COMPLETE POWER STATION PROJECTS< 100 MW
STATUS AS ON AUGUST 25, 2009
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
1.
Power Plant at Raigarh,
Chhattisgarh of M/s Monnet
Ispat & Energy Ltd.
1x80 MW
Coal/Lignite/BagassePreparation of
Detailed Project Report
July 2009
In progress
2.
Metdist Limited, UK – Captive
Thermal Power Station for
Smelter Complex in
Gujarat
75 MW Coal/Lignite/BagassePreparation of
Feasibility Report
Aug. 1993
Completed
3.
Kutch Lignite Thermal Power
Station Extension Unit-
IV at Panandharo
1x75Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation and
post commissionin
g services
March 2004
Under Execution
4.Kutch Lignite
Thermal Power Station Stage-II
1x75Coal/Lignite/Bagasse
Design, engineering, procurement of indigenous
packages, overall project management for the total
plant
January 1994
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
5.
Kutch Lignite Thermal Power Station Stage-I 2x70
Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation and
post commissionin
g services
July 1979
Completed
6.
Renusagar Thermal Power Station Stage-I 2x70
Coal/Lignite/Bagasse
Review of bidding
documents and Vendor’s
proposals, construction
planning, supervision, guidance,
quality control, co-ordination
of foreign supplies with indigenous
work
1965 Completed
7.
Gouripore Thermal Power Station by Birla
Technical Services
2x67.5 MW
Coal/Lignite/BagassePreparation of Project Report
June 1992
Completed
8.
Captive Power Plant for Orient Paper Mills at Amlai, M.P.
1x67.5 MW
Coal/Lignite/BagassePreparation of Pre-Feasibility
Report
April 1994
Completed
9.
Coal Washery Projects Power
Plant in Chhattisgarh – SV Power Ltd.
63 Coal/Lignite/BagasseDetailed
Engineering Services
Nov. 2007
Under Execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
10.
Captive Power Plant at
Rajmundhry for A.P. Paper Mills
Ltd.
1x60 MW
Coal/Lignite/BagassePreparation of
Feasibility Report
Dec. 1995
Completed
11.
Independent Power Plant at Choudwar of
Indian Charge Chrome Ltd.
2x60 MW Coal/Lignite/Bagasse
Preparation of Feasibility
Report
Feb. 2004
Completed
12.
Power Plant at Mundra SEZ, Dist. Kutch for
Mundra Special Economic Zone
Limited
1x60 MW Coal/Lignite/Bagasse
Preparation of Feasibility
Report
Feb. 2004
Completed
13.
Cogeneration Plant at Mirwah
Gorchani Mirpurkhas,
Pakistan of M/s Al.abbas Sugar
Mills Ltd., Pakistan
1x60 MW
Coal/Lignite/BagassePreparation of
Detailed Project Report
Aug. 2008
In progress
14.
Coal Washery Projects Power
Plant in Chhattisgarh –
SV Power Private Ltd.
2x60 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Dec. 2006
Under Execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
15.
Coal based Power Plant at
Jagannadhpur of Karthik Rukmini Alloys & Energy
Limited
1x60 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
May 2006
Under Execution
16.
Captive Power Plant near
Raigarh of M/s Monnet Ispat & Energy Limited
1x60/70 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
April, 2008
Under Execution
17.
Singareni Collieries Co. Ltd. – Captive Power Plant
60 MW Coal/Lignite/BagassePreparation of
Feasibility Report
May 1989
Completed
18.
Independent Power Plant at Choudwar of
Indian Charge Chrome Ltd.
2x60 MW Coal/Lignite/Bagasse
Preparation of Feasibility
Report
Feb. 2004
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
19.
Power Plant at Mundra SEZ, Dist. Kutch for
Mundra Special Economic Zone
Limited
1x60 MW Coal/Lignite/Bagasse
Preparation of Feasibility
Report
Feb. 2004
Completed
20.
Captive Power Plant at Raigarh for Jindal Strips
Ltd.
55 Coal/Lignite/Bagasse
Detailed Project
Report, EIA Study and Complete
design and engineering,
overall supervision of
erection, commissionin
g & initial operation and
post commissionin
g services
Sept. 1997
Completed
21.
Captive Power Plant at Dolvi – Ispat Industries
Ltd.
2x55 Coal/Lignite/BagasseDetailed
Engineering Services
July 2007
Under Execution
22.
Captive Thermal Power Station – Indian Charge Chrome Ltd.
2x55 Coal/Lignite/Bagasse
Review consultancy services for
installation of the project on turnkey basis
including supervi-sion of
erection, commissioning and initial operation
Dec. 1985
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
23.
Captive Power Plant at Raigarh for Jindal Steel
& Power Limited
55 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
October 2001
Completed
24.
Gas based Simple Cycle
Power Plant at Sharourah in
Saudi Arabia – Saudi Electricity
Company
51 Combined Cycle Based
Review Engineering
Services
April 2007
Under Execution
25.
Captive Thermal Power Station of
Nav Bharat Ferro Alloys Ltd.
at Paloncha
1x50 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation, and
post commissionin
g services
October 1994
Completed
26.
Coal based Power Plant at Chandrapur,
Maharashtra of Gondwana Ispat
Ltd.
2x50 MW
Coal/Lignite/BagassePreparation of Project Report
Oct. 2006
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
27.
Coal based Power Plant at
Binani Zinc, Binanipuram, Kochi – Binani
Industries Limited
50 MW Coal/Lignite/BagassePreparation of
Feasibility Report
Feb. 2002
Completed
28.
Diesel Engine based Power
Plant at Dharwad for
Gujarat Fluorochemicals
/ INOX
42 MW
Diesel Engine Based
Owner’s Engineering
Services August 1998
Completed
29.
Power Plant at Village Joratarai,
Tahsil & Dist. Rajnandgaon,
Chhattisgarh of M/s Akshay
Ispat Udyog Pvt. Ltd.
40 MW Coal/Lignite/BagassePreparation of
Feasibility Report
March 2009
In progress
30.
Captive Power Plant at
Jharsuguda, Orissa of M/s Action Ispat & Power (P) Ltd.
2x40 MW
Coal/Lignite/BagassePreparation of
Detailed Project Report
April 2009
In progress
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
31.
Captive Power Plant at Raigarh
for Monnet Power Ltd.
2x37.5 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Sept. 2004
Under Execution
32.
Captive Power Plant at Raipur
for Monnet Power Ltd.
37 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
August 2001
Completed
33.
Gas based Cabinda Simple
Cycle Power Plant at Angola - Isolux Corsan,
Gurgaon
2x35Combined Cycle
Based
Design & Engineering
Services
April 2008
Completed
34.
Coal based Captive Power Plant at Ras Al Khimah Cement Plant in UAE of
Star Cement Co. L.L.C, UAE
35 MW Coal/Lignite/Bagasse
Preparation of Techno-
Economic Feasibility
Report
Sept. 2007
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
35.
Coal based Power Plant at Chandrapur,
Maharashtra of B.S. Ispat Ltd.
2x35 MW
Coal/Lignite/BagassePreparation of Project Report
Oct. 2006
Completed
36.
Gas based Combined Cycle Power Project at
Vijjeswaram
2x33
+ 1x34
Combined Cycle Based
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation and
post commissionin
g services
March 1988
Completed
37.
Kathalguri Gas based
Combined Cycle Power Station
6x30
+ 3x30
Combined Cycle Based
Assistance in review of design
drawings, specifications, bid evaluation,
etc. to the Retainer
Consultant, EPDCI, Japan
March 1989
Completed
38.
Basin Bridge Gas Turbine
Power Station of Tamil Nadu
Electricity Board
4x30Combined Cycle
Based
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation and
post commissionin
g services
April 2008
Under Execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
39.
Captive Power Plant at
Jamshedpur – Usha Martin Ltd.
1x30 Coal/Lignite/BagasseDetailed
Engineering Services
Aug. 2006
Completed
40.
Captive Thermal Power Station at
Shriram Fertilizers and
Chemicals, Kota
1x30 Coal/Lignite/Bagasse
Design and engineering, procu-rement
of needed equipment,
inspection and overall
supervision of re-erection,
commissioning and initial operation of
an old 30 MW Plant. The
scope involved conversion of
old stoker boiler to
fluidised bed combustion boiler, and complete
modernisation of instruments,
control and protec-tion systems
Feb. 1993
Completed
41.
Captive Power Plant at
Dhenkanal in Orissa of Nava Bharat Ferro Alloys Ltd.
30 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation, and
post commissionin
g services
March 2002
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
42.
Captive Power Plant at Korba of
Aryan Coal Benefications
Pvt. Ltd.
30 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation, and
post commissionin
g services
July 2004
Completed
43.
Captive Power Plant for Nava Bharat Ferro Alloys Ltd.
30 MW Coal/Lignite/BagassePreparation of Feasibility and Project Report
April 1994
Completed
44.
Sabarmati Thermal Power
Station ‘C’ Phase I & II of
The Ahmedabad Electricity Co.
Ltd.
2x30 MW
Coal/Lignite/BagassePreparation of
Feasibility Report
March 1996
Completed
45.
Captive Power Plant at Korba of
Aryan Coal Benefications
Pvt. Ltd.
30 MW Coal/Lignite/BagassePreparation of
Feasibility Report
July 2004
Completed
46.
Cogeneration Plant at
Sameerwadi of The Godavari
Sugar Mills Ltd.30 MW Coal/Lignite/Bagasse
Preparation of Detailed
Project Report
May 2006
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
47.
Captive Power Plant at Bela,
Rewa of Jaypee Cement Ltd.
27 Coal/Lignite/Bagasse
Complete design and
engineering, procurement,
overall supervision of
erection, commissioning and Initial operation
Dec. 2002
Completed
48.
Captive Power Plant at
Chittorgarh of Birla Corporation
Limited
27 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation, and
post commissionin
g services
Oct. 2003
Completed
49.
Captive Power Plant at Satna of Birla Corporation
Limited
27 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation, and
post commissionin
g services
Oct. 2003
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
50.
Coal based Power Project at
Dalmiapuram, Tamil Nadu of
Dalmia Cement (Bharat) Limited
27 Coal/Lignite/Bagasse
Complete design and
engineering, procurement,
overall supervision of
erection, commissioning and Initial operation
July 2003
Completed
51.
Captive Power Plant at Raigarh for Jindal Steel
& Power Limited
3x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
June 2004
Under Execution
52.
Power Plant in Orissa of Visa Steel Limited
(Unit # 1, 2 & 3)
3x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Sept. 2005
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
53.
Captive Power Plant for Hirmi Cement Works
of UltraTech Cement Ltd.
2x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
June 2006
Under Execution
54.
Captive Power Plant at
Chandrapur – Grace Industries
Ltd.
1x25 Coal/Lignite/BagasseDetailed
Engineering Services
Dec. 2006
Under Execution
55.
Power Plant in Orissa of Visa Steel Limited
(Addl. Work for Unit # 3)
1x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Sept. 2008
Under Execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
56.
Captive Power Plant for Grasim Cement, Rawan
of Grasim Industries Ltd.
1x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
June 2006
Under Execution
57.Power Plant in Orissa of Visa
Steel Ltd.1x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
July 2006
Under Execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
58.
Captive Power Plant at
Renukoot for Kanoria
Chemicals & Industries
1x25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection commissionin
g & initial operation and
post commissionin
g services
March 1994
Completed
59.
Captive Power Plant at
Kottayam – Hindustan
Newsprint Ltd.
25 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection commissionin
g & initial operation and
post commissionin
g services
Dec. 2006
Under Execution
60.Captive Power
Plant for Binani Cement
25 MW Coal/Lignite/Bagasse
Preparation of Feasibility
Report considering
lignite/coal or naphtha/ HSD or furnace oil/ diesel as fuel
and new or old plant
May 1995
Completed
61.
Captive Power Plant at Garhwa works for Bihar
Caustic & Chemicals Ltd.
1x25 MW
Coal/Lignite/BagassePreparation of
Feasibility Report
Oct. 1995
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
62.
Captive Power Plant at Raigarh for Jindal Steel & Power Ltd.
3x25 MW Coal/Lignite/Bagasse
Preparation of Detailed
Project Report
June 2004
Completed
63.
Coal/Flue Gas based Power
Plant at Choudwar, Dist.
Cuttack in Orissa of Indian Charge Chrome
Limited
25 MW Coal/Lignite/BagassePreparation of
Detailed Project Report
Oct. 2004
Completed
64.
Captive Power Plant of Rawmet Ferrous Ind. Pvt.
Ltd.
3x25 MW Coal/Lignite/Bagasse
Preparation of Techno-
economic feasibility
report
May, 2005
65.
Lignite based Captive Co-generation
Power Plant of Indo Gulf
Fertilisers & Chemicals
Corporation for Copper Smelter Project at Dahej,
Gujarat
1x24.5
+
1x10
Coal/Lignite/Bagasse
Pre-investment
study, techno-economic feasibility
report, complete
design and engineering, procurement, inspection & expediting,
project management, supervision of
erection, commissionin
g & initial operation and post commi-
ssioning services
Feb. 1995
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
66.
Bagasse fired Captive Power
Plant at Sameerwadi for Godavari Sugar
Mills Ltd.
24 Coal/Lignite/Bagasse
Detailed Project
Report, EIA Study and Complete
design and engineering,
overall supervision of
erection, commissionin
g & initial operation and
post commissionin
g services
May 1997
Completed
67.
Bagasse based Cogeneration
Plant at Sameerwadi in Karnataka for
Godavari Sugar Mills Ltd.
24 MW Coal/Lignite/BagassePreparation of
Detailed Project Report
June 2001 Completed
68.
Captive Power Plant at Mordi,
Banswara, Rajasthan – Rajasthan Spinnin &
Weaving Mills Ltd.
2x23 Coal/Lignite/BagasseDetailed
Engineering Services
Feb. 2006
Completed
69.
Captive Power Plant at Raigarh for Jindal Steel
& Power Limited
21 Coal/Lignite/BagasseDetailed
Engineering Services
Dec. 2001
Completed
70.Captive Power Plant in UAE
2x20 Coal/Lignite/BagasseDetailed
Engineering Services
March 2008
Under execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
71.
Bagasse fired Captive Power
Plant at Sameerwadi for Godavari Sugar
Mills Ltd.
20 Coal/Lignite/Bagasse
Complete design and
engineering, overall
supervision of erection,
commissioning & initial
operation and post
commissioning services
Jan. 2008
Under execution
72.
Captive Power Plant of Heavy
Engineering Corpn. Ltd.
2x20 MW
Coal/Lignite/BagassePreparation of
Detailed Project Report
Aug. 1981
Completed
73.
Captive Thermal Power Station of
Hindustan Fertilizer
Corporation Ltd. – Barauni Unit
1x16 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Feb. 1982
Completed
74.
Power Plant in Punjab for M/s Universal Bio-Mass Energy Private Ltd.
1x15 Coal/Lignite/Bagasse
Complete design and
engineering, overall
supervision of erection,
commissioning & initial
operation and post
commissioning services
April, 2008
Under execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
75.
Captive Power Plant at
Bhatapara of Gujarat Ambuja Cements Ltd.
1x15
+
1x33
Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Sept. 2006
Under Execution
76.
Captive Power Plant at Raigarh for Jindal Strips
Ltd.4x15 +
2x20Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
Feb. 1994
Completed
77.
Cogeneration Captive Power
Plant at Butibori, Nagpur – Indo
Rama Synthetics (I)
Ltd.
2x15 Coal/Lignite/BagasseDetailed
Engineering Services
Nov. 2004
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
78.
Captive Thermal Power Station of
National Fertilizers Ltd. at
Panipat
2x15 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
project management, supervision of
erection, commissionin
g & initial operation and post commi-
ssioning services
October 1984
Completed
79.
Captive Power Plant at IRSL,
Butibori, Nagpur of Indo Rama Synthetics (I)
Ltd.
2X15 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspection & expediting,
overall supervision of
erection, commissionin
g & initial operation, and
post commissionin
g services
March 2004
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
80.
Captive Power Plant at Raipur
for Monnet Power Ltd.
15 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
March 2004
Completed
81.
Captive Power Plant at
Ghazipur, Uttar Pradesh –
Sukhbir Agro Energy Ltd.
1x15 Coal/Lignite/BagasseDetailed
Engineering Services
Dec. 2006
Completed
82.
Captive Power Plant for M/s
Grasim Industries
Limited, Ariyalur – BSES Limited
12.5 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
project management, supervision of
erection, commissionin
g & initial operation and post commi-
ssioning services
January 2002
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
83.
Coal based Power Plant at
Gajraula of Jubilant
Organosys Limited
12 Coal/Lignite/Bagasse
Complete design and
engineering, procurement,
overall supervision of
erection, commissioning and Initial operation
June 2003
Completed
84.
Cogeneration Power Plant at Sakarwadi of M/s Somaiya
Organo-Chemicals
10-12 MW
Coal/Lignite/BagassePreparation of
Detailed Project Report
July 2008
Completed
85.
Coal based Captive
Cogeneration Plant for PT Indo
Bharat Rayon (IBR), Indonesia
2x10 Coal/Lignite/BagasseOwner’s
Engineering Services
April 2002
Completed
86.
DLF Energy Systems –
Captive Power Plant for Coal
Washery
1x10 MW
Coal/Lignite/BagassePreparation of
Feasibility Report
Dec. 1992
Completed
87.Power Plant at
Hazira for KRIBHCO
10 MW Coal/Lignite/BagassePreparation of
Feasibility Report
Oct. 1997
Completed
88.
Captive Power Plant at Korba of
Aryan Coal Benefications
Pvt. Ltd.
10 MW Coal/Lignite/BagassePreparation of
Feasibility Report
Dec. 2003
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
89.
Coal/Flue Gas based Power
Plant at Choudwar, Dist.
Cuttack in Orissa of Indian Charge Chrome
Limited
10 MW Coal/Lignite/BagassePreparation of
Detailed Project Report
Sept. 2004
Completed
90.
Captive Power Plant at
Ghamaria, Jamshedpur –
Vardhman Industries Ltd.
1x8 Coal/Lignite/BagasseDetailed
Engineering Services
July 2004
Completed
91.
Captive Power Plant at Bhiwani,
Haryana – Grasim
Industries Ltd.
1x8 Coal/Lignite/BagasseDetailed
Engineering Services
July 2006
Completed
92.
Ranigunj (Mangalpur) Coal based
Captive Power Plant of Shyam
SEL Limited
8 Coal/Lignite/Bagasse
Complete design and
engineering, procurement,
overall supervision of
erection, commissioning and Initial operation
Dec. 2002
Completed
93.
Coke Oven Exhaust Gas
Heat Recovery based Power
Project at Mundra,
Distt.Kutch Gujarat of Jindal
Saw Ltd.
2x7.5 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
project management, supervision of
erection, commissionin
g & initial operation and post commi-
ssioning services
Sept. 2005
Under Execution
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
94.
Thermal Power Stations at Raipur for
Monnet Power Ltd.
7.5 Coal/Lignite/Bagasse
Complete engineering Services for
the EPC Contractor, BSES Ltd.
May 1999 Completed
95.
Biomass based Power Plant at
Bellary, Karnataka –
Shiv Sai Power Systems Pvt.
Limited
7.5 MW Coal/Lignite/Bagasse
Preparation of Detailed Project Report
Sept. 2003
Completed
96.
Biomass based Power Plants in Karnataka for
Karnataka Renewable
Energy Development
Ltd.
5x7.5 MW Coal/Lignite/Bagasse
Preparation of Project Report
March 2004
Completed
97.
Hindustan Newsprint Division of Hindustan Newsprint
Limited
7 Coal/Lignite/Bagasse
Technical Consultancy Services for Steam Turbo
Generator
Jan. 2003
Completed
98.
Coal based Power Plants in Indonesia of PT
Central Korporindo
International Tbk
3x2x7 Coal/Lignite/Bagasse
Complete design and
engineering, procurement, inspe-ction & expediting,
overall supervision of
erection, commi-
ssioning & initial
operation and post
commissioning services
August 2004
Completed
Sl. No.
Name of Project
Capacity (MW)
Fuel Scope of Work
Date of Award
Present Status
99.
Coal based Cogeneration
Plant at Baddi of Mahavir
Spinning Mills Ltd. (Vardhman
Acrylics Ltd.)
6-8 MW Coal/Lignite/BagassePreparation of Pre-feasibility
Report
June, 2005
Completed
100.
Biomass Power Plant at
Bangalore of Mangalam
Energy Pvt. Ltd.
6 MW Coal/Lignite/BagassePreparation of
Feasibility Report
Sept. 2003
Completed
101.
Burdwan Coal based Captive Power Plant of
Shyam SEL Limited
5 Coal/Lignite/Bagasse
Complete design and
engineering, procurement,
overall supervision of
erection, commissioning and Initial operation
Dec. 2002
Completed
102.
Captive Power Plant of M/s Raymond
Woollen Mills Ltd.,
Chhindwara, U.P.
5 MWCoal/Lignite/Bagasse
Preparation of Feasibility
Report
Dec. 1991
Completed
103.Co-Generation Power Plant at
Haldia for CFCL2.5 Coal/Lignite/Bagasse
Detailed Engineering
Services
Feb. 1998
Completed