Upload
kier-bothwell
View
240
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Â
Citation preview
kier bothwellarchitectural assistant - part 2
architecture isnt just for special occasions.expectations need to change.places for daily activities should be highly valued.people can have more than they think.We expect great qualities in buildings like museums;shouldnt we also expect them in places for everyday living?an individuals self-image is based on the quality of his or her daily life.
Julie eizenberg, architect (2006)
____________________________________________________________________________________________________
Kier calluMbothwell_____________________________________nationality: irish // south africanirish passport no.: pt3306905current address: 49 jackson road holloway, n7 6eG london, united kingdomdate of birth: 02.10.1989gender: malelanguages: english // afrikaans
eDUCAtioN
University of the witwatersrand Johannesburg2013 // Master of architecture (professional) (riBa part 2)cum laude 2012 // Bachelor of architectural studies with honoursdesign studio passed with distinction2010 // Bachelor of architectural studies (riBa part 1)architectural design & theory III passed with distinction
St Stithians boys College Johannesburg2007 // Full Matric exemption (independent examination Board)
CoNtiNUeD eDUCAtioN
2014 // sacap candidate architect 2011 // student representative for the south african council for the architectural profession (sacap) accreditation for the university of cape towns school of architecture2010 // Digital Design and Fabrication Workshop held in Johannesburg by Kristof crolla & Jeroen van ameijden from the architectural association school of architecture in london
ProFeSSioNAl eXPerieNCe
hood Napier Architects Johannesburg2014 // candidate architect2012 // Junior architect2011 // Junior architectdesign development, 3d modelling & rendering in revit, autocad drafting & technical documentation, project management, site management & snagging, presentations, client/architect liaison
reFerences aVailaBle upOn reQuest
hoNoUrS + AwArDS
DM burton Prize the best graduand in the discipline of architecture // 2013
Saul Margo Memorial PrizeThe final year student whose performance over the entire curriculum for the degrees of architecture is judged to be the most meritorious // 2013
Frank Gordon Mcintosh Prize in Architecturethe Master of architecture (prof.) graduand who submitted the best architectural design and discourse on some aspect of architectural construction or the best set of drawings // 2013
Second Year Design Studio tutor // 2013
the everite Prizethe best graduand in the Bachelor of architectural studies // 2010
Gauteng institute for Architecture Awardthe Bachelor of architecture studies graduand who submits the most comprehensively resolved major project in the course architectural theory & Design // 2010
MDS Architects Prizethe student who submits the best design project for a commercial building in the final year of study for the Bachelor of Architectural studies degree // 2010
Certificate of Merit // 2010
the Deans list awarded to the top 10% of students in the faculty of the built environment // 2010/2012/2013
Member of the international Golden key Society
School Prefect // 2007
Academic Colours // 2007
Art Colours // 2007
Shirley woodhouse Award for Art // 2007
School Art Prize // 2005/2006
SkillSet
Computer revit / autocaD / adobe photoshop / adobe inDesign / Microsoft suiteBasic Knowledge: sketchup pro / adove illustrator / rhinoceros / Grasshopper
PhysicalModel production / hand drafting / project Management
[email protected] // +44 7467 492638
eDucatiOnaleXperience_____________________________________________________________________________________________
Redefining Perceptions and Integrating the Police Station in City and Suburban
master of architecture (professional) design & theory dissertationcity & suburban, jhb // 2013 the dissertation proposes a hybrid police station which comprises a police museum and library, located in the historical Three Castles Cigarette Factory, a lecture hall, retail space, a youth zone, police dormitory in the former Nugget Hotel and a public square. through this diverse programmatic approach and careful design considerations for the polices specific requirements to operate, hierarchies of circulation, the celebration of old and new, materials inspired by the context, use of light and shadow, water and sound, vegetation and visual connections, this new police station challenges negative perceptions associated with policing in south africa and begins to integrate the people and the states strong-arm of power; redefining perceptions from the past.
Please follow link for complete thesis: http://issuu.com/kierbothwell/docs/kier_c._bothwell_-_rotten_potatoes_
rotteN PotAtoeS_____________________________________________________________________________________________________
towards the Three Castles Cigarette Factory and the police stations Main entranceRevit to Photoshop
3,570
8,160
12,240
0,000
15,980
4,420
7,650
12,240
0,510
16,830
-3,400
cc
dd
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
top of page: north elevationabove:longitudinal section through police stationAutocad
Ground Floor planAutocad
Copy right:
Water reticulation:
Electrical notes:
D A T E
R E V
D E S C R I P T I O N
J O B N O
D A T E
D R A W I N G
D R A W I N G N OS C A L E
R E V P R O J E C T
WIL.22.05.14
Wil-021:50
22.05.14
1
General notes:
Setting out, excavation & site operations - SANS 10400-G & F
Structural notes:
Roof notes - SANS 10400 - L
Drainage - SANS 10400-PTo all wc's provide 100 mm waste pipes.
all vents shall finish 900mm minimum above any roof finish.
provide overflow gully at lowest point of drainage system include gully to
pool if at lowest point.
This drawing is copyright reserved and remains the property of the architect any
changes to the internal or external structure by any other design party will not be
permitted without first confirming with the architect. No part of this drawing may be
copied or used by any other party or other designer without permission from the
architect. All materials to be SABS or agreement board approved. All work to
comply with the National Building Regulations (SANS 10400) the applicable SABS
codes & building society regulations.
The architects specification, instructions, larger scaled details drawings, engineers
details etc. shall take preferance to these drawings. These drawings are not to be
scaled, use figured dimensions only. All material and workmanship to be the best
of their respective kinds and to conform with SABS standards and specifications,
all work to be carried out in strict accordance with architects instructions. Materials
used & applied must be referred to using manufactures printed instructions.
Contractor to arrange and ensure that all required inspections are carried out by
the local building inspectorate. On completion of contract, all rubbish and rubble is
to be removed from the site, and may not be used as fill, unless otherwise directed.
Provide and erect in approved position, standard architects notice board. All
habitable rooms to be provided with natural light and ventilation as set out in SANS
10400-O. The architect will not be held responsible for the quality of the
workmanship. The construction of the building may not commence without
approval of the building plans through council.
Drawings are prepared from surface examination of site only. Depth of foundations,
height of plinths number of steps & final finished ground levels to be determined by
the contractor & engineer on site & confirmed with the architects. Top of all
foundations to be a minimum 500mm below the finished ground. Any changes of
levels deemed necessary on site must be first reported to and approved by the
architect. All levels, dimensions, building lines and other data to be checked on site
and any discrepancies are to be reported to the architect and engineer for
correction. The architect will not be held responsible for dimensional errors if not
notified at the time of commencing work on site.
Build in precast prestressed concrete lintels (SABS approved) above all openings.
Depth of foundation trenches to be a min of 500mm below ground level.
Foundations to be set on firm supportable ground and to be checked & confirmed
by engineer. New concrete surface bed to be a minimum of 15mpa 100mm thick
on damp proof membrane DPM (gunplas green or equivalent) on sand blinding on
well compacted fill. Top of concrete surface bed to be a min of 150mm above NGL.
Provide approved dpc (gundle brickgrip or equivalent ) under all walls & window
sills & provide vertical dpc.s to all changes of floor levels. All surface beds to be
finished with 30mm minimum sand cement screed unless otherwise detailed or
specified. All brickwork to receive brickforce every 4 courses all openings to
receive brickforce every course for 3 courses extending 1m past opening on both
sides. All stairs unless otherwise detailed to have equal risers 185mm maximum
with equal treads 250mm minimum. Provide handrail at 900mm height where
number of risers exceed five & 1m high to balconies & landings and a min of
100mm baluster spacing according to NBR. The FFL at changes between floor
finishes must remain constant. contractor to take account of differences in depths
of floor finishes when screed is laid.
Rafters & trusses to be tied down with galvanized hoop iron threaded through four
courses of brickwork. Parapet walls to min of 300mm above roof level. Provide all
required flashings and counter flashings at changes in roof levels. Abutments
between roof and parapet walls, chimneys, roof valleys & ridges. Provide approved
insulation over all ceilings. Flat rooves to have 50mm chip stone on raised mesh
grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm
screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers
details. design & specifications downpipes to be chased into walls & plastered
using wire mesh & plaster at a min size of 75
Provide inspection eyes (ie) at all junctions and rodding eyes (re) to all bends,
changes in direction and ramps. Provide ie at every 24 meters along straight run of
drain, provide such with purpose made marked cover plates at finished ground
level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV).
provide 50 anti siphon pipe where vertical drop exceeds 1200mm. Drains shall
have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building,
provide adequate protection to ensure no load is transferred to drain from building.
Drains must have straight runs where passing beneath buildings. Pipes to have re's
at either end. All ie & re,s to be accessible. To all wash hand basins & vanity
basins provide 32 mm waste pipes. To all sinks, baths,
showers, laundry trough and urinals provide 38mm waste pipes.
All electrical work to be done by licenced electrician and all work and to be carried
out according to SABS standards. Contractor to ensure a 3 phase supply &
adequate circuit breakers provided. Electrician to provide compliance certificate.
All hot water circulation pipes, and all externally exposed pipes to be insulated
along their entire length with 25mm canvas wrapped fibre insulation and sealed
with sealer paint. All externally exposed pipes to be covered in weatherproof GMS
jacket.
the architect will not be held responsible for any discrepancies which may arise as
a result of unapproved plans by local authority and owner. please note that the
signed approval of this plan by owner must be obtained before construction can
comm
ence. all specifications by developer overides plans. the architect must be
informed in writing of any changes to these plans. sewer and water connection to
be confirmed with engineer before building comm
ences the contractor shall provide
all assistance & everything necessary to enable the accuracy of the setting out to
be checked. checking of the setting out shall not relieve the contractor of his
responsibility for correctness thereof & the contractor shall rectify any errors in the
works that may arise from incorrect setting out without any adjustment to the
contract sum. the contractor/client may not claim against the architect as a result
of discrepencies or errors not reported to the architect before construction
Disclaimer:
demolition of all walls to be confirmed by structural engineer
all dimensions to be checked on site prior to ordering or installing all windows & doors
Fax.0 8 6 6 1 0 1 7 2 6
p o n e t s u i t e 6 9 7 p r i v a t e b a g x 1 5 3
n i c k @ h o o d n a p i e r . c o . z a
e-mail.
l a r a h o o d
n i c k n a p i e r
0 8 2 9 0 2 4 1 9 9
0 8 3 2 6 6 7 4 6 2
B.Arch. M.I.A. R.I.B.A.
Reg. No 7019Reg. No ST 0617l a r a @
h o o d n a p i e r . c o . z a
e-mail.
b r y a n s t o n 2 0 2 1 ground floor plan proposed new house for
on Portion 1 of ERF 314
Wilson Nkosi
Sandown Ext. 24
13.6.2014
1
council submission
atrium
serve
r
room
C
C
A
A
B
B
C
C
covered patio
T.O.C.
-0,680tiles
diningT.O.C.-0,510tiles
kitchen
tiles
scullery
T.O.C.
-0,510tiles
pantry
tiles
loungetiles
family room
T.O.C.
-0,680tiles
entrance hall
T.O.C.
0,000tiles
double garage
T.O.C.
0,170tiles
studyT.O.C.0,000tiles
staff room
T.O.C.
0,000tiles
storetiles
storeT.O.C.0,170tilesgue
st wc
tiles
sinksink
d/w
w/m
t/d
gulley
whb
geberitwc
whb
whb
wc
wc
shr
sink
fr
fr
p/b
extractor above
gas stove
driveway
pavers
T.O.C.
-0,850tiles
poolby specialist
deep end
shallow end
kitchen layout detailing,
counters and cupboards
to specialist detailsto specialist details
final kitchen electrical layout
gas braai
gas fireplace
gas fireplace
stair note:
risers @ 170mm
treads @ 280mm
12
3
up
up1
23
stair note:
risers @ 170mm
treads @ 300mm
170m
m ste
p dow
n
170m
m ste
p dow
n
170m
m ste
p dow
n
weather step down
230 fire wall
fire door30min solid
230 fire wall
230 f
ire wa
ll
Floor laid to 1% fall
screed & tiles
laid to a min fall
screed & tiles
laid to a min fall
shelves
line of cantilevered
slab above
ramp up to garage floor level
aluminium automated sectional horizontally slatted door
rcl @ 2125mm ht
rcl @ 2465mm ht
line of cantilevered
slab above
beam
@ 28
05mm h
t
beam @ 2805mm ht
line of rc bridge above
Side shower walls
and floor to be
correctly sealed
and waterproofed
water feature
by specialist
paving
infraset village cobble with
a dump rock embedded road
edge beam step d
own
step d
own
paving
infraset village cobble with
a dump rock embedded road
edge beam
170mm step down
line of cantilevered
slab above
D1
D2
D3
D4
slide
slide
fold
fold
slide
paving
infraset village cobble with
a dump rock embedded road
edge beam
insitu cast concrete
staircase according
to engineers details
gas bottle storage
see detail and notesgas line
gas line gas line
gas line
gas line
proposed pool pump
position to be confirmed
with pool specialist
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
stainless steel handrail @ 1m high above
floor level with s/s balusters and
horizontal running steel rods
all to specialist details
all balustrades to comply with SANS 0400
& SANS 10160
access panels
in Duct with
100 OVP
access panels
in Duct with
100 OVP
rcl @
2465m
m ht
rcl @
2465m
m ht
D10
D11
D11
D11
D12
D13
D11
D11
slide
D18
D18
D18
D19
cupboards and shelving
to specialist joinery detailing
and specifications
cupboards and shelving
to specialist joinery detailing
and specifications
access panels
in Duct with
100 OVP
steps upup
1
2
3
final number of steps to be
determined on site and confirmed
with architect before construction
stair note:
risers @ 170mm
treads @ 350mm
beam
@ 29
75mm h
t
W3
high le
vel wi
ndow
W2
W1
W5
W6
W7
W8
W9
W9
W10
shelves
cupboards and shelving
to specialist joinery detailing
and specifications
ie
ie
ie
ie
ie
ie
re
re
re
re
ie
contractor to confirm
position of sewer connection
point on site and adjust sp
line accordingly
re 1,5m away from
sewer connection
contractor to confirm
position of sewer connection
point on site and adjust sp
line accordingly
re 1,5m away from
sewer connection
nbr regulations
to be according to the
all plumbing above ground
minimunm 450mm invert level
to sewer connection
laid to a min. fall of 1:40
100 soil pipe to sabs standards
all plumbing pipes to be
900mm away from walls
nbr regulations
to be according to the
all plumbing above ground
minimunm 450mm invert level
to sewer connection
laid to a min. fall of 1:40
100 soil pipe to sabs standards
all plumbing pipes to be
900mm away from walls
nbr regulations
to be according to the
all plumbing above ground
minimunm 450mm invert level
to sewer connection
laid to a min. fall of 1:40
100 soil pipe to sabs standards
all plumbing pipes to be
900mm away from walls
ground floor plan
scale 1:50
1102
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
230
1435
115115
115
115
1115
230
1770
230
3685
1000
230
2690
1665
3035
5260
1230
1770
6460
230
6000
19420
23014
7
230
4370
8728
925
345
230
230 2
3037
746
0
4830
9073
1270
230
230
1724
0
770
345
1000
230
230
2140
345
230
115
1000
115
1000
115
5800
1000
1230
230
1460
2370
1341
0
230
3460
1724
0
230470
230
1800
230
3000
460
4800
345
15102555
2030
5375
3000
2480
3980
230
2020
19420
345
230520
115
2885
1200
345
3000
3540
345
4800
230
1200
600
1200
230
1000
230
2540
230
2000
230
3000
230115
2770
115
115
2885
230
345
1800
230
1510
460
230
4170
530
4800
1115
230
1770
1180
1230
115115
3685
115
230
1000
115
115
1115
230
115115
115
230
230
345
5800
230
1575
230
4770
230 2
30
1000
3770
600
300
1425
300
230
7710
1200
230
1000
1000
1000
115
115
115
3460
230
2000
230
230
230
2400
115
1232
230
230
2700
115
1262
0
3226
230
2366
560
280
280
280
280
280
280
280
280
280
3718
345
115
230
4370
230
4830
8243
485
345
1500
345
1270
230
230
230
460
230
1200
6928
4
5
gas bottle storage
see detail and notes
access panels
in Duct with
100 RWDP
RW pipe to be
protected from load
D21
slide
100 x 100mm steel
structural post
to eng. spec., painted
to match window frame
boundary wall
stormwater to discharge at
regular intervals through weep
holes according to nbr and
engineers specifications
230
230landscaped planter
accessible from garden
located below slab &
230
1000
230
3960
gulley
ie
3,570
8,160
12,240
0,000
15,980
4,420
7,650
12,240
0,510
16,830
-3,400
cc
dd
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
0,040FFL LOBBY
5,820FFL YOUTH ZONE
11,220TOC ROOF
12,155TO PARAPET
5485
5143
935
10,965U/S CEILING
255
5,525U/S CEILING
295
4,590U/S RCL
935
3mm profiled aluminium sheetpowder coated
80mm polyurethane insulationcushion behind 6mm float glass
fixed glazing: 6mm float glass, 12mmargon-filled cavity, 12mm float glass
by manufacturer
150 x 150 x 5mm MS angle fixed to RCdown-stand beam with rawl bolts; painted with
one coat red lead primer, one coat universalundercoat & two coats enamel
anodised aluminium transom with pressure &drainage opening to specialist spec.
powder coated 'charcoal grey'
cementitious bandage
10 year warranty, torch on bituminouswaterproofing with 75mm side laps & 100mm endlaps under 250 micron plastic sheeting with 50mmlaps, loose laid as protection layer in accordance
with manufacturer
50mm layer of river rounded stones; no geotextile sheet required
min. 35mm screed laid to min. falls 1:50 to 100mm FBO set min. 20mm below slab on a 255mm RC
slab with down-stand beams to eng. spec.
80mm polyurethane insulation panels bonded toslab with 100mm spacings between panels
by specialist
exposed cable trays
flush plastered ceiling with 12 x 10mm recessedjoint to slab at corner of soffit: 'shadowline'
internal wall to be smoothlyplastered & painted with onecoat universal undercoat &two coats 'white' PVA
380 x 25mm SA pine board to bebonded to RC up-stand beam
40mm polished screed, pigmented 'burntorange', with 40 x 10mm recessed joint to
slab at corner of soffit ('shadowline') on min.255mm RC slab with up-stand beams to
eng. spec.
brick pavers laid to fall away from building onmin. 25mm bedding sand on min. 50mm level
compacted aggregate on min. 25mm layers ofcompacted earth
precast concrete kerb
plastered drip detail
RC lintel to eng. spec.
youth passively surveyingPort Plein Park
6mm suspended gypsum ceilingboard painted with one coatuniversal undercoat & two coats'white' PVA, suspended byaluminium T-section runnerspowder coated 'white' at 600mmc/c spacings
internal wall to be smoothlyplastered & painted with onecoat universal undercoat &two coats 'white' PVA
350 x 80mm SA pine light boxesbolted to the u/s of slab toreduce sound reverberation
400 x 30mm SA pine board to bebonded to top of low brick wall
riser: 170mmtread: 330mm
40mm polished screedwith 40 x10mm recessed joint to slab atcorner of soffit ('shadowline') onmin. 255mm RC slab to eng.spec.
polished cast-in-situ concretereception desk with chamferedcorners
1000
1000
850 0,040
FFL
340
50mm stainless steel hand railat 1m above ffl
-2,930FFL BASEMENT
2970
NGL
RC foundation toeng. spec.
85mm step in slab
50mm hardwood timber treadssuspended & fixed with stainlesssteel rope to eng. spec.
80mm polyurethanefoam insulation
'v' joint
cranked DPC with weepholeevery 5th perb
300mm masonry cavity wall with internalbrick leaf connected to external brick leafwith galvanized butterfly ties at spacing asper eng. spec.
40mm polished screed, with 40 x 10mmrecessed joint to slab at corner of soffit
('shadowline') on min. 255mm RC slab with300mm up-stand beam to eng. spec.
BOE and plastered cill with drip detail
internal wall to be smoothly plastered wallwith one coat primer & two coats
'white' PVA
150 x 20mm meranti cill bondedto top of internal brick leaf
silicone joint
aluminium window framepowder coated 'charcoal grey'
RCL
existing masonry castle wall to be madegood & re-plastered and painted to matchoriginal
DPC
existing windows to be removed andopenings made good for new aluminiumwindows, powder coated 'charcoal grey'
external wall to be smoothly plastered &painted with one coat universal undercoat& two coats 'white' PVA
50 x 50mm MS grate painted with one coatred lead primer, one coat universal
undercoat & two coats 'charcoal grey'enamel
35 x 35 x 600mm MS square tubewelded to grate & MS plate
100 x 100 x 5mm MS plate fixed to u/s of RCslab with rawl bolts to eng. spec
150 x 75 x 10mm MS angle fixed to castlewall with rawl bolts to fall to 100 RWDP
152 x 76 MS taper flange channel built intoexisting castle walls
galvanized steel flashing cementitious bandage
silicone joint
soft joint
fixed glazing: 6mm toughened glass, 12mmargon-filled cavity, 6mm float glassby manufacturer placed at 7 deg to gutter
Note: all MS components to be painted withone coat red lead primer, one coat universalundercoat & two coats 'charcoal grey'enamel
cementitious bandage
200 x 50mm precast conc. copingwith drip detail
silicone joint
885
125 x 75mm galvanized C-channel gutter
INTERIOR OF POLICE MUSEUM
INTERIOR OFMEDIA CENTRE
50mm polished conc. on 10 year warranty,torch on bituminous waterproofing, with
75mm side laps & 100mm end laps under250 micron plastic sheeting with 50mm laps,
loose laid as protection layer inaccordance with manufacturer
min. 35mm screed laid to min. falls 1:50 to100mm FBO set min. 20mm below slab on
a 170mm RC slab with down-stand beamsto eng. spec.
80mm polyurethane insulation panelsbonded to slab with 100mm spacings
between panelsby specialist
silicone joint
3mm aluminium cleat at 100 deg.
3mm aluminium cleat at 80 deg.
345mm cast-in-situ RC 'tower'wall with 115mm cavity
flush plastered ceiling with 12 x 10mmrecessed joint to slab at corner of
soffit: 'shadowline'
weep hole
aluminium surround profileby specialist
3mm corten steel cladding
50 x 50 x 3mm angle bracketwith aluminium captive nut rail
by specialist
INTERIOR OF STAIRWELL 'TOWER'
INTERIOR OF SAPS BUILDING
EXTERNAL 'JUICE BAR'
dpm
dpm
agricultural drain to eng. detail
6mm toughened glass bonded tosoft joints on MS IPE 140 beams
125 x 75mm galvanized C-channel gutter
850 x 40mm galvanized grate fixedto152 x 76 MS taper flange channels to
eng. spec.
chamfered edge to RC slab
acrylic bandage flashing
152 x 76 MS taper flange channels fixedto RC slab with rawl bolts
40mm polished screed with 40 x 10mmrecessed joint to slab at corner of soffit
('shadowline') on min. 255mm RC slab withto eng. spec.
fixed glazing: 6mm float glass, 12mmargon-filled cavity, 12mm float glass
by manufacturer
anodised aluminium transom with pressure& drainage opening to specialist spec.
powder coated 'charcoal grey'
min. 35mm screed laid to min. falls 1:50 to50mm RWO set min. 20mm below slab ona 170mm RC slab to eng. spec.
75 x 100mm aluminium mullion fixed toMS channel with 50 x 50 x 3mm angle
bracket
soft joint by manufacturer
3.8mm ceramic rods at 215 c/c fixed toaluminium mullion with brackets by specialist
35mm screed
external wall to be smoothlyplastered & painted with onecoat universal undercoat &two coats 'white' PVA
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
perimeter section through Main entranceAutocad
CNC laser cut model
lobby ViewRevit to Photoshop
100
BRA
M F
ISC
HER
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
bas honours design studio randburg cbd, jhb // october 2012 since the end of apartheid the identity of public service buildings has not signifi cantly changed. As a result, the people are unable to identify with the state and vice versa.
the Magistrates court proposed stands in opposition to the courts which exist across the south african landscape today. celebrating transparency, movement and light, this court building is an extension of the street domain, encouraging the people to partake in the judicial system by which their lives are governed.
MAGiStrAteS CoUrt_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________
left:site plan AutocadOpposite page:concept Diagrams Photoshop concept Model Hardwood Timbers Working concept Models Polystyrene
Copy right:
Water reticulation:
Electrical notes:
D A T E
R E V
D E S C R I P T I O N
J O B N O
D A T E
D R A W I N G
D R A W I N G N OS C A L E
R E V P R O J E C T
WIL.22.05.14
Wil-021:50
22.05.14
1
General notes:
Setting out, excavation & site operations - SANS 10400-G & F
Structural notes:
Roof notes - SANS 10400 - L
Drainage - SANS 10400-PTo all wc's provide 100 mm waste pipes.
all vents shall finish 900mm minimum above any roof finish.
provide overflow gully at lowest point of drainage system include gully to
pool if at lowest point.
This drawing is copyright reserved and remains the property of the architect any
changes to the internal or external structure by any other design party will not be
permitted without first confirming with the architect. No part of this drawing may be
copied or used by any other party or other designer without permission from the
architect. All materials to be SABS or agreement board approved. All work to
comply with the National Building Regulations (SANS 10400) the applicable SABS
codes & building society regulations.
The architects specification, instructions, larger scaled details drawings, engineers
details etc. shall take preferance to these drawings. These drawings are not to be
scaled, use figured dimensions only. All material and workmanship to be the best
of their respective kinds and to conform with SABS standards and specifications,
all work to be carried out in strict accordance with architects instructions. Materials
used & applied must be referred to using manufactures printed instructions.
Contractor to arrange and ensure that all required inspections are carried out by
the local building inspectorate. On completion of contract, all rubbish and rubble is
to be removed from the site, and may not be used as fill, unless otherwise directed.
Provide and erect in approved position, standard architects notice board. All
habitable rooms to be provided with natural light and ventilation as set out in SANS
10400-O. The architect will not be held responsible for the quality of the
workmanship. The construction of the building may not commence without
approval of the building plans through council.
Drawings are prepared from surface examination of site only. Depth of foundations,
height of plinths number of steps & final finished ground levels to be determined by
the contractor & engineer on site & confirmed with the architects. Top of all
foundations to be a minimum 500mm below the finished ground. Any changes of
levels deemed necessary on site must be first reported to and approved by the
architect. All levels, dimensions, building lines and other data to be checked on site
and any discrepancies are to be reported to the architect and engineer for
correction. The architect will not be held responsible for dimensional errors if not
notified at the time of commencing work on site.
Build in precast prestressed concrete lintels (SABS approved) above all openings.
Depth of foundation trenches to be a min of 500mm below ground level.
Foundations to be set on firm supportable ground and to be checked & confirmed
by engineer. New concrete surface bed to be a minimum of 15mpa 100mm thick
on damp proof membrane DPM (gunplas green or equivalent) on sand blinding on
well compacted fill. Top of concrete surface bed to be a min of 150mm above NGL.
Provide approved dpc (gundle brickgrip or equivalent ) under all walls & window
sills & provide vertical dpc.s to all changes of floor levels. All surface beds to be
finished with 30mm minimum sand cement screed unless otherwise detailed or
specified. All brickwork to receive brickforce every 4 courses all openings to
receive brickforce every course for 3 courses extending 1m past opening on both
sides. All stairs unless otherwise detailed to have equal risers 185mm maximum
with equal treads 250mm minimum. Provide handrail at 900mm height where
number of risers exceed five & 1m high to balconies & landings and a min of
100mm baluster spacing according to NBR. The FFL at changes between floor
finishes must remain constant. contractor to take account of differences in depths
of floor finishes when screed is laid.
Rafters & trusses to be tied down with galvanized hoop iron threaded through four
courses of brickwork. Parapet walls to min of 300mm above roof level. Provide all
required flashings and counter flashings at changes in roof levels. Abutments
between roof and parapet walls, chimneys, roof valleys & ridges. Provide approved
insulation over all ceilings. Flat rooves to have 50mm chip stone on raised mesh
grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm
screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers
details. design & specifications downpipes to be chased into walls & plastered
using wire mesh & plaster at a min size of 75
Provide inspection eyes (ie) at all junctions and rodding eyes (re) to all bends,
changes in direction and ramps. Provide ie at every 24 meters along straight run of
drain, provide such with purpose made marked cover plates at finished ground
level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV).
provide 50 anti siphon pipe where vertical drop exceeds 1200mm. Drains shall
have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building,
provide adequate protection to ensure no load is transferred to drain from building.
Drains must have straight runs where passing beneath buildings. Pipes to have re's
at either end. All ie & re,s to be accessible. To all wash hand basins & vanity
basins provide 32 mm waste pipes. To all sinks, baths,
showers, laundry trough and urinals provide 38mm waste pipes.
All electrical work to be done by licenced electrician and all work and to be carried
out according to SABS standards. Contractor to ensure a 3 phase supply &
adequate circuit breakers provided. Electrician to provide compliance certificate.
All hot water circulation pipes, and all externally exposed pipes to be insulated
along their entire length with 25mm canvas wrapped fibre insulation and sealed
with sealer paint. All externally exposed pipes to be covered in weatherproof GMS
jacket.
the architect will not be held responsible for any discrepancies which may arise as
a result of unapproved plans by local authority and owner. please note that the
signed approval of this plan by owner must be obtained before construction can
comm
ence. all specifications by developer overides plans. the architect must be
informed in writing of any changes to these plans. sewer and water connection to
be confirmed with engineer before building commences the contractor shall provide
all assistance & everything necessary to enable the accuracy of the setting out to
be checked. checking of the setting out shall not relieve the contractor of his
responsibility for correctness thereof & the contractor shall rectify any errors in the
works that may arise from incorrect setting out without any adjustment to the
contract sum. the contractor/client may not claim against the architect as a result
of discrepencies or errors not reported to the architect before construction
Disclaimer:
demolition of all walls to be confirmed by structural engineer
all dimensions to be checked on site prior to ordering or installing all windows & doors
Fax.0 8 6 6 1 0 1 7 2 6
p o n e t s u i t e 6 9 7 p r i v a t e b a g x 1 5 3
n i c k @ h o o d n a p i e r . c o . z a
e-mail.
l a r a h o o d
n i c k n a p i e r
0 8 2 9 0 2 4 1 9 9
0 8 3 2 6 6 7 4 6 2
B.Arch. M.I.A. R.I.B.A.
Reg. No 7019Reg. No ST 0617l a r a @
h o o d n a p i e r . c o . z a
e-mail.
b r y a n s t o n 2 0 2 1 ground floor plan proposed new house for
on Portion 1 of ERF 314
Wilson Nkosi
Sandown Ext. 24
13.6.2014
1
council submission
atrium
serve
r
room
C
C
A
A
B
B
C
C
covered patio
T.O.C.
-0,680tiles
diningT.O.C.-0,510tiles
kitchen
tiles
scullery
T.O.C.
-0,510tiles
pantry
tiles
loungetiles
family room
T.O.C.
-0,680tiles
entrance hall
T.O.C.
0,000tiles
double garage
T.O.C.
0,170tiles
studyT.O.C.0,000tiles
staff room
T.O.C.
0,000tiles
storetiles
storeT.O.C.0,170tilesgue
st wc
tiles
sinksink
d/w
w/m
t/d
gulley
whb
geberitwc
whb
whb
wc
wc
shr
sink
fr
fr
p/b
extractor above
gas stove
driveway
pavers
T.O.C.
-0,850tiles
poolby specialist
deep end
shallow end
kitchen layout detailing,
counters and cupboards
to specialist detailsto specialist details
final kitchen electrical layout
gas braai
gas fireplace
gas fireplace
stair note:
risers @ 170mm
treads @ 280mm
12
3
up
up1
23
stair note:
risers @ 170mm
treads @ 300mm
170m
m ste
p dow
n
170m
m ste
p dow
n
170m
m ste
p dow
n
weather step down
230 fire wall
fire door30min solid
230 fire wall
230 f
ire wa
ll
Floor laid to 1% fall
screed & tiles
laid to a min fall
screed & tiles
laid to a min fall
shelves
line of cantilevered
slab above
ramp up to garage floor level
aluminium automated sectional horizontally slatted door
rcl @ 2125mm ht
rcl @ 2465mm ht
line of cantilevered
slab above
beam
@ 28
05mm h
t
beam @ 2805mm ht
line of rc bridge above
Side shower walls
and floor to be
correctly sealed
and waterproofed
water feature
by specialist
paving
infraset village cobble with
a dump rock embedded road
edge beam step d
own
step d
own
paving
infraset village cobble with
a dump rock embedded road
edge beam
170mm step down
line of cantilevered
slab above
D1
D2
D3
D4
slide
slide
fold
fold
slide
paving
infraset village cobble with
a dump rock embedded road
edge beam
insitu cast concrete
staircase according
to engineers details
gas bottle storage
see detail and notesgas line
gas line gas line
gas line
gas line
proposed pool pump
position to be confirmed
with pool specialist
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
stainless steel handrail @ 1m high above
floor level with s/s balusters and
horizontal running steel rods
all to specialist details
all balustrades to comply with SANS 0400
& SANS 10160
access panels
in Duct with
100 OVP
access panels
in Duct with
100 OVP
rcl @
2465m
m ht
rcl @
2465m
m ht
D10
D11
D11
D11
D12
D13
D11
D11
slide
D18
D18
D18
D19
cupboards and shelving
to specialist joinery detailing
and specifications
cupboards and shelving
to specialist joinery detailing
and specifications
access panels
in Duct with
100 OVP
steps upup
1
2
3
final number of steps to be
determined on site and confirmed
with architect before construction
stair note:
risers @ 170mm
treads @ 350mm
beam
@ 29
75mm h
t
W3
high le
vel wi
ndow
W2
W1
W5
W6
W7
W8
W9
W9
W10
shelves
cupboards and shelving
to specialist joinery detailing
and specifications
ie
ie
ie
ie
ie
ie
re
re
re
re
ie
contractor to confirm
position of sewer connection
point on site and adjust sp
line accordingly
re 1,5m away from
sewer connection
contractor to confirm
position of sewer connection
point on site and adjust sp
line accordingly
re 1,5m away from
sewer connection
nbr regulations
to be according to the
all plumbing above ground
minimunm 450mm invert level
to sewer connection
laid to a min. fall of 1:40
100 soil pipe to sabs standards
all plumbing pipes to be
900mm away from walls
nbr regulations
to be according to the
all plumbing above ground
minimunm 450mm invert level
to sewer connection
laid to a min. fall of 1:40
100 soil pipe to sabs standards
all plumbing pipes to be
900mm away from walls
nbr regulations
to be according to the
all plumbing above ground
minimunm 450mm invert level
to sewer connection
laid to a min. fall of 1:40
100 soil pipe to sabs standards
all plumbing pipes to be
900mm away from walls
ground floor plan
scale 1:50
1102
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
75 rwdp chased
into wall using wire
mesh & plaster
230
1435
115115
115
115
1115
230
1770
230
3685
1000
230
2690
1665
3035
5260
1230
1770
6460
230
6000
19420
23014
7
230
4370
8728
925
345
230
230 2
3037
746
0
4830
9073
1270
230
230
1724
0
770
345
1000
230
230
2140
345
230
115
1000
115
1000
115
5800
1000
1230
230
1460
2370
1341
0
230
3460
1724
0
230470
230
1800
230
3000
460
4800
345
15102555
2030
5375
3000
2480
3980
230
2020
19420
345
230520
115
2885
1200
345
3000
3540
345
4800
230
1200
600
1200
230
1000
230
2540
230
2000
230
3000
230115
2770
115
115
2885
230
345
1800
230
1510
460
230
4170
530
4800
1115
230
1770
1180
1230
115115
3685
115
230
1000
115
115
1115
230
115115
115
230
230
345
5800
230
1575
230
4770
230 2
30
1000
3770
600
300
1425
300
230
7710
1200
230
1000
1000
1000
115
115
115
3460
230
2000
230
230
230
2400
115
1232
230
230
2700
115
1262
0
3226
230
2366
560
280
280
280
280
280
280
280
280
280
3718
345
115
230
4370
230
4830
8243
485
345
1500
345
1270
230
230
230
460
230
1200
6928
4
5
gas bottle storage
see detail and notes
access panels
in Duct with
100 RWDP
RW pipe to be
protected from load
D21
slide
100 x 100mm steel
structural post
to eng. spec., painted
to match window frame
boundary wall
stormwater to discharge at
regular intervals through weep
holes according to nbr and
engineers specifications
230
230landscaped planter
accessible from garden
located below slab &
230
1000
230
3960
gulley
ie
ngl
toc first floor4,080
toc second floor7,480
toc third floor10,880
toc roof14,195
toc ground floor0,000
toc first floor4,080
toc second floor8,330
toc third floor11,220
toc fourth floor15,470
toc fifth floor18,360
toc roof23,205
lower ground floor-1,360
security room
strong room
server room
buildingmanager
cleaners room
child protection
witness prep.
witness prep.
archiverecord room (current)
court cell
court room
holding cells
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
toc first floor4,080
toc second floor7,480
toc third floor10,880
toc fourth floor14,195
toc ground floor0,000
toc first floor4,080
toc second floor8,330
toc third floor11,220
toc fourth floor15,470
toc fifth floor18,360
toc roof23,205
lower groundfloor-1,360
ngl
toc first floor4,080
toc second floor7,480
toc third floor10,880
toc roof14,195
toc ground floor0,000
toc first floor4,080
toc second floor8,330
toc third floor11,220
toc fourth floor15,470
toc fifth floor18,360
toc roof23,205
lower ground floor-1,360
security room
strong room
server room
buildingmanager
cleaners room
child protection
witness prep.
witness prep.
archiverecord room (current)
court cell
court room
holding cells holding cells
conference room
archiverecord room
strong roomcash hall
ngl
toc first floor4,250
toc second floor7,990
toc third floor11,390
toc fourth floor15,130
toc fifth floor18,530
toc roof22,185
toc ground floor0,000ngl
toc first floor4,080
toc second floor8,330
toc third floor11,220
toc fourth floor15,470
toc fifth floor18,360
toc roof23,205
lower groundfloor-1,360
ngl
ngl
ngl
toc first floor4,250
toc second floor7,990
toc third floor11,390
toc fourth floor15,130
toc fifth floor18,530
toc roof22,185
toc ground floor0,000
toc first floor4,080
toc second floor8,330
toc third floor11,220
toc fourth floor15,470
toc fifth floor18,360
toc roof23,205
lower groundfloor
-1,360PR
ODU
CED
BY A
N AU
TODE
SK E
DUCA
TIO
NAL
PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
magistratesoffice
regionalprosecutor
witnessroom
public passage
magistratesbridge
courtroom
court cell
c-c
a-a
d-d
b-b
c-c
d-d
a-a
b-b
c-c
a-a
d-d
b-b
d-d
b-b
4,080
reception7,480
4,250 7,9908,330
4,080
building manager'sstore
tea room
estateofficer
regionalprosecutor
estateofficer
interdictclerks
conferece room
typist's
interpreter'sarea
snr. prosecutor
snr. prosecutor
server room
play roomchildprotection
strongroom
assessor'soffice
assessor'soffice
assessor'soffice
consul.room
assessor'soffice
magistratesoffice
regionalprosecutor
processoffice
c-c
a-a
c-c
a-a
magistratesoffice
regionalprosecutor
witnessroom
consul.room
courtroom
public passage
magistratesbridge
court cell
d-d
b-b
c-c
d-d
a-a
b-b
c-c
a-a
d-d
b-b
d-d
b-b
10,880
11,390
11,220 15,470
roof below
cleanersstore
cleanersrest room
regionalprosecutor
family counc.
maintenanceinvestigator
maintenanceofficer's
record room(current)
record room
archive
buildingmanager'soffice
magistratesoffice
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
entrance tobasement parkingbelow park
basemententrance
magistrate'sbasemententrance
outdooramphitheater
1,360
0,680
1,190
c-c
a-a
-1,360
0,000
0,000
supervisor'soffice
accesscontrol
security
up
d-d
b-b
c-c
d-d
a-a
b-b
magistrate'sbasement below
BRAM FISCHER ROAD
snack shop
kitchen
refuse storeaccuseddrop-off area
saps office 1
street court
public atrium
cash hall
'chill' area
intenet cafe
coffee bar
kitchen
cafeteria 2
cafeteria 1
law library
strongroom
drop-off
lobby
media center/library
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
cross section through court rooms
West elevation
interior atrium and court room ViewsRevit to Photoshop
Ground Floor plan (left)
third Floor plan (above)
bas honours design studio elective johannesburg cbd // march 2012 Delvers street is a melting pot within the Johannesburg inner city, recognised for the considerably varying social conditions across the four districts which define it. Conceived as a vegetable nursery, the steel structure supports the sustainable production of vegetables through the use of recycled Coca-Cola bottles, rain water harvesting, and education. attempting to bridge the divides between diverse groups of people who occupy Delvers street and the greater Johannesburg inner city, the structure allows for the nursery to adapt to the changing needs of the citys dwellers and in particular those of the informal vegetable traders.
DelVerS StreetiNterVeNtioN_________________________________________________________________________________A inner City Vegetable Nursery
Ground Floor plan
hand drawn site observation (above)
First Floor plan
Revit to Photoshop
West elevation
Copy
right:
Water
reticu
lation
:
Electr
ical no
tes:
D A T
E
R E V
D E S
C R I P
T I O
N
J O B
N O
D A T
E
D R A
W I N
G
D R A
W I N
G N
OS C
A L E
R E V P
R O J E
C T
WIL.2
2.05.1
4
Wil-0
21:5
0
22.05
.14
1
Gener
al note
s:
Settin
g out,
excava
tion &
site op
eration
s - SA
NS 10
400-G
& F
Struct
ural no
tes:
Roof
notes
- SAN
S 1040
0 - L
Draina
ge - S
ANS 1
0400-P
To all
wc's p
rovide
100
mm wa
ste pip
es.
all ven
ts sha
ll finis
h 900
mm m
inimum
above
any ro
of finis
h.
provid
e over
flow gu
lly at l
owest
point
of drain
age sy
stem i
nclude
gully
to
pool if
at low
est po
int.
This d
rawing
is cop
yright r
eserve
d and
remain
s the p
ropert
y of th
e arch
itect an
y
change
s to the
intern
al or e
xterna
l struc
ture b
y any
other
design
party
will no
t be
permit
ted wi
thout f
irst co
nfirmin
g with
the ar
chitec
t. No p
art of
this dr
awing
may b
e
copie
d or u
sed by
any o
ther p
arty o
r othe
r desi
gner w
ithout p
ermiss
ion fro
m the
archi
tect. A
ll mate
rials t
o be S
ABS o
r agre
ement
board
appro
ved. A
ll work
to
comp
ly with
the Na
tional B
uilding
Regul
ations
(SANS
10400)
the app
licable
SABS
code
s & bu
ilding
society
regul
ations.
The a
rchitec
ts spec
ificatio
n, inst
ruction
s, larg
er sca
led de
tails d
rawing
s, engi
neers
detail
s etc.
shall ta
ke pre
feranc
e to the
se dra
wings.
These
draw
ings a
re not
to be
scale
d, use
figure
d dime
nsions
only.
All ma
terial
and wo
rkmans
hip to
be the
best
of the
ir resp
ective
kinds
and to
confor
m with
SABS
standa
rds an
d spec
ificatio
ns,
all wo
rk to
be ca
rried o
ut in s
trict a
ccorda
nce wi
th arc
hitects
instru
ctions.
Mate
rials
used
& app
lied mu
st be r
eferre
d to us
ing ma
nufact
ures p
rinted
instru
ctions
.
Contr
actor
to arra
nge an
d ensu
re tha
t all re
quired
inspec
tions a
re car
ried ou
t by
the loc
al build
ing ins
pector
ate. O
n com
pletion
of co
ntrac
t, all ru
bbish
and r
ubble
is
to be
remo
ved fro
m the
site,
and m
ay not
be us
ed as
fill, u
nless
otherw
ise dir
ected
.
Provid
e and
erect
in app
roved
positio
n, stan
dard a
rchitec
ts notic
e boa
rd. Al
l
habita
ble ro
oms to
be pr
ovided
with n
atural
light an
d vent
ilation
as se
t out in
SANS
1040
0-O. T
he arc
hitect w
ill not b
e held
respo
nsible
for the
qualit
y of th
e
workm
anshi
p. The
constru
ction o
f the b
uilding
may n
ot com
menc
e witho
ut
approv
al of th
e build
ing pla
ns thr
ough c
ouncil.
Drawin
gs are
prepa
red fro
m surf
ace ex
amina
tion of
site o
nly. D
epth o
f found
ations,
heigh
t of pli
nths n
umber
of ste
ps & f
inal fin
ished
groun
d level
s to be
deter
mined
by
the co
ntract
or & e
nginee
r on s
ite & c
onfirm
ed wit
h the a
rchitec
ts. To
p of al
l
found
ations
to be
a min
imum 5
00mm
below
the
finish
ed gr
ound. A
ny cha
nges o
f
levels
deem
ed ne
cessar
y on s
ite mu
st be fi
rst rep
orted
to and
approv
ed by
the
archi
tect. A
ll level
s, dime
nsion
s, build
ing
lines a
nd ot
her d
ata to
be ch
ecked
on sit
e
and a
ny dis
crepan
cies a
re to b
e repo
rted to
the ar
chitec
t and
engin
eer for
corre
ction.
The a
rchitec
t will n
ot be
held r
espons
ible fo
r dime
nsion
al erro
rs if n
ot
notifie
d at th
e time
of co
mmen
cing w
ork on
site.
Build
in prec
ast pr
estres
sed co
ncrete
lintels
(SABS
approve
d) abov
e all op
enings.
Depth
of fou
ndation
trench
es to b
e a mi
n of 50
0mm b
elow g
round
level.
Foun
dation
s to be
set o
n firm
suppo
rtable
groun
d and
to be c
hecked
& con
firmed
by eng
ineer.
New c
oncret
e surf
ace be
d to be
a minim
um of
15mp
a 100m
m thic
k
on da
mp pr
oof me
mbran
e DPM
(gunpla
s green
or equ
ivalent)
on sa
nd bli
nding
on
well c
ompac
ted fill
. Top
of conc
rete s
urface
bed to
be a m
in of 15
0mm a
bove N
GL.
Provid
e appr
oved d
pc (gu
ndle br
ickgrip
or eq
uivale
nt ) un
der all
walls &
window
sills &
provi
de ver
tical dp
c.s to
all cha
nges o
f floor
levels
. All s
urface
beds
to be
finishe
d with
30mm
minim
um sa
nd ce
ment
scree
d unle
ss oth
erwise
detail
ed or
specifi
ed. Al
l brick
work t
o rece
ive br
ickfor
ce eve
ry 4 co
urses
all ope
nings
to
rece
ive br
ickfor
ce eve
ry cour
se for
3 cour
ses ex
tendin
g 1m p
ast op
ening
on bot
h
sides.
All st
airs un
less o
therwi
se de
tailed
to ha
ve equ
al rise
rs 185m
m maxi
mum
with e
qual tre
ads 25
0mm m
inimum
. Prov
ide ha
ndrail
at 90
0mm h
eight w
here
num
ber o
f risers
excee
d five
& 1m
high to
balco
nies &
landin
gs and
a min o
f
100m
m ba
luster
spaci
ng acc
ording
to NB
R. Th
e FFL
at cha
nges b
etwee
n floo
r
finishe
s must
rema
in con
stant.
contr
actor
to tak
e acco
unt o
f diffe
rences
in de
pths
of floo
r finis
hes w
hen s
creed
is laid
.
Rafte
rs & t
russes
to be
tied d
own w
ith gal
vanize
d hoop
iron th
readed
throug
h four
cour
ses o
f brick
work.
Parap
et wa
lls to
min of
300m
m ab
ove ro
of lev
el. Pro
vide a
ll
requi
red fla
shings
and c
ounter
flashi
ngs at
change
s in ro
of leve
ls. Ab
utment
s
betwe
en ro
of an
d para
pet wa
lls, ch
imneys
, roof v
alleys
& ridg
es. Pr
ovide
approv
ed
insula
tion ov
er all
ceiling
s. Flat
roove
s to h
ave 50
mm ch
ip ston
e on r
aised
mesh
grill or
ceram
ic tiles
on du
rbigum
(sp4) w
aterpro
ofing to
speci
alist de
tails, o
n 50m
m
scre
ed to
falls
to do
wnpip
e on 1
70 and
/or 25
5mm c
oncre
te sla
b to e
nginee
rs
detail
s. desi
gn & s
pecific
ations
downpi
pes to
be cha
sed int
o walls
& pla
stere
d
using
wire
mesh
& plas
ter at
a min s
ize of
75
Provid
e inspe
ction e
yes (ie)
at all ju
nctions
and rod
ding eye
s (re) t
o all be
nds,
change
s in dir
ection
and r
amps.
Provi
de ie a
t every
24 me
ters a
long s
traigh
t run
of
drain,
provid
e such
with p
urpose
made
marke
d cove
r plate
s at fin
ished
ground
level.
All sa
nitary f
ittings
to be p
rovide
d with
65mm r
eseal t
raps a
nd air
valve
(AV).
provid
e 50
anti s
iphon
pipe w
here v
ertica
l drop
exceed
s 1200
mm. D
rains
shall
have
minimu
m fall
1:60
or m
aximu
m fall
1:5.
Where
drain
s pass
unde
r build
ing,
provid
e adeq
uate p
rotect
ion to
ensure
no loa
d is tra
nsferr
ed to d
rain fro
m build
ing.
Drains
must
have
straig
ht runs
where
passi
ng ben
eath b
uilding
s. Pipe
s to ha
ve re's
at eith
er en
d. All
ie & re
,s to b
e acce
ssible
. To a
ll wash
hand
basin
s & va
nity
basin
s prov
ide 32
mm w
aste p
ipes. T
o all s
inks, b
aths,
showe
rs, lau
ndry t
rough
and ur
inals p
rovide
38m
m wast
e pipe
s.
All ele
ctrica
l work
to be
done
by lic
enced
electri
cian a
nd all
work
and t
o be c
arried
out a
ccordin
g to SA
BS sta
ndards
. Cont
ractor
to ens
ure a 3
phase
suppl
y &
adequ
ate cir
cuit br
eakers
provi
ded. E
lectric
ian to
provid
e com
pliance
certif
icate.
All ho
t wate
r circu
lation
pipes,
and a
ll exte
rnally
expose
d pipe
s to be
insula
ted
along
their e
ntire le
ngth w
ith 25m
m canv
as wra
pped fi
bre ins
ulation
and s
ealed
with s
ealer
paint.
All ex
ternal
ly expo
sed pip
es to b
e cove
red
in wea
therpr
oof GM
S
jacket.
the ar
chitec
t will n
ot be
held r
espons
ible for
any d
iscrep
ancies
which
may a
rise as
a res
ult of
unapp
roved
plans
by loc
al auth
ority a
nd ow
ner. pl
ease n
ote tha
t the
signed
appro
val of
this pla
n by o
wner
must b
e obta
ined b
efore
constru
ction c
an
comm
ence
. all s
pecific
ations
by dev
eloper
overid
es pla
ns. the
archi
tect m
ust be
inform
ed in
writing
of any
chang
es to t
hese p
lans. s
ewer
and wa
ter co
nnec
tion to
be co
nfirme
d with
engin
eer be
fore b
uilding
comm
ences
the co
ntrac
tor sh
all pro
vide
all ass
istance
& eve
rything
neces
sary to
enab
le the
accur
acy of
the se
tting o
ut to
be ch
ecked
. che
cking
of the
setting
out sh
all no
t reliev
e the
contr
actor
of his
respo
nsibili
ty for
correc
tness
thereo
f & the
contr
actor
shall re
ctify a
ny er
rors
in the
works
that
may a
rise fro
m inco
rrect s
etting
out w
ithout a
ny adju
stment
to the
contr
act s
um. th
e con
tracto
r/clien
t may
not cl
aim ag
ainst
the ar
chitec
t as a
resul
t
of dis
crepen
cies o
r erro
rs not r
eporte
d to t
he ar
chitec
t befo
re con
structio
n
Discla
imer:
demo
lition o
f all w
alls to
be co
nfirme
d by s
tructu
ral eng
ineer
all dim
ensio
ns to
be ch
ecked
on sit
e prior
to ord
ering o
r insta
lling a
ll wind
ows &
doors
Fax.
0 8 6
6 1 0
1 7 2
6
p o n e
t s u i
t e 6
9 7 p
r i v a t
e b a
g x 1
5 3
n i c
k @ h o
o d n a
p i e r
. c o .
z a
e-ma
il.
l a r a
h o
o d
n i c
k n
a p i e
r
0 8 2
9 0 2
4 1 9
9
0 8 3
2 6 6
7 4 6
2
B.Arch
. M.I.A
. R.I.B
.A.
Reg. N
o 7019
Reg. N
o ST 0
617l a
r a @
h o o d
n a p i
e r . c
o . z a
e-ma
il.
b r y a
n s t o
n 2 0
2 1
ground
floor
plan
propos
ed new
house
for
on Po
rtion 1
of ER
F 314
Wilso
n Nkos
i
Sando
wn Ex
t. 24
13.6.
2014
1
coun
cil sub
missio
n
atrium
serv
er
room
C
C
A
A
B
B
C
C
cove
red p
atio
T.O.C.
-0,6
80tiles
diningT.O
.C.
-0,5
10tiles
kitche
n
tiles
sculle
ry
T.O.C.
-0,5
10tiles
pantr
ytile
s
lounge
tiles
family
room
T.O.C.
-0,6
80tiles
entra
nce h
all
T.O.C.
0,000til
es
doub
le gara
ge
T.O.C.
0,170til
es
study
T.O.C.
0,000til
es
staff r
oom
T.O.C.
0,000til
es
store
tiles
store
T.O.C.
0,170tile
s
gues
t wc
tiles
sink
sink
d/w
w/m
t/d
gulley
whb
geberit
wc
whb
whb
wc
wc
shr
sink
fr
fr
p/b
extra
ctor a
bove
gas sto
ve
drivew
ay
pavers
T.O.C.
-0,8
50tiles
pool
by spe
cialist
deep
end
shallow
end
kitche
n layou
t detail
ing,
coun
ters a
nd cu
pboard
s
to spe
cialist
detail
sto
specia
list de
tails
final ki
tchen
electr
ical la
yout
gas br
aai
gas fire
place
gas fire
place
stair n
ote:
risers
@ 170
mm
tread
s @ 28
0mm
12
3
up
up 12
3
stair n
ote:
risers
@ 170
mm
tread
s @ 30
0mm
170m
m ste
p dow
n
170m
m ste
p dow
n
170m
m ste
p dow
n
weath
er ste
p dow
n
230 f
ire wa
ll
fire do
or30
min so
lid
230 f
ire wa
ll
230 f
ire w
all
Floor
laid to
1% fa
ll
scre
ed &
tiles
laid to
a min
fall
scre
ed &
tiles
laid to
a min
fall
shelve
s
line of
cantil
evered
slab a
bove
ramp
up to
garage
floor
level
alumin
ium au
tomate
d sect
ional h
orizon
tally s
latted
door
rcl @
2125m
m ht
rcl @
2465m
m ht
line of
cantil
evered
slab a
bove
beam
@ 28
05mm
ht
beam
@ 28
05mm h
t
line of
rc br
idge a
bove
Side s
hower
walls
and f
loor to
be
corre
ctly se
aled
and w
aterpr
oofed
water
featu
re
by spe
cialist
paving
infrase
t villag
e cobb
le with
a dum
p rock
embed
ded r
oad
edge
beam
step d
own
step d
own
paving
infrase
t villag
e cobb
le with
a dum
p rock
embed
ded ro
ad
edge
beam
170m
m ste
p dow
n
line of
cantil
evered
slab a
bove
D1
D2
D3
D4
slide
slide
fold
fold
slide
paving
infrase
t villag
e cobb
le with
a dum
p rock
embed
ded ro
ad
edge
beam
insitu
cast co
ncrete
stairca
se acc
ording
to en
gineer
s deta
ils
gas bo
ttle sto
rage
see d
etail a
nd no
tesgas
line
gas lin
e
gas lin
e
gas lin
e
gas lin
e
propos
ed poo
l pump
positio
n to be
confir
med
with p
ool sp
ecialis
t
75 r
wdp c
hased
into wa
ll usin
g wire
mes
h & pla
ster
75 r
wdp c
hased
into wa
ll usin
g wire
mes
h & pla
ster
75 r
wdp c
hased
into wa
ll usin
g wire
mes
h & pla
ster
stainle
ss ste
el han
drail @
1m hig
h abov
e
floor le
vel wi
th s/s
balus
ters a
nd
horizo
ntal ru
nning
steel r
ods
all to
specia
list de
tails
all ba
lustra
des to
comp
ly with
SANS
0400
& SAN
S 1016
0
acce
ss pa
nels
in Duct
with
100
OVP
acce
ss pa
nels
in Duct
with
100
OVP
rcl @
2465
mm ht
rcl @
2465
mm ht
D10
D11
D11
D11
D12
D13
D11
D11
slide
D18
D18
D18
D19
cupbo
ards a
nd she
lving
to spe
cialist
joinery
detailing
and s
pecific
ations
cupbo
ards a
nd she
lving
to spe
cialist
joinery
detailing
and s
pecific
ations
acce
ss pa
nels
in Duct
with
100
OVP
steps
upup
1
2
3
final nu
mber
of ste
ps to b
e
deter
mined
on sit
e and
confir
med
with a
rchitec
t befo
re con
structio
n
stair n
ote:
risers
@ 170
mm
tread
s @ 35
0mm
beam
@ 29
75mm
ht
W3
high l
evel
windo
w
W2
W1
W5
W6
W7
W8
W9
W9
W10
shelve
s
cupbo
ards a
nd she
lving
to spe
cialist
joinery
detailing
and s
pecific
ations
ie
ie
ie
ie
ie
ie
re
re
re
re
ie
contr
actor
to co
nfirm
positio
n of se
wer co
nnectio
n
point o
n site
and ad
just sp
line ac
cordin
gly
re 1,
5m aw
ay fro
m
sewe
r con
nectio
n
contr
actor
to co
nfirm
positio
n of se
wer co
nnectio
n
point o
n site
and ad
just sp
line ac
cordin
gly
re 1,
5m aw
ay fro
m
sewe
r con
nectio
n
nbr re
gulatio
ns
to be
accor
ding to
the
all plu
mbing
above
groun
d
minim
unm
450m
m inv
ert lev
el
to se
wer c
onne
ction
laid to
a min
. fall o
f 1:40
100
soil p
ipe to
sabs s
tandar
ds
all plu
mbing
pipes
to be
900m
m aw
ay fro
m walls
nbr re
gulatio
ns
to be
accor
ding to
the
all plu
mbing
above
groun
d
minim
unm
450m
m inv
ert lev
el
to se
wer c
onne
ction
laid to
a min
. fall o
f 1:40
100
soil p
ipe to
sabs s
tandar
ds
all plu
mbing
pipes
to be
900m
m aw
ay fro
m walls
nbr re
gulatio
ns
to be
accor
ding to
the
all plu
mbing
above
groun
d
minim
unm
450m
m inv
ert lev
el
to se
wer c
onne
ction
laid to
a min
. fall o
f 1:40
100
soil p
ipe to
sabs s
tandar
ds
all plu
mbing
pipes
to be
900m
m aw
ay fro
m walls
ground
floor
plan
scale
1:50
110
2
75 r
wdp c
hased
into wa
ll usin
g wire
mes
h & pla
ster
75 r
wdp c
hased
into wa
ll usin
g wire
mes
h & pla
ster
75 r
wdp c
hased
into wa
ll usin
g wire
mes
h & pla
ster
230
1435
1151
15
115
115
1115
230
1770
230
3685
1000
230
2690
1665
3035
5260
1230
1770
6460
230
6000
1942
0
23014
7
230
4370
8728
925
345
230
2302
3037
746
0
4830
9073
1270
230
230
1724
0
770
345
1000
230
230
2140
345
230
115
1000
115
1000
115
5800
1000
1230
230
1460
2370
1341
0
230
3460
1724
0
230
470
230
1800
230
3000
460
4800
345
1510
2555
2030
5375
3000
2480
3980
230
2020
1942
0
345
230
520
115
2885
1200
345
3000
3540
345
4800
230
1200
600
1200
230
1000
230
2540
230
2000
230
3000
230
115
2770
115
115
2885
230
345
1800
230
1510
460
230
4170
530
4800
1115
230
1770
1180
1230
1151
15
3685
115
230
1000
115
115
1115
230
115
115
115
230
230
345
5800
230
1575
230
4770
2302
30
1000
3770
600
300
1425
300
230
7710
1200
230
1000
1000
1000
115
115
115
3460
230
2000
230
230
230
2400
115
1232
230
230
2700
115
1262
0
3226
230
2366
560
280
280
280
280
280
280
280
280
280
3718
345
115
230
4370
230
4830
8243
485
345
1500
345
1270
230
230
230
460
230
1200
6928
4
5
gas bo
ttle sto
rage
see d
etail a
nd no
tes
acce
ss pa
nels
in Duct
with
100
RWDP
RW pip
e to be
protec
ted fro
m load
D21
slide
100 x
100m
m ste
el
struc
tural p
ost
to en
g. spec
., pain
ted
to ma
tch wi
ndow
frame
boun
dary w
all
storm
water
to dis
charge
at
regul
ar inte
rvals t
hrough
weep
holes
accor
ding to
nbr a
nd
engin
eers s
pecific
ations
230
230
landsc
aped p
lanter
acce
ssible
from g
arden
locate
d belo
w slab
&
230
1000
230
3960
gulley
ie
bas honours advanced theory & practice of construction johannesburg cbd // may 2012 the major project for the advanced theory and practice of construction honours course required groups of four students to explore inter-systems performance in design and construction through re-conceptualising the design of an existing, dated inner city building. With the primary focus being on sustainability, the proposed design needed to facilitate bio-physical, socio-economic, socio-political and socio-cultural issues specific to the context. individuals were then required to design relevant details.
CoNStrUCtioN____________________________________________________________________________
above:second Floor planleft:Ground Floor plan Opposite page:West elevation Autocad
Copy
right:
Water
reticu
lation
:
Electr
ical no
tes:
D A T
E
R E V
D E S
C R I P
T I O
N
J O B
N O
D A T
E
D R A
W I N
G
D R A
W I N
G N
OS C
A L E
R E V P
R O J E
C T
WIL.2
2.05.1
4
Wil-0
21:5
0
22.05
.14
1
Gener
al note
s:
Settin
g out,
excava
tion &
site op
eration
s - SA
NS 10
400-G
& F
Struct
ural no
tes:
Roof
notes
- SAN
S 1040
0 - L
Draina
ge - S
ANS 1
0400-P
To all
wc's p
rovide
100
mm wa
ste pip
es.
all ven
ts sha
ll finis
h 900
mm m
inimum
above
any ro
of finis
h.
provid
e over
flow gu
lly at l
owest
point
of drain
age sy
stem i
nclude
gully
to
pool if
at low
est po
int.
This d
rawing
is cop
yright r
eserve
d and
remain
s the p
ropert
y of th
e arch
itect a
ny
change
s to the
intern
al or e
xterna
l struc
ture b
y any
other
design
party
will no
t be
permit
ted wi
thout f
irst co
nfirmin
g with
the ar
chitec
t. No p
art of
this dr
awing
may b
e
copie
d or u
sed by
any o
ther p
arty o
r othe
r desi
gner w
ithout p
ermiss
ion fro
m the
archi
tect. A
ll mate
rials t
o be S
ABS o
r agre
ement
board
appro
ved. A
ll work
to
comp
ly with
the Na
tional B
uilding
Regul
ations
(SANS
10400)
the app
licable
SABS
code
s & bu
ilding
society
regul
ations.
The a
rchitec
ts spec
ificatio
n, inst
ruction
s, larg
er sca
led de
tails d
rawing
s, engi
neers
detail
s etc.
shall ta
ke pre
feranc
e to the
se dra
wings.