schedule
August September October November December ED SPECS
FEASIBILITY STUDY
ed spec
BLPC meetings
PFRC meetings
school board meetings
framework concept
18 25 9 16 23 8 20
26 17 12
5
1 6
11
27
presentation overview
precedent images site circulation building planning
media center multipurpose room break out spaces outdoor learning
renovation and construction
upper level
heavy renovation
light renovation
multipurpose room
admin
media center
classrooms
art
suit
e
sc
sc
new construction
toilet
middle level
stu
den
t se
rvic
es
classrooms
music suite
sc
break break
sc
toilet
heavy renovation
light renovation
new construction
renovation and construction
N
40
30
30
O P P O R T U N I T I E S
• All vehicular access remains
off 8th Road N
• Parents have restricted access
to 8th Road N during pick-
up/drop-off
• No parking on school side of
8th Road N during pick-
up/drop-off
17
8th Road Option
13
Raised pedestrian crosswalk for traffic calming
L I M I TA T I O N S • More pedestrian conflict
points on 8th Road N
New pedestrian sidewalk from Wilson Blvd.
N
40
30
30 O P P O R T U N I T I E S
• Pedestrians, buses and parent
drop-off/pick-up are
separated
• Resident and permit parking
access only on 8th Road N
during pick-up/drop-off
• No parking on school side of
8th Road N during pick-
up/drop-off
14
Wilson Connection Option
16
Raised pedestrian crosswalk for traffic calming
New pedestrian sidewalk from Wilson Blvd.
N
40
30
30 O P P O R T U N I T I E S
• Pedestrians, buses and parent
drop-off/pick-up are
separated
• Resident and permit parking
access only on 8th Road N
during pick-up/drop-off
• No parking on school side of
8th Road N during pick-
up/drop-off
23
Manchester Entry Option
7
Raised pedestrian crosswalk for traffic calming
New pedestrian sidewalk from Wilson Blvd.