15
ARLINGTON COUNTY CIVIC FEDERATION (ACCF) 22202 Development Summary & Amazon Update Dec 17, 2019

ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

ARLINGTON COUNTY CIVIC FEDERATION (ACCF)

22202 Development Summary & Amazon UpdateDec 17, 2019

Page 2: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Current Development Activity2

Conceptual Applications

Preliminary Applications

Final Applications*

Level of Plan Development

High level drawings and vision for how a particular site could redevelop

More refined set of plans depicting detailed elements of the proposal

Complete set of civil engineering, landscape, and architecture plans meeting County’s submission requirements

Review TypeCursory Review by Staff

Detailed review by staff

Public Review Process may begin (LRPC/SPRC)

Distinct Stages of Site Plan Review (Arlington County)

* Final Applications are reviewed by Long Range Planning and Site Plan Review Committees (as necessary), various Commissions, and finally the County Board

Page 3: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

3

NORTH

1

2

3

Approved in October 2019

Approved in December 2019

22202 Development Summary

December 2019

Approved Site Plans

1 Crystal City Verizon Site

2 Met Park (Phase 6-8)

3 Crystal Houses

Page 4: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

4

NORTH

2

3

4

Approved in October 2019

Approved in December 2019

22202 Development Summary

December 2019

Final Site Plan Applications

4 1900 Crystal Drive

Approved Site Plans

1 Crystal City Verizon Site

2 Met Park (Phase 6-8)

3 Crystal Houses

1

Page 5: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

5

NORTH

2

3

Preliminary SP Applications

5 River House

6 12th Street (Brookfield)

7 101 12th Street

8 2001 Richmond Highway

92300 Crystal Drive/223 23rd Street

10 2525 Crystal Drive

5

6

8

9

10

22202 Development Summary

December 2019

Approved in October 2019

Approved in December 2019

Final Site Plan Applications

4 1900 Crystal Drive

Approved Site Plans

1 Crystal City Verizon Site

2 Met Park (Phase 6-8)

3 Crystal Houses

17

4

Page 6: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

6

NORTH

2

3

5

6 11

General Character Of Development

1 Residential w/ retail

2 Office w/ retail

3 Residential

4 Residential w/ retail

5 Residential w/ retail

6 Mixed Use (TBD)

7 Office

8 Residential

9 Office and Residential

10 Residential

11 Office w/ retail

AMAZONHQ2

Approved in October 2019

Approved in December 2019

Preliminary SP Applications

5 River House

6 12th Street (Brookfield)

7 101 12th Street

8 2001 Richmond Highway

92300 Crystal Drive/223 23rd Street

10 2525 Crystal Drive

22202 Development Summary

December 2019

Final Site Plan Applications

4 1900 Crystal Drive

Approved Site Plans

1 Crystal City Verizon Site

2 Met Park (Phase 6-8)

3 Crystal Houses

Future Applications

11 PenPlace

1

4

7

8

9

10

Page 7: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Amazon’s Anticipated Growth7

Amazon HQ2

(Source: ZGF Architects LLP)

1

3

2

Page 8: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Crystal City – Amazon’s Interim Office Space

8

Amazon HQ2

Stage 1: Several existing buildings are in the process of being leased or significantly renovated to accommodate the initial Amazon workforce

241 18th Street S. 2345 Crystal Drive

Amazon currently occupies several floors in each building

Page 9: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Crystal City – Amazon’s Interim Office Space

9

Amazon HQ2

Stage 1: Several existing buildings are in the process of being leased or significantly renovated to accommodate the initial Amazon workforce

1770 Crystal Drive 1800 S. Bell Street

Anticipated completion: Mid-2020 (Approximately 450,000 sf of space)

Page 10: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

1

23 4-5

Pentagon City – Amazon’s Headquarters10

Amazon HQ2

Stage 2: Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings)

(Source: ZGF Architects LLP)

Page 11: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Pentagon City – Amazon’s Headquarters11

Amazon HQ2

Stage 2: Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings)

Phase 6Phases 7/8

Source: ZGF Architects LLP

Page 12: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Pentagon City – Amazon’s Headquarters12

Amazon HQ2

Stage 2: Redevelopment of Metropolitan Park with Phases 6 and 7/8 (2 new buildings)

Proposed Renderings of Met Park 6-8 (Source: ZGF Architects LLP)

Page 13: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Pentagon City – Amazon’s Headquarters13

Amazon HQ2

Stage 3: Redevelopment of PenPlace (multiple new buildings – likely in phases)

Met Park Phases 6-8

PenPlace Evaluation of PenPlace Master Plan to consider: • 2013 adopted vision for the block• Guidance developed through the

Pentagon City (PDSP) Planning Study

2020 Outlook

Met Park 6-8 Final Plans & Construction• Final Civil Engineering Plans, Building Plans,

and Landscape Plans• Start of Construction• Anticipated completion in early 2023

Page 14: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

14

Pentagon City – Next Steps

Phased Development Site Plan (PDSP) will be updated through a planning study in 2020 to evaluate the local transportation network and its capacity to support future growth in this area

Pentagon City Future

Page 15: ARLINGTON COUNTY CIVIC FEDERATION (ACCF) · 2020. 1. 1. · Final Applications*. Level of Plan Development. High level drawings and vision for how a particular site could redevelop

Thank You