Architekten von Gerkan, Marg und Partner FIFA WM 2014 Arena da Amazônia, Manaus, Brasilien FIFA WC 2014 Arena da Amazônia, Manaus, Brazil
PressevorabinformationPress advance information
gmp
FIFA WM 2014 Arena da Amazônia, Manaus, Brasilien
FIFA WC 2014 Arena da Amazônia, Manaus, Brazil
This stadium design was based on the idea of creating a simple but highly efficient stadium which also makes reference to the special location, to the fascination and natural diversity of forms in the tropical rainforest. Designed for 44,400 spectators, the sta-dium is located at the central traffic axis that links the airport with the inner city. The new building was integrated into a sports park with Sambadrome, field and track facilities, multi-purpose halls and an aquatic center. The project was developed in coop-eration with the gmp partner practice STADIA from São Paulo and the structural engineers schlaich bergermann und partner.Making best use of the topography with its gentle slope in the terrain, the stadium has been placed on a base which provides space for VIP access, the media, the players and parking spaces. A ring including spectator boxes, offices and a restaurant sepa-rates the upper tier from the lower tier, which is recessed in the base. The roof structure is composed of mutually bracing canti-lever elements in the form of hollow steel box girders which also serve as large gutters for the discharge of the enormous quanti-ties of water expected during tropical rain events. In view of the hot and humid climate at the Amazon, the roof extends into a facade which provides shade to the spectator balconies and verti-cal access routes. The roof and facade panels consist of translu-cent glass fiber fabric. The Arena da Amazônia is one of the world’s first stadiums to be certified under the LEED scheme administered by the US Green Building Council.
FIFA WM 2014 Arena da Amazônia, Manaus, BrasilienFIFA WC 2014 Arena da Amazônia, Manaus, Brazil
Beim Entwurf dieses Stadions stand die Idee im Vordergrund, ein einfaches, aber hocheffizientes Stadion zu konzipieren, das gleichzeitig eine Referenz an den besonderen Ort, an die Faszina-tion und die natürliche Formenvielfalt des tropischen Regen-walds darstellt. Für 44.400 Zuschauer konzipiert, liegt es an der zentralen Verkehrsachse, die den Flughafen mit der Innenstadt verbindet. Der Neubau wurde in einen Sportpark mit Sambadrom, Leichtathletikanlagen, Mehrzweckhallen und Schwimmzentrum integriert. Das Projekt wurde gemeinsam mit dem gmp-Partner-büro STADIA aus São Paulo und mit schlaich bergermann und partner als Tragwerksplaner entwickelt. Die natürliche Topografie nutzend, befindet sich das Stadion auf einem in den leichten Hang gesetzten Sockel, in dem sich die Erschließung für VIPs, Medien und Sportler sowie Stellplätze be-finden. Ein umlaufender Ring aus Logen, Büroflächen und Res-taurant trennt den Ober- von dem in den Sockel eingelassenen Unterrang. Die Dachkonstruktion setzt sich aus sich gegenseitig aussteifenden Kragarmen zusammen, deren Stahlhohlkastenträ-ger gleichzeitig als große Rinnen für die enormen Wassermassen der tropischen Niederschläge dienen. Angesichts des feuchthei-ßen Klimas am Amazonas geht das Dach in eine Fassade über, die auch die Zuschauerumgänge und Vertikalerschließungen ver-schattet. Dach- und Fassadenfelder bestehen aus transluzentem Glasfasergewebe. Als eines der ersten Stadien weltweit wird die Arena da Amazônia nach den Kriterien des US Green Building Councils LEED zertifi-ziert werden.
Konzept und Entwurfsplanung gmp und schlaich bergermann und partner mit stadia, São Paulo Ausführungsplanung gmp und schlaich bergermann und partnerConcept and scheme design gmp and schlaich bergermann and partners with stadia, São Paulo Detailed design gmp and schlaich bergermann and partners
Design Volkwin Marg and Hubert Nienhoff with Martin Glass, 2008
Project management Martin Glass, Maike Carlsen
Project management, Brazil Burkhard Pick, Sander-Christiaan Troost
Director of gmp do Brazil Ralf Amann
Team members (alphabetical) Sophie-Charlotte Altrock, Felipe Bellani, Lena
Brögger, Claudia Chiappini, Lieselotte Decker, Barbara Düring, Stephanie
Eichelmann, Konstanze Erbe, Silke Flaßnöcker, Priscila Lima da Silva Giersdorf,
Elke Glass, Ruthie Gould, Jacqueline Gregorius, Claudio Aceituno Husch, Fa-
bian Kirchner, Juliana Kleba-Rizental, Jochen Köhn, Martin Krebes, Helge
Lezius, Veit Lieneweg, Ausias Lobatón Ortega, Guilherme Maia, Rodrigo Math-
ias Duro Teixeira, Lucia Martinez Rodriguez, Adel Motamedi , Dirk Müller, Dirk
Peissl, Ivanka Percovic, Camila Preve, Nicolai Reich, Stefan Saß, Florian
Schwarthoff, Fariborz Rahimi, Sara Taberner Bonastre, Sonia Taborda, An-
guelica Larocca Troost, Katerine Witte
In cooperation with schlaich bergermann and partners, Stuttgart; stadia, São
Paulo
Structural design schlaich bergermann and partners – Knut Göppert with
Knut Stockhusen and Miriam Sayeg
Team members (alphabetical) Tiago Carvalho, Uli Dillmann, Andreas Eisele,
Florian Geiger, Alberto Goosen, Sebastian Grotz, Jochen Gugeler, Achim Holl,
Roman Kemmler, Hubert Kunz, Sandra Küstner, Walter Paganucci, Jana Pav-
lovic, Bernd Ruhnke, Guilherme Sayeg, Tilman Schober, Alexander Stäblein,
Alfred Strasdeit, Kai Zweigart
Structural design of solid construction in cooperation with EGT, São
Paulo; Larenge, São Paulo; Ruy Bentes, São Paulo
Services engineering b.i.g. Bechtold Ingenieurgesellschaft mbH; (scheme
design phase), mha, São Paulo; Teknika Projetos e Consultoria ltda, São Paulo;
Soeng Construção hidroelétrica ltda, São Paulo; Bosco & Associados ltda, São
Paulo; Loudness Sonorização Ltda, São Paulo
Landscape design St raum a (scheme design phase), Interact, São Paulo
Seats approx. 44,400
Length of stadium approx. 240 m
Width of stadium approx. 200 m
Construction period 2010–2014
Entwurf Volkwin Marg und Hubert Nienhoff mit Martin Glass, 2008
Projektleitung Martin Glass, Maike Carlsen
Projektleitung Brasilien Burkhard Pick, Sander-Christiaan Troost
Direktor gmp do Brasil Ralf Amann
Mitarbeiter (alphabetisch) Sophie-Charlotte Altrock, Felipe Bellani, Lena
Brögger, Claudia Chiappini, Lieselotte Decker, Barbara Düring, Stephanie
Eichelmann, Konstanze Erbe, Silke Flaßnöcker, Priscila Lima da Silva Giersdorf,
Elke Glass, Ruthie Gould, Jacqueline Gregorius, Claudio Aceituno Husch, Fa-
bian Kirchner, Juliana Kleba-Rizental, Jochen Köhn, Martin Krebes, Helge Le-
zius, Veit Lieneweg, Ausias Lobatón Ortega, Guilherme Maia, Rodrigo Mathias
Duro Teixeira, Lucia Martinez Rodriguez, Adel Motamedi , Dirk Müller, Dirk
Peissl, Ivanka Percovic, Camila Preve, Nicolai Reich, Stefan Saß, Florian
Schwarthoff, Fariborz Rahimi, Sara Taberner Bonastre, Sonia Taborda, Angu-
elica Larocca Troost, Katerine Witte
Arbeitsgemeinschaft mit schlaich bergermann und partner, Stuttgart;
stadia, São Paulo
Tragwerksentwurf und -planung schlaich bergermann und partner – Knut
Göppert mit Knut Stockhusen und Miriam Sayeg
Mitarbeiter (alphabetisch) Tiago Carvalho, Uli Dillmann, Andreas Eisele,
Florian Geiger, Alberto Goosen, Sebastian Grotz, Jochen Gugeler, Achim Holl,
Roman Kemmler, Hubert Kunz, Sandra Küstner, Walter Paganucci, Jana
Pavlovic, Bernd Ruhnke, Guilherme Sayeg, Tilman Schober, Alexander
Stäblein, Alfred Strasdeit, Kai Zweigart
Tragwerksplanung Massivbau in Zusammenarbeit mit EGT, São Paulo;
Larenge, São Paulo; Ruy Bentes, São Paulo
Haustechnik b.i.g. Bechtold Ingenieurgesellschaft mbH; (Entwurfsphase),
mha, São Paulo; Teknika Projetos e Consultoria ltda, São Paulo; Soeng Cons-
trução hidroelétrica ltda, São Paulo; Bosco & Associados ltda, São Paulo;
Loudness Sonorização Ltda, São Paulo
Freiraumplanung St raum a (Entwurfsphase), Interact, São Paulo
Sitzplätze ca. 44.400
Länge des Stadions ca. 240 m
Breite des Stadions ca. 200 m
Bauzeit 2010–2014
Projektdaten Data of the project
240 m length
200 m width
2 video screens of approx. 60 sqm each
Stadium
Facade
35 m height
44,405 seats
2 balconies
10,467 sqm membrane
83,500 sqm gross floor area
6,855 t steel construction
Inmitten des Dschungels – 1.500 km vom Meer entfernt – liegt die Milionenstadt Manaus. Die Arena da Amazônia befindet sich an der zentralen Verkehrsachse, die den Flughafen mit der Innenstadt verbindet. Manaus – a city of over 1 million inhabitants – lies 1,500 km from the sea, surrounded by jungle. The Arena da Amazônia is located at the central arterial road linking the inner city with the airport
Dach und Fassadenfelder bestehen aus transluzentem Glasfasergewebe und schützen die 44.000 Sitzplätze, Zuschauerumgänge und Vertikalerschließungen vor Regen und vor Sonneneinstrahlung.The roof and facade panels consist of translucent glass fibre fabric which protects the 44,000 seats, spectator balconies and vertical access routes from rain and solar radiation.
1 Lageplan 2 Grundriss Ebene 1 3 Schnitt Dach und Tribüne 4 Längsschnitt 5 Querschnitt1 Site plan 2 Floor plan level 1 3 Section through roof and grandstand 4 Longitudinal section 5 Cross section
1
4
5
3
2
DachaufsichtRoof from above
Grundriss Ebene 0Floor plan level 0
Stadienkompetenz weltweit Worldwide stadium builders
Berlin Olympic StadiumGermany
Commerzbank-Arena FrankfurtGermany
RheinEnergieStadium CologneGermany
Estádio Mineirão, Belo HorizonteBrazil
Estádio Nacional de BrasíliaBrazil
Arena da Amazônia, ManausBrazil
National Stadium, WarsawPoland
Olympic Stadium, KievUkraine
National Arena, BucharestRomania
Moses Mabhida Stadium, Durban South Africa
Cape Town Stadium, Cape TownSouth Africa
Nelson Mandela Bay Stadium, Port Elizabeth South Africa
Shanghai Oriental Sports CenterChina
Bao´an Stadium, ShenzhenChina
Sports Center, ShenzhenChina
“Stadium of Friendship” CottbusGermany
Sports and Concert Hall, BakuAzerbaijan
Jawaharlal Nehru Stadium, New Delhi India
Century Lotus Sports Park, FoshanChina
Basketball Center, DongguanChina
Swimming Stadium, New DelhiIndia
Geschäftsleitung Team
Hubert NienhoffPartner
Nikolaus GoetzePartner
Jürgen HillmerPartner
Stephan SchützPartner
Wu WeiPartner China
Meinhard von GerkanGründungspartnerFounding partner
Volkwin MargGründungspartnerFounding partner
The architectural practice von Gerkan, Marg and Partners was founded by
Meinhard von Gerkan and Volkwin Marg in 1965. Since its inception it has
grown to include four additional partners, one partner for China, eleven
associate partners and more than 500 employees in thirteen offices in Ger-
many and abroad. gmp is one of the few practices with a generalist position,
which takes responsibility for a project from the design idea and its realiza-
tion right through to the interior design.
In more than 45 years Meinhard von Gerkan, Volkwin Marg and their part-
ners have planned and constructed buildings in most major German cities.
They have designed small scale homes, hotels, museums, theaters and con-
cert halls, office buildings, commercial centers and hospitals as well as re-
search, educational and sports facilities, buildings for transportation, trade
and industry buildings and master plans.
gmp became internationally known as a team of airport architects when, in
1975, the Berlin Tegel building with its drive-in airplane terminal for “stacked
parking” was established. This innovative design has been further developed
to transform the departure and arrival halls at Stuttgart and Hamburg air-
ports. They are internationally recognized not only for their projects like the
New Trade Fair in Leipzig, the Rimini Exhibition Center or the Christ Pavilion
for the EXPO 2000, but also for their designs. Key examples are the designs
for the reconstruction and roofing of the Olympic Stadium in Berlin or Berlin
Central Station, which was completed in 2006.
gmp has succeeded in winning more than 590 prizes in national and inter-
national competitions, among them more than 290 first prizes and a large
number of awards for exemplary architecture. More than 350 buildings have
been constructed by gmp worldwide.
Amongst others in China, the exhibition and convention centers in Nanning
and Shenzhen, the Shanghai Pudong museum and the Zhongguancun Cul-
tural Center in Beijing as well as the Universiade Sports Center in Shenzhen
and the Oriental Sports Center in Shanghai have been built. Further buildings
are the opera houses in Chongqing, Qingdao and Tianjin as well as the Chi-
nese National Museum in Beijing and the new Tianjin West Railway Station.
In the year 2006 in Hanoi/Vietnam the National Conference Center was fin-
ished, the Hanoi Museum was realized in 2010. In South Africa three World
Cup stadiums, in Cape Town, Durban and Port Elizabeth were finished in
2009. For the 2014 FIFA World Cup in Brazil gmp realized the stadiums in
Brasília and Manaus. Von Gerkan, Marg and Partners have demonstrated
town-planning competence with their visionary proposals for “Stuttgart 21”
for the Deutsche Bahn, HafenCity Hamburg, and the urban master plan of
Bucharest/Romania, as well as many urban projects in China, including the
planning of Lingang New City for 800,000 inhabitants.
Aside from Germany gmp is currently involved in projects in China, India,
Vietnam, Brazil, Italy, Russia, Latvia, and Turkey to name but a few.
Büroprofil
Die Architektensozietät gmp wurde 1965 von Meinhard von Gerkan und
Volkwin Marg gegründet. Mittlerweile sind vier weitere Partner, ein Partner
für China und elf assoziierte Partner hinzugekommen. Mit über 500 Mitarbei-
tern, die sich auf dreizehn Büros verteilen, ist gmp im In- und Ausland aktiv.
gmp gehört zu den wenigen Büros mit einer generalistischen Position, die
sich für ein Projekt von seiner entwurflichen Idee und deren Realisierung bis
hin zum Interieurdesign verantwortlich fühlen.
Meinhard von Gerkan, Volkwin Marg und ihre Partner haben in über 45 Jah-
ren in nahezu allen großen Städten der Bundesrepublik geplant und gebaut.
Ihre Projekte reichen von Einfamilienhäusern, Hotels, Museen, Theatern und
Konzerthallen, Bürogebäuden, Handelszentren und Krankenhäusern bis hin
zu Forschungs-, Sport- und Bildungseinrichtungen sowie Verkehrsbauten,
Gewerbebauten und Masterplanungen.
Bekannt wurde gmp vor allem durch seine Flughafen-Architektur: 1975 wur-
de Berlin-Tegel als Drive-In-Airport eröffnet. Dieser innovative Entwurf ist
für die Abflug- und Ankunftebenen der Flughäfen Stuttgart und Hamburg
weiterentwickelt worden. Weltweite Beachtung finden nicht nur ihre Projekte
wie die Neue Messe Leipzig, die Messe Rimini oder der Christus-Pavillon für
die EXPO 2000, sondern auch ihre Entwürfe, z. B. für die Rekonstruktion und
Überdachung des Olympiastadions in Berlin oder den im Jahr 2006 fertigge-
stellten Berliner Hauptbahnhof.
Bei nationalen und internationalen Wettbewerben errang gmp über 590 Prei-
se, darunter mehr als 290 erste Preise sowie zahlreiche Auszeichnungen für
beispielhafte Architektur. Mehr als 350 Bauten sind bis heute realisiert.
In China sind unter anderem die Messe- und Kongresszentren in Nanning
und Shenzhen sowie das Museum in Shanghai-Pudong, das Zhongguancun
Kulturzentrum in Peking sowie das Universiade Sports Center und das Orien-
tal Sports Center in Shanghai realisiert. Weitere Bauten sind die Opernhäuser
in Chongqing, Qingdao und Tianjin sowie das Chinesische Nationalmuseum
in Peking und der neue Westbahnhof Tianjin. Im Jahr 2006 wurde in Hanoi/
Vietnam bereits das Nationale Kongresszentrum fertiggestellt. Das Hanoi
Museum wurde 2010 eingeweiht. In Südafrika wurden im Jahr 2009 drei
Weltmeisterschaftsstadien in Kapstadt, Durban und Port Elizabeth in Betrieb
genommen. Für die FIFA WM 2014 in Brasilien wurden die Stadien in Brasília
und Manaus realisiert.
Mit ihren städtebaulichen Studien für „Stuttgart 21”, die HafenCity Hamburg
und „Bukarest 2000“ sowie einer Vielzahl städtebaulicher Projekte in China,
darunter die neue Stadt Lingang New City für 800 000 Einwohner, haben
von Gerkan, Marg und Partner ihre Kompetenz auch auf diesem Gebiet unter
Beweis gestellt.
Zurzeit engagiert sich gmp mit Projekten außerhalb Deutschlands unter
anderem in China, Indien, Vietnam, Brasilien, Italien, Russland, Lettland und
der Türkei.
The practice
Pressekontakt Press Contact
Michael KuhnHead of CommunicationT: +49.40.88 151 [email protected]
gmp · Architekten von Gerkan, Marg und PartnerPublic Relations und KommunikationPublic Relations and CommunicationElbchaussee 139 · 22763 Hamburg · Germanywww.gmp-architekten.de
© gmp Februar February 2014
Bildnachweis Picture creditsgmp Titel titleMarcus Bredt 14, 15Klaus Frahm 14Christian Gahl 15Heiner Leiska 14Alcides Netto 6/7, 14Timmo Schreiber 16Knut Stockhusen 15
www.gmp-architekten.de