLC

Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

  • Upload
    others

  • View
    20

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Art Of TheP&ID

1Ford, Bacon & Davis, LLC

Page 2: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Piping And Instrument Diagram (P&ID) Is A Schematic Diagram That Shows How Equipment And Instruments Connect To Form A Functional Process System

• The P&ID Is The Chief Control Document For The Engineering Design Of Petrochemical And Refinery Systems

Ford, Bacon & Davis, LLC 2

Page 3: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Defines Scope• Specifies Systems• Identifies Essential Components• Guides Engineering Design• Tracks Changes• Assists Construction• Trains Operators• Meets PSI Requirements

Ford, Bacon & Davis, LLC 3

Page 4: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Component Function

Equipment Convert

Instruments Control

Pipe ConnectConvey

Ford, Bacon & Davis, LLC 4

Page 5: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Equipment Is Shown With Symbols That Represent Different Types Of Equipment– Columns– Heat Exchangers– Pressure Vessels– Pumps– Tanks

5Ford, Bacon & Davis, LLC

Page 6: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Instruments Are Shown With Symbols That Represent Inline Or Attached Devices That Measure Or Control The Process– Analyzers– Control Valves– Flow Meters– Local Indicators– Software Elements– Transmitters

6Ford, Bacon & Davis, LLC

Page 7: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Piping Between Equipment Is Shown As Lines With Special Symbols For Piping Components– Expansion Joints– Insulation / Heat Tracing– Flanges– Reducers– Specialty Pipe Items– Valves

Ford, Bacon & Davis, LLC 7

Page 8: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Signals Between Instruments Are Also Shown As Lines, Usually Dashed Or With Special Symbols– Hard Wired Links– Hydraulic Connections– Pneumatic Connections– Software Links

Ford, Bacon & Davis, LLC 8

Page 9: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Locate The ROAD MAP• Standardize On FORMAT• LAYOUT For Clarity• ANALYZE Content for Accuracy• AUDIT For Completeness• CHECK For Consistency

Ford, Bacon & Davis, LLC 9

Page 10: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Locate TheROAD MAP

10Ford, Bacon & Davis, LLC

Page 11: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Finalize P&ID Legends & Symbols Early– Use Client Standard If Available– Copy From Previous Client Project– Develop For New Project & Get Client Approval

• Use PIP PIC001 P&ID Documentation Criteria As Default

• Legends & Symbols Should Match CADD Drafting Symbology

Ford, Bacon & Davis, LLC 11

Page 12: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Use P&ID Kickoff Meeting(s) For Project Team Review And Consensus– P&ID Symbology / Layout– Execution Plan– Management Of Change

• Follow P&ID Quality Assurance Matrix And P&ID Completeness Checklist For Each Stage Of P&ID Development

Ford, Bacon & Davis, LLC 12

Page 13: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Abbreviations• Equipment Symbols• Instrument Symbols• Pipe Symbols• Keys For Equipment, Instrument, & Pipe

Numbering• Standard Details

Ford, Bacon & Davis, LLC 13

Page 14: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 14

Page 15: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 15

Page 16: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 16

Page 17: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 17

Page 18: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 18

Page 19: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 19

Page 20: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 20

Page 21: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 21

Page 22: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Tag Numbers For Equipment– Letter Code For Equipment Type– Number For Specific Identification

Ford, Bacon & Davis, LLC 22

Page 23: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Function TypeExchange Heat CT = Cooling Tower

FH = Fired HeaterHE = Heat Exchanger (Shell & Tube)

RU = Refrigeration UnitMove Fluid K = Blower/Fan/Compressor

EJ= Eductor/EjectorP = Pump

React Components FL = FlareRX = Reactor (Catalyst Bed, Furnace)

Separate Components C = ColumnF = Filter

Store Fluid D = DrumTK = Tank

Ford, Bacon & Davis, LLC 23

Page 24: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Loop Numbers For Instruments (ISA Typical)– Letter Code For Instrument Function– Letter Code For Instrument Type– Number For Specific Identification

Ford, Bacon & Davis, LLC 24

Page 25: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Function Type

A = Analyze C = Controller

F = Flow E = Element

L = Level I = Indicator

P = Pressure T = Transmitter

T = Temperature V = Valve

Ford, Bacon & Davis, LLC 25

Page 26: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Line Numbers For Piping– Pipe Size– Process Or Utility Service Code – Number For Specific Identification– Pipe Specification– Insulation Type– Insulation Thickness– Heat Tracing Requirement

Ford, Bacon & Davis, LLC 26

Page 27: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Specialty Item Numbers For Special Pipe Components Not Addressed In Pipe Specifications

• Tie Point Numbers• Sample Connection Numbers• Valve Specification Numbers

Ford, Bacon & Davis, LLC 27

Page 28: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 28

Page 29: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Standardize OnFORMAT

29Ford, Bacon & Davis, LLC

Page 30: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 30

DrawingTitle Block

RevisionLog

Notes

ReferenceDrawings

List

IncomingStreamArrows

OutgoingStreamArrows

Stationary Equipment Title Blocks

Rotating Equipment Title Blocks

Stationary Equipment Symbols

Rotating Equipment Symbols

Upper Pipe Highway

Lower Pipe Highway

Border

Page 31: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 31

Page 32: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 32

Page 33: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 33

Page 34: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 34

Page 35: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 35

Page 36: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 36

Page 37: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 37

Page 38: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 38

Page 39: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 39

Page 40: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 40

Page 41: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 41

Page 42: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 42

Page 43: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• P&ID Drafting Procedure (Client)• Drawing Size• Borders• Drawing Title Block• Equipment Title Blocks• Layers• Line Weights• Fonts

Ford, Bacon & Davis, LLC 43

Page 44: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Standard P&ID Drawing Size Is ANSI D Which Is 22” High By 34” Wide

• 11” X 17” Size (ANSI B) Is Typically Used For Reference Is A Reduction Of The Standard Size

Ford, Bacon & Davis, LLC 44

Page 45: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Identifies Boundary Of Drawing Content

• Spacing Between Edge Of Drawing And Border To Allow For Copy Misalignment

• Thickness Of Border Line May Vary

• Drawing File Name Usually Outside Of Border

Ford, Bacon & Davis, LLC 45

Page 46: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Client Name And Logo• Location• Drawing Subject Information• Drawing Number• Revision Number• General Drafting Information• Revision Description

Ford, Bacon & Davis, LLC 46

Page 47: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 47

Page 48: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• First Line: Plant Or Unit Or Project• Second Line: Type Of Drawing

– Piping & Instrument Diagram– Process Flow Diagram– Process Block Diagram

• Third Line: Process Section Of Plant Or Unit• Fourth Line: Key Equipment Description

Ford, Bacon & Davis, LLC 48

Page 49: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Client Usually Has Specific System For Numbering Drawings

• Typical Drawing Number Format– Drawing Size Designator – Plant/Unit/Process Section Designator– Type Of Drawing Designator– Sequential Drawing Number

Ford, Bacon & Davis, LLC 49

Page 50: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Example: D-1015-G-00233• D = Drawing Size (22” X 34”)• 1015 = Unit Number• G = Flow Diagram• 00233 = Sequential Number

Ford, Bacon & Davis, LLC 50

Page 51: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Drawings For A Project Are Generally Issued At Different Stages Of Development

• Each Stage More Complete Than The Preceding Stage

• Typical Stages:– Issue For Client Comment (IFCC) Or Preliminary Issue– Issue For Approval (IFA) – Issue For Design (IFD)– Issue For Construction (IFC)– Issue For Record (IFR)

Ford, Bacon & Davis, LLC 51

Page 52: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• New Drawing Will Carry a Revision Letter A, B, C, Etc. During Preliminary, Approval, and Design Issues

• Drawing is Typically Issued For Construction As Revision 0 (Zero)

• Any Further Revisions Carry Revision Numbers (1, 2, 3, Etc.)

• Revision Description For New Drawing Will Use Issue Description (IFCC, IFA, IFD, IFC, IFR)

Ford, Bacon & Davis, LLC 52

Page 53: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Existing Drawing Revised For A Project Will Carry The Next Revision Number Followed By A Letter A, B, C, Etc. During Preliminary, Approval, And Design Issues

• When The Drawing Is Issued For Construction, The Letter Designation Is Dropped From The Revision Number

• The Revision Description For A Revised Drawing Will Typically Use The Project Title Along With Development Stage (IFCC, IFA, IFD, IFC, IFR)

Ford, Bacon & Davis, LLC 53

Page 54: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Select Meaningful Drawing Titles

• Update Drawing Titles As P&ID Content Changes

• Keep Revision Log Up To Date

Ford, Bacon & Davis, LLC 54

Page 55: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

LAYOUT For Clarity

55Ford, Bacon & Davis, LLC

Page 56: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• P&IDs Are Conceptual Drawings• However, Presentation Should Reflect Reality

As Much As Possible• Pipers’ Trap:

– Why Didn’t You Design It Like The P&ID?– The P&ID Is A Conceptual Drawing!– Why Did You Design It This Way?– I Designed It Just Like The P&ID Showed It!

Ford, Bacon & Davis, LLC 56

Page 57: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 57

GRA

VITY

FLO

W

Page 58: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 58

GRAVITY FLOW

Page 59: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 59

Page 60: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 60

Page 61: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 61

Page 62: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 62

Page 63: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Develop A Preliminary P&ID List Based On PFD Review

• Assign Which Equipment Goes On Each Drawing

• Minimize Drawing Density• Leave Room For Other Disciplines To Add Their

Symbology And Tags

Ford, Bacon & Davis, LLC 63

Page 64: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Equipment Number Of Items On One P&ID

Columns 1

Compressors 1 (Complex)

Fired Heaters 1

Packaging Equipment Complete System If Possible

Pressure Vessels Feed – 1 to 2 Reflux - 1 (Include With Condenser)

Storage – 1 to 2

Pumps Include With Related Equipment (Suction)

Tanks 1 to 2

Ford, Bacon & Davis, LLC 64

Page 65: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 65

Page 66: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 66

Page 67: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 67

Page 68: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 68

Page 69: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 69

Page 70: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 70

Page 71: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 71

Page 72: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

ANALYZE Content For Accuracy

72Ford, Bacon & Davis, LLC

Page 73: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Standardize On Unit Operation Configurations

• Use P&ID Checklists To Validate Content

• Build Set Of Archive P&IDs For Reference

Ford, Bacon & Davis, LLC 73

Page 74: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 74

Page 75: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 75

Page 76: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 76

Page 77: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 77

Page 78: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ejectors Instruments

Equipment Title Blocks Pipe

Fired Heaters Pressure Vessels

Flares Rotating Equipment

Heat Exchangers Storage Tanks

Ford, Bacon & Davis, LLC 78

Page 79: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 79

Page 80: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 80

Page 81: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 81

Page 82: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 82

Page 83: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

AUDIT For Completeness

83Ford, Bacon & Davis, LLC

Page 84: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Each Issue Of P&ID Builds On The One Before

• Use P&ID Completeness Checklist To Validate Completeness For Each Stage Of P&ID Development

• When Appropriate, Use HOLD Clouds To Flag Incomplete or Preliminary Information

Ford, Bacon & Davis, LLC 84

Page 85: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 85

PREL

IMIN

ARY

ISSU

E

EQUIPMENT WITH TAG NO. / TITLE

PRIMARY PIPE LINE SIZESSERVICE CODESPIPE SPECS

KEY PROCESS VALVES

PRIMARY INSTRUMENT LOOP ELEMENTS

PRIMARY RELIEF VALVES

COMPLETE P&ID LEGENDS/SYMBOLS SHEETS

Page 86: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 86

PREL

IMIN

ARY

ISSU

E

ISSU

E FO

R AP

PRO

VAL ALL EQUIPMENT DETAILS / TITLE BLOCKS

ALL PIPE SHOWN (PRIMARY / SECONDARY)PIPE DETAILSINSULATION / TRACINGPIPE SPECIALTY ITEMS

ALL VALVES SHOWN (TYPES IDENTIFIED)

COMPLETE INSTRUMENT LOOPS

MOTOR CONTROLS

ALL SPECIAL NOTATIONS COMPLETE

ALL RELIEF VALVES SHOWN

Page 87: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 87

PREL

IMIN

ARY

ISSU

E

ISSU

E FO

R AP

PRO

VAL

ISSU

E FO

R DE

SIG

N

ALL DESIGN DETAILS COMPLETE

PIPE TAG NUMBERS COMPLETELINE NUMBERSPIPE SPECIALTY ITEM NUMBERSTIE POINT NUMBERS

ALL VALVE SIZES / TAGS COMPLETE

ALL INSTRUMENT NUMBERS COMPLETE

ALL LOGIC / INTERLOCKS DEPICTED

HOLDS SHOWN FOR INCOMPLETE ITEMS

ALL RELIEF DEVICES SIZES COMPLETE

Page 88: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 88

Page 89: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

CHECK For Consistency

89Ford, Bacon & Davis, LLC

Page 90: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• Perform Stream Arrow Cross-Checks Between P&IDs

• Conduct Process Team Reviews• Conduct Interdisciplinary Team Reviews• Implement Team Reviews Per P&ID Quality

Assurance Matrix

Ford, Bacon & Davis, LLC 90

Page 91: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 91

Page 92: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

• If More Than One Team Member Is Assigned P&ID Development, Process Lead Should Routinely Review All Drawings For Presentation Consistency

• Use Peer Review For Completeness Checks• Use Expertise Review For Complex Or

Specialty Systems

Ford, Bacon & Davis, LLC 92

Page 93: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 93

IDENTIFYNEEDED DISCIPLINES

OBTAIN PROJECT / LEAD SUPPORT

SET UP MEETINGPLACES / TIMES

VERIFY ADEQUATE MEETING SPACE

ISSUE REVIEW COPIES

EARLY

HAVE SUPPORTCONTROL DOCUMENTS

AVAILABLE:LINE LIST

INSTRUMENT INDEX

IN MEETINGS:HIGHLIGHT COMPONENTS

AS REVIEWEDMAINTAIN MASTER

MARKUP SET

PLANFOLLOW UP

REVIEWSAS REQUIRED

Page 94: Art Of The P&ID · Drafting Symbology. Ford, Bacon & Davis, LLC. 11 • Use . P&ID Kickoff Meeting(s) For Project Team Review And Consensus – P&ID Symbology / Layout ... • Develop

Ford, Bacon & Davis, LLC 94

Locate The ROAD MAP P&ID Legends & SymbolsStandardize On FORMATLAYOUT For ClarityANALYZE Content for AccuracyAUDIT For CompletenessCHECK For Consistency

Arrange Drawing Building Blocks EffectivelyDon’t Crowd P&IDsDevelop Standard Configurations & DuplicateUse P&ID Completeness ChecklistUse Interdisciplinary Review Teams