47
Arlington Memorial Bridge Rehabilitation

Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Arlington Memorial Bridge Rehabilitation

Page 2: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Presentation Overview

▪ EFLHD Introduction

▪ Arlington Memorial Bridge

▪ Project Location

▪ Historic & Cultural Significance

▪ Bridge Overview

▪ Design & Construction

Page 3: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Office of Federal Lands Highway

Page 4: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

OverviewFLH Core Business:▪ Project Delivery

• Engineering Services• Technical Expertise

▪ Liaison with Federal Land Management Agencies▪ Training and Development▪ Deployment of New Technologies▪ 706 FHWA Employees (approx. 23% of FHWA)

Eastern Federal Lands Program: ▪ $160-200 Million FLHP Funds Allocations In A Year▪ 40-50 Construction Contracts Awarded Annually

Page 5: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Services Provided▪ Program Administration

▪ Emergency Response

▪ Transportation Planning

▪ Highway Design

▪ Contract Procurement

▪ Construction Management

▪ Road Inventory

▪ Asset Management

• Bridge and Pavement Management

▪ Environmental Compliance

▪ Bridge Inventory

▪ Training & Technical Support

Page 6: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Our Methods

▪ Design-Bid-Build

▪ Contract Manager/General Contractor (CMGC)

▪ Design-Build

Page 7: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Federal Partner Agencies

Page 8: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Other Partners

▪ Federally recognized Indian tribal governments

▪ State DOTs

▪ Local Governments (Cities/Counties)

▪ U.S. Virgin Islands

▪ District of Columbia

▪ Private Entities (for example CSX)

▪ Other Federal Agencies

Page 9: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Our Nicheflexible solutions for unique needs

▪ Aesthetic, Historic, Cultural, and Environmentally Sensitive Projects

▪ Highly Visible, Politically Sensitive Projects with Security Requirements

▪ Hands-On Project Delivery

▪ Collaboration with Multiple Partners

▪ Independent 3rd Party Facilitator with Decision Making Responsibility

Page 10: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

AMB – Location

Page 11: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Historic & Cultural Significance

Page 12: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview

• Built 1926-1932• Opened in 1932• 2,162 feet long• 94 feet wide

Page 13: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview

• 11 Spans total• 10 reinforced concrete arch spans• Two 50-ft spans over roadways (underpasses)• 8 spans over Potomac River, 166 – 180 ft• Center double-leaf steel bascule span – 216 ft

Page 14: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview

• (6) 10-ft lanes of traffic• (2) 14-ft sidewalks• ≈ 65,000 vehicles per day

Page 15: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview

Page 16: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview - Bascule

• Largest & Heaviest at 8,650 kips total with a 6,508 kip counterweight

• Quickest to open when built• Last opened in 1960’s

Page 17: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview - Bascule

Page 18: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview – Existing Condition

Page 19: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview – Existing Condition

Page 20: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bridge Overview – Existing Condition

Page 21: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Increased Inspections

Inspection Frequency:

▪ Bascule Trunnion Post Inspection –Every 2 Months

▪ In-depth Inspection – semi annual inspections (rotate in-depth and interim) of deck, concrete beams, and bascule span – 6 Months

▪ Entire Bridge Routine Inspection –24 Months

Page 22: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design and Construction

Design-Build Project

2 Step Process to Select DB-Team

1) Request for Qualifications

- Short list top firms

2) Request for Proposals

- Select Best Value based on Technical and Price Proposals

Page 23: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design and Construction

▪ Scope of Work▪ Complete Deck Replacement – Precast Panels, UHPC,

LMC overlay▪ Replacement of Bascule Span with fixed span▪ Concrete repairs and Replacement of Pier Frames/Select

Crosswalls▪ Granite removal and reset, cleaning and repair▪ Sidewalk replacement▪ Restoration of metal fascia, rail, light poles

Page 24: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design and Construction

Contract Info:

▪ Overall $227M Project

▪ 1,000 Calendar Days Schedule

▪ Major Construction Started October 2018

▪ First phase complete November 2019

▪ Anticipated completion Early 2021

Page 25: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design and Construction

NPS – Owner/Maintaining Agency

FHWA – Prelim Engineering andConstruction Contract Administration

Kiewit – Design-Build Contractor

Stakeholders (DDOT, VDOT, Arlington County, SHPOs, CFA)

Page 26: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design & Construction

Construction in 2 Phases

▪ Closed 3 lanes on one side for construction

▪ 3 lanes for traffic on other side• 2 lanes inbound and 1 outbound

in morning• 1 lane inbound and 2 outbound

in evening

Page 27: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Traffic Impacts

Traffic impacts analyzed with regional traffic models in Environmental Assessment and the Transportation Management Plan

3-lane closure on Arlington Memorial Bridge resulted in increased traffic volumes on adjacent bridges

Coordination with NPS, VDOT, DDOT and Arlington County

Page 28: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Traffic Control – Lane Use Control Signs

Page 29: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design & Construction

Deck Replacement▪ 10” precast deck with 2” LMC overlay▪ UHPC closures between deck panels▪ Stainless steel reinforcement▪ Stainless steel prestressing strand▪ Cast in place exposed aggregate sidewalk

Page 30: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design & Construction

Variable depth truss bascule spans replaced with a variable depth steel plate girder▪ Understory truss to replicate existing▪ Shallow section at mid-span▪ Required 70 ksi bottom flange

Page 31: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Design & Construction

Page 32: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Phase 1 Construction

Page 33: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bascule Shoring

Page 34: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bascule Fascia Removal

Page 35: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Bascule Removal

Page 36: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Deck and Beam Removal

Page 37: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Crosswalls after Deck Removal

Page 38: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Precast Deck Install

Page 39: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Precast Concrete Deck

Page 40: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

UHPC Closure Pours

Page 41: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Steel Girder Install

Page 42: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Fascia Re-Install

Page 43: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Granite Reset

Page 44: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

LMC Overlay

Page 45: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Exposed Aggregate Sidewalk

Page 46: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Near Completion of Phase 1

Page 47: Arlington Memorial Bridge Rehabilitation - WDCSITEwdcsite.org/wp-content/uploads/2019/11/0.-Keynote-Evans...Arlington Memorial Bridge Project Location Historic & Cultural Significance

Any Questions?