ARIZONA COUNTIES’ ROADWAY NEEDS STUDY
2008 UPDATE
AACE 2009 January Quarterly Meeting,
January 29, 2009
Rancho De Los Cabelleros, Wickenburg, AZ
Arizona Association of County
Engineers
Total County Roadway Needs 2008Compared to Previous Study Years
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Ro
ad
s N
ee
ds
(in
mill
ion
a-y
ea
r 2
00
8 d
olla
rs)
1994 1997 2000 2004 2008
Year of AACE Study/Update
Operations
New Bridges
Existing Bridges
Safety
New Roads
Maintenance
Upgrade Existing Roads
$12.85 Billion
How Can One Declare “$12.85 Billion”…As Costs Rise and Fall Daily?
The Easy Answer: Study Methods and Cost Inflator Series are Consistent with Previous Studies
Yes, but… Costs are Inflated to 3rd Quarter 2008 Dollars Cost of $1.00 in 2004 became $1.308 in 3rd Quarter 2008
Users of the Study during 2009-2013 Should Revise the Costs to the (Current) Year as they use the Study Results.
But What about 2009? Gasoline, in one year, $3.09 to $4.11 to $1.68 /gal. Copper, in one year, $ 3.46 to $4.10 to $ 1.84 /lb.
Costs Rise and Fall…Continued
If Costs are coming Down, could adjust the inflator
Are contractor labor costs coming down?
Are Asphalt costs coming down?
Let’s decide--in the Strategy Session--whether to Adjust the Inflator
Revenue and Needs Effects of Decline in Travel
DECLINE IN VEHICLE-MILES TRAVELED ON RURAL HIGHWAYS, UNITED STATES, 2006-NOVEMBER, 2008
Source: USDOT, FHWA, Policy Information, Travel Monitoring
Decline in Vehicle-miles Traveled on Rural Arterial Roads, 2008 vs. 2007
Area
November October
Vehicle-Miles (Millions)
PercentChange
Vehicle-Miles (Millions)
PercentChange
2008(Preliminary)
2007 2008 (Revised)
2007
Arizona 940 1,029 -8.6 1,018 1,110 -8.3
WesternUnited States*
9,988 10,617 -5.9 10,730 11,336 -5.3
United States 49,721 52,524 -5.3 53,660 56,210 -4.5
Source: USDOT, FHWA, Policy Information, Travel Monitoring *Alaska, Arizona, California, Colorado, Hawaii, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming
Revenue Effects of Decline in Travel… HURF and VLT Funds
Year
September 2008 January 2009 September 2008 January 2009
Net HURF Counties3
Revised Net HURF4,
Counties VLT, CountiesRevised
VLT, Counties
2009 $247.1 $232.3 $53.0 $48.72010 $271.8 $243.9 $56.9 $50.62011 $284.7 $252.5 $62.0 $52.82012 $299.0 $265.3 $67.4 $57.4
2013 $314.5 $279.0 $73.5 $62.6
2014 $329.8 $292.6 $79.6 $67.8
2015 $346.6 $307.4 $86.1 $73.4
2016 $364.0 $322.9 $93.4 $79.6
2017 $380.6 $337.7 $100.3 $85.5
2018 $398.8 $353.8 $108.4 $92.4
Total $3,236.9 $2,887.3 $780.7 $670.6
HURF AND VLT REVENUE PROJECTIONS ($MILLIONS)
Source: September projections, adopted by AZ State Transportation Board; January, by consultant to AACE study
Needs Effects of Decline in Travel… Needs Effects of Less Growth in Travel… If Travel is Down by 10% for a Few Years, Can the Period For
Repaving Stretch (from 7..from 20…from 40…to longer multiple-year intervals ?)
If it is decided to reduce Population Projections, the Model would Indicate fewer Capacity Failures
Should the Population increases for 2009-2013 be adjusted?
How Did the Model Calculate the “$12.85 Billion”…
Asked the question previously, as a jumping-off point to discuss the current economic conditions
Do we adjust Inflator for Needs? Do we adjust Population Projections? Do we adjust Maintenance Periods?
Now asked the question again to transition to discussion of Progress Methods Findings in the Data Counties Supplied
Scope and Study Progress Kickoff Meeting on September 25Kickoff Meeting on September 25thth
Requested County Data on Cost Factors Requested County 2008 Roadway Inventory Data Developed Revised Cost Factors and Economic Inflators TAC Meeting on October 30TAC Meeting on October 30thth; Focus upon Cost Factors and Planning Guidelines
Received Inventories from many counties; received Bridge Data from ADOTReceived Inventories from many counties; received Bridge Data from ADOT
Ran the AACE Model with 2004 County Data and Revised Cost FactorsRan the AACE Model with 2004 County Data and Revised Cost Factors
County Engineers’ Meeting, December 11th; Interim results by countyCounty Engineers’ Meeting, December 11th; Interim results by county
Continued to receive and update county dataContinued to receive and update county data
Remainder of Study applied Revised Cost Factors to 2008 Roadway Remainder of Study applied Revised Cost Factors to 2008 Roadway InventoriesInventories
Draft Report Provided to MCDOT Draft Report Provided to MCDOT
County Needs Study Report at AACE January 2009 Meeting County Needs Study Report at AACE January 2009 Meeting (Wickenburg): Draft Report and Presentation Slides Distributed(Wickenburg): Draft Report and Presentation Slides Distributed
Final Written Report, March 2009 Final Written Report, March 2009
Procedure: Same as in 2004
Arizona Counties
Revised CostFactors
CalculateMaintenance
Costs
Review byAACE Committee
RevisedCost Factorsand Planning
Guidelines
CalculateOperating
Costs
Select EligibleProjects
ADOT Bridge
Inspection ReportsRoad
Inventories
MaintenanceCost Factors
from 2004 Study
RoadwayCost Factors and
Planning Guidelinesfrom 2004 Study
CountyPlans/CIPs
Road Mileageby Type
Review byAACE Committee
MaintenanceNeeds
CalculateSafetyNeeds
Total Needs
Existing BridgesNeeds
MaintenanceNeeds
Operating CostNeeds
UpgradingExisting Roads
NeedsSafety Needs
New Bridges on
Existing Roads Needs
New RoadNeeds
Analysis ofDeficienciesProgram
Comparison of Urban vs. Rural Miles
CountyCounty
2004 2004 Urban Urban MilesMiles
2004 2004 Rural MilesRural Miles
2004 2004 TotalsTotals
2008 2008 Urban Urban MilesMiles
2008 Rural 2008 Rural MilesMiles
2008 2008 TotalsTotals
Apache 0 1,689 1,698 0 1,694 1,694
Coconino 36 1,097 1,133 339 691 1,030
Graham 21 748 769 18 714 731
Maricopa 1,229 1,400 2,629 1,531 907 2,438
Pima 252 613 864 1,379 838 2,217
Pinal 1,340 945 2,285 1,354 863 2,217
9,370 10,330
Breakout of Roadways by Functional Classification 2004
Breakout of Roadway by Functional Classification 2008
2009-2018 Needed Expenditures by County
County MaintenanceExistingBridges
New Bridges
on Existing
Roads
UpgradeExistingRoads
NewRoads Safety Operating Total
Apache $213,861 $1,576 $0 $106,904 $0 $34,373 $21,386 $378,099
Cochise $125,839 $7,102 $2,615 $247,190 $1,306 $39,663 $12,584 $436,298
Coconino $154,750 $64 $0 $408,736 $25,028 $60,405 $15,475 $664,459
Gila $58,872 $530 $5,151 $102,685 $71,428 $24,455 $5,887 $269,008
Graham $43,871 $6,435 $11,853 $69,723 $12,335 $14,861 $4,387 $163,466
Greenlee $15,650 $2,555 $0 $7,062 $0 $2,683 $1,565 $29,516
La Paz $66,902 $1,706 $0 $72,271 $0 $14,757 $6,690 $162,327
Maricopa $465,261 $128,011 $152,617 $1,783,362 $200,718 $277,650 $46,526 $3,054,145
Mohave $362,595 $1,353 $0 $1,608,531 $6,661 $201,540 $36,259 $2,216,939
Navajo $107,721 $11,853 $0 $159,377 $49,462 $33,918 $10,772 $373,103
Pima $367,782 $28,351 $44,076 $1,409,641 $317,452 $220,408 $36,778 $2,424,489
Pinal $244,950 $20,026 $0 $719,809 $27,942 $103,722 $24,495 $1,140,943
SantaCruz $54,432 $6,484 $0 $55,578 $25,847 $14,778 $5,443 $162,562
Yavapai $180,730 $38,029 $0 $428,156 $1,894 $66,688 $18,073 $733,571
Yuma $143,203 $1,934 $0 $399,481 $28,242 $58,718 $14,320 $645,898
TOTAL $2,606,419 $256,009 $216,311 $7,578,507 $768,315 $1,168,620 $260,642 $12,854,824
Nearly Finished, but Will Ask Help Refining…
New Roads and Bridges
Bridge Repairs /Replacements
Other Items You Discover in Your Review