65
Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Embed Size (px)

Citation preview

Page 1: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Administration

General Services Division

Proudly Presents The...August 2012

Page 2: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Construction Services Group Roger Berna, General Manager 602-542-6051

Bill Anderson 364-2366 Mike Rank 542-1983Janet Collegio 542-1925 Alvin Spencer 542-0096Joe Grajeda 364-0776 John Webster 542-6229Terry Gutman 542-1935 Clara Youngberg 542-6042Jeff Pugh 542-0074

Page 3: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Bill Anderson

Meet the Staff of Construction Services

Jeff Pugh

Mike Rank

Alvin Spencer

Clara Youngberg

Roger Berna

Janet Collegio

Terry Ann Gutman

Joe Grajeda

John Webster

Page 4: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

What we do….

Construction Services provides:

Project Management Services for the design and construction

of new facilities, renovations and major maintenance projects.

Page 5: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Why choose the Construction Services (CS) Group to manage

your construction project?

•We understand the special nature of public sector projects.

•We know what it takes to deliver those

projects successfully.

•We have the experience; over $1.1 billion in total project value since our inception in 1985.

Page 6: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Our staff knows how to coordinate with multiple user groups and decision makers to

provide you with a management plan.

As construction professionals directing the project team, we can provide a

significant savings on the cost, while ensuring the quality and schedule of

your project is maintained.

Page 7: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Our Project Managers have the expertise in coordination and communications to complete construction “on time” and

“within budget”.

Page 8: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

METHODS OF APPROACH

Page 9: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

• Consulting on initial budgets or project approach.

• Consulting on project scope definition.

• Assisting in identifying and assessing risk.

• Coordinating the planning, design, construction and other related facility activities required to make your project a success.

• Providing you with personal attention by assigning a Project Manager to your project from startup to closeout.

• Acting as your liaison throughout the project.

Our key role is to represent your interests by:

Page 10: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

BENEFITS OF CS GROUP

ON YOUR TEAM

Page 11: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Expertise in Construction Management

Expertise in coordinating the procurement of design and construction services

Thorough knowledge of the State construction statutes

Expertise in all forms of project delivery

Commitment to Customer Service

No project is too big or too small

Page 12: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Cost Savings

$ Construction Services’ management fees are based on “Salary and Expenses only,” which means more dollars dedicated to your project!

$ We provide comprehensive project budget profiles, which include detailed budget accounting for all project costs, vendor payment, reconciliation, administration, cost accounting, and eliminate “surprises” and cost overruns, which also equates to substantial cost savings!

Page 13: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

$ The average fee for a Project Manager in the Valley is $150+ per

hour

$ Construction Services’ fee is only $55 per hour!

Page 14: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Prior to commencement, Construction Services will

advise you on the best method to design and

construct your project to meet your budget and

scheduled goals.

Design-Bid-Build

Design-Build

Construction Manager @ Risk

Job Order Contracting

Architect/Engineer Services

Energy Performance Contracts

Project Delivery Services

Page 15: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Material Purchases

Invitation for Bid

Coordination of Emergency Procurement

Recommendation for Award of Contract

Requests for Proposals and/or Qualifications

Other Services…

Page 16: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Construction Management

Before work begins, we will coordinate all the necessary site investigations and environmental surveys.

As work begins in the field, we will be your onsite representative.

We will administer and oversee all construction.

We will manage the budget and maintain all records, logs and reports, and most importantly…

We will keep you informed on all progress and issues affecting the project.

Page 17: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Satisfied Customers

Repeat Business

Quick Response Time

Our Surveys say…….

Commitment to Customer Service

Page 18: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

CUSTOMER SURVEYOverall Satisfaction with Construction Services on a scale

of 1 to 8

0

2

4

6

8

Az D

ept

Veteran

s'S

ervices

AD

OC

AD

OT

Az S

tateH

ospital

Az D

eaf&

Blin

dS

chool

Client A/E General Contractor

Page 19: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

CLIENT LIST

Page 20: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

• Arizona Department of Administration (ADOA)

• Arizona Department of Corrections (ADC)

• Arizona Department of Health Service (AHS)

• Arizona Department of Juvenile Corrections

(ADJC)

• Arizona Department of Veterans Services (ADVS)

• Arizona Department of Transportation (ADOT)

• Arizona State Hospital (ASH)

• Arizona Historical Society (AZHS)

• Arizona Department of Environmental Quality

(ADEQ)

• Arizona Department of Commerce

• Arizona State Forestry Division (ASFD)

Page 21: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

• Arizona School for Deaf and Blind – Tucson (ASDB)

• Phoenix Day School for the Deaf – Phoenix (PSDS)

• Arizona State Lottery (ASL)

• Arizona Exposition & State Fair (AESF)

• Arizona Department of Revenue (ADOR)

• Arizona Supreme Court

• Governor’s Office

• Arizona Game and Fish (AZGF)

• Office of Attorney General

• Arizona Pioneers’ Home (APH)

• Arizona Department of Economic Security (DES)

• Arizona Department of Public Safety (DPS)

Page 22: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• Executive Tower Emergency Power Panel $33,000

• Pioneers’ Home Women’s Ward Remodel $204,000

• DES 20,000 SF Remodel $670,000

• PDSD Kachina Classroom Remodel $107,000

• ASPC Perryville-Natural Gas Line Replacement $856,000

• Pioneers’ Home Asbestos Floor Replacement $38,000

• ADC Lewis Prison 4150 Bed Facility $220M

• ADC Yuma Complex Cheyenne Unit $25M

Page 23: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• ADC Douglas Wastewater Pipeline/Clarifier $3.7M

• ADHS New Health Lab $30M

• Arizona State Hospital Complex $67M

• Arizona State Hospital Sexual Predator 60 Bed Bldg. $5.5M

• Dept. of Agriculture Historic Preservation $2.7M

• Capitol Executive Tower Renovation $3.1M

• Weights & Measures Test Lab Remodel $516,000

• Capitol Museum Restoration $2M

• DES Duct Replacement $388,000

Page 24: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• Pioneers’ Home Plumbing Modernization $1.2M

• ADC 1000 Bed Prison Project $24.3M

• PDSD Transportation Bldg. $427,000

• Arizona State Supreme Court Re-Roof $550,000

• ADC Florence Prison Water Tank Upgrades $1M

• ADOR Elevator Upgrades $1.45M

• ADOR Restroom Upgrades $1.2M

• ADOA Tucson Complex Chiller Upgrades $1M

• AESF Coliseum Structural Roof Repairs $6.15M

Page 25: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• PDSD High School/Middle School $13M

• ASDB Vocational/Student Health Bldg-Tucson $6M

• ADJC Arsenic Removal System $700,000

• DES Elevator Upgrades/Renovations $957,000

• ADOT Payson Equipment Shop $1.4M

• ADC 4000 Bed Prison Expansion Project $200M

• ADC Yuma New Reverse Osmosis Water TreatmentPlant $5.2M

• ADC Lewis Water Treatment Plant Upgrades/WellEquipment Repair & Replacement $1.735M

Page 26: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• ADC Yuma Expansion of Wastewater Treatment Plant $11M

• ADOT Employee Housing @ Grand CanyonAirport $2.5M

• Arizona State Hospital/Forensic Hospital $32M

• ADVS Phoenix Veterans’ Home Dining Room Expansion $750,000

• ADVS New Tucson Veterans’ Home $28.6M

• Statewide American Recovery & Reinvestment Act (ARRA) of 2009 $4.6M

Page 27: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• DPS Fire Alarm System Upgrades (Computer Room) $160,000

• ADC Florence Central Unit – Structural & Life Safety Analyses and Roof Replacement $350,000

• Arizona State Supreme Court Chiller Installation $1.7M

• ADJC Adobe and Catalina Mountain School Renovations $2.9M

• ADOT New AZ Transportation Research Center (ATRC) $250,000

• ADVS Phoenix Veterans’ Home Chiller Replacement $800,000

Page 28: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• ASPC Lewis New Water Well #5 $2.3M

• AZ Historical Society-Tempe Historical Society Museum Re-Roof $333,000

• Arizona State Hospital Replace Heat Exchange $190,000

• Arizona State Capitol Dome Repairs $300,000

• ADJC Replace HVAC Systems @ Adobe Mountain and Black Canyon Schools $260,000

• DPS Replace Chiller, Cooling Tower and HVAC Systems @ Forensics Sciences Lab $600,000

• AESF Cattle Barn Structural Roof Repairs and Roof Replacement $460,000

Page 29: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

SOME OF OUR PROJECTS

• Arizona Forestry Division/Flagstaff Parking Lot Resurface and Office Renovations $130,000

• ADOA Replace Electrical Service Entrance @ Executive Tower $1.133M

• AZ Prescott Historical Society-Sharlot Hall Museum Cooling Tower, Water Heater & Roof Replacement $225,000

• ADOA Tucson Office Complex Tucson Disaster Recovery Center New UPS and Backup Genset $228,000

• Building Renewal (Capital Maintenance/Repairs) for Fiscal Year 2013 $10M

Page 30: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

PHOTO ALBUM

Page 31: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona State Capitol Dome Hail Damage Repair Completion Dec 2011

Page 32: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona State Hospital ComplexNew Forensic 120 Bed Hospital

Gilbane Building Companies

Completion Sep 2011

Ground Breaking Ceremony Nov. 2, 2009 (Main Hospital 120 Beds)

New Forensic Site Excavation

Ground Opening Ceremony Oct. 5, 2011

Page 33: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona State Hospital ComplexNew Forensic 120 Bed Hospital

Gilbane Building Companies Completion Sep 2011

Security Control Room

Patient Bathroom

Administrative Office

Semi-Private Patient Room

Main Entrance

Patient Dayroom

Administrative Office

Aerial Sep 2011

Staff Work Area

Guard Station Hospital Entrance

Page 34: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Veterans ServicesNew AZ Tucson Veterans’ Home – 120 Bed

Facility Completion Sep

2011

Page 35: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Veterans ServicesNew AZ Tucson Veterans’ Home – 120 Bed

Facility Completion Sep

2011

Page 36: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Veterans ServicesNew Chiller and AHU Replacement, Phoenix, AZ

Completion Aug 2011

Chiller Piping Chiller Piping

1 of 2 Air Handler Units1 of 2 Air Handler Units

Page 37: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona State Supreme Court - Chiller Installation

1501 W. Washington, Phoenix, AZCompletion May 2011

Circulation Pumps

Lifting Chiller Over Wall to Set in Basement

Lifting Chiller to Set in Basement

1 of 3 New Chillers in Place

Page 38: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona School for Deaf and Blind – TucsonManzanita Dorm Fire Remodel Completion Jun 2010

Page 39: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of TransportationBurnt Wells Rest Area Residence Renovations

I-10, Mile Post 86 Completion Jun 2010

Page 40: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of RevenuePassenger Elevator Modernization

Completion Mar 2010

Page 41: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Veterans ServicesAZ Veterans’ Home - Dining Room

ExpansionCompletion Feb 2010

Page 42: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

ADC 4000 Bed Prison Expansion ProjectASPC Perryville (1000 Bed) Completion Feb 2010

McCarthy Building Companies

Prototypical Visitation AreaPrototypical Housing DormPrototypical Kitchen

Prototypical Dental Office

San Carlos Unit

Page 43: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

ADC 4000 Bed Prison Expansion ProjectASPC Tucson (1000 Bed) Completion Feb 2010

McCarthy Building Companies

Prototypical Washroom

Whetstone Unit

Prototypical Dormitory Officers’ Station

Prototypical Kitchen Office

Prototypical Kitchen Officers’ Control Room

Prototypical Showers

Page 44: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

ADC 4000 Bed Prison Expansion ProjectASPC Yuma (2000 Bed) Completion Feb 2010

McCarthy Building Companies

Prototypical LaundryPrototypical Control Room

Pedestrian Sallyport

La Paz and Cibola Units 1000 Beds Each

Prototypical Dining Room

Page 45: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

ADC 4000 Bed Prison Expansion ProjectASPC Yuma Water Treatment Plant

Completion Feb 2010McCarthy Building Companies

Raw Water Pump Station

Finished Water Pump Station

Chemical Feed System Reverse Osmosis System

Page 46: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

ADC 4000 Bed Prison Expansion ProjectASPC Yuma Wastewater Treatment Plant

Completion Feb 2010 McCarthy Building Companies

New Effluent Storage PondClarifier & Operations Bldg.Alkalinity Feed System & Headworks

Page 47: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Department of Transportation (ADOT)

Grand Canyon Employee Housing Completion Feb 2009

Page 48: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Phoenix Day School for the Deaf High School/Middle School

Completion Jul 2008

Page 49: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Arizona Dept Juvenile Corrections Arsenic Removal System Installation

Completion Nov 2007

Page 50: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2012

Tucson Office Complex Solar Photovoltaic

ADOT CCP Office Remodel

ASH Cooling Tower Repairand Replacement

ADOT Admin Bldg Roof Replacement

ADOT Kingman Yard Sewer Conversion

State Forestry Div. Flagstaff-Resurface Parking Lot & Siding Replacement

AESF AZ Veterans Coliseum Cattle Barn Bldg. Roof Replacement

ADJC Adobe Mountain and Black Canyon Schools HVAC Replacement

Sharlot Hall Museum Cooling Tower Replacement

ADC Florence Cell Block 2 Structural Repairs

Page 51: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2012

AZ State Hospital Solar Photovoltaic

So. AZ Veterans Memorial Cemetery Solar Photovoltaic

Tucson Office Complex Solar Photovoltaic

DES 1789 W. Jefferson Solar Photovoltaic

Page 52: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2011

ADOT Tonopah Water Storage Tank Replacement

ADOT Phoenix Equipment Services

1 of 3 Bldgs Roof Replacement

Phoenix Day School for Deaf SPAC Bldg. Re-Roof

Phoenix Day School for Deaf-SPAC Bldg. HVAC Replacement

ASPC Florence Central Unit #8 Roof Replacement

ADJC Adobe Mountain Toilet Modifications

Page 53: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2011

Executive Tower Roof Replacement

Health Lab Pre Cooler Installation

ADJC Adobe Mt Chapel Roof Replacement

Topock Port of Entry Remodel

ASPC Lewis New Water Well #5

Page 54: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2010-2011

ADOT 1801 W. Jefferson MVD Remodel

ADOT Transportation Research Center

ADOT Kingman Point of Entry Renovations

Arizona Exposition & State Fair Coliseum Re-Roof

ADOT Wikieup Maintenance Yard Repairs

Page 55: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2010-2011

ASPC Perryville Central Kitchen Remodel

ADOT HRDC Skylight Replacement ADOT Chandler Modular Office Relocation

ASPC Perryville Central Kitchen Upgrades

Polly Rosenbaum Archives Bldg. Solar Photovoltaic AHCCCS Bldg. 701 E. Jefferson Solar Photovoltaic

Page 56: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2009-2010

Tucson Office Complex Disaster Relief Data Center Upgrades

ADOT Littlefield MVD Renovation

ADOT Holbrook Maintenance Yard A/C Replacement

ADOT Holbrook Maintenance Yard Re-Roof

ADOT Page Refueling Bldg. Re-Roof

ASPC Lewis Water Treatment Plant Upgrades

Page 57: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2009-2010

ASPC Lewis Wells 1 & 2 Renovations

ASPC Tucson Sewer Connection to Pima County

Tucson Office Complex Cooling Tower Replacement

ASPC Tucson New Water Tank

Tucson Office Complex Plumbing Renovations

1510 W. Adams CRAC Unit Installation

Page 58: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2008-2009

ASPC Lewis Staff Training Bldg.

ASPC Perryville Gas Line Installation

AZ Historical Society Sanguinetti House Renovations

ASPC Tucson Rincon Lock Replacement

ADOT-Grand Canyon Airport TSA Passenger Screening Remodel

ADOT East Metro Facility Sewer Line Installation

Page 59: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2008

ADOT HRDC Window Installation

ADOT Modulars 1715 W. Jackson ADOT Williams, AZ - De-Icer Canopy Installation

ADOT HRDC Parking Lot Drain

ADOT Right of Way Office Remodel

ASDB Tucson Student Health Bldg

AZ State Hospital Dietary Bldg Sewer Line

Replacement

Page 60: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2008

ADJC Adobe Mountain Re-RoofAZ Supreme Court Re-Roof

Evans House Repaint Capital Center Parapet Wall Repair

Tucson Office Bldg-400 W. Congress Upgrades

Page 61: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Other Construction Projects 2007-2008

Capital Center Make Up Air Replacement

AESF Coliseum Structural Roof Repair

ASPC Florence Water Tank Renovation

ADOR Restroom Upgrades

ADOT HRDC Parking Lot Drain Repair

ADOT Right of Way Office Remodel

Page 62: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

Southern Arizona Veterans Memorial Cemetery Committal Shelter

Other Construction Projects 2000-2006

Arizona Department Health Services State Laboratory

ADOT Payson Equipment Shop

AZ State Prison Complex-LewisBuckeye, AZ

AESF Concrete Masonry Wall Installation

AZ State Hospital Perimeter FencingArizona State Hospital ACPTC Perimeter Fencing

Page 63: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

CONCLUSION

Page 64: Arizona Department of Administration General Services Division Proudly Presents The... August 2012

• Full service Project Management Team

• Expertise in Construction Management

• Cost Savings

• Customer Service

• Projects on Time and within Budget