Department of Energy Project Management Workshop 2014 “Meeting the Challenge—Integrated Acquisition & Project Management” Are We There Yet? Michael Peek, PE, CCP, CFM Director, Project Management DOE Office of Acquisition and Project Management

Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Department of Energy Project Management Workshop

20

14

“Meeting the Challenge—Integrated Acquisition & Project Management”

Are We There Yet?

Michael Peek, PE, CCP, CFM Director, Project Management

DOE Office of Acquisition and Project Management

Page 2: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Michael Peek

Director

John White

Chief

Assessments

Brian Huizenga

Gen Engr

Lead SC

Robin Noyes

Gen Engr

SC

Tony Ermovick

Gen Engr

Lead EM/EERE

Brian Kong

Gen Engr

EM/WTP

Rick Blaisdell

Gen Engr

EM

Mike Fenn

Gen Engr

EM/FE

Mark Whitson

Gen Engr

Lead NNSA

John Snyder

Gen Engr

NNSA

Vacant

Gen Engr

NNSA

Mel Frank

Chief

Policy & Systems

Igor Pedan

Prgm Analyst

PARS Reports/Analysis

Bob Loop

Prgm Analyst

EV Focal Point/Policy

Tom Bruder

Gen Engr

EV Focal Point

Ruben Sanchez

Gen Engr

Policy & Guides

Pete Bako

Gen Engr

Policy & Guides

Garrett Richardson

Prgm Analyst

Budget

Mike Beattie Prgm Analyst EV Focal Point

Project Management (MA-63)

2

Page 3: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

• Project Management

– How are we doing?

• Current Initiatives

• Future Initiatives

• Next Step

Overview

3

Page 5: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Number of Projects (2008-2014)

Current Post CD-2 Workload

0

20

40

60

80

100

120

140

Jan Jan Jan Jan Jan Jan Jan

121

36

2008 2012 2013 2009 2010 2011 5

2014

Page 6: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

6

Current Project Portfolio Status (Based on Current Performance Baseline)

Program

Total Active

Projects

Post CD-2

Total Projects

Post CD-2

Green

Total Projects

Post CD-2

Yellow

Total Projects

Post CD-2

Red

% of Post CD-2

Projects with

Acceptable

Status

No. $(M) No. $(M) No. $(M) No. $(M) No. $(M)

EERE 1 $16 -- -- 1 $16 -- -- 100% 100%

EM 9 $17,866 3 $1,567 -- -- 6 $16,299 33% 9%

NA 10 $6,055 8 $784 -- -- 2 $5,271 80% 13%

SC 16 $2,264 15 $1,986 1 $278 -- -- 100% 100%

DOE 36 $26,201 26 $4,337 2 $294 8 $21,570 78% 18% 6

Page 7: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

7

FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Pre-RCA 79% 74% 75% 77% 70%

Post-RCA 100% 95% 89% 84%

All Projects 79% 78% 88% 86% 83%

Target 80% 85% 90% 90% 90%

50%

60%

70%

80%

90%

100%

(30 / 38)

(6 / 6)

(30 / 38)

(7 / 10)

(70 / 83)

(77 / 93)

(21 / 28) (26 / 35)

(32 /41)

(63 / 71)

(Dem

arca

tio

n D

ate:

Oct

ob

er 1

, 20

07

)

(83 / 97) (63 / 72)

(42 / 44)

(20 / 26)

Project Success - How are we Doing? Pre- vs. Post-RCA (Based on 3-year Rolling Timeline)

7

Page 8: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

8

FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Pre-RCA 79% 74% 75% 77% 70%

Post-RCA 100% 95% 89% 84%

All Projects 79% 78% 88% 86% 83%

Target 80% 85% 90% 90% 90%

50%

60%

70%

80%

90%

100%

(30 / 38)

(6 / 6)

(30 / 38)

(7 / 10)

(70 / 83)

(77 / 93)

(21 / 28) (26 / 35)

(32 /41)

(63 / 71)

(Dem

arca

tio

n D

ate:

Oct

ob

er 1

, 20

07

)

(83 / 97) (63 / 72)

(42 / 44)

(20 / 26)

Project Success - How are we Doing? Pre- vs. Post-RCA (Based on 3-year Rolling Timeline)

8

Page 9: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

9

FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Pre-RCA 79% 74% 75% 77% 70%

Post-RCA 100% 95% 89% 84%

All Projects 79% 78% 88% 86% 83%

Target 80% 85% 90% 90% 90%

50%

60%

70%

80%

90%

100%

(30 / 38)

(6 / 6)

(30 / 38)

(7 / 10)

(70 / 83)

(77 / 93)

(21 / 28) (26 / 35)

(32 /41)

(63 / 71)

(Dem

arca

tio

n D

ate:

Oct

ob

er 1

, 20

07

)

(83 / 97) (63 / 72)

(42 / 44)

(20 / 26)

Project Success - How are we Doing? Pre- vs. Post-RCA (Based on 3-year Rolling Timeline)

9

Page 11: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

• DOE O 413.3B, Program and Project Management Nov 2010

for the Acquisition of Capital Assets • Secretarial Memoranda Regarding Project Management

– "Paper" Energy Systems Acquisition Advisory Board Jan 2009 Process

– Project Full Funding Policy in the Annual Budget Jan 2009 Request

– Management Principles Dec 2009 – Project Management Principles Mar 2010 – Project Assessment and Reporting System (PARS II) May 2010 – Project Peer Reviews Apr 2011 – Project Assessment and Reporting System (PARS II) Jun 2012

Data Quality – Aligning Contract Incentives for Capital Asset Projects Dec 2012 – Improving Capital Asset Project Documentation Apr 2013

Project Management Policy and Governance

11

Page 13: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

• Work Classification Policy • Updating DOE O 413.3B Guides

– DOE G 413.3-1 Managing Design and Construction Using Systems Engineering

– DOE G 413.3-5A Performance Baseline – DOE G 413.3-9 Project Review – DOE G 413.3-13 Acquisition Strategy – DOE G 413.3-20 Change Control Management – DOE G 413.3-21 Cost Estimating Guide

• Updating OAPM Standard Operating Procedures – Energy Systems Acquisition Advisory Board (ESAAB) – Earned Value Management System (EVMS) and Project

Analysis Standard Operating Procedure (EPASOP)

Guides and Best Practices

13

Page 14: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

• Developing Handbooks – Project Management Glossary of Terms

• One Word/Phrase = One Meaning

– Work Breakdown Structure (WBS) – Federal Project Director Handbook

• Training Snippets – Earned Value Management Best Practices

• https://powerpedia.energy.gov/wiki/Earned_Value_Management_System

– Road Show • Distinction and proper use of Management Reserve and Contingency;

Forecasting Estimate at Complete

• PARS IIe – Advanced schedule analysis – Searchable Lessons Learned capability – Enhanced User’s Interface and document management capability

Guides and Best Practices

14

Page 15: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

Guides and Best Practices

• Future Updates/Initiatives

– DOE G 413.3-7A Risk Management

– DOE G 413.3-10A Earned Value Management

– DOE G 413.3-20 Change Control Management

– DOE G 413.3-XX Schedule Development

– DOE G 413.3-XX Work Classification

15

Page 17: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

• The RCA identified that “…DOE does not have an adequate number of federal contracting and project personnel with the appropriate skills…”

• PMCDP course content has been updated – Project Management Systems and Practices in DOE (I) – Project Risk Analysis and Management (I) – Leadership Through Effective Communication (II) – Advanced Risk Management (III)

• New courses have been developed and incorporated into the Certification and Equivalency Guidelines (CEG) to strengthen our Federal Project Teams’ capabilities – Earned Value Management Systems (EVMS) Online (I) – Managing Contract Changes (I) – Cost and Schedule Estimation and Analysis (II) – Advanced Earned Value Analysis (III)

• Program Offices have hired, or contracted for, additional contract and project management professionals with the skills to successfully manage our contracts and project portfolio …

Project Management Knowledge, Skills and Capacity

17

Page 19: Are We There Yet? - Energy.gov · 2014-03-28 · Gen Engr Lead SC Robin Noyes Gen Engr SC Tony Ermovick Gen Engr Lead EM/EERE Brian Kong ... 8 FY07-09 FY08-10 FY09-11 FY10-12 FY11-13

• It’s time to execute

– Follow the Order

– Utilize the Guides

Execution