39
Air hlavigation Service (Ar{s)

(Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air hlavigation Service

(Ar{s)

Page 2: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Depantment of TransportationCIVIL AVIATION AUTHORITY OF THE PHILIPPINES

!tIPPINE

ACCOMPLISHMENT REPORTcY 2017

trio ffifirffiffin"li'11.," I ArR NAvTGAIToN sERVtcE

Page 3: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

ANS MANDATE

ORGANIZATIONAL $ETUP

FUNCTIONS OF EACH DEPARTMENT

PERSONNEL GOMPLEMENT AND STATUS

MAJOR ACCOMPLISHMENTS

INFRASTRUCTURE PROJECTS

Altachments

I nfrastructu re Projects Descri ptio n

Project Acceptance, I nspection, Evaluation, Hei g ht cleara nce Description

Navigational Aids Serviceability

ANS AccomPlishment RePort 2017

ANS MANDATE

Page 4: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

The Air Navigation Service (ANS) is mandated to establish, operate, maintain and flightcheck air navigation system and equipment nationwide to provide safe, reliable,expeditious, and efficient service in conformance with lnternational Civil AviationOrganization (ICAO) Standards and Recommended Practices (SARps).

To be a leading provider of high quality air navigation systems and services that otfersstrategic value to aviation stakeholders.

The Air Navigation Service (ANS) is envisioned to provide:

1, Effective plans, programs and design of air navigation systems and facilitiesnationwide.

2. Complete engineering services for the establishment and improvement of airnavigation facilities.

3. Functional operation, maintenance and efficient management of air navigationsystems equipment including airfield lighting systems, power plant and futuretechnologies in conformance with ICAO Standards and RecommendedPractices(SARPS).

Functions

The Air Navigation Service shall have the following functions:

1. Administration and implementation of operational plans, programs in

conformance with ICAO Annexes and SARPs'

2. Formulation of the safety management systems, policies and procedures inconformance with ICAO Annexes and SARPs

3. Technical competency development of CNS Systems Specialist and AirfieldLighting & Power Technician personnel

4. Establishment of air navigation facilities nationwide.

S. Determine the operational and developmental requirement of air navigational

facilities, in coordination with the Air Traffic Service for inclusion in the ANF

Maintenance and/or lnfrastructure Program of the CAAP.

6. Engineering data gathering and site survey for the improvement and

establishment of air navigation facilities'

7. Develops and implements a system of projects, post evaluation and prioritization

for the assessment of ANFplans and investment programs.

8. operation and maintenance of air navigation facilities.

g. provision of technical and material requirements of air navigation facilities'

l0.lmplementation of ANS regulations, policies, standard operational procedures for

ANS

l l.lnspection and evaluation of air navigation facilities.

12.Flight inspection and evaluation of air navigation facilities in compliance with the

ICAO regulations and requirements'

ANS AccornPlishment RePort 2017

Page 5: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

ANS AccorrPlishment Report 2017

(nnttrrltdar C

llrvitrtksl

Page 6: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

The following Air Navigation Service Departments are hereby created with theircorrespond ing fu nctions:

1. Air Navigation Project Planning and Design Department - Responsible forthe preparation of programs, plans, feasibility studies and system design ofprojects related to the establishment and/or improvement of air navigationfacilities.

2. Air Navigation Prdect lmplementation Division Responsible for theexecution of approved plans and designs as prepared by the Air NavigationPlanning and Design Department for the establishment and/or improvement of airnavigation facilities.

g. Air Navigation Quality Management Department Responsible for theformulation and implementation of standard procedures, regulation, evaluationand inspection of air navigation facilities. Responsible for the implementation ofsafety management systems policy and standards as necessary.

4. Air Navigation Operations Department - Responsible for the functional

operation and maintenance of Communications, Navigations and Surveillance

system components including Meteorological, Airfield Lighting and Power

Systems.

S. ANS Field Offices - ANS field offices shall be established and responsible for

the operation and maintenance of air navigation facilities in their respeclive

areas. All Area Centers shall be headed by ANS Area Field Office Chief (AFOC)

who shall be reporting direcfly to the Air Navigation ServiceAssistant Director

General.

ANS AccomPlishmenl RePort 2017

Page 7: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

ACCOMPLISFI ME[\ilT

Ai n Navigation $elvice

ANS AccolnPlishment RePorl 2O17

Page 8: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

1. Conducted the detailed engineering and canied out the procurement activities inaccordance with RA9184 for the project detailed in the attach Status Report.

2. Updated the ANF Development Plan for CY 2018-2019.

3. Submitted the proposed CY2O'IBANF Capital Outlay and lnfrastructure ProposedBudget.

4. Updated and finalized the adaptation of DPWH Revised Guidelines in the preparationof Approved Budget of Contract (ABC) for CY2017 Projects.

5. Creation of standard Air Traffic Controller (ATC) console for Flight lnformation Service(FlS) facilities.

6. Creation of standard VHF Communication System Design Air Navigation Facilities.

7. Completed 23 CY2017 Projects and turned-over to Bids and Awards Committee(BAC) for procurement(see attach Annex A).

8. Awarded (with NOA & NTn and turn-over the following projects to Projectlmplementation Department (PID) for implementation:

8.1. Purchase/lnstallation of DVOR/DME at San Jose Airport.

8.2. Purchase/lnstatlation of Voice Logging System (VLS) at TuguegaraoAirport.

8.3. Upgrading of Airfield l-ighting System and Runway Thresholdldentifications Lights at Tambler (General Santos lnternational Airport).

A.4. Purchase/lnstallation of PAPI System and Aerodrome Beacon atCauayan Airport.

g.S. Purchase/lnstallation of LED Floodlight and Solar-powered TaxiwayEdge Lights (New System) at Kalibo lnternationalAirport.

8.6. Purchase/tnstallation of Solar Powered Windcone and LED Apron

Floodlight (Old System) at Kalibo lnternationalAirport.

g.7. Rehabilitation of Circuit 1 of REL, STL, TEL and LED Apron Flood

Lights and additional ccR at Laoag lnternationalAirport.

8.8. Rehabilitation of AFC Building including control Tower and other

Works at Mactan-Cebu lnternational Airport.

g. Requested the process of Fund Transfer to Area t in connection with the project lnset

Runway LightsAdditional Taxiway Edge Lights at Laoag lnternationalAirport.

l0.submitted monthly DoTr PMES Monitoring Form 1 Project status Report'

1 1. Submitted weekly ANS project status report for CAAP CY2o17 Absorptive Capacity.

1 2. submitted cY201 6 Annual Accomplishment Report.

l3.Attended project coordination meeting at Department of Transportation (DoTr) under

Msayas and Mindanao Sector.

14. prepared various ANS conespondences for the different Agencies/Office/

ANS AccomPlishment RePort 2017

Page 9: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

15. Conducted Site Acceptance Testing at Tuguegarao Airport for VLS lnstallation Project.

l6.Conducted Site Acceptance Testing at Laoag lnternational Airport Rehabilitaion ofAir Field Lighting System Ckt 1 .

lT.Participated in the testing on completion of CNS ATM electromechanical & auxiliaryworks.

lS.Conducted site inspection of ongoing DVOR/DME installation Project at San JoseAirport.

19. Conducted final inspection of Mactan Control Tower Rehabilitation Project and listdown punch list items for rectification.

20.Attended meetings at DOTr Head Office regarding proposed Development Project atvarious airport such as Leyte, Kalibo, Siargao, Laoag and Dumaguete Airports.

21. Participated in the training /seminar regarding SMS training at CATC.

22. Conducted Final lnspection for the newly completed KALIBO lntemational Airport AirField Lighting System Projects.

23.Conducted site Acceptance Test for at BUTUAN, DIPOLOG, DUMAGUETE and

COTABATO Airport Voice Communication System and VLS Projects.

24.Conducted site inspection in General Santos lntemational Airpo( for Power House

Rehab and upgrading of Power System.

25.Continuously monitor status of ongoing implementation of ANPPDD INFRA Projecls-- for various iirports for CY 2016 / 2017 through FIC's and persons in charge and

update Project status list.

Below is the List of projects being implemented and completed:

Statusect DetailsPNo.

Completed

KALIBO lnternational Ai rt

1

and installation of VoiceSystem (VLS) Tuguegarao

Ai rt

PurchaseLogging

2

CompletedPurchase and installationCommunication and Voice

of VoiceLogging

rtfor Butuan Aitem

CompletedPurchase and installationCommunication and Voice

of VoiceLogging

rt.for Di Aitem

4

Purchase and installationCommunication and Voice

for Duma uete Ais m

of VoiceLogging

5

ANS Accomplishme t Report 2017

Purchase and lnstallation of LED ApronFlood Lights , Solar Powered TEL &

Solar Pbwered Lighted Wind Cone at

Completed

Completed

Page 10: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

6 Purchase and installation of VoiceCommunication and Voice Logging

em (VLS) for Cotabato Airport

Completed

7 Rehab of circuitl of REL,STL, TEL andLED Apron Flood Light, Additional CCR(LAOAGAi r Field Lighting System)

Completed

I Rehab of AFC Building lncluding ControlTower at MACTAN lntemational Airport

Completed

Some Projects for CY 2017 APP are still ongoing implementation.

No. ON GOING Projects Status

1 Purchase/lnstallation of PAPI System &Aerodrome Beacon Light at CauayanAirport

Suspendeddue toongoingDOTr Prolect

2 Purchase and lnstallation of DVOF/DMEequipment for San Jose Airport-Occidental Mindoro

Sitelnstallation inprogress

J UpGrading of Airfield lighting System andlnstallation of Runway Thresholdldentification Lights at Gen. Santoslnternational Ai

mobilizationstage

26.Evaluation of Two Thousand Five Hundred Eighty Two (2,582) Height clearancePermits (Approved Applications), One Hundred Seven (107) Height Limitatjon, Twenty

Nine (29) Temporary Structure and One Hundred Seventy Eight. (178) Denied.

27. INSPECTION / EVALUATION /TESTING

27.j. Surge Protection Devices for Meteorological lnstruments at Bacolod-

SilaY AirPort.

27.2. Two (2) units Portable LED ProjectorforANS

27.3. Batteries for UMART UPS at Manila Tower/Navaids Facility

27.4. Batteries for ATS at Manila Tower/Navaids Power Plant Facility

27.5.Three(3)unitsofSix(6)DoorsSteelLockerCabinetsforANFMDivision

2T.6.loWVHFAMAirBandTransceiversforANSTechnicalCenter

2T.T.2500PadsofCarbonlessDailyMaintenanceLogSheetsforANFNationwide

27.8. Batteries for DVOR/DME and UPS at Tower cab at Laoag lnt'|. Airport

ANS Accomplishmenl RePort 2017

Page 11: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

27.9.

27.10.

27.11.

27.12.

27.13.

27.14.

27.15.

27.16.

27.17.

27.18.

27.19.

27.20.

27.21.

27.22.

27.23.

27.24.

27.25

27.26.

27.27.

27.28.

27.29

Portable Fire Extinguishers for NCR area ANS Facitities

Three (3) Units 125W HF Transceivers for ANS Technical Center

Batteries for 30 K/A UPS of Tower Cab, Control Station & NavaidsStation of Davao lnt'|. Airport

Parts and Accessories for Airfield Lighting System at New BacolodSilay Airport

Batteries for Diesel Engine Generator Set (DEGS) & Batteries forSupply of Control Relays at Laguindingan Airport

Spare parts Modules for Park Air Electronics (PAE) VHFCommunication Equipment at Mactan AFC

Printer Head for Thermal Printer IER 512C and IER 4OOB2 at ManilaRadar Facility

Barcode-based lnventory Control System for Air Navigation Service

Parts and Accessories for Runway Edge Lights and Taxiway Edge

Lights at Zamboanga Airport

Alignment Tool for ADB Precession Approach Path lndicator (PAPI) forANS.

5W VHF AM Air Band Handheld Radio for ANS Technical Center

Digital Ground Earth Tester for various ANF

Timer Board for Runway Threshold ldentification Light (RTIL) at

Dumaguete & Kalibo Airport.

Desktop Computer with Voice Recording System Software for various

Airport.

Spare Parts for SAF Digltal Microwave Radio (DMR) of Manila AFC.

Automatic Voltage Regulator (AVR) for Perkins Diesel Engine

Generator Set at Sanga-Sanga Airport.

SparePartsModulesforVaisalaAWOSMeteorologicallnstrumentatBacolod I SilaY AirPort.

Parts & Accessories for Airfield Lightning System at Pto Princesa

Airport.

BatteriesforDieselEngineGeneratorSet(DEGS)forANSTechnicalCenter.

Parts & Accessories for Airfield Lighting System at Laguindingan &

Kalibo Airports.

Parts & Accessories for Airfield Lighting System at Tacloban Airport'

ANS Accomptshment RePort 2017

Page 12: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

27.30. Bulbs & Accessories for Airfield Lighting System at Tagbilaran Airport.

27.31. ACU Compressor for S-ton Air Conditioning Unit for the RadarEquipment Room & Tagaytay Radar Facility.

27.32. Air Traffic Light Gun for ANS Technical Center.

27.33. Coaxial Detector for lt4anila Radar & Tagaytay Radar Facilities.

27.34. Five (5) units Outdoor Motor Driven Vertical Siren for ANS.

27.35. Radar Facility under CNS ATM Project at Apari ANF

27.36. Status of CNS MET at Tuguegarao ANF

27 .37 . Ten (10) Units 10W VHF AM Transceivers for ANS Technical Center.

27.38. DC-DC & AC-DC Converter Modules for Tagaytay Radar, lloilo &

Davao

28. Follow-up lnspection & Evaluation of CNS Equipments & lts Ancillaries in the followingAirports.

28.1. Kalibo

28.2. Mrac

28.3. Cauayan

28.4. Bacolod

28.5. Naga

28.6. Tagbilaran

28.7. Butuan

28.8. Basco

28.9. Laoag

28.10. Davao

28.11. Pto. Princesa

28.12. San Fernando

28.13. Dumaguete

28.14. Laguindingan

28.15. Tuguegarao

28.16. LegazPi

28.17. Tacloban

28.18. Gen. Santos

28.19. Roxas

ANS Accomplishment RePort 2017

Page 13: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

28.20. Busuanga

28.21. Dipotog

28.22. Surigao

29. Final review of Facility Operations Manual

2s.1. Mt. Majic RCAG

29.2. Subic

30.Approved Facility Operations Manual

30.1. Sanga-sanga

30.2. Tandag

30.3. Mactan AFC/Transmitter

30.4. Laguindingan

30.5. Calbayog

31. Conducted Safety Management System (SIrtlS ) Audit in the following Airports

31.1 . Davao

31.2. Laoag

31.3. lloilo

31.4. Kalibo

32. Conducted Training Plans and Programs Seminar in all Area Centers

33.Attended Meeting with CNS SG at Bangkok, Thailand

34.Attended Meeting CANSO at Hanoi, Metman

35.Attended Meeting with LGU regarding OLS at Mactan-Cebu lnternational Airport

36. Attended Telecommunication Summit sponsored by Department of lnformation &Communications Technology

37. Checked DVOR bearing Misalignment at Cabanatuan Airport

3S.Coordination meeting with Presidential Management staff regarding CAVITEXinfrastructure

39.Attended Frequency spectrum Management Panel Meetlng at Bangkok, Thailand

40.Attended the 3'd Meeting of Common Aeronautical Virtual Private Network Operations

Group at Bangkok Thailand

41. Monitoring of Safety Management System

42. Technical Competency Certificate (TCC) Planning & lmplementation

43.Continuously monitored the operational status of CNS/Met, Power and Airfield Lighting

System and equipment of ANF nationwide thru Daily Personnel and Operations Report

(DPOR), lncident and Monthly Reports.

ANS Accomplishmenl RePort 2017

Page 14: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

44' Followed-up the flight check of navigational aids facilities that were due for calibration.57'27o/o of Radio Navaids and 47.9-5% ot PAPi hrre .rrrent flight check status. Thescheduled flight calibration of both the Radio Navaids and pApt ,1" on-going.45' Prepared Programs

9f -w-ork (PoW for the purchase.and delivery of various parts forCNS/Met, Power and Airfield Lightihg Equipment and Fixtures foi th. ,pproval of theDirector General. - .v -r-'r

46' Prepared the documents for the transfer of funds of the approved programs of work toANF's Area Cluster.

47. Repaired equipment and/or parts of equipment at the Air Navigation Technical Centerand facilitated their transfer from the Airports/ANF's to the Ceitrai bmo ioili. ,"p":,at the AN Technical Center and its delivery and installation to the orijinafinfAirports/ANF's after its restoration.

48. Provided materials, technical and personnel assistance to Air Navigation Facilities forthe repair and restoration of CNS/MET, Power and Airfield Liglting System antequipment including installation of new cNs/MET equipment.

49. Purchased and provided the Airports/ANFs with equipment parts, components andother devices and materials for the continuous and reliable operation of these facilities.

50. Prepared AIPAFs for the issuance of NOTAM of various CNS/MET, Power and AirfieldLighting System that had encountered equipmenusystem trouble including thosefacilities that needed to be shutdown during preventive maintenance procedures.

Sl.Validated the received Operational Hazard Reports, facilitated the execution ofconective measures and submitted reports to the ANQMD for the preparation of replyletter to concerned airlines or other CAAP services.

52. Prepared coordination letters to airport managers and other government agenciesincluding other communications to equipment suppliers and service providers.

53. Coordinated with other CAAP services/offices, other govemment agencies andstakeholders for the immediate solution to problems including other issues andconcerns that may directly or indirectly affect the operation of alrports/facilitiesnationwide.

BALUCATINGActing Chief, Air Navigation Service

ANS Report 2017

Page 15: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

ATTACHIVIHNT1. Air Navigation Project Planning and Design Departmentprojects.

a. PPDD Project Management Reportb. CY2017 Turnover of Projects for lmplementationc. Five Year ANF Development Plan

2. Au Navigation Operations Departmenta. Radio Navaids Equipmentb. PAPWASIc. On-Site Technical Assistance Provided to Air Navigation Facitities for

cY2017

ANS Accomplishmerrt RePort 2017

Page 16: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navigation Operations Department

1 February 2018

AlrporUFaclllty

Equipment Brand/Model Frequency Channel StatusDate of LastFllght Check

Explry Date ofFlight Check Remarks

CLARK

DAVAO

SANTOS)

TAMBLER

Due for llight check.29-Dec-l7operational 29-DecJ6113,0 tvlhz

29-Deo17

KALIBO

LAOAG

Due fu flight check.29-Dec-16

Page 17: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navigation Operations Department

I February2018

.,f

AlrporUFacility

Equlpment Brand/Model Frequency Channel StatusDate of LastFllght Check

Explry Date ofFllght Check Remarks

MACTAN

MANILA

PUERTO

PRINCESA

Due for flight cfieck.02-Sep-16 02€ep17OperationalFSD45

SUBIC BAY

L-

Page 18: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navigation Operations Department

,t

1February2018

Alrport/Facility Brand/Model Frequency Channel Status

Dde of LastFlight Check

Explry Date ofFllght Check Remarks

4329 115.3 MHz Operational 29-Dec-16 N-Dec-17 Due lor flight check.

Operational 29-Deo16 20-Deo17

BACOLOD.SILAY

Operational 9Jan-17 9Jul-'17

BUTUAN

NEC NNG-5708 0perational 21-Apr-15 21-Apr-16

CAGAYAN DE

WLCOX 5858 113.7 t./d:'2 Operational 2-Dec-16 Due for flight chect.COTABATO

1119 Operational 21-Apr-15 2'l-Apr-16 Due lor flight check.

DUMAGUETE 114.1Mh2 0perational 1tl-Nov-18 1tl-Nov-17 Due for flight c*reck,

DVOR 116.3lrfrrz Operational 20-Dec-16 29-Da*17rLotLo

NAGA

29-Dec-17 m single syslem.( def Md Slg Gen)0perational 29Dec-16112.9 Mttz

Due for Flight Checd.29-Dec-16 29-Dac-170peratlonal

ROXAS

Due for Flight Check.1-Sep-16 1-Sep170perational

1-Sep-17 Due for Flight Check.Operational't18X

SAN JOSE

100x Due for flight check.

75lliltz Due tun flight check.

Due for flight check,

2-Dec-,l5

Due for flight chock.

1lox Operational 29-Dec-,l6 2*Dec-17 Due lor flight check,

76X

117.1t{frr2

1-Sep-16

Page 19: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navlgation Operations Department

I February 2018

AlrporUFaclllty

Brand/Model Frequency Channel StatusDete of LadFlight Check

Explry Date ofFlight Check Remarks

TACLOBAN

TUGUEGARAO 0perational 24.Jan-14 2tUan.15 Due for flight check.'

BAGUIO 272Rhz Due for Flight Check.

BASCO

PW3OOL 278Khz 3GAug-16 30-Aug-17 Due lor Flight Check.

CATICLAN

JOLO

NEC NNG-9708 104X 0perational 11.lun-14 11-lun-15 Due for Flight Cheok.MASBATE

415 Khz Operational 28-Apr-15 28-Apr-18 on tlng/e system.SURIGAO ND-500il

CAUAYAN

I befe'dlve Mod, Sl0. 6cr. t/odule:it r'. .. :.

Operational from 05Ct0 - 2100 only. Due

tu flioht chec*.5Jun-12 SJun-13t14X OperationalNEC NNG.1797DME

JOMALIG

&Ma-16 Due for Flight Check.0perational &Mar-15117.5 KhzVOR ASI 1150

Due for Flight Chec,k.&Mar-16122X 0perational 4-Mar-15ASr 1119

LUBANG

AH'tvAyroArti,' :

VOR::,,;,,:1;,,BACNOTAN

DVOR--rJ--5i-;!.-.

DIiiIE

'112.,71th2

74X

fPfl:ril"bporational,

CABANATUAN

, D!0 tb fi ulfii'udrnfi errlEl pov#'sjrlcnr

LIPA

SUMMARY:

Total Number of Radio Navaids Equlpment

Number of Operational Radio Navaids Equipment witr Cunent Flight Check Sfstrs

Number of operational Radio Navaids Equipment witr Due For Flight check stafus

Number of On-Test Radio Navaids Equipment

Number of Non-Operational Radio Navaids Equipment

110

63

t55

27

57.270/"

Operational 24,Jan-14 244an-|5

Page 20: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navlgatlon Operafl ons Department

Facility EQPT BRANDYear

lnghlledEqulpment

Status FlightLast

Currency of FllghtCheck

Expiry of FlightCheck Valldity Remerks

PAPI O2R 284pr-15 28-Apr-16

PAPI 20L 2&Apr-15 2&Apr-'16

PAPI 05 6"Jun-,l6 Due for Flight Check. 2-Jun-171', Pilot &

DAVAO

1996 9-Sep"16 9-Sep17GEN, SANTOS

ITAMBLER) 9"Sep-16

KALIBO

PAPI 04 2&Sep13 26-Sep-14

26-Sep-13 26-Sep-'14MACTAN

$Nov-16lSNov-l5PAPI 13

14Jul-14 Due for Flight Ched<, 14Jul-15

NAIA

PAPI 31

PUERTO

PRINCESA

9-Nov-16

PAPI 25SUBIC

BACOLOD.SILAY

BUTUAN

cl*ed due lo the openhtg25€ep-1325.Sep12

Aendnne cleed iln lo lha oPenlng25-Sep-13Due for Flight Chec*.25-Sep-121994PAPI 19

CAGAYAN DE

oRo

COTABATO

DIPOLOG

Due for Flight Ched<.

Due for Flight Ched<,

2000

Due for Flight Check.

1996 Due for Fllght Cheok. 9-Sep-17

Due for Flight Cheok,

Due for Flight Chec*.

Due for Flight Chedr.

Due for Fllght Cheok,

Oct'10 Due for Fllght Chec{i.

Due tor Flight Check.

Page 21: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navlgatlon Operations Department

Facilig EQPT BRANDYear

lnshlledEqulpment

Slrtus FllghtLast

Cunency of FlightCheck

Explry of FllghtCheck Validity Remarks

DUMAGUETE

lLolLo

PAPI 09 YOTJYANG 15-Sep-14 Due for FllghtCheck, Pllot slde onty.LAGUINDINGAN

PAPI27 '15-Sep-'14 Due for Fllght Check. 1S-Sep-15

PAPI 24 20-Oct-16 2&Oct-17

NAGA

3,0 t0

ROXAS

JOSE

TACLOBAN

TAGBILARAN

sedw dwbobvwtatlot,Cc'Plld Slde Ohly, Unlled dslbilfty at Lef,

PAP!27 2W2BAGUIO

BUSUANGA

TARMAN

TICLAN

v@dtion.

wlh,asfilctlon. Umlted vlslbilry d left sector

af e44ltuach pdh duetoobstrucllngMARINDUQUE

2013 f 5€ep-15

2013

't994 Due for Fllght Checlt.

Due for Fllght Ched<. 26-Oct-'13

7-Feb-141993 7-Feb-13

Page 22: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Alr Navlgatlon Operafl ons Department

13 Decembet 20'17

Facility EQPT BRANDYear

lnshlledEqulpment

Shtue

Date LastFllght

Checked

Currency of FllghtCheck

Explry of FllghtCheck Validity Remarks

MASBATE

SURIGAO

VIRAC

OZAMISPAPI 03 THORN OP 13JanJ6 Due for Flight Check, 12-Jan-17

PAPI 21 THORN 13Jan-16 Due for Flight Check, 12-Jan-17

SAN FERNANDO

SUMMAFY:

Total Number of Visual Landing Aids:

Number of Operational Visual Landing Aids Due for Flight Check:

Number of Operational Visual Landing Aids with Flight Chec{< Cunent:

Number of Non-Operational Visual Landing Alds:

Number of Visual Landing Aids with 0n-Test Status:

Tobl Number of Vlsual Landing Alds due for fllght check for 2017:

73

20

35

I8

23

47.95o/o

Submifted By:

FELIPE D. LABADO

Department Manager lll, ANOD

Page 23: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Submitted by:

D. LABADOent Manager III, ANOD

Alr Navigatlon Operallons Departmer{

ON.SME TECHIVICAL ASSISTANCE PROITDED TOAIR NAVIGATION FACILIIMS FOR CY 2017

T.O. No s FACILITY MISSION DT.IRATION

007-17 Virac

. To assess the damage toantenna systan includingtyphoon NINA.

the Non-Direcfional Beacon (NDB)guy support structures caused by

. To determine the scope of works ilcluding the materials neededto restore the NDB to normal

January 4 - 6,2017

828-17 Naga testing of repated modules of Toshib a TW2280OperationalDVOR atN on FaciliAir Navi Apm 3 - 7,2017

t104-17 &1354-

17@xt)

Legazpi &Virac

of radio conununications system(s) forVHF airto-ground radio communications at Legazpi and ifnecessary, Virac Aerodrome, to improve/extend the radiocoverage of Legazpi Tower/Approach Conhol for a reliable radiocommulications in JUBAL and TORNE

lnstallation and testing

May l0 - 22,2017

|05-17 &.1355-17

Legazpi &Virac

Installation of antenna system(s) for \rHF air-to-ground radiocommunications at Legazpi and if necessary, Virac Aerodrome,to improve/extend dre radio coverage oflegazpiTower/Approach Control for a reliable radio commrmications inJUBALaldTORNE

May 10 -22,2017

1749-17 Taga\4ryDsmantling of two (2) six!-foot high Trylonru antenna towermasts at Radar F Jnly 5 -15, 2017

21.21-17 PlaridelAccompany and proyide assistance to Toshiba JapaneseEngineers in the evaluation and testing of communicationsconsole modules at Plaridel

August 4, 2017

CauavanProvide on-site technical assistance to restore the ToshibaTW2280 DVOR at Cauayan Air Navigation Facility to dual

olrs.

August 2l - 25,2017

2139-1.7

October 4-11,2017Rornblon

. Transport One (l) Unil 7.5 KVA Portable Diesel Generator Set.

. lnstruct and Assist On-Site ANS Personnol in its InstallatiorLOperation and Mainten ance.

ANS-2017-025 & ANS-

2017-033

Provide on-site technical assistance in the retuning ofJohon(Unit 3) VHF AM Transmitter and Receiver System fiom 122.0

MHz to 121.5 MHz.

ANS-2017-029

November 13-16,2017

. Provide on-site technical assistance in the restoration of METlnstruments.. Installation ofnew ATC Light Gun.. Installation ofPC-based Voice Lo

BusuangaANS-2017-

064

November 20-25,2017

. Provide on-site technical assistance in the restorationDVOR equipment to dual system operations.

of the

of Toshiba DVOR modules., ReliabiliZa;r:,.boanga

ANS-2017-063

Novernber 24-29,2017

Provide on-site technical assistance in the restoration ote aeronautical communications to normal

f the 119.3

MHz en-rouLaoagANS-2017-074

November 27-30,2017

Provide on-site technical assistance in the replacement

\rHF Antenna used for extended approach control which wasof the

LegazpiANS-2017-069

CAAP compound, MIA Rd., Pasay City'1300r el No. 94+2192 I A799 255

Attachment to ANOD Accomplishtuenl Repo/t 2017

@ ;yUlUgl"* AUrHoRrry oF rHE pHrrpprN's

October 10-13,2017Dumaguete

FELII)

Page 24: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

$1.---t- '(Republic of the philipprrrrs

CNIIL A\'IATION AT.ITH O RTTI' OF THE PHILIPPINES

u

MEMORANDUM

FOR : EDGARDO M. FELISTLDADeparfment Manager, ANPID

FROM : Department Manager, ANPPDD

SUBJECT : TURNOVER Or PROIECTS FOR IMPTEMENTATI0N

DATE :3 November?OtT

The ANPPDD have completed its task of planning detailed engineering and design,preparation of Program of work (POvv], preparation of Bidding Documents, andproviding support during the procurement of the Project mentioned below.

Attached is approved copy of the POWs, Notice of Award [NOA], ContractAgreement/Purchase Order and Notice to Proceed (NTPJ of the aforementioned Projects.Copy of the Contractor's Technical and Financial Bid may be requested from the BAC foryour Department's reference.

It should he noted that the ANPPDD, as part of its function, will be implementing a postproject impiementation review after the completion of these Projects,

It is requested that the ANPPDD be provided with a copy of the following documents afterProiect completion:

{$,-

Name of Proiect Airport/ANF CY ContractTime fCDl

Contract Amount

1) Upgrading of Airfield LightingSystem and Runway Thresholdldentification Lights

Gen. San

Airport2077 180 days PhP39,9BB,55B,OB

2l Purchase/lnstallation of PAPI

System and Aerodrome BeaconCauayan

Airportz0t7

ICarriedOver)

120 days PhP14,388,880.81

a, Site Acceptance Test Report;

In this regard, said Project is herebyturned over to ANPID for execution/implementation;

Page 25: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

lrT.IPPDD Form AD-3-2015

Acting Chiefl, ANS

b. Certificate of Project Completion/ Final Acceptancec, Soft Copy ofTechnical Manuals;d. As- Built Drawings (soft copy, if available);e. Commissioning Flight Test Report (as applicable)

For appropriate action,

CECILIO M,

Noted by:

Page 26: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

'fi\ /gqRepublieof the philippi. ,

CTVILAVIATTON AUTHORITY OT T"HE PHILIPPINES

MEMORANDUM

FOR ; EDGARDO M. FEIISIIDADepaitment Manager, ANPI D

FROM Department Manager, ANPPDD

SUBIECT : TURNOVER OF PROJECTS FOR IMPLEMENTATION

DATE :20fune2017

The ANPPDD have completed its task of planning, detailed engineering and design,preparation of Program of Work (P0VD, preparation of Bidding Documents, andproviding support during the procurement of the Project mentioned below.

In this regard, said Project is hereby turned over to ANPID for execution/implementation:

Name of Proiect Airport/ANF CY ContractTime(6D)

ContractAhount

1) Purchase,/lnstallation of LED

AFL and Solar Powered TEL- (r."2J Purthase/lnstallation of .Solar

Powered Windcone and LED

AFL ' "' o1' '; '.';', pn I

Kalibo Airport1

20'16 60 days

60 days PhP22, 208,888.29

Attached is approved copy of the POWs, Notice of Award (NOA), Contract

Agreement/Purchase 0rder and Notice to Proceed [NTP) of the aforementioned Projects,

Copy of the Contractor's Technical and Financial Bid may be requested from the BAC for

your Department's reference.

It should be noted that the ANPPDD, as part of its function, will be implementing a post

proiect implementation review afterthe completion of these Proiects.

It is requested that the ANPPDD be provided with a copy of the following documents after

Project completion:

a, Site Acceptance Test RePort;

b. Certificate of Project Completion/ Final Acceptance

c, Soft Copy ofTechnical Manuals;

Lr,,:,, o rd

't ( "r

-'' ' i,{

! -...o i '' '- '(

Page 27: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

d. As- Built Drawings [soft copy, if available);e. Commissioning Flight Test Report (as applicable)

For appropriate action.

CECILIO M.

Noted by:

DD Form AD-3-2015

TINGActing Chief, ANS

CJt.

Page 28: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

..*\

Republic of the PhilippinesCruILA\TIATION AIITHORITY OF TIIE PHILTPPINES

MEMORANDUM

FOR EDGARDO M. FETISILDADepartment Manager, ANPID

FROM Department Manager, ANPPDD

SUBIECT : TURNOVER OF PROJECTS FOR IMPLEMENTATION

DATE : 05 luly 2017

The ANPPDD have completed its task of planning, detailed engineering and design,preparation of Program of Work (POVVJ, preparation of Bidding Documents, andproviding support during the procurement of the Proiect mentioned below.

ln this regard, said Project is hereby turned over to ANPID for execution/implementation:

Attached is approved copy of the P0Ws, Notice of Award (N0AJ, Contract

Agreement/Purchase Order ancl Notice to Proceed [NTPJ of the aforementioned Projects.

Cop1, of the Contractor's Technical and Financial Bid may be requested from the BAC foryour Department's reference.

It should be noted that the ANPPDD, as part of ils function, will be implementing a post

proiect implementatiou review after the completion of these Pi'oje*s,

It is :.equested that the ANPPDD be prorridecl rvith ai copy of the foilowing docurnents after

Project cornnletion:

tl.,;.r,r".J tr, r,v !tr{.: !.. . . . t,t,) ,r,rr. i.r-\f,tf1

Name of Proiect Airport/ANF CY CoEtractTime [CD]

Contract Amount

1) Purchase/lnstallation of VLS TuguegaraoAirport

2077 180 days PhP1,900,000.00

2) Rehabilitatlon ofCitcuits"l ofREL, STL, TEL aNd LED APTON

Flood Llghts, Additlonal rcR _ ,

Laoag Alrport ZOTT

(CaniedOverJ

150 days PhP24,988,810,39

3) Rehabilitation of AFC Builclingincludlng Control Tower and

Ot}er Works

Mactan Airport 2077

ICarried0verJ

120 days PhP10,6B3 109,99

Page 29: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

ANPPDD Form AD.3-2015

DR. CATINGActing Chieg ANS

a. Site Acceptance Test Report;b. Certificate of proiect Completion/ Final Acceptancec. Soft Copy ofTechnical Manuals;d. As- Built Drawings (soft copy, ifauailableJ;e. Commissioning FIight Test Reporr (as applicablel

For appropriate action.

CECILIO

Noted byr

Page 30: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Republic of the philirrpirrr-CTVIL AVTATION AUTHORITY OiiTNb PHILIPPINES

FOR

MEMORANDUM

: EDGARDO M.ITELISILDADepartment Manaiger, A N p I I)

FROM Department Manager, ANppDD

SUBIECT : TURNOVER OF pROlEcTs FoR TMPLEMENTATTON

DATE : A6fintZ0tZ

The ANPPDD have completed lts task of planning, detailed engineering and design,preparation of Program of work (pow), preparation ot Bidding Doiumenrs, ;dproviding support during the procurement of the proJect menHonecl below,

ln this rcgard, said Project is he retry turnecl ovcr to ANPID for execution/implementation:

Anached is approved copy of the Pow, Norice of Award (NoA), conracrAgreementlPurchase 0rder and Notice to Proceed (N'tP) ol'the a['rrrementioned Projects.Copy of the Contractor's Technical and Financi,al Bid may be requested frorn the BAC foryour Deparrment's reference.

It should be noted that the ANPPDD, as part of its ftrnction, will bc implementing a postproject implemcntation review after the completion of the se Projects.

It is requested that the AN PPDD be provided with a copy of rhe followlrrg docr.rments afterProject completion:

a. Site Acceptance Test Roporq

b. Certificate of Project Completion/ [tin{ Acceptancec, .Soft Copy of Technical Manuals;d. As- Built Drawings (soft copy, ilavailable);

Name of Proicct Alrport/ANF CY ContractTime (CDl

Contract Amount

1) Purchase/lnsellation ofDV0R/DME

San JoseAirport

2AL7(Cany-over)

365 PhP58,297,267.27

&/N/6 r "'2tFN.

Page 31: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

A \*-, DD Form AD-3-2015

R. UCATINGActing Chief, ANS

e, Conrrnissioning Flight Test Report (as applicablc)

For appropriate action.

..1{ li\ \', ',1 \ I .''. ,'-l Y

CECILIO M. ORTiZ1

"t4'/1.t

Notecl by:

Page 32: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

REGION / AIRPORT / FACILITY

TOTAL PROJECTS PER YEAR

,.2017. ,

:,. 20L9,. 2A20, ..

' a-

35 30 19 6915,058,000 813,300,000 745,500,000 453,000,000

,CR )00

MANILA AFC

1Rehabilitation of HF Transmitter of Aeronautical Mobile Service

(AMS)150,000,000

2 Relocation of TOP SKY 100,000,000MANILA CENTRAL OFFICE

L Rehabilitation/lmprovement of ANS Office 14,500,000

2 Establishment of ADS-B Ground Station (Pagasa lsland Station)

132,000,0003 Establishment of ADS-B Ground Station (Bolinao Station)

4 Establishment of ADS-B Ground Station (lba Station)

5 Establishment of ADS-B Ground Station (Jomalig Station) 41,000,000MANILA TECHNICAT CENTER

1 Purchase of Spare parts for CNS/MET Equipments 100,000,000

2Purchase of Spare parts for Electro-Mechanical and Airfield lighting

Equipments 100,000,000

00 :", 137p-A,A -LAOAG

L Purchase/lnstallation of ILS 75,000,000

2Rehabilitation of Airfield Lighting System, REL CKT1, TWY CKT1 and

ccR 25,633,000

f Purchase/lnstallation of PAPI System RNWY 01 & RNWY 19 Pilot &co-Pilot side. 50,000,000

4 Purchase/lnstallation of PALS RNWY 01 62,000,0005 Purchase/lnstallation of ABN. 1,000,000

5 UPS 3-Phase 20KVA 1,000,0007 Construction of CHB Perimeter Fence at RWY01 (SALS Area) 10,000,000

VIGAN

L Purchase/lnstallation of FSS equipment 0 002 Construction of FSS Building 20,000,000

LINGAYEN

1 Construction of FSS Facility including Powerhouse 20,000,000

Tion O2:;,,:,:: ,r', 60,000,000 ,- , 135,600,00G ::: 1O00O00QCAUAYAN

1 Purchase/lnstallation of Aerodrome Beacon15,200,000

2 Purchase/lnstallation of PAPI

3Purchase/lnstallation of AFL (REL, FL, TEL, WDIL, RTIL, THL/END &

ABN including CCR) 60,000,0004 Replacement of MET lnstruments 10,000,000

AND C rearANr uevetopmentrlan zvtl

16

339-800,0OO

1

I

I

I

Page 33: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

AlrD o rearANr ueveloPmentFlan zvtt

TUGUEGARAO

1 Purchase/lnstallation of VLS 2,800,0002 Site Acquisition for the lnstallation of DVOR 2,000,0003 Purchase/lnstallation of DVOR/DME 65,000,0004 Construction of 6-Storey Control Tower Building 35,000,0005 Purchase/lnstallation of Communication Equipment including VCS 25,600,0006 of MET lnstruments

RADAR

10,000,000

1 Purchase/lnstallation of RADAR System200,000,000

LIPA

-E

7. ::---

":: .,, 6q,000,00065,000,000

. :.: r-_

-

., ZOO,OO-O,OOGPUERTO PRINCESA

1 lnstallation Of Terminal Radar and lntegration to ATMC 200,000,000BUSUANGA

1 Pu Co 02 Purchase/lnstallation of VL5 2,800,000

3Upgrading of Commercial Power Line from Single Phase to 3 phase

6,000,000SAN JOSE

1 Replacement of DVOR/DME 60,000,0002 Purchase/lnstallation of Communication Equipment

12,000,000

sAN VICENTE

1 Purchase/lnstallation of Communications Equipment 7,000.0002 Purchase/lnstallation of MET lnstruments 5,000,0003 Purchase/lnstallation of Airfield Lighting System 12,000,000

2

,,i

Page 34: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

AND C rearANr UeveppmentFlan zvt I

TEGASPI

i;r.',,,. 46,900,000. ,';.:,:' 29i500,00G.

f':,,t.'..r:'r,

.l.' ,:.','.

1 Purchase/lnstallation of Communications Equipment 8,000,0002 Purchase/lnstallation of PAPI System 15,000,0003 Replacement of Console and Voice Communication Switch 15,000,000

I 4 Airfield Lighting Remote Control Panel 2,000,000

5 300kVA Generator Set includig Power Transmissin Lines 2,900,000

MASBATE

1Construction of New 3-storey FSS Building including Powerhouse 20,000,000

2 Replacement of FSS equipment. 5,000,000NAGA

1 Purchase/lnstallation of VLS 2,800,000

2Purchase/lnstallation of Apron Floodlight and Lighted Windcone 12,500,000

VIRAC

7 Purchase/lnstallation of Runway Threshold ldentification Lights,

Wind Direction lndicator Lights, and Apron Flood Lights 23,500,000

2Construction of New 4-storey FSS Building with Powerhouse 20,000,000

3 Establishment of RCAG 4,000,0004 Replacement of Communications Equipment 2,000,000

?qinryQG::'ANTIQUE

i...,,'., 40,525,00O ,.... ri4o00,ooo,':',, ,, 6,5ii0,00O

1 Establishment of RCAG 4,000,000KATIBO

1 Replacement of ILS 75,000,000

2 Purchase/lnstallation of PAPI at Runway 23 8,000,000

3Purchase/lnstallation of Lighted Windcone and Apron Flood Light(for old Apron) 22,725,000

4 Purchase/lnstallation of Apron Floodlight (for new Apron)

5 lnstallation of New Elevator at Control Tower 6,500,000ROXAS

1 Purchase/lnstallation of Communications Equipment 12,000,000

2 Purchase/lnstallation of VLS 2,800,000

3 Purchase/lnstallation of VCS 15,000,0004 Construction of New s-Storey Control Tower Building 15,000,000

lLotto1 Purchase/lnstallation of VLS 2,800,0002 Purchase/lnstallation of Communications Equipment 12,000,000

3

.:.:., 41,300,00O, ., r,,:15;000,000,

I

I

I

I

t

Page 35: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

AND C YearANF Uevetopmentt-lan zvtt

MACTANTOWER

tPurchase/lnstallation of Communication Equipment including VCS 35,000,000

MACTAN AFC

1 Rehabilitation of AFC Building including Control Tower 15,000,000

MT. MAJIC

1 lmprovement of Water Supply System 3,000,000

1 Upgrade of Power System 1,500,000

TAGBILARAN'). Upgrading of Power System 4,000,000

2 Purchase/lnstallation of VLS 2,800,000

3 Purchase/lnstallation of 300KVA DEGS for entire Tagbilaran Airport

including Rehabilitation of Powerhouse 5,000,0004 Rehabilitation of Taxiway Lights 8,000,0005 lmprovement of MET lnstrument 5,000,000

: 20,00q.000..ORMOC

1 Construction of FSS Building including Powerhouse 20,000,000TACLOBAN

1 Replacement of DVOR/DME 65,000,000

Rt

DIPOLOG

L Purchase/lnstallation of PAPI System 12,000,0002 Establishment of RCAG 4,000,000

PAGADIAN

1 Purchase/lnstallation of Communications Equipment 28,000,000

2 Purchase/l nstallation of VLS 2,800,000

3 Purchase lnstallation of AFL 60,000,000

4Construction of New Powerhouse Building for 1-20KVA Generator 6,000,000

5 Replacement of MET lnstruments 10,000,000

4

I

I

Page 36: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Arro c rearANr ueveroPmenf i-lan zvll

1 Construction of New Control Tower Building 40,000,000

2 Replacement of ILS 75,000,000

3 Purchase/lnsta llation of Aerodrome Beacon Light 1,500,0004 Purchase/lnstallation of PAPI System 25,000,000

5 Purchase/lnstallation of Airfi eld ng system 6s,000,000 40,000,000

6 Purchase/lnstallation of Apron Flood Lights 10,000,000

7 Purchase/lnstallation of Simple Approach Light System 15,000,000

CAMIGUIN

1 Purchase/lnstallation of FSS equipment 2,000,000

ozAMls

1Construction of S-Storey Control Tower Builing including

Powerhouse 35,000,000

2 Purchase/lnstallation of Communications Equipment 2,000,000

3Purchase/lnstallation of Communications Equipment including VCS

and Lightgun 28,000,000

4 Purchase/lnstallation of VLS 2,800,000

DAVAO

1 Purchase/lnstallation of Communications Equipment including VCS 35,000,000

2 Edge Lights 12,000,000

I 3 Purchase/lnstallation of ILS (both runway) 150,000,000

4 Construction of New Davao FSS Building 5,000,000

R,

COTABATO

1 Replacement of MET lnstruments 10,000,000

2 Replacement of DvOR/DME 65,000,0003 Upgrading of AFL System (PAPI, Threshold Lights & others) 8,000,000

4Construction of Tower Multi-Function Building including furnishings 3,000,000

5

I

I

I Total perYeor>>. i:_

:,i'i,,: 56,000-000 I ;:, 28,000,000 ,, 116;000,000 ,. ,:106,000;0qq

Page 37: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

AND C rearANr Ueveppmenlrlan

Total Number of Pro.iects Per Year>> 35 30 19 6

Note: Above proposed projects are based on current operational requirements. Amounts are approximate (ballpark figure)

Recom mendi n g AP P rovo I :

zvtt

cEclLloM. oRTlzDepartment ManogerAN2-PPDD

EDGARDO M. FELISITDA

Deportment ManogerAN3.PID

MARIOT. MENDOZADeportment MonagerAN4.QMD

76

FETIPE D. LABADO

Department MonagerANS.ANOD

Date Approved (ANS):ARNOLD R. BATUCATING

Ading ChiefAir Navigation Service

6

TAMBLER

Establishment of ADS-B 41,000,000L

Replacement of lnstrument Landing System (lLS) @ RWY 17 75,000,0002

41,000,0003 Rehabilitation of Airfield Lighting System (REL fWY, THL) and

lnstallation of Additional Runway Threshold ldentification Lights

10,000,000Replacement of MET lnstruments4

15,000,000Purchase/lnstallation of PAPI System and solar Lighted Windcone5

; ,'r'102,00O00041,000,000

-:-:::a'l : li: :.:1 . -l::.

Purchase/lnstallation of PALS at RNWY 17

BUTUAN2,000,000Site Acquisition of SALS1

35,000,0002

Construction of 7-Storey Control Tower Builing including

Powerhouse65,000,000Purchase/lnstallation of DVOR/DME including access road3

.,- r::. 1O,00C00c' :: . 35,000,00O

JOtO15,000,0001 Purchase/lnstallation of PAPI

5,000,000Purchase/lnstallation of MET Instruments2

Construction of 4 Storey FSS Building and Powerhouse 20,000,0003

SANGA-sANGA5,000,000Purchase/lnstallation of MET lnstruments1

Approved:

6

I

Page 38: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

Air Navigation Sewice

PPDD Ptoiect Management Report

ANNEXA-CY2O17 PROIECISIURNED{VER-TO BAC FOR PROCUREMENT February 2, 2018

Proiect Package l-oration APP Proiect Cost Currenl Adiyities/Actlon Taken Remarks / Planned Activities/ SAC Acrivities

1 nstallationotN nalAids JOFET TAMBLER 137,000,000 8id evaluation by 8AC TWG ofl'going.

2 Airfleld VER & JOJO NAGA D.P29 30,000,000 8id Evaluation undertaken by BAC.

l Pur.hase/lnstallationof PAPlSYstemand LightedWindcone vER &JOIO TAMBLER D.P3O2S,000,000

POW preparation on-going.

4Purchase/lnstallation of HF Communications Svstems

Manila aMs.JOFET MANILA CENTRAI. OFFICE D.P29

20,500,000

5 tstablishrnent of ADs-B G round stetion {Pagasa) IOFET MANILA CENTRALOFFICE19,200,000 Proiect .e-earmarked last 15lanlary 2018. Awaiting for the schedu le ofprocurement

BAC.

5 Rehabilitation/lm provem ent of aNS Offices FINTAND MANILA CENTRAT OFFICT E,P5O14,500,000

8AC resolutionto re-bid the project forsiBnaturc

7Purchase/lnstallation of Apron Flood tigh! Solar Powered

Ed htsvER &loJo D.P3O

12,000,000Bid evaluation by BAC TWG on-going-

8 JUN & GE8ALD NAGA D,P29 10,000,000

9VER ZAI\IEOANGA D,P29 10,000,000

10 ofDvo JOEET&]UN IACLOBAN D.PZ9 9,750,000 ect for Award to the winni bidder.

11 ment ofDVOR/DME ROSE & GERALD BUTUAN D,P3O 9,750,000 Post Qualifi cation evaluation undertak€n BACTWG.

12iurchase/lnstallation of Airfleld tighting SYstem (REr-TEl-

solarWD ABN & PAPIvER &toJo ZAMBOANGA D,P3O

9,750,000POW approva I on-going.

13Purchase/lnstallation of Communications Eq

vcsin.luROSE & GERALD N,4ACIAN AFC D.P3O

5,250,000 Project re-earmarked last 15lanuary 2018. Awaiting fortheschedute ofBACforpre.

t4Purchase/lnstallation of Communications Equipment

includi vcsJUN & GERALD DAVAO D,P30 s,250,000

Project re-earmarked last 15 January 2018. AwaitinS for the schedule of BAC for pre-

15 JUN &GERALD ROXAs D,P29 2,800,000 ofPost Qualiflcations Evaluation Result to BAC.

16constluction of New 3-storev FSS Building including other

FINLAND MASEATE E,P5O 2,250,000 POWapproved last 31Janlary 2018. Preparation ofgidding Documents on-going.

construction of New 4storey FSS 8u ildins including Power TINLAND E.P51 2,250,000 POWapproved last 3l lanuary 2018. Preparation ofBidding Docu ments on-going.

18 P!rchase/tnstallation of 5imple Approach LiSht Systern VER &JOIO ZAMBOANGA D-P3O2,250,000

POW preparation on-going.

19 SU & Del of t55 Communication flOS€ &GERALD VIGAN o.P29 2,000,000 re-earma.ked last 15 Ja 2018.

20 5u &De ]UN & GERALD VIRAC D.P29 2,000,000 Project re-earmarked last 15 January 2018. Prol€€t forre-bid.

2t & Delive of t55 Communications Eq ]UN & G€RALO CAMIGUIN o.P30 2,000,000

22 & of Communications E ROSE & GERAI-D ozAMtz D.P3O 2,000,000

21 lation of Aerodrome Beacon vER & loro LAOAG D-P29 1,000,000 POW prepalation on-going-

D:\PPDD\ANPPDDREPORTSUnnualAccomplLhmentReport\CY2017\20lSPPDDProjectManagementReport

335,500 000

Printed:

Project re-earmarked last 15lafluary 2018. AwaitinS forthe schedule of BAC for pre-

.POW a pp roval on-soins.

Project re-earmarked last 15lanuary 2018. Project forre-bid.Project re-earmarked last 15lanuary 2018. Project for r+bid.

t-gornt

Page 39: (Ar{s)...Solar Pbwered Lighted Wind Cone at Completed Completed 6 Purchase and installation of Voice Communication and Voice Logging em (VLS) for Cotabato Airport Completed 7 Rehab

PPDD Project Management Report

I Detailed Engineering tr POW under Approval il For Bidding On-Going Bidding