Air hlavigation Service
(Ar{s)
Depantment of TransportationCIVIL AVIATION AUTHORITY OF THE PHILIPPINES
!tIPPINE
ACCOMPLISHMENT REPORTcY 2017
trio ffifirffiffin"li'11.," I ArR NAvTGAIToN sERVtcE
ANS MANDATE
ORGANIZATIONAL $ETUP
FUNCTIONS OF EACH DEPARTMENT
PERSONNEL GOMPLEMENT AND STATUS
MAJOR ACCOMPLISHMENTS
INFRASTRUCTURE PROJECTS
Altachments
I nfrastructu re Projects Descri ptio n
Project Acceptance, I nspection, Evaluation, Hei g ht cleara nce Description
Navigational Aids Serviceability
ANS AccomPlishment RePort 2017
ANS MANDATE
The Air Navigation Service (ANS) is mandated to establish, operate, maintain and flightcheck air navigation system and equipment nationwide to provide safe, reliable,expeditious, and efficient service in conformance with lnternational Civil AviationOrganization (ICAO) Standards and Recommended Practices (SARps).
To be a leading provider of high quality air navigation systems and services that otfersstrategic value to aviation stakeholders.
The Air Navigation Service (ANS) is envisioned to provide:
1, Effective plans, programs and design of air navigation systems and facilitiesnationwide.
2. Complete engineering services for the establishment and improvement of airnavigation facilities.
3. Functional operation, maintenance and efficient management of air navigationsystems equipment including airfield lighting systems, power plant and futuretechnologies in conformance with ICAO Standards and RecommendedPractices(SARPS).
Functions
The Air Navigation Service shall have the following functions:
1. Administration and implementation of operational plans, programs in
conformance with ICAO Annexes and SARPs'
2. Formulation of the safety management systems, policies and procedures inconformance with ICAO Annexes and SARPs
3. Technical competency development of CNS Systems Specialist and AirfieldLighting & Power Technician personnel
4. Establishment of air navigation facilities nationwide.
S. Determine the operational and developmental requirement of air navigational
facilities, in coordination with the Air Traffic Service for inclusion in the ANF
Maintenance and/or lnfrastructure Program of the CAAP.
6. Engineering data gathering and site survey for the improvement and
establishment of air navigation facilities'
7. Develops and implements a system of projects, post evaluation and prioritization
for the assessment of ANFplans and investment programs.
8. operation and maintenance of air navigation facilities.
g. provision of technical and material requirements of air navigation facilities'
l0.lmplementation of ANS regulations, policies, standard operational procedures for
ANS
l l.lnspection and evaluation of air navigation facilities.
12.Flight inspection and evaluation of air navigation facilities in compliance with the
ICAO regulations and requirements'
ANS AccornPlishment RePort 2017
ANS AccorrPlishment Report 2017
(nnttrrltdar C
llrvitrtksl
The following Air Navigation Service Departments are hereby created with theircorrespond ing fu nctions:
1. Air Navigation Project Planning and Design Department - Responsible forthe preparation of programs, plans, feasibility studies and system design ofprojects related to the establishment and/or improvement of air navigationfacilities.
2. Air Navigation Prdect lmplementation Division Responsible for theexecution of approved plans and designs as prepared by the Air NavigationPlanning and Design Department for the establishment and/or improvement of airnavigation facilities.
g. Air Navigation Quality Management Department Responsible for theformulation and implementation of standard procedures, regulation, evaluationand inspection of air navigation facilities. Responsible for the implementation ofsafety management systems policy and standards as necessary.
4. Air Navigation Operations Department - Responsible for the functional
operation and maintenance of Communications, Navigations and Surveillance
system components including Meteorological, Airfield Lighting and Power
Systems.
S. ANS Field Offices - ANS field offices shall be established and responsible for
the operation and maintenance of air navigation facilities in their respeclive
areas. All Area Centers shall be headed by ANS Area Field Office Chief (AFOC)
who shall be reporting direcfly to the Air Navigation ServiceAssistant Director
General.
ANS AccomPlishmenl RePort 2017
ACCOMPLISFI ME[\ilT
Ai n Navigation $elvice
ANS AccolnPlishment RePorl 2O17
1. Conducted the detailed engineering and canied out the procurement activities inaccordance with RA9184 for the project detailed in the attach Status Report.
2. Updated the ANF Development Plan for CY 2018-2019.
3. Submitted the proposed CY2O'IBANF Capital Outlay and lnfrastructure ProposedBudget.
4. Updated and finalized the adaptation of DPWH Revised Guidelines in the preparationof Approved Budget of Contract (ABC) for CY2017 Projects.
5. Creation of standard Air Traffic Controller (ATC) console for Flight lnformation Service(FlS) facilities.
6. Creation of standard VHF Communication System Design Air Navigation Facilities.
7. Completed 23 CY2017 Projects and turned-over to Bids and Awards Committee(BAC) for procurement(see attach Annex A).
8. Awarded (with NOA & NTn and turn-over the following projects to Projectlmplementation Department (PID) for implementation:
8.1. Purchase/lnstallation of DVOR/DME at San Jose Airport.
8.2. Purchase/lnstatlation of Voice Logging System (VLS) at TuguegaraoAirport.
8.3. Upgrading of Airfield l-ighting System and Runway Thresholdldentifications Lights at Tambler (General Santos lnternational Airport).
A.4. Purchase/lnstallation of PAPI System and Aerodrome Beacon atCauayan Airport.
g.S. Purchase/lnstallation of LED Floodlight and Solar-powered TaxiwayEdge Lights (New System) at Kalibo lnternationalAirport.
8.6. Purchase/tnstallation of Solar Powered Windcone and LED Apron
Floodlight (Old System) at Kalibo lnternationalAirport.
g.7. Rehabilitation of Circuit 1 of REL, STL, TEL and LED Apron Flood
Lights and additional ccR at Laoag lnternationalAirport.
8.8. Rehabilitation of AFC Building including control Tower and other
Works at Mactan-Cebu lnternational Airport.
g. Requested the process of Fund Transfer to Area t in connection with the project lnset
Runway LightsAdditional Taxiway Edge Lights at Laoag lnternationalAirport.
l0.submitted monthly DoTr PMES Monitoring Form 1 Project status Report'
1 1. Submitted weekly ANS project status report for CAAP CY2o17 Absorptive Capacity.
1 2. submitted cY201 6 Annual Accomplishment Report.
l3.Attended project coordination meeting at Department of Transportation (DoTr) under
Msayas and Mindanao Sector.
14. prepared various ANS conespondences for the different Agencies/Office/
ANS AccomPlishment RePort 2017
15. Conducted Site Acceptance Testing at Tuguegarao Airport for VLS lnstallation Project.
l6.Conducted Site Acceptance Testing at Laoag lnternational Airport Rehabilitaion ofAir Field Lighting System Ckt 1 .
lT.Participated in the testing on completion of CNS ATM electromechanical & auxiliaryworks.
lS.Conducted site inspection of ongoing DVOR/DME installation Project at San JoseAirport.
19. Conducted final inspection of Mactan Control Tower Rehabilitation Project and listdown punch list items for rectification.
20.Attended meetings at DOTr Head Office regarding proposed Development Project atvarious airport such as Leyte, Kalibo, Siargao, Laoag and Dumaguete Airports.
21. Participated in the training /seminar regarding SMS training at CATC.
22. Conducted Final lnspection for the newly completed KALIBO lntemational Airport AirField Lighting System Projects.
23.Conducted site Acceptance Test for at BUTUAN, DIPOLOG, DUMAGUETE and
COTABATO Airport Voice Communication System and VLS Projects.
24.Conducted site inspection in General Santos lntemational Airpo( for Power House
Rehab and upgrading of Power System.
25.Continuously monitor status of ongoing implementation of ANPPDD INFRA Projecls-- for various iirports for CY 2016 / 2017 through FIC's and persons in charge and
update Project status list.
Below is the List of projects being implemented and completed:
Statusect DetailsPNo.
Completed
KALIBO lnternational Ai rt
1
and installation of VoiceSystem (VLS) Tuguegarao
Ai rt
PurchaseLogging
2
CompletedPurchase and installationCommunication and Voice
of VoiceLogging
rtfor Butuan Aitem
CompletedPurchase and installationCommunication and Voice
of VoiceLogging
rt.for Di Aitem
4
Purchase and installationCommunication and Voice
for Duma uete Ais m
of VoiceLogging
5
ANS Accomplishme t Report 2017
Purchase and lnstallation of LED ApronFlood Lights , Solar Powered TEL &
Solar Pbwered Lighted Wind Cone at
Completed
Completed
6 Purchase and installation of VoiceCommunication and Voice Logging
em (VLS) for Cotabato Airport
Completed
7 Rehab of circuitl of REL,STL, TEL andLED Apron Flood Light, Additional CCR(LAOAGAi r Field Lighting System)
Completed
I Rehab of AFC Building lncluding ControlTower at MACTAN lntemational Airport
Completed
Some Projects for CY 2017 APP are still ongoing implementation.
No. ON GOING Projects Status
1 Purchase/lnstallation of PAPI System &Aerodrome Beacon Light at CauayanAirport
Suspendeddue toongoingDOTr Prolect
2 Purchase and lnstallation of DVOF/DMEequipment for San Jose Airport-Occidental Mindoro
Sitelnstallation inprogress
J UpGrading of Airfield lighting System andlnstallation of Runway Thresholdldentification Lights at Gen. Santoslnternational Ai
mobilizationstage
26.Evaluation of Two Thousand Five Hundred Eighty Two (2,582) Height clearancePermits (Approved Applications), One Hundred Seven (107) Height Limitatjon, Twenty
Nine (29) Temporary Structure and One Hundred Seventy Eight. (178) Denied.
27. INSPECTION / EVALUATION /TESTING
27.j. Surge Protection Devices for Meteorological lnstruments at Bacolod-
SilaY AirPort.
27.2. Two (2) units Portable LED ProjectorforANS
27.3. Batteries for UMART UPS at Manila Tower/Navaids Facility
27.4. Batteries for ATS at Manila Tower/Navaids Power Plant Facility
27.5.Three(3)unitsofSix(6)DoorsSteelLockerCabinetsforANFMDivision
2T.6.loWVHFAMAirBandTransceiversforANSTechnicalCenter
2T.T.2500PadsofCarbonlessDailyMaintenanceLogSheetsforANFNationwide
27.8. Batteries for DVOR/DME and UPS at Tower cab at Laoag lnt'|. Airport
ANS Accomplishmenl RePort 2017
27.9.
27.10.
27.11.
27.12.
27.13.
27.14.
27.15.
27.16.
27.17.
27.18.
27.19.
27.20.
27.21.
27.22.
27.23.
27.24.
27.25
27.26.
27.27.
27.28.
27.29
Portable Fire Extinguishers for NCR area ANS Facitities
Three (3) Units 125W HF Transceivers for ANS Technical Center
Batteries for 30 K/A UPS of Tower Cab, Control Station & NavaidsStation of Davao lnt'|. Airport
Parts and Accessories for Airfield Lighting System at New BacolodSilay Airport
Batteries for Diesel Engine Generator Set (DEGS) & Batteries forSupply of Control Relays at Laguindingan Airport
Spare parts Modules for Park Air Electronics (PAE) VHFCommunication Equipment at Mactan AFC
Printer Head for Thermal Printer IER 512C and IER 4OOB2 at ManilaRadar Facility
Barcode-based lnventory Control System for Air Navigation Service
Parts and Accessories for Runway Edge Lights and Taxiway Edge
Lights at Zamboanga Airport
Alignment Tool for ADB Precession Approach Path lndicator (PAPI) forANS.
5W VHF AM Air Band Handheld Radio for ANS Technical Center
Digital Ground Earth Tester for various ANF
Timer Board for Runway Threshold ldentification Light (RTIL) at
Dumaguete & Kalibo Airport.
Desktop Computer with Voice Recording System Software for various
Airport.
Spare Parts for SAF Digltal Microwave Radio (DMR) of Manila AFC.
Automatic Voltage Regulator (AVR) for Perkins Diesel Engine
Generator Set at Sanga-Sanga Airport.
SparePartsModulesforVaisalaAWOSMeteorologicallnstrumentatBacolod I SilaY AirPort.
Parts & Accessories for Airfield Lightning System at Pto Princesa
Airport.
BatteriesforDieselEngineGeneratorSet(DEGS)forANSTechnicalCenter.
Parts & Accessories for Airfield Lighting System at Laguindingan &
Kalibo Airports.
Parts & Accessories for Airfield Lighting System at Tacloban Airport'
ANS Accomptshment RePort 2017
27.30. Bulbs & Accessories for Airfield Lighting System at Tagbilaran Airport.
27.31. ACU Compressor for S-ton Air Conditioning Unit for the RadarEquipment Room & Tagaytay Radar Facility.
27.32. Air Traffic Light Gun for ANS Technical Center.
27.33. Coaxial Detector for lt4anila Radar & Tagaytay Radar Facilities.
27.34. Five (5) units Outdoor Motor Driven Vertical Siren for ANS.
27.35. Radar Facility under CNS ATM Project at Apari ANF
27.36. Status of CNS MET at Tuguegarao ANF
27 .37 . Ten (10) Units 10W VHF AM Transceivers for ANS Technical Center.
27.38. DC-DC & AC-DC Converter Modules for Tagaytay Radar, lloilo &
Davao
28. Follow-up lnspection & Evaluation of CNS Equipments & lts Ancillaries in the followingAirports.
28.1. Kalibo
28.2. Mrac
28.3. Cauayan
28.4. Bacolod
28.5. Naga
28.6. Tagbilaran
28.7. Butuan
28.8. Basco
28.9. Laoag
28.10. Davao
28.11. Pto. Princesa
28.12. San Fernando
28.13. Dumaguete
28.14. Laguindingan
28.15. Tuguegarao
28.16. LegazPi
28.17. Tacloban
28.18. Gen. Santos
28.19. Roxas
ANS Accomplishment RePort 2017
28.20. Busuanga
28.21. Dipotog
28.22. Surigao
29. Final review of Facility Operations Manual
2s.1. Mt. Majic RCAG
29.2. Subic
30.Approved Facility Operations Manual
30.1. Sanga-sanga
30.2. Tandag
30.3. Mactan AFC/Transmitter
30.4. Laguindingan
30.5. Calbayog
31. Conducted Safety Management System (SIrtlS ) Audit in the following Airports
31.1 . Davao
31.2. Laoag
31.3. lloilo
31.4. Kalibo
32. Conducted Training Plans and Programs Seminar in all Area Centers
33.Attended Meeting with CNS SG at Bangkok, Thailand
34.Attended Meeting CANSO at Hanoi, Metman
35.Attended Meeting with LGU regarding OLS at Mactan-Cebu lnternational Airport
36. Attended Telecommunication Summit sponsored by Department of lnformation &Communications Technology
37. Checked DVOR bearing Misalignment at Cabanatuan Airport
3S.Coordination meeting with Presidential Management staff regarding CAVITEXinfrastructure
39.Attended Frequency spectrum Management Panel Meetlng at Bangkok, Thailand
40.Attended the 3'd Meeting of Common Aeronautical Virtual Private Network Operations
Group at Bangkok Thailand
41. Monitoring of Safety Management System
42. Technical Competency Certificate (TCC) Planning & lmplementation
43.Continuously monitored the operational status of CNS/Met, Power and Airfield Lighting
System and equipment of ANF nationwide thru Daily Personnel and Operations Report
(DPOR), lncident and Monthly Reports.
ANS Accomplishmenl RePort 2017
44' Followed-up the flight check of navigational aids facilities that were due for calibration.57'27o/o of Radio Navaids and 47.9-5% ot PAPi hrre .rrrent flight check status. Thescheduled flight calibration of both the Radio Navaids and pApt ,1" on-going.45' Prepared Programs
9f -w-ork (PoW for the purchase.and delivery of various parts forCNS/Met, Power and Airfield Lightihg Equipment and Fixtures foi th. ,pproval of theDirector General. - .v -r-'r
46' Prepared the documents for the transfer of funds of the approved programs of work toANF's Area Cluster.
47. Repaired equipment and/or parts of equipment at the Air Navigation Technical Centerand facilitated their transfer from the Airports/ANF's to the Ceitrai bmo ioili. ,"p":,at the AN Technical Center and its delivery and installation to the orijinafinfAirports/ANF's after its restoration.
48. Provided materials, technical and personnel assistance to Air Navigation Facilities forthe repair and restoration of CNS/MET, Power and Airfield Liglting System antequipment including installation of new cNs/MET equipment.
49. Purchased and provided the Airports/ANFs with equipment parts, components andother devices and materials for the continuous and reliable operation of these facilities.
50. Prepared AIPAFs for the issuance of NOTAM of various CNS/MET, Power and AirfieldLighting System that had encountered equipmenusystem trouble including thosefacilities that needed to be shutdown during preventive maintenance procedures.
Sl.Validated the received Operational Hazard Reports, facilitated the execution ofconective measures and submitted reports to the ANQMD for the preparation of replyletter to concerned airlines or other CAAP services.
52. Prepared coordination letters to airport managers and other government agenciesincluding other communications to equipment suppliers and service providers.
53. Coordinated with other CAAP services/offices, other govemment agencies andstakeholders for the immediate solution to problems including other issues andconcerns that may directly or indirectly affect the operation of alrports/facilitiesnationwide.
BALUCATINGActing Chief, Air Navigation Service
ANS Report 2017
ATTACHIVIHNT1. Air Navigation Project Planning and Design Departmentprojects.
a. PPDD Project Management Reportb. CY2017 Turnover of Projects for lmplementationc. Five Year ANF Development Plan
2. Au Navigation Operations Departmenta. Radio Navaids Equipmentb. PAPWASIc. On-Site Technical Assistance Provided to Air Navigation Facitities for
cY2017
ANS Accomplishmerrt RePort 2017
Air Navigation Operations Department
1 February 2018
AlrporUFaclllty
Equipment Brand/Model Frequency Channel StatusDate of LastFllght Check
Explry Date ofFlight Check Remarks
CLARK
DAVAO
SANTOS)
TAMBLER
Due for llight check.29-Dec-l7operational 29-DecJ6113,0 tvlhz
29-Deo17
KALIBO
LAOAG
Due fu flight check.29-Dec-16
Air Navigation Operations Department
I February2018
.,f
AlrporUFacility
Equlpment Brand/Model Frequency Channel StatusDate of LastFllght Check
Explry Date ofFllght Check Remarks
MACTAN
MANILA
PUERTO
PRINCESA
Due for flight cfieck.02-Sep-16 02€ep17OperationalFSD45
SUBIC BAY
L-
Air Navigation Operations Department
,t
1February2018
Alrport/Facility Brand/Model Frequency Channel Status
Dde of LastFlight Check
Explry Date ofFllght Check Remarks
4329 115.3 MHz Operational 29-Dec-16 N-Dec-17 Due lor flight check.
Operational 29-Deo16 20-Deo17
BACOLOD.SILAY
Operational 9Jan-17 9Jul-'17
BUTUAN
NEC NNG-5708 0perational 21-Apr-15 21-Apr-16
CAGAYAN DE
WLCOX 5858 113.7 t./d:'2 Operational 2-Dec-16 Due for flight chect.COTABATO
1119 Operational 21-Apr-15 2'l-Apr-16 Due lor flight check.
DUMAGUETE 114.1Mh2 0perational 1tl-Nov-18 1tl-Nov-17 Due for flight c*reck,
DVOR 116.3lrfrrz Operational 20-Dec-16 29-Da*17rLotLo
NAGA
29-Dec-17 m single syslem.( def Md Slg Gen)0perational 29Dec-16112.9 Mttz
Due for Flight Checd.29-Dec-16 29-Dac-170peratlonal
ROXAS
Due for Flight Check.1-Sep-16 1-Sep170perational
1-Sep-17 Due for Flight Check.Operational't18X
SAN JOSE
100x Due for flight check.
75lliltz Due tun flight check.
Due for flight check,
2-Dec-,l5
Due for flight chock.
1lox Operational 29-Dec-,l6 2*Dec-17 Due lor flight check,
76X
117.1t{frr2
1-Sep-16
Air Navlgation Operations Department
I February 2018
AlrporUFaclllty
Brand/Model Frequency Channel StatusDete of LadFlight Check
Explry Date ofFlight Check Remarks
TACLOBAN
TUGUEGARAO 0perational 24.Jan-14 2tUan.15 Due for flight check.'
BAGUIO 272Rhz Due for Flight Check.
BASCO
PW3OOL 278Khz 3GAug-16 30-Aug-17 Due lor Flight Check.
CATICLAN
JOLO
NEC NNG-9708 104X 0perational 11.lun-14 11-lun-15 Due for Flight Cheok.MASBATE
415 Khz Operational 28-Apr-15 28-Apr-18 on tlng/e system.SURIGAO ND-500il
CAUAYAN
I befe'dlve Mod, Sl0. 6cr. t/odule:it r'. .. :.
Operational from 05Ct0 - 2100 only. Due
tu flioht chec*.5Jun-12 SJun-13t14X OperationalNEC NNG.1797DME
JOMALIG
&Ma-16 Due for Flight Check.0perational &Mar-15117.5 KhzVOR ASI 1150
Due for Flight Chec,k.&Mar-16122X 0perational 4-Mar-15ASr 1119
LUBANG
AH'tvAyroArti,' :
VOR::,,;,,:1;,,BACNOTAN
DVOR--rJ--5i-;!.-.
DIiiIE
'112.,71th2
74X
fPfl:ril"bporational,
CABANATUAN
, D!0 tb fi ulfii'udrnfi errlEl pov#'sjrlcnr
LIPA
SUMMARY:
Total Number of Radio Navaids Equlpment
Number of Operational Radio Navaids Equipment witr Cunent Flight Check Sfstrs
Number of operational Radio Navaids Equipment witr Due For Flight check stafus
Number of On-Test Radio Navaids Equipment
Number of Non-Operational Radio Navaids Equipment
110
63
t55
27
57.270/"
Operational 24,Jan-14 244an-|5
Air Navlgatlon Operafl ons Department
Facility EQPT BRANDYear
lnghlledEqulpment
Status FlightLast
Currency of FllghtCheck
Expiry of FlightCheck Valldity Remerks
PAPI O2R 284pr-15 28-Apr-16
PAPI 20L 2&Apr-15 2&Apr-'16
PAPI 05 6"Jun-,l6 Due for Flight Check. 2-Jun-171', Pilot &
DAVAO
1996 9-Sep"16 9-Sep17GEN, SANTOS
ITAMBLER) 9"Sep-16
KALIBO
PAPI 04 2&Sep13 26-Sep-14
26-Sep-13 26-Sep-'14MACTAN
$Nov-16lSNov-l5PAPI 13
14Jul-14 Due for Flight Ched<, 14Jul-15
NAIA
PAPI 31
PUERTO
PRINCESA
9-Nov-16
PAPI 25SUBIC
BACOLOD.SILAY
BUTUAN
cl*ed due lo the openhtg25€ep-1325.Sep12
Aendnne cleed iln lo lha oPenlng25-Sep-13Due for Flight Chec*.25-Sep-121994PAPI 19
CAGAYAN DE
oRo
COTABATO
DIPOLOG
Due for Flight Ched<.
Due for Flight Ched<,
2000
Due for Flight Check.
1996 Due for Fllght Cheok. 9-Sep-17
Due for Flight Cheok,
Due for Flight Chec*.
Due for Flight Chedr.
Due for Fllght Cheok,
Oct'10 Due for Fllght Chec{i.
Due tor Flight Check.
Air Navlgatlon Operations Department
Facilig EQPT BRANDYear
lnshlledEqulpment
Slrtus FllghtLast
Cunency of FlightCheck
Explry of FllghtCheck Validity Remarks
DUMAGUETE
lLolLo
PAPI 09 YOTJYANG 15-Sep-14 Due for FllghtCheck, Pllot slde onty.LAGUINDINGAN
PAPI27 '15-Sep-'14 Due for Fllght Check. 1S-Sep-15
PAPI 24 20-Oct-16 2&Oct-17
NAGA
3,0 t0
ROXAS
JOSE
TACLOBAN
TAGBILARAN
sedw dwbobvwtatlot,Cc'Plld Slde Ohly, Unlled dslbilfty at Lef,
PAP!27 2W2BAGUIO
BUSUANGA
TARMAN
TICLAN
v@dtion.
wlh,asfilctlon. Umlted vlslbilry d left sector
af e44ltuach pdh duetoobstrucllngMARINDUQUE
2013 f 5€ep-15
2013
't994 Due for Fllght Checlt.
Due for Fllght Ched<. 26-Oct-'13
7-Feb-141993 7-Feb-13
Alr Navlgatlon Operafl ons Department
13 Decembet 20'17
Facility EQPT BRANDYear
lnshlledEqulpment
Shtue
Date LastFllght
Checked
Currency of FllghtCheck
Explry of FllghtCheck Validity Remarks
MASBATE
SURIGAO
VIRAC
OZAMISPAPI 03 THORN OP 13JanJ6 Due for Flight Check, 12-Jan-17
PAPI 21 THORN 13Jan-16 Due for Flight Check, 12-Jan-17
SAN FERNANDO
SUMMAFY:
Total Number of Visual Landing Aids:
Number of Operational Visual Landing Aids Due for Flight Check:
Number of Operational Visual Landing Aids with Flight Chec{< Cunent:
Number of Non-Operational Visual Landing Alds:
Number of Visual Landing Aids with 0n-Test Status:
Tobl Number of Vlsual Landing Alds due for fllght check for 2017:
73
20
35
I8
23
47.95o/o
Submifted By:
FELIPE D. LABADO
Department Manager lll, ANOD
Submitted by:
D. LABADOent Manager III, ANOD
Alr Navigatlon Operallons Departmer{
ON.SME TECHIVICAL ASSISTANCE PROITDED TOAIR NAVIGATION FACILIIMS FOR CY 2017
T.O. No s FACILITY MISSION DT.IRATION
007-17 Virac
. To assess the damage toantenna systan includingtyphoon NINA.
the Non-Direcfional Beacon (NDB)guy support structures caused by
. To determine the scope of works ilcluding the materials neededto restore the NDB to normal
January 4 - 6,2017
828-17 Naga testing of repated modules of Toshib a TW2280OperationalDVOR atN on FaciliAir Navi Apm 3 - 7,2017
t104-17 &1354-
17@xt)
Legazpi &Virac
of radio conununications system(s) forVHF airto-ground radio communications at Legazpi and ifnecessary, Virac Aerodrome, to improve/extend the radiocoverage of Legazpi Tower/Approach Conhol for a reliable radiocommulications in JUBAL and TORNE
lnstallation and testing
May l0 - 22,2017
|05-17 &.1355-17
Legazpi &Virac
Installation of antenna system(s) for \rHF air-to-ground radiocommunications at Legazpi and if necessary, Virac Aerodrome,to improve/extend dre radio coverage oflegazpiTower/Approach Control for a reliable radio commrmications inJUBALaldTORNE
May 10 -22,2017
1749-17 Taga\4ryDsmantling of two (2) six!-foot high Trylonru antenna towermasts at Radar F Jnly 5 -15, 2017
21.21-17 PlaridelAccompany and proyide assistance to Toshiba JapaneseEngineers in the evaluation and testing of communicationsconsole modules at Plaridel
August 4, 2017
CauavanProvide on-site technical assistance to restore the ToshibaTW2280 DVOR at Cauayan Air Navigation Facility to dual
olrs.
August 2l - 25,2017
2139-1.7
October 4-11,2017Rornblon
. Transport One (l) Unil 7.5 KVA Portable Diesel Generator Set.
. lnstruct and Assist On-Site ANS Personnol in its InstallatiorLOperation and Mainten ance.
ANS-2017-025 & ANS-
2017-033
Provide on-site technical assistance in the retuning ofJohon(Unit 3) VHF AM Transmitter and Receiver System fiom 122.0
MHz to 121.5 MHz.
ANS-2017-029
November 13-16,2017
. Provide on-site technical assistance in the restoration of METlnstruments.. Installation ofnew ATC Light Gun.. Installation ofPC-based Voice Lo
BusuangaANS-2017-
064
November 20-25,2017
. Provide on-site technical assistance in the restorationDVOR equipment to dual system operations.
of the
of Toshiba DVOR modules., ReliabiliZa;r:,.boanga
ANS-2017-063
Novernber 24-29,2017
Provide on-site technical assistance in the restoration ote aeronautical communications to normal
f the 119.3
MHz en-rouLaoagANS-2017-074
November 27-30,2017
Provide on-site technical assistance in the replacement
\rHF Antenna used for extended approach control which wasof the
LegazpiANS-2017-069
CAAP compound, MIA Rd., Pasay City'1300r el No. 94+2192 I A799 255
Attachment to ANOD Accomplishtuenl Repo/t 2017
@ ;yUlUgl"* AUrHoRrry oF rHE pHrrpprN's
October 10-13,2017Dumaguete
FELII)
$1.---t- '(Republic of the philipprrrrs
CNIIL A\'IATION AT.ITH O RTTI' OF THE PHILIPPINES
u
MEMORANDUM
FOR : EDGARDO M. FELISTLDADeparfment Manager, ANPID
FROM : Department Manager, ANPPDD
SUBJECT : TURNOVER Or PROIECTS FOR IMPTEMENTATI0N
DATE :3 November?OtT
The ANPPDD have completed its task of planning detailed engineering and design,preparation of Program of work (POvv], preparation of Bidding Documents, andproviding support during the procurement of the Project mentioned below.
Attached is approved copy of the POWs, Notice of Award [NOA], ContractAgreement/Purchase Order and Notice to Proceed (NTPJ of the aforementioned Projects.Copy of the Contractor's Technical and Financial Bid may be requested from the BAC foryour Department's reference.
It should he noted that the ANPPDD, as part of its function, will be implementing a postproject impiementation review after the completion of these Projects,
It is requested that the ANPPDD be provided with a copy of the following documents afterProiect completion:
{$,-
Name of Proiect Airport/ANF CY ContractTime fCDl
Contract Amount
1) Upgrading of Airfield LightingSystem and Runway Thresholdldentification Lights
Gen. San
Airport2077 180 days PhP39,9BB,55B,OB
2l Purchase/lnstallation of PAPI
System and Aerodrome BeaconCauayan
Airportz0t7
ICarriedOver)
120 days PhP14,388,880.81
a, Site Acceptance Test Report;
In this regard, said Project is herebyturned over to ANPID for execution/implementation;
lrT.IPPDD Form AD-3-2015
Acting Chiefl, ANS
b. Certificate of Project Completion/ Final Acceptancec, Soft Copy ofTechnical Manuals;d. As- Built Drawings (soft copy, if available);e. Commissioning Flight Test Report (as applicable)
For appropriate action,
CECILIO M,
Noted by:
'fi\ /gqRepublieof the philippi. ,
CTVILAVIATTON AUTHORITY OT T"HE PHILIPPINES
MEMORANDUM
FOR ; EDGARDO M. FEIISIIDADepaitment Manager, ANPI D
FROM Department Manager, ANPPDD
SUBIECT : TURNOVER OF PROJECTS FOR IMPLEMENTATION
DATE :20fune2017
The ANPPDD have completed its task of planning, detailed engineering and design,preparation of Program of Work (P0VD, preparation of Bidding Documents, andproviding support during the procurement of the Project mentioned below.
In this regard, said Project is hereby turned over to ANPID for execution/implementation:
Name of Proiect Airport/ANF CY ContractTime(6D)
ContractAhount
1) Purchase,/lnstallation of LED
AFL and Solar Powered TEL- (r."2J Purthase/lnstallation of .Solar
Powered Windcone and LED
AFL ' "' o1' '; '.';', pn I
Kalibo Airport1
20'16 60 days
60 days PhP22, 208,888.29
Attached is approved copy of the POWs, Notice of Award (NOA), Contract
Agreement/Purchase 0rder and Notice to Proceed [NTP) of the aforementioned Projects,
Copy of the Contractor's Technical and Financial Bid may be requested from the BAC for
your Department's reference.
It should be noted that the ANPPDD, as part of its function, will be implementing a post
proiect implementation review afterthe completion of these Proiects.
It is requested that the ANPPDD be provided with a copy of the following documents after
Project completion:
a, Site Acceptance Test RePort;
b. Certificate of Project Completion/ Final Acceptance
c, Soft Copy ofTechnical Manuals;
Lr,,:,, o rd
't ( "r
-'' ' i,{
! -...o i '' '- '(
d. As- Built Drawings [soft copy, if available);e. Commissioning Flight Test Report (as applicable)
For appropriate action.
CECILIO M.
Noted by:
DD Form AD-3-2015
TINGActing Chief, ANS
CJt.
..*\
Republic of the PhilippinesCruILA\TIATION AIITHORITY OF TIIE PHILTPPINES
MEMORANDUM
FOR EDGARDO M. FETISILDADepartment Manager, ANPID
FROM Department Manager, ANPPDD
SUBIECT : TURNOVER OF PROJECTS FOR IMPLEMENTATION
DATE : 05 luly 2017
The ANPPDD have completed its task of planning, detailed engineering and design,preparation of Program of Work (POVVJ, preparation of Bidding Documents, andproviding support during the procurement of the Proiect mentioned below.
ln this regard, said Project is hereby turned over to ANPID for execution/implementation:
Attached is approved copy of the P0Ws, Notice of Award (N0AJ, Contract
Agreement/Purchase Order ancl Notice to Proceed [NTPJ of the aforementioned Projects.
Cop1, of the Contractor's Technical and Financial Bid may be requested from the BAC foryour Department's reference.
It should be noted that the ANPPDD, as part of ils function, will be implementing a post
proiect implementatiou review after the completion of these Pi'oje*s,
It is :.equested that the ANPPDD be prorridecl rvith ai copy of the foilowing docurnents after
Project cornnletion:
tl.,;.r,r".J tr, r,v !tr{.: !.. . . . t,t,) ,r,rr. i.r-\f,tf1
Name of Proiect Airport/ANF CY CoEtractTime [CD]
Contract Amount
1) Purchase/lnstallation of VLS TuguegaraoAirport
2077 180 days PhP1,900,000.00
2) Rehabilitatlon ofCitcuits"l ofREL, STL, TEL aNd LED APTON
Flood Llghts, Additlonal rcR _ ,
Laoag Alrport ZOTT
(CaniedOverJ
150 days PhP24,988,810,39
3) Rehabilitation of AFC Builclingincludlng Control Tower and
Ot}er Works
Mactan Airport 2077
ICarried0verJ
120 days PhP10,6B3 109,99
ANPPDD Form AD.3-2015
DR. CATINGActing Chieg ANS
a. Site Acceptance Test Report;b. Certificate of proiect Completion/ Final Acceptancec. Soft Copy ofTechnical Manuals;d. As- Built Drawings (soft copy, ifauailableJ;e. Commissioning FIight Test Reporr (as applicablel
For appropriate action.
CECILIO
Noted byr
Republic of the philirrpirrr-CTVIL AVTATION AUTHORITY OiiTNb PHILIPPINES
FOR
MEMORANDUM
: EDGARDO M.ITELISILDADepartment Manaiger, A N p I I)
FROM Department Manager, ANppDD
SUBIECT : TURNOVER OF pROlEcTs FoR TMPLEMENTATTON
DATE : A6fintZ0tZ
The ANPPDD have completed lts task of planning, detailed engineering and design,preparation of Program of work (pow), preparation ot Bidding Doiumenrs, ;dproviding support during the procurement of the proJect menHonecl below,
ln this rcgard, said Project is he retry turnecl ovcr to ANPID for execution/implementation:
Anached is approved copy of the Pow, Norice of Award (NoA), conracrAgreementlPurchase 0rder and Notice to Proceed (N'tP) ol'the a['rrrementioned Projects.Copy of the Contractor's Technical and Financi,al Bid may be requested frorn the BAC foryour Deparrment's reference.
It should be noted that the ANPPDD, as part of its ftrnction, will bc implementing a postproject implemcntation review after the completion of the se Projects.
It is requested that the AN PPDD be provided with a copy of rhe followlrrg docr.rments afterProject completion:
a. Site Acceptance Test Roporq
b. Certificate of Project Completion/ [tin{ Acceptancec, .Soft Copy of Technical Manuals;d. As- Built Drawings (soft copy, ilavailable);
Name of Proicct Alrport/ANF CY ContractTime (CDl
Contract Amount
1) Purchase/lnsellation ofDV0R/DME
San JoseAirport
2AL7(Cany-over)
365 PhP58,297,267.27
&/N/6 r "'2tFN.
A \*-, DD Form AD-3-2015
R. UCATINGActing Chief, ANS
e, Conrrnissioning Flight Test Report (as applicablc)
For appropriate action.
..1{ li\ \', ',1 \ I .''. ,'-l Y
CECILIO M. ORTiZ1
"t4'/1.t
Notecl by:
REGION / AIRPORT / FACILITY
TOTAL PROJECTS PER YEAR
,.2017. ,
:,. 20L9,. 2A20, ..
' a-
35 30 19 6915,058,000 813,300,000 745,500,000 453,000,000
,CR )00
MANILA AFC
1Rehabilitation of HF Transmitter of Aeronautical Mobile Service
(AMS)150,000,000
2 Relocation of TOP SKY 100,000,000MANILA CENTRAL OFFICE
L Rehabilitation/lmprovement of ANS Office 14,500,000
2 Establishment of ADS-B Ground Station (Pagasa lsland Station)
132,000,0003 Establishment of ADS-B Ground Station (Bolinao Station)
4 Establishment of ADS-B Ground Station (lba Station)
5 Establishment of ADS-B Ground Station (Jomalig Station) 41,000,000MANILA TECHNICAT CENTER
1 Purchase of Spare parts for CNS/MET Equipments 100,000,000
2Purchase of Spare parts for Electro-Mechanical and Airfield lighting
Equipments 100,000,000
00 :", 137p-A,A -LAOAG
L Purchase/lnstallation of ILS 75,000,000
2Rehabilitation of Airfield Lighting System, REL CKT1, TWY CKT1 and
ccR 25,633,000
f Purchase/lnstallation of PAPI System RNWY 01 & RNWY 19 Pilot &co-Pilot side. 50,000,000
4 Purchase/lnstallation of PALS RNWY 01 62,000,0005 Purchase/lnstallation of ABN. 1,000,000
5 UPS 3-Phase 20KVA 1,000,0007 Construction of CHB Perimeter Fence at RWY01 (SALS Area) 10,000,000
VIGAN
L Purchase/lnstallation of FSS equipment 0 002 Construction of FSS Building 20,000,000
LINGAYEN
1 Construction of FSS Facility including Powerhouse 20,000,000
Tion O2:;,,:,:: ,r', 60,000,000 ,- , 135,600,00G ::: 1O00O00QCAUAYAN
1 Purchase/lnstallation of Aerodrome Beacon15,200,000
2 Purchase/lnstallation of PAPI
3Purchase/lnstallation of AFL (REL, FL, TEL, WDIL, RTIL, THL/END &
ABN including CCR) 60,000,0004 Replacement of MET lnstruments 10,000,000
AND C rearANr uevetopmentrlan zvtl
16
339-800,0OO
1
I
I
I
AlrD o rearANr ueveloPmentFlan zvtt
TUGUEGARAO
1 Purchase/lnstallation of VLS 2,800,0002 Site Acquisition for the lnstallation of DVOR 2,000,0003 Purchase/lnstallation of DVOR/DME 65,000,0004 Construction of 6-Storey Control Tower Building 35,000,0005 Purchase/lnstallation of Communication Equipment including VCS 25,600,0006 of MET lnstruments
RADAR
10,000,000
1 Purchase/lnstallation of RADAR System200,000,000
LIPA
-E
7. ::---
":: .,, 6q,000,00065,000,000
. :.: r-_
-
., ZOO,OO-O,OOGPUERTO PRINCESA
1 lnstallation Of Terminal Radar and lntegration to ATMC 200,000,000BUSUANGA
1 Pu Co 02 Purchase/lnstallation of VL5 2,800,000
3Upgrading of Commercial Power Line from Single Phase to 3 phase
6,000,000SAN JOSE
1 Replacement of DVOR/DME 60,000,0002 Purchase/lnstallation of Communication Equipment
12,000,000
sAN VICENTE
1 Purchase/lnstallation of Communications Equipment 7,000.0002 Purchase/lnstallation of MET lnstruments 5,000,0003 Purchase/lnstallation of Airfield Lighting System 12,000,000
2
,,i
AND C rearANr UeveppmentFlan zvt I
TEGASPI
i;r.',,,. 46,900,000. ,';.:,:' 29i500,00G.
f':,,t.'..r:'r,
.l.' ,:.','.
1 Purchase/lnstallation of Communications Equipment 8,000,0002 Purchase/lnstallation of PAPI System 15,000,0003 Replacement of Console and Voice Communication Switch 15,000,000
I 4 Airfield Lighting Remote Control Panel 2,000,000
5 300kVA Generator Set includig Power Transmissin Lines 2,900,000
MASBATE
1Construction of New 3-storey FSS Building including Powerhouse 20,000,000
2 Replacement of FSS equipment. 5,000,000NAGA
1 Purchase/lnstallation of VLS 2,800,000
2Purchase/lnstallation of Apron Floodlight and Lighted Windcone 12,500,000
VIRAC
7 Purchase/lnstallation of Runway Threshold ldentification Lights,
Wind Direction lndicator Lights, and Apron Flood Lights 23,500,000
2Construction of New 4-storey FSS Building with Powerhouse 20,000,000
3 Establishment of RCAG 4,000,0004 Replacement of Communications Equipment 2,000,000
?qinryQG::'ANTIQUE
i...,,'., 40,525,00O ,.... ri4o00,ooo,':',, ,, 6,5ii0,00O
1 Establishment of RCAG 4,000,000KATIBO
1 Replacement of ILS 75,000,000
2 Purchase/lnstallation of PAPI at Runway 23 8,000,000
3Purchase/lnstallation of Lighted Windcone and Apron Flood Light(for old Apron) 22,725,000
4 Purchase/lnstallation of Apron Floodlight (for new Apron)
5 lnstallation of New Elevator at Control Tower 6,500,000ROXAS
1 Purchase/lnstallation of Communications Equipment 12,000,000
2 Purchase/lnstallation of VLS 2,800,000
3 Purchase/lnstallation of VCS 15,000,0004 Construction of New s-Storey Control Tower Building 15,000,000
lLotto1 Purchase/lnstallation of VLS 2,800,0002 Purchase/lnstallation of Communications Equipment 12,000,000
3
.:.:., 41,300,00O, ., r,,:15;000,000,
I
I
I
I
t
AND C YearANF Uevetopmentt-lan zvtt
MACTANTOWER
tPurchase/lnstallation of Communication Equipment including VCS 35,000,000
MACTAN AFC
1 Rehabilitation of AFC Building including Control Tower 15,000,000
MT. MAJIC
1 lmprovement of Water Supply System 3,000,000
1 Upgrade of Power System 1,500,000
TAGBILARAN'). Upgrading of Power System 4,000,000
2 Purchase/lnstallation of VLS 2,800,000
3 Purchase/lnstallation of 300KVA DEGS for entire Tagbilaran Airport
including Rehabilitation of Powerhouse 5,000,0004 Rehabilitation of Taxiway Lights 8,000,0005 lmprovement of MET lnstrument 5,000,000
: 20,00q.000..ORMOC
1 Construction of FSS Building including Powerhouse 20,000,000TACLOBAN
1 Replacement of DVOR/DME 65,000,000
Rt
DIPOLOG
L Purchase/lnstallation of PAPI System 12,000,0002 Establishment of RCAG 4,000,000
PAGADIAN
1 Purchase/lnstallation of Communications Equipment 28,000,000
2 Purchase/l nstallation of VLS 2,800,000
3 Purchase lnstallation of AFL 60,000,000
4Construction of New Powerhouse Building for 1-20KVA Generator 6,000,000
5 Replacement of MET lnstruments 10,000,000
4
I
I
Arro c rearANr ueveroPmenf i-lan zvll
1 Construction of New Control Tower Building 40,000,000
2 Replacement of ILS 75,000,000
3 Purchase/lnsta llation of Aerodrome Beacon Light 1,500,0004 Purchase/lnstallation of PAPI System 25,000,000
5 Purchase/lnstallation of Airfi eld ng system 6s,000,000 40,000,000
6 Purchase/lnstallation of Apron Flood Lights 10,000,000
7 Purchase/lnstallation of Simple Approach Light System 15,000,000
CAMIGUIN
1 Purchase/lnstallation of FSS equipment 2,000,000
ozAMls
1Construction of S-Storey Control Tower Builing including
Powerhouse 35,000,000
2 Purchase/lnstallation of Communications Equipment 2,000,000
3Purchase/lnstallation of Communications Equipment including VCS
and Lightgun 28,000,000
4 Purchase/lnstallation of VLS 2,800,000
DAVAO
1 Purchase/lnstallation of Communications Equipment including VCS 35,000,000
2 Edge Lights 12,000,000
I 3 Purchase/lnstallation of ILS (both runway) 150,000,000
4 Construction of New Davao FSS Building 5,000,000
R,
COTABATO
1 Replacement of MET lnstruments 10,000,000
2 Replacement of DvOR/DME 65,000,0003 Upgrading of AFL System (PAPI, Threshold Lights & others) 8,000,000
4Construction of Tower Multi-Function Building including furnishings 3,000,000
5
I
I
I Total perYeor>>. i:_
:,i'i,,: 56,000-000 I ;:, 28,000,000 ,, 116;000,000 ,. ,:106,000;0qq
AND C rearANr Ueveppmenlrlan
Total Number of Pro.iects Per Year>> 35 30 19 6
Note: Above proposed projects are based on current operational requirements. Amounts are approximate (ballpark figure)
Recom mendi n g AP P rovo I :
zvtt
cEclLloM. oRTlzDepartment ManogerAN2-PPDD
EDGARDO M. FELISITDA
Deportment ManogerAN3.PID
MARIOT. MENDOZADeportment MonagerAN4.QMD
76
FETIPE D. LABADO
Department MonagerANS.ANOD
Date Approved (ANS):ARNOLD R. BATUCATING
Ading ChiefAir Navigation Service
6
TAMBLER
Establishment of ADS-B 41,000,000L
Replacement of lnstrument Landing System (lLS) @ RWY 17 75,000,0002
41,000,0003 Rehabilitation of Airfield Lighting System (REL fWY, THL) and
lnstallation of Additional Runway Threshold ldentification Lights
10,000,000Replacement of MET lnstruments4
15,000,000Purchase/lnstallation of PAPI System and solar Lighted Windcone5
; ,'r'102,00O00041,000,000
-:-:::a'l : li: :.:1 . -l::.
Purchase/lnstallation of PALS at RNWY 17
BUTUAN2,000,000Site Acquisition of SALS1
35,000,0002
Construction of 7-Storey Control Tower Builing including
Powerhouse65,000,000Purchase/lnstallation of DVOR/DME including access road3
.,- r::. 1O,00C00c' :: . 35,000,00O
JOtO15,000,0001 Purchase/lnstallation of PAPI
5,000,000Purchase/lnstallation of MET Instruments2
Construction of 4 Storey FSS Building and Powerhouse 20,000,0003
SANGA-sANGA5,000,000Purchase/lnstallation of MET lnstruments1
Approved:
6
I
Air Navigation Sewice
PPDD Ptoiect Management Report
ANNEXA-CY2O17 PROIECISIURNED{VER-TO BAC FOR PROCUREMENT February 2, 2018
Proiect Package l-oration APP Proiect Cost Currenl Adiyities/Actlon Taken Remarks / Planned Activities/ SAC Acrivities
1 nstallationotN nalAids JOFET TAMBLER 137,000,000 8id evaluation by 8AC TWG ofl'going.
2 Airfleld VER & JOJO NAGA D.P29 30,000,000 8id Evaluation undertaken by BAC.
l Pur.hase/lnstallationof PAPlSYstemand LightedWindcone vER &JOIO TAMBLER D.P3O2S,000,000
POW preparation on-going.
4Purchase/lnstallation of HF Communications Svstems
Manila aMs.JOFET MANILA CENTRAI. OFFICE D.P29
20,500,000
5 tstablishrnent of ADs-B G round stetion {Pagasa) IOFET MANILA CENTRALOFFICE19,200,000 Proiect .e-earmarked last 15lanlary 2018. Awaiting for the schedu le ofprocurement
BAC.
5 Rehabilitation/lm provem ent of aNS Offices FINTAND MANILA CENTRAT OFFICT E,P5O14,500,000
8AC resolutionto re-bid the project forsiBnaturc
7Purchase/lnstallation of Apron Flood tigh! Solar Powered
Ed htsvER &loJo D.P3O
12,000,000Bid evaluation by BAC TWG on-going-
8 JUN & GE8ALD NAGA D,P29 10,000,000
9VER ZAI\IEOANGA D,P29 10,000,000
10 ofDvo JOEET&]UN IACLOBAN D.PZ9 9,750,000 ect for Award to the winni bidder.
11 ment ofDVOR/DME ROSE & GERALD BUTUAN D,P3O 9,750,000 Post Qualifi cation evaluation undertak€n BACTWG.
12iurchase/lnstallation of Airfleld tighting SYstem (REr-TEl-
solarWD ABN & PAPIvER &toJo ZAMBOANGA D,P3O
9,750,000POW approva I on-going.
13Purchase/lnstallation of Communications Eq
vcsin.luROSE & GERALD N,4ACIAN AFC D.P3O
5,250,000 Project re-earmarked last 15lanuary 2018. Awaiting fortheschedute ofBACforpre.
t4Purchase/lnstallation of Communications Equipment
includi vcsJUN & GERALD DAVAO D,P30 s,250,000
Project re-earmarked last 15 January 2018. AwaitinS for the schedule of BAC for pre-
15 JUN &GERALD ROXAs D,P29 2,800,000 ofPost Qualiflcations Evaluation Result to BAC.
16constluction of New 3-storev FSS Building including other
FINLAND MASEATE E,P5O 2,250,000 POWapproved last 31Janlary 2018. Preparation ofgidding Documents on-going.
construction of New 4storey FSS 8u ildins including Power TINLAND E.P51 2,250,000 POWapproved last 3l lanuary 2018. Preparation ofBidding Docu ments on-going.
18 P!rchase/tnstallation of 5imple Approach LiSht Systern VER &JOIO ZAMBOANGA D-P3O2,250,000
POW preparation on-going.
19 SU & Del of t55 Communication flOS€ &GERALD VIGAN o.P29 2,000,000 re-earma.ked last 15 Ja 2018.
20 5u &De ]UN & GERALD VIRAC D.P29 2,000,000 Project re-earmarked last 15 January 2018. Prol€€t forre-bid.
2t & Delive of t55 Communications Eq ]UN & G€RALO CAMIGUIN o.P30 2,000,000
22 & of Communications E ROSE & GERAI-D ozAMtz D.P3O 2,000,000
21 lation of Aerodrome Beacon vER & loro LAOAG D-P29 1,000,000 POW prepalation on-going-
D:\PPDD\ANPPDDREPORTSUnnualAccomplLhmentReport\CY2017\20lSPPDDProjectManagementReport
335,500 000
Printed:
Project re-earmarked last 15lafluary 2018. AwaitinS forthe schedule of BAC for pre-
.POW a pp roval on-soins.
Project re-earmarked last 15lanuary 2018. Project forre-bid.Project re-earmarked last 15lanuary 2018. Project for r+bid.
t-gornt
PPDD Project Management Report
I Detailed Engineering tr POW under Approval il For Bidding On-Going Bidding