15
Session 2: Opening Salvo — Maintenance ARSA Symposium March 2017

ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

  • Upload
    dotu

  • View
    224

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Session 2: Opening Salvo — Maintenance

ARSA Symposium March 2017

Page 2: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

MINISTRY OFDEFENSE

NAVY ARMY

REPUBLIC PRESIDENT

DECEAAIR TRAFFIC CONTROLCivil & Military Aircraft

CONACNational Civil

Aviation Council

Federal Organizational Framework

MINISTRY OFTRANSPORT, PORTS AND

CIVIL AVIATION

AIR FORCE

CENIPAAccident Investigation

Authority

National Civil Aviation Agency

Page 3: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

DirectorHélio Paes de Barros Júnior

DirectorRicardo

Fenelon Junior

DirectorRicardo Sérgio Maia Bezerra

DirectorJuliano Alcântara

Noman

President DirectorJosé Ricardo Pataro Botelho de Queiroz

Other supporting branches (press, audit, ombudsman,

administration, IT...)

SARAirworthinessDepartment

SIAAerodromes Department

SPO Flight Standards

Department

SRAAeronauticalInfrastructure Department

ANAC Organizational Chart

Safety Trend Analysis

SASAir Service Economic

Regulation Department

International Affairs

SFIOversight

Department

Technical Regulation

Page 4: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

GTPAPlanning and Control

Branch

GTGCKnowledge

Management Branch

GTRABBrazilian Aeronautical

Register Branch

GTPNAirworthiness

Standards Branch

GGCPAeronautical Product Certification Branch

GGACContinued

Airworthiness Branch

SARAirworthiness Department

GTASAdvisory Branch

AIR Organizational Chart

Page 5: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Maintenance Organization Regulations & Policies

State Safety Program (SSP) (PSOE ANAC) - approved on 11 May 2009.

RBAC 145 amdt. 01 – Aeronautical Products MaintenanceOrganizations, approved on 07 March 2014 to align ANACrequirements with FAA requirements, including SMS.

RBAC 43 - Maintenance, Preventive Maintenance, Rebuilding andModification amdt. 01, approved on 02 Dec 2014 to change thecriteria for ANAC acceptance of services performed on Brazilianaeronautical products by foreign maintenance organizations.

ANAC Supplemental Instruction (IS) 145-002, REV B, issued on 14 Apr2016 – Certification Process of a Foreign Maintenance Organizationsupdated.

ANAC Supplemental Instruction (IS) 145-214-001, REV A, issued on 21Mar 2014 – SMS on Maintenance Organization.

Page 6: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Brazil-EU: BASA between Brazil and the European Union (2013)MAG – Maintenance Annex Guidance (June 2015)MAG Revision 1: 2016.

Brazil-Canada:Technical Arrangement on Aviation Maintenance (April 2002)Implementation Procedures (March 2005)

Brazil-USA: BASA between Brazil and the USA (2004)MIP – Maintenance Implementation ProceduresOriginal MIP: In progress.

SRVSOP: Multilateral Agreement in Latin America (ICAO and CLAC)Multinational team to assess and audit maintenanceorganizations and recommend certification to each SignatoryState (Brazil inclusion still in progress).

MMT Maintenance Management Team – First meeting JUN 2016 JMCB Joint Maintenance Coordination Board - Meeting JUN 2016 SM ICG Safety Management International Collaboration Group

Maintenance Airworthiness Agreements

Page 7: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

FAA-ANAC MIP Status

The FAA-ANAC MIP is being developed according to FAA Order 8000.85

4 Phased Project:Phase 1: System FamiliarizationPhase 2: System EvaluationPhase 3: Development of MIPPhase 4: Coordination Process

We are here (March/17):

Phase 2: Joint assessment of Rep. Stations.

Phase 3: Determination of Special Conditions.

Page 8: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Phase 1: System Familiarization

ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015) ANAC presents Assessment Job Aid to FAA (26 AUG 2015) FAA final decision to pursue MIP with ANAC (30 DEC 2015)

Phase 1 was concluded in 30 DEC 2015.

FAA-ANAC MIP Status

Page 9: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

FAA-ANAC MIP Status

Phase 2: System Evaluation ANAC Capability Assessment by FAA (26 JAN 2016) FAA Positive Response Letter to ANAC (03/23/2016) ANAC familiarization to FAA working procedures

and assessment of FAA Repair Stations (27 JUL 2016) Regulatory Comparison (in progress)

Regulatory Comparison in progress, to be concluded in March2017 (face-to-face meeting in Rio). In January 2017 thediscussion on the Special Conditions started and will continuealong the development of the content of the MIP. Somepotential Special Conditions may required decisions from theANAC Board of Directors and need to be further evaluated (ex:SMS).

Page 10: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

FAA-ANAC MIP Status

NEXT STEPS: Phase 2: System Evaluation Joint Assessment of ANAC Repair Stations (1st Q. 2017)

Conclusion of Phase 2 after Joint Assessment. (March 2017) Phase 3: Development of MIP

In progress. Special Conditions under discussion. Necessary to agree on which differences must be Special Conditions in the MIP and which ones may be addressed through instruction/guidance procedures in the MAG.

Phase 4: Coordination ProcessExpectation to have MIP signed by the end of 2017.

After MIP signature it is necessary 1 year to develop the MAG.

Page 11: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Maintenance Organization – ANAC Certificate

USA: 127Canada: 27Mexico: 3

South America: 10

Central America: 2

Europe: 36

Asia: 9

Oceania: 1

Middle East: 2

Foreign

217

US: 58%Domestic

515

BRAZIL

Total

732

Status until FEB 2017

Page 12: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Maintenance Organization Classification

Size (number of employees)

Big - 50 < nr

Medium - 50 ≤ nr ≤ 16

Small - 15 ≤ nr ≤ 08

Micro - nr ≤ 07

Complexity

High - RBAC 121

Medium - RBAC 135 pax ≥ 19

Low - Others

Page 13: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Phases

Size/ComplexityPlan Implementation Operational

Big/ High or Medium 08 SEP 2015 08 MAR 2017 08 MAR 2019

Medium / Big or Medium 08 MAR 2016 08 SEP 2017 08 MAR 2019

Others 08 SEP 2016 08 MAR 2018 08 MAR 2019

Maintenance Organization SMS Target Dates

10% 20% 70%

Page 14: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Maintenance Organization Mindset Changing

Start of the SMS implementation (based on 4 components of the SSP)

Number of maintenance organizations to be supervised - 515 domestic AMOs

Human resources Budget constraints Industry expectations

Risk Assessment• ICAO SSP - PSOE ANAC• Assurance System Determination of Safety Reports • Performance Based Oversight

Page 15: ARSA Symposium March 2017arsa.org/wp-content/uploads/2017/03/...ANACTarquinio-20170309.pdf · ANAC formal request (20 AUG 2012) FAA requests ANAC Assessment Job Aid (10 MAR 2015)

Hélio Tarquinio Júnior General Manager Continuous Airworthiness General Branch Department of Airworthiness Phone: +55 61 3314 4849 E-mail: [email protected] www.anac.gov.br