47
ARISSat-1 Overview ARISSat-1 Overview Loudon County ARES Loudon County ARES November 2010 November 2010 Gould Smith, WA4SXM Gould Smith, WA4SXM ARISSat-1 AMSAT Project ARISSat-1 AMSAT Project Manager Manager

ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Embed Size (px)

Citation preview

Page 1: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 OverviewARISSat-1 OverviewLoudon County ARESLoudon County ARES

November 2010November 2010

Gould Smith, WA4SXMGould Smith, WA4SXM

ARISSat-1 AMSAT Project ManagerARISSat-1 AMSAT Project Manager

Page 2: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

SuitSat-2 MissionSuitSat-2 Mission

Suitsat II was an enhanced follow-up to the Suitsat II was an enhanced follow-up to the 2006 SuitSat project2006 SuitSat project

It was a joint project between AMSAT, It was a joint project between AMSAT, ARISS, NASA and EnergiaARISS, NASA and Energia

Major mission is to promote STEM Major mission is to promote STEM educationeducation

AMSAT to build the modules, Energia to AMSAT to build the modules, Energia to launch, NASA to interface, ARISS to launch, NASA to interface, ARISS to publicizepublicize

Page 3: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

SuitSat-2 SystemSuitSat-2 System

Page 4: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

SuitSat-2 System 05/09SuitSat-2 System 05/09

Page 5: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

SuitSat became ‘SuitlessSat’SuitSat became ‘SuitlessSat’

Due to safety issues and space Due to safety issues and space constraints, Orlan suit #27 was placed into constraints, Orlan suit #27 was placed into Progress vessel 33 and released from the Progress vessel 33 and released from the ISS to deorbit on 13 July 2009ISS to deorbit on 13 July 2009

We still had the upmass for a Jan ’10 We still had the upmass for a Jan ’10 launch and EVA time in the Spring of 2010launch and EVA time in the Spring of 2010

Page 6: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Hardware ChangesARISSat-1 Hardware Changes New structureNew structure New antennasNew antennas Cameras on separate sides of the Cameras on separate sides of the

structure with mirrorsstructure with mirrors Module changes – MPPT & IHU Module changes – MPPT & IHU New cablesNew cables Battery attachmentBattery attachment Control Panel attachmentControl Panel attachment Experiment attachmentExperiment attachment

Page 7: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Innovations and ARISSat-1 Innovations and ExperimentsExperiments

New structureNew structure microSD card to store voice datamicroSD card to store voice data Cameras with mirrorsCameras with mirrors MPPT MPPT SDX TechnologySDX Technology Shallow Charge/Discharge of AgZn Battery Shallow Charge/Discharge of AgZn Battery Velcro Solar Panel attachmentVelcro Solar Panel attachment New Vacuum Data ExperimentNew Vacuum Data Experiment More microcontrollers than a satellite 5 times More microcontrollers than a satellite 5 times

its sizeits size Colder satellite than most other AMSAT satsColder satellite than most other AMSAT sats Multiple communication protocolsMultiple communication protocols

Page 8: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Hardware ChangesARISSat-1 Hardware Changes

*5 *5

+ development+ development

Page 9: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Module LocationsARISSat-1 Module Locations

Page 10: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 StructureARISSat-1 Structure

Page 11: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ThermalThermal

Page 12: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

AntennasAntennas

Page 13: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

CamerasCameras

Page 14: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 SystemARISSat-1 System

Page 15: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

RF ModuleRF Module

Page 16: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

New MPPT moduleNew MPPT module

Page 17: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

IHU Modular DesignIHU Modular Design

SDXSDX Software Defined Transponder Software Defined Transponder IHUIHU Integrated Housekeeping Unit Integrated Housekeeping Unit PCBPCB Power Converter Board Power Converter Board ICBICB Interconnect Board (bottom) Interconnect Board (bottom)

Page 18: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

IHU / SDX / PSU / ICB enclosure IHU / SDX / PSU / ICB enclosure

Power cable, 50 pin control/signal cable, 2 solar Power cable, 50 pin control/signal cable, 2 solar panel cables, 4 experiment connectorspanel cables, 4 experiment connectors

Page 19: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 IHU moduleARISSat-1 IHU module

Page 20: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

IHUIHU

Page 21: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

SDXSDX

Page 22: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Solar PanelsSolar Panels 6 High 6 High

efficiency efficiency panelspanels

Panels Panels donated by donated by NASA from NASA from SMEX projectSMEX project

19” x 10.5”19” x 10.5”

Page 23: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

SuitSat-2 CablingSuitSat-2 Cabling

Page 24: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 CablingARISSat-1 Cabling

Page 25: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 CablingARISSat-1 Cabling

Page 26: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 BatteryARISSat-1 Battery

825M3 Orlan 825M3 Orlan Suit BatterySuit Battery

18 AgZn cells18 AgZn cells

28 volts28 volts

Designed for 5 Designed for 5 rechargesrecharges

Page 27: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Control PanelARISSat-1 Control Panel

Page 28: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 ExperimentARISSat-1 Experiment

Experiment sampled once per orbitExperiment sampled once per orbit Experiment must run on +5V Experiment must run on +5V ≤ ≤ 100ma100ma Experiment powered for 100 min/orbitExperiment powered for 100 min/orbit Collect up to 2k of dataCollect up to 2k of data Then 2k of data downloaded to IHU for 2 Then 2k of data downloaded to IHU for 2

seconds, then Exp powered downseconds, then Exp powered down Data transmitted in BPSK data stream with Data transmitted in BPSK data stream with

TelemetryTelemetry

Page 29: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Kursk ExperimentKursk Experiment

Kursk State Kursk State Technical Technical UniversityUniversity

Measures the Measures the vacuum at vacuum at different different altitudesaltitudes

Page 30: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Submitted Drawings and Docs Submitted Drawings and Docs from around the worldfrom around the world

Page 31: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 OperationARISSat-1 Operation

Page 32: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Band PlanARISSat-1 Band Plan

Page 33: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Live ARISSat-1 SignalsLive ARISSat-1 Signals

CW, BPSK, Transponder, FM (Voice/SSTV)CW, BPSK, Transponder, FM (Voice/SSTV)

Page 34: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 SignalsARISSat-1 Signals FM on 2mFM on 2m

CW ID, Telemetry and CallsignsCW ID, Telemetry and Callsigns

BPSK Experiment and Telemetry DataBPSK Experiment and Telemetry Data New Phil Karn, KA9Q BPSK-1000 encoding New Phil Karn, KA9Q BPSK-1000 encoding

scheme, plus old Phase 3 400 bps BPSKscheme, plus old Phase 3 400 bps BPSK

70cm/2m U/V Transponder70cm/2m U/V Transponder

Page 35: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Voice GreetingsVoice Greetings

24 different greetings24 different greetings Mainly from children, some adults, and Mainly from children, some adults, and

GagarinGagarin Secret wordSecret word 15 different languages15 different languagesEnglishEnglish SpanishSpanish RussianRussian FrenchFrenchItalianItalian DutchDutch SwedishSwedish JapaneseJapaneseChineseChinese CatalanCatalan BengaliBengali PortuguesePortugueseHebrewHebrew NepaleseNepalese GermanGerman

Page 36: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 TelemetryARISSat-1 Telemetry

Page 37: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

Experiment DataExperiment Data

Page 38: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 MirrorsARISSat-1 Mirrors

Page 39: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Video ImageARISSat-1 Video Image

Actual Robot-36 SSTV image transmitted Actual Robot-36 SSTV image transmitted from the ARISSat-1 using the +Y mirrorfrom the ARISSat-1 using the +Y mirror

Page 40: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Solar Panel CoversARISSat-1 Solar Panel Covers

Page 41: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 Thermal/Vacuum ARISSat-1 Thermal/Vacuum

Page 42: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1 NASA Safety ReviewARISSat-1 NASA Safety Review

Page 43: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1/RadioSkaf VARISSat-1/RadioSkaf Vvibration testingvibration testing

Page 44: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1/RadioSkaf VARISSat-1/RadioSkaf VUnderwater testingUnderwater testing

Page 45: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1/RadioSkaf VARISSat-1/RadioSkaf Vwill travel to the ISS on Russian will travel to the ISS on Russian

on Progress vessel 41Pon Progress vessel 41P

Page 46: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1/RadioSkaf VARISSat-1/RadioSkaf V“Amateur Radio Experiment”“Amateur Radio Experiment”

Currently scheduled to be Currently scheduled to be deployed on EVA R28deployed on EVA R28

February 2011February 2011

Page 47: ARISSat-1 Overview Loudon County ARES November 2010 Gould Smith, WA4SXM ARISSat-1 AMSAT Project Manager

ARISSat-1/RadioSkaf VARISSat-1/RadioSkaf V“Amateur Radio Experiment”“Amateur Radio Experiment”

Questions?Questions?