EXPERIENCE

COMPLETE POWER STATION PROJECTS< 100 MW

STATUS AS ON AUGUST 25, 2009

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

1.

Power Plant at Raigarh,

Chhattisgarh of M/s Monnet

Ispat & Energy Ltd.

1x80 MW

Coal/Lignite/BagassePreparation of

Detailed Project Report

July 2009

In progress

2.

Metdist Limited, UK – Captive

Thermal Power Station for

Smelter Complex in

Gujarat

75 MW Coal/Lignite/BagassePreparation of

Feasibility Report

Aug. 1993

Completed

3.

Kutch Lignite Thermal Power

Station Extension Unit-

IV at Panandharo

1x75Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation and

post commissionin

g services

March 2004

Under Execution

4.Kutch Lignite

Thermal Power Station Stage-II

1x75Coal/Lignite/Bagasse

Design, engineering, procurement of indigenous

packages, overall project management for the total

plant

January 1994

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

5.

Kutch Lignite Thermal Power Station Stage-I 2x70

Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation and

post commissionin

g services

July 1979

Completed

6.

Renusagar Thermal Power Station Stage-I 2x70

Coal/Lignite/Bagasse

Review of bidding

documents and Vendor’s

proposals, construction

planning, supervision, guidance,

quality control, co-ordination

of foreign supplies with indigenous

work

1965 Completed

7.

Gouripore Thermal Power Station by Birla

Technical Services

2x67.5 MW

Coal/Lignite/BagassePreparation of Project Report

June 1992

Completed

8.

Captive Power Plant for Orient Paper Mills at Amlai, M.P.

1x67.5 MW

Coal/Lignite/BagassePreparation of Pre-Feasibility

Report

April 1994

Completed

9.

Coal Washery Projects Power

Plant in Chhattisgarh – SV Power Ltd.

63 Coal/Lignite/BagasseDetailed

Engineering Services

Nov. 2007

Under Execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

10.

Captive Power Plant at

Rajmundhry for A.P. Paper Mills

Ltd.

1x60 MW

Coal/Lignite/BagassePreparation of

Feasibility Report

Dec. 1995

Completed

11.

Independent Power Plant at Choudwar of

Indian Charge Chrome Ltd.

2x60 MW Coal/Lignite/Bagasse

Preparation of Feasibility

Report

Feb. 2004

Completed

12.

Power Plant at Mundra SEZ, Dist. Kutch for

Mundra Special Economic Zone

Limited

1x60 MW Coal/Lignite/Bagasse

Preparation of Feasibility

Report

Feb. 2004

Completed

13.

Cogeneration Plant at Mirwah

Gorchani Mirpurkhas,

Pakistan of M/s Al.abbas Sugar

Mills Ltd., Pakistan

1x60 MW

Coal/Lignite/BagassePreparation of

Detailed Project Report

Aug. 2008

In progress

14.

Coal Washery Projects Power

Plant in Chhattisgarh –

SV Power Private Ltd.

2x60 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Dec. 2006

Under Execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

15.

Coal based Power Plant at

Jagannadhpur of Karthik Rukmini Alloys & Energy

Limited

1x60 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

May 2006

Under Execution

16.

Captive Power Plant near

Raigarh of M/s Monnet Ispat & Energy Limited

1x60/70 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

April, 2008

Under Execution

17.

Singareni Collieries Co. Ltd. – Captive Power Plant

60 MW Coal/Lignite/BagassePreparation of

Feasibility Report

May 1989

Completed

18.

Independent Power Plant at Choudwar of

Indian Charge Chrome Ltd.

2x60 MW Coal/Lignite/Bagasse

Preparation of Feasibility

Report

Feb. 2004

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

19.

Power Plant at Mundra SEZ, Dist. Kutch for

Mundra Special Economic Zone

Limited

1x60 MW Coal/Lignite/Bagasse

Preparation of Feasibility

Report

Feb. 2004

Completed

20.

Captive Power Plant at Raigarh for Jindal Strips

Ltd.

55 Coal/Lignite/Bagasse

Detailed Project

Report, EIA Study and Complete

design and engineering,

overall supervision of

erection, commissionin

g & initial operation and

post commissionin

g services

Sept. 1997

Completed

21.

Captive Power Plant at Dolvi – Ispat Industries

Ltd.

2x55 Coal/Lignite/BagasseDetailed

Engineering Services

July 2007

Under Execution

22.

Captive Thermal Power Station – Indian Charge Chrome Ltd.

2x55 Coal/Lignite/Bagasse

Review consultancy services for

installation of the project on turnkey basis

including supervi-sion of

erection, commissioning and initial operation

Dec. 1985

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

23.

Captive Power Plant at Raigarh for Jindal Steel

& Power Limited

55 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

October 2001

Completed

24.

Gas based Simple Cycle

Power Plant at Sharourah in

Saudi Arabia – Saudi Electricity

Company

51 Combined Cycle Based

Review Engineering

Services

April 2007

Under Execution

25.

Captive Thermal Power Station of

Nav Bharat Ferro Alloys Ltd.

at Paloncha

1x50 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation, and

post commissionin

g services

October 1994

Completed

26.

Coal based Power Plant at Chandrapur,

Maharashtra of Gondwana Ispat

Ltd.

2x50 MW

Coal/Lignite/BagassePreparation of Project Report

Oct. 2006

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

27.

Coal based Power Plant at

Binani Zinc, Binanipuram, Kochi – Binani

Industries Limited

50 MW Coal/Lignite/BagassePreparation of

Feasibility Report

Feb. 2002

Completed

28.

Diesel Engine based Power

Plant at Dharwad for

Gujarat Fluorochemicals

/ INOX

42 MW

Diesel Engine Based

Owner’s Engineering

Services August 1998

Completed

29.

Power Plant at Village Joratarai,

Tahsil & Dist. Rajnandgaon,

Chhattisgarh of M/s Akshay

Ispat Udyog Pvt. Ltd.

40 MW Coal/Lignite/BagassePreparation of

Feasibility Report

March 2009

In progress

30.

Captive Power Plant at

Jharsuguda, Orissa of M/s Action Ispat & Power (P) Ltd.

2x40 MW

Coal/Lignite/BagassePreparation of

Detailed Project Report

April 2009

In progress

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

31.

Captive Power Plant at Raigarh

for Monnet Power Ltd.

2x37.5 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Sept. 2004

Under Execution

32.

Captive Power Plant at Raipur

for Monnet Power Ltd.

37 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

August 2001

Completed

33.

Gas based Cabinda Simple

Cycle Power Plant at Angola - Isolux Corsan,

Gurgaon

2x35Combined Cycle

Based

Design & Engineering

Services

April 2008

Completed

34.

Coal based Captive Power Plant at Ras Al Khimah Cement Plant in UAE of

Star Cement Co. L.L.C, UAE

35 MW Coal/Lignite/Bagasse

Preparation of Techno-

Economic Feasibility

Report

Sept. 2007

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

35.

Coal based Power Plant at Chandrapur,

Maharashtra of B.S. Ispat Ltd.

2x35 MW

Coal/Lignite/BagassePreparation of Project Report

Oct. 2006

Completed

36.

Gas based Combined Cycle Power Project at

Vijjeswaram

2x33

+ 1x34

Combined Cycle Based

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation and

post commissionin

g services

March 1988

Completed

37.

Kathalguri Gas based

Combined Cycle Power Station

6x30

+ 3x30

Combined Cycle Based

Assistance in review of design

drawings, specifications, bid evaluation,

etc. to the Retainer

Consultant, EPDCI, Japan

March 1989

Completed

38.

Basin Bridge Gas Turbine

Power Station of Tamil Nadu

Electricity Board

4x30Combined Cycle

Based

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation and

post commissionin

g services

April 2008

Under Execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

39.

Captive Power Plant at

Jamshedpur – Usha Martin Ltd.

1x30 Coal/Lignite/BagasseDetailed

Engineering Services

Aug. 2006

Completed

40.

Captive Thermal Power Station at

Shriram Fertilizers and

Chemicals, Kota

1x30 Coal/Lignite/Bagasse

Design and engineering, procu-rement

of needed equipment,

inspection and overall

supervision of re-erection,

commissioning and initial operation of

an old 30 MW Plant. The

scope involved conversion of

old stoker boiler to

fluidised bed combustion boiler, and complete

modernisation of instruments,

control and protec-tion systems

Feb. 1993

Completed

41.

Captive Power Plant at

Dhenkanal in Orissa of Nava Bharat Ferro Alloys Ltd.

30 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation, and

post commissionin

g services

March 2002

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

42.

Captive Power Plant at Korba of

Aryan Coal Benefications

Pvt. Ltd.

30 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation, and

post commissionin

g services

July 2004

Completed

43.

Captive Power Plant for Nava Bharat Ferro Alloys Ltd.

30 MW Coal/Lignite/BagassePreparation of Feasibility and Project Report

April 1994

Completed

44.

Sabarmati Thermal Power

Station ‘C’ Phase I & II of

The Ahmedabad Electricity Co.

Ltd.

2x30 MW

Coal/Lignite/BagassePreparation of

Feasibility Report

March 1996

Completed

45.

Captive Power Plant at Korba of

Aryan Coal Benefications

Pvt. Ltd.

30 MW Coal/Lignite/BagassePreparation of

Feasibility Report

July 2004

Completed

46.

Cogeneration Plant at

Sameerwadi of The Godavari

Sugar Mills Ltd.30 MW Coal/Lignite/Bagasse

Preparation of Detailed

Project Report

May 2006

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

47.

Captive Power Plant at Bela,

Rewa of Jaypee Cement Ltd.

27 Coal/Lignite/Bagasse

Complete design and

engineering, procurement,

overall supervision of

erection, commissioning and Initial operation

Dec. 2002

Completed

48.

Captive Power Plant at

Chittorgarh of Birla Corporation

Limited

27 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation, and

post commissionin

g services

Oct. 2003

Completed

49.

Captive Power Plant at Satna of Birla Corporation

Limited

27 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation, and

post commissionin

g services

Oct. 2003

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

50.

Coal based Power Project at

Dalmiapuram, Tamil Nadu of

Dalmia Cement (Bharat) Limited

27 Coal/Lignite/Bagasse

Complete design and

engineering, procurement,

overall supervision of

erection, commissioning and Initial operation

July 2003

Completed

51.

Captive Power Plant at Raigarh for Jindal Steel

& Power Limited

3x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

June 2004

Under Execution

52.

Power Plant in Orissa of Visa Steel Limited

(Unit # 1, 2 & 3)

3x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Sept. 2005

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

53.

Captive Power Plant for Hirmi Cement Works

of UltraTech Cement Ltd.

2x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

June 2006

Under Execution

54.

Captive Power Plant at

Chandrapur – Grace Industries

Ltd.

1x25 Coal/Lignite/BagasseDetailed

Engineering Services

Dec. 2006

Under Execution

55.

Power Plant in Orissa of Visa Steel Limited

(Addl. Work for Unit # 3)

1x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Sept. 2008

Under Execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

56.

Captive Power Plant for Grasim Cement, Rawan

of Grasim Industries Ltd.

1x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

June 2006

Under Execution

57.Power Plant in Orissa of Visa

Steel Ltd.1x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

July 2006

Under Execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

58.

Captive Power Plant at

Renukoot for Kanoria

Chemicals & Industries

1x25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection commissionin

g & initial operation and

post commissionin

g services

March 1994

Completed

59.

Captive Power Plant at

Kottayam – Hindustan

Newsprint Ltd.

25 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection commissionin

g & initial operation and

post commissionin

g services

Dec. 2006

Under Execution

60.Captive Power

Plant for Binani Cement

25 MW Coal/Lignite/Bagasse

Preparation of Feasibility

Report considering

lignite/coal or naphtha/ HSD or furnace oil/ diesel as fuel

and new or old plant

May 1995

Completed

61.

Captive Power Plant at Garhwa works for Bihar

Caustic & Chemicals Ltd.

1x25 MW

Coal/Lignite/BagassePreparation of

Feasibility Report

Oct. 1995

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

62.

Captive Power Plant at Raigarh for Jindal Steel & Power Ltd.

3x25 MW Coal/Lignite/Bagasse

Preparation of Detailed

Project Report

June 2004

Completed

63.

Coal/Flue Gas based Power

Plant at Choudwar, Dist.

Cuttack in Orissa of Indian Charge Chrome

Limited

25 MW Coal/Lignite/BagassePreparation of

Detailed Project Report

Oct. 2004

Completed

64.

Captive Power Plant of Rawmet Ferrous Ind. Pvt.

Ltd.

3x25 MW Coal/Lignite/Bagasse

Preparation of Techno-

economic feasibility

report

May, 2005

65.

Lignite based Captive Co-generation

Power Plant of Indo Gulf

Fertilisers & Chemicals

Corporation for Copper Smelter Project at Dahej,

Gujarat

1x24.5

+

1x10

Coal/Lignite/Bagasse

Pre-investment

study, techno-economic feasibility

report, complete

design and engineering, procurement, inspection & expediting,

project management, supervision of

erection, commissionin

g & initial operation and post commi-

ssioning services

Feb. 1995

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

66.

Bagasse fired Captive Power

Plant at Sameerwadi for Godavari Sugar

Mills Ltd.

24 Coal/Lignite/Bagasse

Detailed Project

Report, EIA Study and Complete

design and engineering,

overall supervision of

erection, commissionin

g & initial operation and

post commissionin

g services

May 1997

Completed

67.

Bagasse based Cogeneration

Plant at Sameerwadi in Karnataka for

Godavari Sugar Mills Ltd.

24 MW Coal/Lignite/BagassePreparation of

Detailed Project Report

June 2001 Completed

68.

Captive Power Plant at Mordi,

Banswara, Rajasthan – Rajasthan Spinnin &

Weaving Mills Ltd.

2x23 Coal/Lignite/BagasseDetailed

Engineering Services

Feb. 2006

Completed

69.

Captive Power Plant at Raigarh for Jindal Steel

& Power Limited

21 Coal/Lignite/BagasseDetailed

Engineering Services

Dec. 2001

Completed

70.Captive Power Plant in UAE

2x20 Coal/Lignite/BagasseDetailed

Engineering Services

March 2008

Under execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

71.

Bagasse fired Captive Power

Plant at Sameerwadi for Godavari Sugar

Mills Ltd.

20 Coal/Lignite/Bagasse

Complete design and

engineering, overall

supervision of erection,

commissioning & initial

operation and post

commissioning services

Jan. 2008

Under execution

72.

Captive Power Plant of Heavy

Engineering Corpn. Ltd.

2x20 MW

Coal/Lignite/BagassePreparation of

Detailed Project Report

Aug. 1981

Completed

73.

Captive Thermal Power Station of

Hindustan Fertilizer

Corporation Ltd. – Barauni Unit

1x16 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Feb. 1982

Completed

74.

Power Plant in Punjab for M/s Universal Bio-Mass Energy Private Ltd.

1x15 Coal/Lignite/Bagasse

Complete design and

engineering, overall

supervision of erection,

commissioning & initial

operation and post

commissioning services

April, 2008

Under execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

75.

Captive Power Plant at

Bhatapara of Gujarat Ambuja Cements Ltd.

1x15

+

1x33

Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Sept. 2006

Under Execution

76.

Captive Power Plant at Raigarh for Jindal Strips

Ltd.4x15 +

2x20Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

Feb. 1994

Completed

77.

Cogeneration Captive Power

Plant at Butibori, Nagpur – Indo

Rama Synthetics (I)

Ltd.

2x15 Coal/Lignite/BagasseDetailed

Engineering Services

Nov. 2004

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

78.

Captive Thermal Power Station of

National Fertilizers Ltd. at

Panipat

2x15 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

project management, supervision of

erection, commissionin

g & initial operation and post commi-

ssioning services

October 1984

Completed

79.

Captive Power Plant at IRSL,

Butibori, Nagpur of Indo Rama Synthetics (I)

Ltd.

2X15 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspection & expediting,

overall supervision of

erection, commissionin

g & initial operation, and

post commissionin

g services

March 2004

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

80.

Captive Power Plant at Raipur

for Monnet Power Ltd.

15 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

March 2004

Completed

81.

Captive Power Plant at

Ghazipur, Uttar Pradesh –

Sukhbir Agro Energy Ltd.

1x15 Coal/Lignite/BagasseDetailed

Engineering Services

Dec. 2006

Completed

82.

Captive Power Plant for M/s

Grasim Industries

Limited, Ariyalur – BSES Limited

12.5 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

project management, supervision of

erection, commissionin

g & initial operation and post commi-

ssioning services

January 2002

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

83.

Coal based Power Plant at

Gajraula of Jubilant

Organosys Limited

12 Coal/Lignite/Bagasse

Complete design and

engineering, procurement,

overall supervision of

erection, commissioning and Initial operation

June 2003

Completed

84.

Cogeneration Power Plant at Sakarwadi of M/s Somaiya

Organo-Chemicals

10-12 MW

Coal/Lignite/BagassePreparation of

Detailed Project Report

July 2008

Completed

85.

Coal based Captive

Cogeneration Plant for PT Indo

Bharat Rayon (IBR), Indonesia

2x10 Coal/Lignite/BagasseOwner’s

Engineering Services

April 2002

Completed

86.

DLF Energy Systems –

Captive Power Plant for Coal

Washery

1x10 MW

Coal/Lignite/BagassePreparation of

Feasibility Report

Dec. 1992

Completed

87.Power Plant at

Hazira for KRIBHCO

10 MW Coal/Lignite/BagassePreparation of

Feasibility Report

Oct. 1997

Completed

88.

Captive Power Plant at Korba of

Aryan Coal Benefications

Pvt. Ltd.

10 MW Coal/Lignite/BagassePreparation of

Feasibility Report

Dec. 2003

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

89.

Coal/Flue Gas based Power

Plant at Choudwar, Dist.

Cuttack in Orissa of Indian Charge Chrome

Limited

10 MW Coal/Lignite/BagassePreparation of

Detailed Project Report

Sept. 2004

Completed

90.

Captive Power Plant at

Ghamaria, Jamshedpur –

Vardhman Industries Ltd.

1x8 Coal/Lignite/BagasseDetailed

Engineering Services

July 2004

Completed

91.

Captive Power Plant at Bhiwani,

Haryana – Grasim

Industries Ltd.

1x8 Coal/Lignite/BagasseDetailed

Engineering Services

July 2006

Completed

92.

Ranigunj (Mangalpur) Coal based

Captive Power Plant of Shyam

SEL Limited

8 Coal/Lignite/Bagasse

Complete design and

engineering, procurement,

overall supervision of

erection, commissioning and Initial operation

Dec. 2002

Completed

93.

Coke Oven Exhaust Gas

Heat Recovery based Power

Project at Mundra,

Distt.Kutch Gujarat of Jindal

Saw Ltd.

2x7.5 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

project management, supervision of

erection, commissionin

g & initial operation and post commi-

ssioning services

Sept. 2005

Under Execution

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

94.

Thermal Power Stations at Raipur for

Monnet Power Ltd.

7.5 Coal/Lignite/Bagasse

Complete engineering Services for

the EPC Contractor, BSES Ltd.

May 1999 Completed

95.

Biomass based Power Plant at

Bellary, Karnataka –

Shiv Sai Power Systems Pvt.

Limited

7.5 MW Coal/Lignite/Bagasse

Preparation of Detailed Project Report

Sept. 2003

Completed

96.

Biomass based Power Plants in Karnataka for

Karnataka Renewable

Energy Development

Ltd.

5x7.5 MW Coal/Lignite/Bagasse

Preparation of Project Report

March 2004

Completed

97.

Hindustan Newsprint Division of Hindustan Newsprint

Limited

7 Coal/Lignite/Bagasse

Technical Consultancy Services for Steam Turbo

Generator

Jan. 2003

Completed

98.

Coal based Power Plants in Indonesia of PT

Central Korporindo

International Tbk

3x2x7 Coal/Lignite/Bagasse

Complete design and

engineering, procurement, inspe-ction & expediting,

overall supervision of

erection, commi-

ssioning & initial

operation and post

commissioning services

August 2004

Completed

Sl. No.

Name of Project

Capacity (MW)

Fuel Scope of Work

Date of Award

Present Status

99.

Coal based Cogeneration

Plant at Baddi of Mahavir

Spinning Mills Ltd. (Vardhman

Acrylics Ltd.)

6-8 MW Coal/Lignite/BagassePreparation of Pre-feasibility

Report

June, 2005

Completed

100.

Biomass Power Plant at

Bangalore of Mangalam

Energy Pvt. Ltd.

6 MW Coal/Lignite/BagassePreparation of

Feasibility Report

Sept. 2003

Completed

101.

Burdwan Coal based Captive Power Plant of

Shyam SEL Limited

5 Coal/Lignite/Bagasse

Complete design and

engineering, procurement,

overall supervision of

erection, commissioning and Initial operation

Dec. 2002

Completed

102.

Captive Power Plant of M/s Raymond

Woollen Mills Ltd.,

Chhindwara, U.P.

5 MWCoal/Lignite/Bagasse

Preparation of Feasibility

Report

Dec. 1991

Completed

103.Co-Generation Power Plant at

Haldia for CFCL2.5 Coal/Lignite/Bagasse

Detailed Engineering

Services

Feb. 1998

Completed