29
KIER BOTHWELL ARCHITECTURAL ASSISTANT - PART 2

Architecture Portfolio - Kier C. Bothwell

Embed Size (px)

DESCRIPTION

 

Citation preview

  • kier bothwellarchitectural assistant - part 2

  • architecture isnt just for special occasions.expectations need to change.places for daily activities should be highly valued.people can have more than they think.We expect great qualities in buildings like museums;shouldnt we also expect them in places for everyday living?an individuals self-image is based on the quality of his or her daily life.

    Julie eizenberg, architect (2006)

    ____________________________________________________________________________________________________

  • Kier calluMbothwell_____________________________________nationality: irish // south africanirish passport no.: pt3306905current address: 49 jackson road holloway, n7 6eG london, united kingdomdate of birth: 02.10.1989gender: malelanguages: english // afrikaans

    eDUCAtioN

    University of the witwatersrand Johannesburg2013 // Master of architecture (professional) (riBa part 2)cum laude 2012 // Bachelor of architectural studies with honoursdesign studio passed with distinction2010 // Bachelor of architectural studies (riBa part 1)architectural design & theory III passed with distinction

    St Stithians boys College Johannesburg2007 // Full Matric exemption (independent examination Board)

    CoNtiNUeD eDUCAtioN

    2014 // sacap candidate architect 2011 // student representative for the south african council for the architectural profession (sacap) accreditation for the university of cape towns school of architecture2010 // Digital Design and Fabrication Workshop held in Johannesburg by Kristof crolla & Jeroen van ameijden from the architectural association school of architecture in london

    ProFeSSioNAl eXPerieNCe

    hood Napier Architects Johannesburg2014 // candidate architect2012 // Junior architect2011 // Junior architectdesign development, 3d modelling & rendering in revit, autocad drafting & technical documentation, project management, site management & snagging, presentations, client/architect liaison

    reFerences aVailaBle upOn reQuest

    hoNoUrS + AwArDS

    DM burton Prize the best graduand in the discipline of architecture // 2013

    Saul Margo Memorial PrizeThe final year student whose performance over the entire curriculum for the degrees of architecture is judged to be the most meritorious // 2013

    Frank Gordon Mcintosh Prize in Architecturethe Master of architecture (prof.) graduand who submitted the best architectural design and discourse on some aspect of architectural construction or the best set of drawings // 2013

    Second Year Design Studio tutor // 2013

    the everite Prizethe best graduand in the Bachelor of architectural studies // 2010

    Gauteng institute for Architecture Awardthe Bachelor of architecture studies graduand who submits the most comprehensively resolved major project in the course architectural theory & Design // 2010

    MDS Architects Prizethe student who submits the best design project for a commercial building in the final year of study for the Bachelor of Architectural studies degree // 2010

    Certificate of Merit // 2010

    the Deans list awarded to the top 10% of students in the faculty of the built environment // 2010/2012/2013

    Member of the international Golden key Society

    School Prefect // 2007

    Academic Colours // 2007

    Art Colours // 2007

    Shirley woodhouse Award for Art // 2007

    School Art Prize // 2005/2006

    SkillSet

    Computer revit / autocaD / adobe photoshop / adobe inDesign / Microsoft suiteBasic Knowledge: sketchup pro / adove illustrator / rhinoceros / Grasshopper

    PhysicalModel production / hand drafting / project Management

    [email protected] // +44 7467 492638

  • eDucatiOnaleXperience_____________________________________________________________________________________________

  • Redefining Perceptions and Integrating the Police Station in City and Suburban

    master of architecture (professional) design & theory dissertationcity & suburban, jhb // 2013 the dissertation proposes a hybrid police station which comprises a police museum and library, located in the historical Three Castles Cigarette Factory, a lecture hall, retail space, a youth zone, police dormitory in the former Nugget Hotel and a public square. through this diverse programmatic approach and careful design considerations for the polices specific requirements to operate, hierarchies of circulation, the celebration of old and new, materials inspired by the context, use of light and shadow, water and sound, vegetation and visual connections, this new police station challenges negative perceptions associated with policing in south africa and begins to integrate the people and the states strong-arm of power; redefining perceptions from the past.

    Please follow link for complete thesis: http://issuu.com/kierbothwell/docs/kier_c._bothwell_-_rotten_potatoes_

    rotteN PotAtoeS_____________________________________________________________________________________________________

    towards the Three Castles Cigarette Factory and the police stations Main entranceRevit to Photoshop

  • 3,570

    8,160

    12,240

    0,000

    15,980

    4,420

    7,650

    12,240

    0,510

    16,830

    -3,400

    cc

    dd

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    top of page: north elevationabove:longitudinal section through police stationAutocad

    Ground Floor planAutocad

    Copy right:

    Water reticulation:

    Electrical notes:

    D A T E

    R E V

    D E S C R I P T I O N

    J O B N O

    D A T E

    D R A W I N G

    D R A W I N G N OS C A L E

    R E V P R O J E C T

    WIL.22.05.14

    Wil-021:50

    22.05.14

    1

    General notes:

    Setting out, excavation & site operations - SANS 10400-G & F

    Structural notes:

    Roof notes - SANS 10400 - L

    Drainage - SANS 10400-PTo all wc's provide 100 mm waste pipes.

    all vents shall finish 900mm minimum above any roof finish.

    provide overflow gully at lowest point of drainage system include gully to

    pool if at lowest point.

    This drawing is copyright reserved and remains the property of the architect any

    changes to the internal or external structure by any other design party will not be

    permitted without first confirming with the architect. No part of this drawing may be

    copied or used by any other party or other designer without permission from the

    architect. All materials to be SABS or agreement board approved. All work to

    comply with the National Building Regulations (SANS 10400) the applicable SABS

    codes & building society regulations.

    The architects specification, instructions, larger scaled details drawings, engineers

    details etc. shall take preferance to these drawings. These drawings are not to be

    scaled, use figured dimensions only. All material and workmanship to be the best

    of their respective kinds and to conform with SABS standards and specifications,

    all work to be carried out in strict accordance with architects instructions. Materials

    used & applied must be referred to using manufactures printed instructions.

    Contractor to arrange and ensure that all required inspections are carried out by

    the local building inspectorate. On completion of contract, all rubbish and rubble is

    to be removed from the site, and may not be used as fill, unless otherwise directed.

    Provide and erect in approved position, standard architects notice board. All

    habitable rooms to be provided with natural light and ventilation as set out in SANS

    10400-O. The architect will not be held responsible for the quality of the

    workmanship. The construction of the building may not commence without

    approval of the building plans through council.

    Drawings are prepared from surface examination of site only. Depth of foundations,

    height of plinths number of steps & final finished ground levels to be determined by

    the contractor & engineer on site & confirmed with the architects. Top of all

    foundations to be a minimum 500mm below the finished ground. Any changes of

    levels deemed necessary on site must be first reported to and approved by the

    architect. All levels, dimensions, building lines and other data to be checked on site

    and any discrepancies are to be reported to the architect and engineer for

    correction. The architect will not be held responsible for dimensional errors if not

    notified at the time of commencing work on site.

    Build in precast prestressed concrete lintels (SABS approved) above all openings.

    Depth of foundation trenches to be a min of 500mm below ground level.

    Foundations to be set on firm supportable ground and to be checked & confirmed

    by engineer. New concrete surface bed to be a minimum of 15mpa 100mm thick

    on damp proof membrane DPM (gunplas green or equivalent) on sand blinding on

    well compacted fill. Top of concrete surface bed to be a min of 150mm above NGL.

    Provide approved dpc (gundle brickgrip or equivalent ) under all walls & window

    sills & provide vertical dpc.s to all changes of floor levels. All surface beds to be

    finished with 30mm minimum sand cement screed unless otherwise detailed or

    specified. All brickwork to receive brickforce every 4 courses all openings to

    receive brickforce every course for 3 courses extending 1m past opening on both

    sides. All stairs unless otherwise detailed to have equal risers 185mm maximum

    with equal treads 250mm minimum. Provide handrail at 900mm height where

    number of risers exceed five & 1m high to balconies & landings and a min of

    100mm baluster spacing according to NBR. The FFL at changes between floor

    finishes must remain constant. contractor to take account of differences in depths

    of floor finishes when screed is laid.

    Rafters & trusses to be tied down with galvanized hoop iron threaded through four

    courses of brickwork. Parapet walls to min of 300mm above roof level. Provide all

    required flashings and counter flashings at changes in roof levels. Abutments

    between roof and parapet walls, chimneys, roof valleys & ridges. Provide approved

    insulation over all ceilings. Flat rooves to have 50mm chip stone on raised mesh

    grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm

    screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers

    details. design & specifications downpipes to be chased into walls & plastered

    using wire mesh & plaster at a min size of 75

    Provide inspection eyes (ie) at all junctions and rodding eyes (re) to all bends,

    changes in direction and ramps. Provide ie at every 24 meters along straight run of

    drain, provide such with purpose made marked cover plates at finished ground

    level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV).

    provide 50 anti siphon pipe where vertical drop exceeds 1200mm. Drains shall

    have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building,

    provide adequate protection to ensure no load is transferred to drain from building.

    Drains must have straight runs where passing beneath buildings. Pipes to have re's

    at either end. All ie & re,s to be accessible. To all wash hand basins & vanity

    basins provide 32 mm waste pipes. To all sinks, baths,

    showers, laundry trough and urinals provide 38mm waste pipes.

    All electrical work to be done by licenced electrician and all work and to be carried

    out according to SABS standards. Contractor to ensure a 3 phase supply &

    adequate circuit breakers provided. Electrician to provide compliance certificate.

    All hot water circulation pipes, and all externally exposed pipes to be insulated

    along their entire length with 25mm canvas wrapped fibre insulation and sealed

    with sealer paint. All externally exposed pipes to be covered in weatherproof GMS

    jacket.

    the architect will not be held responsible for any discrepancies which may arise as

    a result of unapproved plans by local authority and owner. please note that the

    signed approval of this plan by owner must be obtained before construction can

    comm

    ence. all specifications by developer overides plans. the architect must be

    informed in writing of any changes to these plans. sewer and water connection to

    be confirmed with engineer before building comm

    ences the contractor shall provide

    all assistance & everything necessary to enable the accuracy of the setting out to

    be checked. checking of the setting out shall not relieve the contractor of his

    responsibility for correctness thereof & the contractor shall rectify any errors in the

    works that may arise from incorrect setting out without any adjustment to the

    contract sum. the contractor/client may not claim against the architect as a result

    of discrepencies or errors not reported to the architect before construction

    Disclaimer:

    demolition of all walls to be confirmed by structural engineer

    all dimensions to be checked on site prior to ordering or installing all windows & doors

    Fax.0 8 6 6 1 0 1 7 2 6

    p o n e t s u i t e 6 9 7 p r i v a t e b a g x 1 5 3

    n i c k @ h o o d n a p i e r . c o . z a

    e-mail.

    l a r a h o o d

    n i c k n a p i e r

    0 8 2 9 0 2 4 1 9 9

    0 8 3 2 6 6 7 4 6 2

    B.Arch. M.I.A. R.I.B.A.

    Reg. No 7019Reg. No ST 0617l a r a @

    h o o d n a p i e r . c o . z a

    e-mail.

    b r y a n s t o n 2 0 2 1 ground floor plan proposed new house for

    on Portion 1 of ERF 314

    Wilson Nkosi

    Sandown Ext. 24

    13.6.2014

    1

    council submission

    atrium

    serve

    r

    room

    C

    C

    A

    A

    B

    B

    C

    C

    covered patio

    T.O.C.

    -0,680tiles

    diningT.O.C.-0,510tiles

    kitchen

    tiles

    scullery

    T.O.C.

    -0,510tiles

    pantry

    tiles

    loungetiles

    family room

    T.O.C.

    -0,680tiles

    entrance hall

    T.O.C.

    0,000tiles

    double garage

    T.O.C.

    0,170tiles

    studyT.O.C.0,000tiles

    staff room

    T.O.C.

    0,000tiles

    storetiles

    storeT.O.C.0,170tilesgue

    st wc

    tiles

    sinksink

    d/w

    w/m

    t/d

    gulley

    whb

    geberitwc

    whb

    whb

    wc

    wc

    shr

    sink

    fr

    fr

    p/b

    extractor above

    gas stove

    driveway

    pavers

    T.O.C.

    -0,850tiles

    poolby specialist

    deep end

    shallow end

    kitchen layout detailing,

    counters and cupboards

    to specialist detailsto specialist details

    final kitchen electrical layout

    gas braai

    gas fireplace

    gas fireplace

    stair note:

    risers @ 170mm

    treads @ 280mm

    12

    3

    up

    up1

    23

    stair note:

    risers @ 170mm

    treads @ 300mm

    170m

    m ste

    p dow

    n

    170m

    m ste

    p dow

    n

    170m

    m ste

    p dow

    n

    weather step down

    230 fire wall

    fire door30min solid

    230 fire wall

    230 f

    ire wa

    ll

    Floor laid to 1% fall

    screed & tiles

    laid to a min fall

    screed & tiles

    laid to a min fall

    shelves

    line of cantilevered

    slab above

    ramp up to garage floor level

    aluminium automated sectional horizontally slatted door

    rcl @ 2125mm ht

    rcl @ 2465mm ht

    line of cantilevered

    slab above

    beam

    @ 28

    05mm h

    t

    beam @ 2805mm ht

    line of rc bridge above

    Side shower walls

    and floor to be

    correctly sealed

    and waterproofed

    water feature

    by specialist

    paving

    infraset village cobble with

    a dump rock embedded road

    edge beam step d

    own

    step d

    own

    paving

    infraset village cobble with

    a dump rock embedded road

    edge beam

    170mm step down

    line of cantilevered

    slab above

    D1

    D2

    D3

    D4

    slide

    slide

    fold

    fold

    slide

    paving

    infraset village cobble with

    a dump rock embedded road

    edge beam

    insitu cast concrete

    staircase according

    to engineers details

    gas bottle storage

    see detail and notesgas line

    gas line gas line

    gas line

    gas line

    proposed pool pump

    position to be confirmed

    with pool specialist

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    stainless steel handrail @ 1m high above

    floor level with s/s balusters and

    horizontal running steel rods

    all to specialist details

    all balustrades to comply with SANS 0400

    & SANS 10160

    access panels

    in Duct with

    100 OVP

    access panels

    in Duct with

    100 OVP

    rcl @

    2465m

    m ht

    rcl @

    2465m

    m ht

    D10

    D11

    D11

    D11

    D12

    D13

    D11

    D11

    slide

    D18

    D18

    D18

    D19

    cupboards and shelving

    to specialist joinery detailing

    and specifications

    cupboards and shelving

    to specialist joinery detailing

    and specifications

    access panels

    in Duct with

    100 OVP

    steps upup

    1

    2

    3

    final number of steps to be

    determined on site and confirmed

    with architect before construction

    stair note:

    risers @ 170mm

    treads @ 350mm

    beam

    @ 29

    75mm h

    t

    W3

    high le

    vel wi

    ndow

    W2

    W1

    W5

    W6

    W7

    W8

    W9

    W9

    W10

    shelves

    cupboards and shelving

    to specialist joinery detailing

    and specifications

    ie

    ie

    ie

    ie

    ie

    ie

    re

    re

    re

    re

    ie

    contractor to confirm

    position of sewer connection

    point on site and adjust sp

    line accordingly

    re 1,5m away from

    sewer connection

    contractor to confirm

    position of sewer connection

    point on site and adjust sp

    line accordingly

    re 1,5m away from

    sewer connection

    nbr regulations

    to be according to the

    all plumbing above ground

    minimunm 450mm invert level

    to sewer connection

    laid to a min. fall of 1:40

    100 soil pipe to sabs standards

    all plumbing pipes to be

    900mm away from walls

    nbr regulations

    to be according to the

    all plumbing above ground

    minimunm 450mm invert level

    to sewer connection

    laid to a min. fall of 1:40

    100 soil pipe to sabs standards

    all plumbing pipes to be

    900mm away from walls

    nbr regulations

    to be according to the

    all plumbing above ground

    minimunm 450mm invert level

    to sewer connection

    laid to a min. fall of 1:40

    100 soil pipe to sabs standards

    all plumbing pipes to be

    900mm away from walls

    ground floor plan

    scale 1:50

    1102

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    230

    1435

    115115

    115

    115

    1115

    230

    1770

    230

    3685

    1000

    230

    2690

    1665

    3035

    5260

    1230

    1770

    6460

    230

    6000

    19420

    23014

    7

    230

    4370

    8728

    925

    345

    230

    230 2

    3037

    746

    0

    4830

    9073

    1270

    230

    230

    1724

    0

    770

    345

    1000

    230

    230

    2140

    345

    230

    115

    1000

    115

    1000

    115

    5800

    1000

    1230

    230

    1460

    2370

    1341

    0

    230

    3460

    1724

    0

    230470

    230

    1800

    230

    3000

    460

    4800

    345

    15102555

    2030

    5375

    3000

    2480

    3980

    230

    2020

    19420

    345

    230520

    115

    2885

    1200

    345

    3000

    3540

    345

    4800

    230

    1200

    600

    1200

    230

    1000

    230

    2540

    230

    2000

    230

    3000

    230115

    2770

    115

    115

    2885

    230

    345

    1800

    230

    1510

    460

    230

    4170

    530

    4800

    1115

    230

    1770

    1180

    1230

    115115

    3685

    115

    230

    1000

    115

    115

    1115

    230

    115115

    115

    230

    230

    345

    5800

    230

    1575

    230

    4770

    230 2

    30

    1000

    3770

    600

    300

    1425

    300

    230

    7710

    1200

    230

    1000

    1000

    1000

    115

    115

    115

    3460

    230

    2000

    230

    230

    230

    2400

    115

    1232

    230

    230

    2700

    115

    1262

    0

    3226

    230

    2366

    560

    280

    280

    280

    280

    280

    280

    280

    280

    280

    3718

    345

    115

    230

    4370

    230

    4830

    8243

    485

    345

    1500

    345

    1270

    230

    230

    230

    460

    230

    1200

    6928

    4

    5

    gas bottle storage

    see detail and notes

    access panels

    in Duct with

    100 RWDP

    RW pipe to be

    protected from load

    D21

    slide

    100 x 100mm steel

    structural post

    to eng. spec., painted

    to match window frame

    boundary wall

    stormwater to discharge at

    regular intervals through weep

    holes according to nbr and

    engineers specifications

    230

    230landscaped planter

    accessible from garden

    located below slab &

    230

    1000

    230

    3960

    gulley

    ie

    3,570

    8,160

    12,240

    0,000

    15,980

    4,420

    7,650

    12,240

    0,510

    16,830

    -3,400

    cc

    dd

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

  • 0,040FFL LOBBY

    5,820FFL YOUTH ZONE

    11,220TOC ROOF

    12,155TO PARAPET

    5485

    5143

    935

    10,965U/S CEILING

    255

    5,525U/S CEILING

    295

    4,590U/S RCL

    935

    3mm profiled aluminium sheetpowder coated

    80mm polyurethane insulationcushion behind 6mm float glass

    fixed glazing: 6mm float glass, 12mmargon-filled cavity, 12mm float glass

    by manufacturer

    150 x 150 x 5mm MS angle fixed to RCdown-stand beam with rawl bolts; painted with

    one coat red lead primer, one coat universalundercoat & two coats enamel

    anodised aluminium transom with pressure &drainage opening to specialist spec.

    powder coated 'charcoal grey'

    cementitious bandage

    10 year warranty, torch on bituminouswaterproofing with 75mm side laps & 100mm endlaps under 250 micron plastic sheeting with 50mmlaps, loose laid as protection layer in accordance

    with manufacturer

    50mm layer of river rounded stones; no geotextile sheet required

    min. 35mm screed laid to min. falls 1:50 to 100mm FBO set min. 20mm below slab on a 255mm RC

    slab with down-stand beams to eng. spec.

    80mm polyurethane insulation panels bonded toslab with 100mm spacings between panels

    by specialist

    exposed cable trays

    flush plastered ceiling with 12 x 10mm recessedjoint to slab at corner of soffit: 'shadowline'

    internal wall to be smoothlyplastered & painted with onecoat universal undercoat &two coats 'white' PVA

    380 x 25mm SA pine board to bebonded to RC up-stand beam

    40mm polished screed, pigmented 'burntorange', with 40 x 10mm recessed joint to

    slab at corner of soffit ('shadowline') on min.255mm RC slab with up-stand beams to

    eng. spec.

    brick pavers laid to fall away from building onmin. 25mm bedding sand on min. 50mm level

    compacted aggregate on min. 25mm layers ofcompacted earth

    precast concrete kerb

    plastered drip detail

    RC lintel to eng. spec.

    youth passively surveyingPort Plein Park

    6mm suspended gypsum ceilingboard painted with one coatuniversal undercoat & two coats'white' PVA, suspended byaluminium T-section runnerspowder coated 'white' at 600mmc/c spacings

    internal wall to be smoothlyplastered & painted with onecoat universal undercoat &two coats 'white' PVA

    350 x 80mm SA pine light boxesbolted to the u/s of slab toreduce sound reverberation

    400 x 30mm SA pine board to bebonded to top of low brick wall

    riser: 170mmtread: 330mm

    40mm polished screedwith 40 x10mm recessed joint to slab atcorner of soffit ('shadowline') onmin. 255mm RC slab to eng.spec.

    polished cast-in-situ concretereception desk with chamferedcorners

    1000

    1000

    850 0,040

    FFL

    340

    50mm stainless steel hand railat 1m above ffl

    -2,930FFL BASEMENT

    2970

    NGL

    RC foundation toeng. spec.

    85mm step in slab

    50mm hardwood timber treadssuspended & fixed with stainlesssteel rope to eng. spec.

    80mm polyurethanefoam insulation

    'v' joint

    cranked DPC with weepholeevery 5th perb

    300mm masonry cavity wall with internalbrick leaf connected to external brick leafwith galvanized butterfly ties at spacing asper eng. spec.

    40mm polished screed, with 40 x 10mmrecessed joint to slab at corner of soffit

    ('shadowline') on min. 255mm RC slab with300mm up-stand beam to eng. spec.

    BOE and plastered cill with drip detail

    internal wall to be smoothly plastered wallwith one coat primer & two coats

    'white' PVA

    150 x 20mm meranti cill bondedto top of internal brick leaf

    silicone joint

    aluminium window framepowder coated 'charcoal grey'

    RCL

    existing masonry castle wall to be madegood & re-plastered and painted to matchoriginal

    DPC

    existing windows to be removed andopenings made good for new aluminiumwindows, powder coated 'charcoal grey'

    external wall to be smoothly plastered &painted with one coat universal undercoat& two coats 'white' PVA

    50 x 50mm MS grate painted with one coatred lead primer, one coat universal

    undercoat & two coats 'charcoal grey'enamel

    35 x 35 x 600mm MS square tubewelded to grate & MS plate

    100 x 100 x 5mm MS plate fixed to u/s of RCslab with rawl bolts to eng. spec

    150 x 75 x 10mm MS angle fixed to castlewall with rawl bolts to fall to 100 RWDP

    152 x 76 MS taper flange channel built intoexisting castle walls

    galvanized steel flashing cementitious bandage

    silicone joint

    soft joint

    fixed glazing: 6mm toughened glass, 12mmargon-filled cavity, 6mm float glassby manufacturer placed at 7 deg to gutter

    Note: all MS components to be painted withone coat red lead primer, one coat universalundercoat & two coats 'charcoal grey'enamel

    cementitious bandage

    200 x 50mm precast conc. copingwith drip detail

    silicone joint

    885

    125 x 75mm galvanized C-channel gutter

    INTERIOR OF POLICE MUSEUM

    INTERIOR OFMEDIA CENTRE

    50mm polished conc. on 10 year warranty,torch on bituminous waterproofing, with

    75mm side laps & 100mm end laps under250 micron plastic sheeting with 50mm laps,

    loose laid as protection layer inaccordance with manufacturer

    min. 35mm screed laid to min. falls 1:50 to100mm FBO set min. 20mm below slab on

    a 170mm RC slab with down-stand beamsto eng. spec.

    80mm polyurethane insulation panelsbonded to slab with 100mm spacings

    between panelsby specialist

    silicone joint

    3mm aluminium cleat at 100 deg.

    3mm aluminium cleat at 80 deg.

    345mm cast-in-situ RC 'tower'wall with 115mm cavity

    flush plastered ceiling with 12 x 10mmrecessed joint to slab at corner of

    soffit: 'shadowline'

    weep hole

    aluminium surround profileby specialist

    3mm corten steel cladding

    50 x 50 x 3mm angle bracketwith aluminium captive nut rail

    by specialist

    INTERIOR OF STAIRWELL 'TOWER'

    INTERIOR OF SAPS BUILDING

    EXTERNAL 'JUICE BAR'

    dpm

    dpm

    agricultural drain to eng. detail

    6mm toughened glass bonded tosoft joints on MS IPE 140 beams

    125 x 75mm galvanized C-channel gutter

    850 x 40mm galvanized grate fixedto152 x 76 MS taper flange channels to

    eng. spec.

    chamfered edge to RC slab

    acrylic bandage flashing

    152 x 76 MS taper flange channels fixedto RC slab with rawl bolts

    40mm polished screed with 40 x 10mmrecessed joint to slab at corner of soffit

    ('shadowline') on min. 255mm RC slab withto eng. spec.

    fixed glazing: 6mm float glass, 12mmargon-filled cavity, 12mm float glass

    by manufacturer

    anodised aluminium transom with pressure& drainage opening to specialist spec.

    powder coated 'charcoal grey'

    min. 35mm screed laid to min. falls 1:50 to50mm RWO set min. 20mm below slab ona 170mm RC slab to eng. spec.

    75 x 100mm aluminium mullion fixed toMS channel with 50 x 50 x 3mm angle

    bracket

    soft joint by manufacturer

    3.8mm ceramic rods at 215 c/c fixed toaluminium mullion with brackets by specialist

    35mm screed

    external wall to be smoothlyplastered & painted with onecoat universal undercoat &two coats 'white' PVA

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    perimeter section through Main entranceAutocad

    CNC laser cut model

    lobby ViewRevit to Photoshop

  • 100

    BRA

    M F

    ISC

    HER

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    bas honours design studio randburg cbd, jhb // october 2012 since the end of apartheid the identity of public service buildings has not signifi cantly changed. As a result, the people are unable to identify with the state and vice versa.

    the Magistrates court proposed stands in opposition to the courts which exist across the south african landscape today. celebrating transparency, movement and light, this court building is an extension of the street domain, encouraging the people to partake in the judicial system by which their lives are governed.

    MAGiStrAteS CoUrt_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________

    left:site plan AutocadOpposite page:concept Diagrams Photoshop concept Model Hardwood Timbers Working concept Models Polystyrene

    Copy right:

    Water reticulation:

    Electrical notes:

    D A T E

    R E V

    D E S C R I P T I O N

    J O B N O

    D A T E

    D R A W I N G

    D R A W I N G N OS C A L E

    R E V P R O J E C T

    WIL.22.05.14

    Wil-021:50

    22.05.14

    1

    General notes:

    Setting out, excavation & site operations - SANS 10400-G & F

    Structural notes:

    Roof notes - SANS 10400 - L

    Drainage - SANS 10400-PTo all wc's provide 100 mm waste pipes.

    all vents shall finish 900mm minimum above any roof finish.

    provide overflow gully at lowest point of drainage system include gully to

    pool if at lowest point.

    This drawing is copyright reserved and remains the property of the architect any

    changes to the internal or external structure by any other design party will not be

    permitted without first confirming with the architect. No part of this drawing may be

    copied or used by any other party or other designer without permission from the

    architect. All materials to be SABS or agreement board approved. All work to

    comply with the National Building Regulations (SANS 10400) the applicable SABS

    codes & building society regulations.

    The architects specification, instructions, larger scaled details drawings, engineers

    details etc. shall take preferance to these drawings. These drawings are not to be

    scaled, use figured dimensions only. All material and workmanship to be the best

    of their respective kinds and to conform with SABS standards and specifications,

    all work to be carried out in strict accordance with architects instructions. Materials

    used & applied must be referred to using manufactures printed instructions.

    Contractor to arrange and ensure that all required inspections are carried out by

    the local building inspectorate. On completion of contract, all rubbish and rubble is

    to be removed from the site, and may not be used as fill, unless otherwise directed.

    Provide and erect in approved position, standard architects notice board. All

    habitable rooms to be provided with natural light and ventilation as set out in SANS

    10400-O. The architect will not be held responsible for the quality of the

    workmanship. The construction of the building may not commence without

    approval of the building plans through council.

    Drawings are prepared from surface examination of site only. Depth of foundations,

    height of plinths number of steps & final finished ground levels to be determined by

    the contractor & engineer on site & confirmed with the architects. Top of all

    foundations to be a minimum 500mm below the finished ground. Any changes of

    levels deemed necessary on site must be first reported to and approved by the

    architect. All levels, dimensions, building lines and other data to be checked on site

    and any discrepancies are to be reported to the architect and engineer for

    correction. The architect will not be held responsible for dimensional errors if not

    notified at the time of commencing work on site.

    Build in precast prestressed concrete lintels (SABS approved) above all openings.

    Depth of foundation trenches to be a min of 500mm below ground level.

    Foundations to be set on firm supportable ground and to be checked & confirmed

    by engineer. New concrete surface bed to be a minimum of 15mpa 100mm thick

    on damp proof membrane DPM (gunplas green or equivalent) on sand blinding on

    well compacted fill. Top of concrete surface bed to be a min of 150mm above NGL.

    Provide approved dpc (gundle brickgrip or equivalent ) under all walls & window

    sills & provide vertical dpc.s to all changes of floor levels. All surface beds to be

    finished with 30mm minimum sand cement screed unless otherwise detailed or

    specified. All brickwork to receive brickforce every 4 courses all openings to

    receive brickforce every course for 3 courses extending 1m past opening on both

    sides. All stairs unless otherwise detailed to have equal risers 185mm maximum

    with equal treads 250mm minimum. Provide handrail at 900mm height where

    number of risers exceed five & 1m high to balconies & landings and a min of

    100mm baluster spacing according to NBR. The FFL at changes between floor

    finishes must remain constant. contractor to take account of differences in depths

    of floor finishes when screed is laid.

    Rafters & trusses to be tied down with galvanized hoop iron threaded through four

    courses of brickwork. Parapet walls to min of 300mm above roof level. Provide all

    required flashings and counter flashings at changes in roof levels. Abutments

    between roof and parapet walls, chimneys, roof valleys & ridges. Provide approved

    insulation over all ceilings. Flat rooves to have 50mm chip stone on raised mesh

    grill or ceramic tiles on durbigum (sp4) waterproofing to specialist details, on 50mm

    screed to falls to downpipe on 170 and/or 255mm concrete slab to engineers

    details. design & specifications downpipes to be chased into walls & plastered

    using wire mesh & plaster at a min size of 75

    Provide inspection eyes (ie) at all junctions and rodding eyes (re) to all bends,

    changes in direction and ramps. Provide ie at every 24 meters along straight run of

    drain, provide such with purpose made marked cover plates at finished ground

    level. All sanitary fittings to be provided with 65mm reseal traps and air valve (AV).

    provide 50 anti siphon pipe where vertical drop exceeds 1200mm. Drains shall

    have minimum fall 1:60 or maximum fall 1:5. Where drains pass under building,

    provide adequate protection to ensure no load is transferred to drain from building.

    Drains must have straight runs where passing beneath buildings. Pipes to have re's

    at either end. All ie & re,s to be accessible. To all wash hand basins & vanity

    basins provide 32 mm waste pipes. To all sinks, baths,

    showers, laundry trough and urinals provide 38mm waste pipes.

    All electrical work to be done by licenced electrician and all work and to be carried

    out according to SABS standards. Contractor to ensure a 3 phase supply &

    adequate circuit breakers provided. Electrician to provide compliance certificate.

    All hot water circulation pipes, and all externally exposed pipes to be insulated

    along their entire length with 25mm canvas wrapped fibre insulation and sealed

    with sealer paint. All externally exposed pipes to be covered in weatherproof GMS

    jacket.

    the architect will not be held responsible for any discrepancies which may arise as

    a result of unapproved plans by local authority and owner. please note that the

    signed approval of this plan by owner must be obtained before construction can

    comm

    ence. all specifications by developer overides plans. the architect must be

    informed in writing of any changes to these plans. sewer and water connection to

    be confirmed with engineer before building commences the contractor shall provide

    all assistance & everything necessary to enable the accuracy of the setting out to

    be checked. checking of the setting out shall not relieve the contractor of his

    responsibility for correctness thereof & the contractor shall rectify any errors in the

    works that may arise from incorrect setting out without any adjustment to the

    contract sum. the contractor/client may not claim against the architect as a result

    of discrepencies or errors not reported to the architect before construction

    Disclaimer:

    demolition of all walls to be confirmed by structural engineer

    all dimensions to be checked on site prior to ordering or installing all windows & doors

    Fax.0 8 6 6 1 0 1 7 2 6

    p o n e t s u i t e 6 9 7 p r i v a t e b a g x 1 5 3

    n i c k @ h o o d n a p i e r . c o . z a

    e-mail.

    l a r a h o o d

    n i c k n a p i e r

    0 8 2 9 0 2 4 1 9 9

    0 8 3 2 6 6 7 4 6 2

    B.Arch. M.I.A. R.I.B.A.

    Reg. No 7019Reg. No ST 0617l a r a @

    h o o d n a p i e r . c o . z a

    e-mail.

    b r y a n s t o n 2 0 2 1 ground floor plan proposed new house for

    on Portion 1 of ERF 314

    Wilson Nkosi

    Sandown Ext. 24

    13.6.2014

    1

    council submission

    atrium

    serve

    r

    room

    C

    C

    A

    A

    B

    B

    C

    C

    covered patio

    T.O.C.

    -0,680tiles

    diningT.O.C.-0,510tiles

    kitchen

    tiles

    scullery

    T.O.C.

    -0,510tiles

    pantry

    tiles

    loungetiles

    family room

    T.O.C.

    -0,680tiles

    entrance hall

    T.O.C.

    0,000tiles

    double garage

    T.O.C.

    0,170tiles

    studyT.O.C.0,000tiles

    staff room

    T.O.C.

    0,000tiles

    storetiles

    storeT.O.C.0,170tilesgue

    st wc

    tiles

    sinksink

    d/w

    w/m

    t/d

    gulley

    whb

    geberitwc

    whb

    whb

    wc

    wc

    shr

    sink

    fr

    fr

    p/b

    extractor above

    gas stove

    driveway

    pavers

    T.O.C.

    -0,850tiles

    poolby specialist

    deep end

    shallow end

    kitchen layout detailing,

    counters and cupboards

    to specialist detailsto specialist details

    final kitchen electrical layout

    gas braai

    gas fireplace

    gas fireplace

    stair note:

    risers @ 170mm

    treads @ 280mm

    12

    3

    up

    up1

    23

    stair note:

    risers @ 170mm

    treads @ 300mm

    170m

    m ste

    p dow

    n

    170m

    m ste

    p dow

    n

    170m

    m ste

    p dow

    n

    weather step down

    230 fire wall

    fire door30min solid

    230 fire wall

    230 f

    ire wa

    ll

    Floor laid to 1% fall

    screed & tiles

    laid to a min fall

    screed & tiles

    laid to a min fall

    shelves

    line of cantilevered

    slab above

    ramp up to garage floor level

    aluminium automated sectional horizontally slatted door

    rcl @ 2125mm ht

    rcl @ 2465mm ht

    line of cantilevered

    slab above

    beam

    @ 28

    05mm h

    t

    beam @ 2805mm ht

    line of rc bridge above

    Side shower walls

    and floor to be

    correctly sealed

    and waterproofed

    water feature

    by specialist

    paving

    infraset village cobble with

    a dump rock embedded road

    edge beam step d

    own

    step d

    own

    paving

    infraset village cobble with

    a dump rock embedded road

    edge beam

    170mm step down

    line of cantilevered

    slab above

    D1

    D2

    D3

    D4

    slide

    slide

    fold

    fold

    slide

    paving

    infraset village cobble with

    a dump rock embedded road

    edge beam

    insitu cast concrete

    staircase according

    to engineers details

    gas bottle storage

    see detail and notesgas line

    gas line gas line

    gas line

    gas line

    proposed pool pump

    position to be confirmed

    with pool specialist

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    stainless steel handrail @ 1m high above

    floor level with s/s balusters and

    horizontal running steel rods

    all to specialist details

    all balustrades to comply with SANS 0400

    & SANS 10160

    access panels

    in Duct with

    100 OVP

    access panels

    in Duct with

    100 OVP

    rcl @

    2465m

    m ht

    rcl @

    2465m

    m ht

    D10

    D11

    D11

    D11

    D12

    D13

    D11

    D11

    slide

    D18

    D18

    D18

    D19

    cupboards and shelving

    to specialist joinery detailing

    and specifications

    cupboards and shelving

    to specialist joinery detailing

    and specifications

    access panels

    in Duct with

    100 OVP

    steps upup

    1

    2

    3

    final number of steps to be

    determined on site and confirmed

    with architect before construction

    stair note:

    risers @ 170mm

    treads @ 350mm

    beam

    @ 29

    75mm h

    t

    W3

    high le

    vel wi

    ndow

    W2

    W1

    W5

    W6

    W7

    W8

    W9

    W9

    W10

    shelves

    cupboards and shelving

    to specialist joinery detailing

    and specifications

    ie

    ie

    ie

    ie

    ie

    ie

    re

    re

    re

    re

    ie

    contractor to confirm

    position of sewer connection

    point on site and adjust sp

    line accordingly

    re 1,5m away from

    sewer connection

    contractor to confirm

    position of sewer connection

    point on site and adjust sp

    line accordingly

    re 1,5m away from

    sewer connection

    nbr regulations

    to be according to the

    all plumbing above ground

    minimunm 450mm invert level

    to sewer connection

    laid to a min. fall of 1:40

    100 soil pipe to sabs standards

    all plumbing pipes to be

    900mm away from walls

    nbr regulations

    to be according to the

    all plumbing above ground

    minimunm 450mm invert level

    to sewer connection

    laid to a min. fall of 1:40

    100 soil pipe to sabs standards

    all plumbing pipes to be

    900mm away from walls

    nbr regulations

    to be according to the

    all plumbing above ground

    minimunm 450mm invert level

    to sewer connection

    laid to a min. fall of 1:40

    100 soil pipe to sabs standards

    all plumbing pipes to be

    900mm away from walls

    ground floor plan

    scale 1:50

    1102

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    75 rwdp chased

    into wall using wire

    mesh & plaster

    230

    1435

    115115

    115

    115

    1115

    230

    1770

    230

    3685

    1000

    230

    2690

    1665

    3035

    5260

    1230

    1770

    6460

    230

    6000

    19420

    23014

    7

    230

    4370

    8728

    925

    345

    230

    230 2

    3037

    746

    0

    4830

    9073

    1270

    230

    230

    1724

    0

    770

    345

    1000

    230

    230

    2140

    345

    230

    115

    1000

    115

    1000

    115

    5800

    1000

    1230

    230

    1460

    2370

    1341

    0

    230

    3460

    1724

    0

    230470

    230

    1800

    230

    3000

    460

    4800

    345

    15102555

    2030

    5375

    3000

    2480

    3980

    230

    2020

    19420

    345

    230520

    115

    2885

    1200

    345

    3000

    3540

    345

    4800

    230

    1200

    600

    1200

    230

    1000

    230

    2540

    230

    2000

    230

    3000

    230115

    2770

    115

    115

    2885

    230

    345

    1800

    230

    1510

    460

    230

    4170

    530

    4800

    1115

    230

    1770

    1180

    1230

    115115

    3685

    115

    230

    1000

    115

    115

    1115

    230

    115115

    115

    230

    230

    345

    5800

    230

    1575

    230

    4770

    230 2

    30

    1000

    3770

    600

    300

    1425

    300

    230

    7710

    1200

    230

    1000

    1000

    1000

    115

    115

    115

    3460

    230

    2000

    230

    230

    230

    2400

    115

    1232

    230

    230

    2700

    115

    1262

    0

    3226

    230

    2366

    560

    280

    280

    280

    280

    280

    280

    280

    280

    280

    3718

    345

    115

    230

    4370

    230

    4830

    8243

    485

    345

    1500

    345

    1270

    230

    230

    230

    460

    230

    1200

    6928

    4

    5

    gas bottle storage

    see detail and notes

    access panels

    in Duct with

    100 RWDP

    RW pipe to be

    protected from load

    D21

    slide

    100 x 100mm steel

    structural post

    to eng. spec., painted

    to match window frame

    boundary wall

    stormwater to discharge at

    regular intervals through weep

    holes according to nbr and

    engineers specifications

    230

    230landscaped planter

    accessible from garden

    located below slab &

    230

    1000

    230

    3960

    gulley

    ie

  • ngl

    toc first floor4,080

    toc second floor7,480

    toc third floor10,880

    toc roof14,195

    toc ground floor0,000

    toc first floor4,080

    toc second floor8,330

    toc third floor11,220

    toc fourth floor15,470

    toc fifth floor18,360

    toc roof23,205

    lower ground floor-1,360

    security room

    strong room

    server room

    buildingmanager

    cleaners room

    child protection

    witness prep.

    witness prep.

    archiverecord room (current)

    court cell

    court room

    holding cells

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    toc first floor4,080

    toc second floor7,480

    toc third floor10,880

    toc fourth floor14,195

    toc ground floor0,000

    toc first floor4,080

    toc second floor8,330

    toc third floor11,220

    toc fourth floor15,470

    toc fifth floor18,360

    toc roof23,205

    lower groundfloor-1,360

    ngl

    toc first floor4,080

    toc second floor7,480

    toc third floor10,880

    toc roof14,195

    toc ground floor0,000

    toc first floor4,080

    toc second floor8,330

    toc third floor11,220

    toc fourth floor15,470

    toc fifth floor18,360

    toc roof23,205

    lower ground floor-1,360

    security room

    strong room

    server room

    buildingmanager

    cleaners room

    child protection

    witness prep.

    witness prep.

    archiverecord room (current)

    court cell

    court room

    holding cells holding cells

    conference room

    archiverecord room

    strong roomcash hall

    ngl

    toc first floor4,250

    toc second floor7,990

    toc third floor11,390

    toc fourth floor15,130

    toc fifth floor18,530

    toc roof22,185

    toc ground floor0,000ngl

    toc first floor4,080

    toc second floor8,330

    toc third floor11,220

    toc fourth floor15,470

    toc fifth floor18,360

    toc roof23,205

    lower groundfloor-1,360

    ngl

    ngl

    ngl

    toc first floor4,250

    toc second floor7,990

    toc third floor11,390

    toc fourth floor15,130

    toc fifth floor18,530

    toc roof22,185

    toc ground floor0,000

    toc first floor4,080

    toc second floor8,330

    toc third floor11,220

    toc fourth floor15,470

    toc fifth floor18,360

    toc roof23,205

    lower groundfloor

    -1,360PR

    ODU

    CED

    BY A

    N AU

    TODE

    SK E

    DUCA

    TIO

    NAL

    PRO

    DUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    magistratesoffice

    regionalprosecutor

    witnessroom

    public passage

    magistratesbridge

    courtroom

    court cell

    c-c

    a-a

    d-d

    b-b

    c-c

    d-d

    a-a

    b-b

    c-c

    a-a

    d-d

    b-b

    d-d

    b-b

    4,080

    reception7,480

    4,250 7,9908,330

    4,080

    building manager'sstore

    tea room

    estateofficer

    regionalprosecutor

    estateofficer

    interdictclerks

    conferece room

    typist's

    interpreter'sarea

    snr. prosecutor

    snr. prosecutor

    server room

    play roomchildprotection

    strongroom

    assessor'soffice

    assessor'soffice

    assessor'soffice

    consul.room

    assessor'soffice

    magistratesoffice

    regionalprosecutor

    processoffice

    c-c

    a-a

    c-c

    a-a

    magistratesoffice

    regionalprosecutor

    witnessroom

    consul.room

    courtroom

    public passage

    magistratesbridge

    court cell

    d-d

    b-b

    c-c

    d-d

    a-a

    b-b

    c-c

    a-a

    d-d

    b-b

    d-d

    b-b

    10,880

    11,390

    11,220 15,470

    roof below

    cleanersstore

    cleanersrest room

    regionalprosecutor

    family counc.

    maintenanceinvestigator

    maintenanceofficer's

    record room(current)

    record room

    archive

    buildingmanager'soffice

    magistratesoffice

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    entrance tobasement parkingbelow park

    basemententrance

    magistrate'sbasemententrance

    outdooramphitheater

    1,360

    0,680

    1,190

    c-c

    a-a

    -1,360

    0,000

    0,000

    supervisor'soffice

    accesscontrol

    security

    up

    d-d

    b-b

    c-c

    d-d

    a-a

    b-b

    magistrate'sbasement below

    BRAM FISCHER ROAD

    snack shop

    kitchen

    refuse storeaccuseddrop-off area

    saps office 1

    street court

    public atrium

    cash hall

    'chill' area

    intenet cafe

    coffee bar

    kitchen

    cafeteria 2

    cafeteria 1

    law library

    strongroom

    drop-off

    lobby

    media center/library

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRO

    DUCE

    D BY

    AN

    AUTO

    DESK

    EDU

    CATI

    ONA

    L PR

    ODU

    CT

    PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

    PRODUCED BY AN AUTO

    DESK EDUCATIONAL PRO

    DUCT

    cross section through court rooms

    West elevation

    interior atrium and court room ViewsRevit to Photoshop

    Ground Floor plan (left)

    third Floor plan (above)

  • bas honours design studio elective johannesburg cbd // march 2012 Delvers street is a melting pot within the Johannesburg inner city, recognised for the considerably varying social conditions across the four districts which define it. Conceived as a vegetable nursery, the steel structure supports the sustainable production of vegetables through the use of recycled Coca-Cola bottles, rain water harvesting, and education. attempting to bridge the divides between diverse groups of people who occupy Delvers street and the greater Johannesburg inner city, the structure allows for the nursery to adapt to the changing needs of the citys dwellers and in particular those of the informal vegetable traders.

    DelVerS StreetiNterVeNtioN_________________________________________________________________________________A inner City Vegetable Nursery

    Ground Floor plan

    hand drawn site observation (above)

    First Floor plan

    Revit to Photoshop

    West elevation

    Copy

    right:

    Water

    reticu

    lation

    :

    Electr

    ical no

    tes:

    D A T

    E

    R E V

    D E S

    C R I P

    T I O

    N

    J O B

    N O

    D A T

    E

    D R A

    W I N

    G

    D R A

    W I N

    G N

    OS C

    A L E

    R E V P

    R O J E

    C T

    WIL.2

    2.05.1

    4

    Wil-0

    21:5

    0

    22.05

    .14

    1

    Gener

    al note

    s:

    Settin

    g out,

    excava

    tion &

    site op

    eration

    s - SA

    NS 10

    400-G

    & F

    Struct

    ural no

    tes:

    Roof

    notes

    - SAN

    S 1040

    0 - L

    Draina

    ge - S

    ANS 1

    0400-P

    To all

    wc's p

    rovide

    100

    mm wa

    ste pip

    es.

    all ven

    ts sha

    ll finis

    h 900

    mm m

    inimum

    above

    any ro

    of finis

    h.

    provid

    e over

    flow gu

    lly at l

    owest

    point

    of drain

    age sy

    stem i

    nclude

    gully

    to

    pool if

    at low

    est po

    int.

    This d

    rawing

    is cop

    yright r

    eserve

    d and

    remain

    s the p

    ropert

    y of th

    e arch

    itect an

    y

    change

    s to the

    intern

    al or e

    xterna

    l struc

    ture b

    y any

    other

    design

    party

    will no

    t be

    permit

    ted wi

    thout f

    irst co

    nfirmin

    g with

    the ar

    chitec

    t. No p

    art of

    this dr

    awing

    may b

    e

    copie

    d or u

    sed by

    any o

    ther p

    arty o

    r othe

    r desi

    gner w

    ithout p

    ermiss

    ion fro

    m the

    archi

    tect. A

    ll mate

    rials t

    o be S

    ABS o

    r agre

    ement

    board

    appro

    ved. A

    ll work

    to

    comp

    ly with

    the Na

    tional B

    uilding

    Regul

    ations

    (SANS

    10400)

    the app

    licable

    SABS

    code

    s & bu

    ilding

    society

    regul

    ations.

    The a

    rchitec

    ts spec

    ificatio

    n, inst

    ruction

    s, larg

    er sca

    led de

    tails d

    rawing

    s, engi

    neers

    detail

    s etc.

    shall ta

    ke pre

    feranc

    e to the

    se dra

    wings.

    These

    draw

    ings a

    re not

    to be

    scale

    d, use

    figure

    d dime

    nsions

    only.

    All ma

    terial

    and wo

    rkmans

    hip to

    be the

    best

    of the

    ir resp

    ective

    kinds

    and to

    confor

    m with

    SABS

    standa

    rds an

    d spec

    ificatio

    ns,

    all wo

    rk to

    be ca

    rried o

    ut in s

    trict a

    ccorda

    nce wi

    th arc

    hitects

    instru

    ctions.

    Mate

    rials

    used

    & app

    lied mu

    st be r

    eferre

    d to us

    ing ma

    nufact

    ures p

    rinted

    instru

    ctions

    .

    Contr

    actor

    to arra

    nge an

    d ensu

    re tha

    t all re

    quired

    inspec

    tions a

    re car

    ried ou

    t by

    the loc

    al build

    ing ins

    pector

    ate. O

    n com

    pletion

    of co

    ntrac

    t, all ru

    bbish

    and r

    ubble

    is

    to be

    remo

    ved fro

    m the

    site,

    and m

    ay not

    be us

    ed as

    fill, u

    nless

    otherw

    ise dir

    ected

    .

    Provid

    e and

    erect

    in app

    roved

    positio

    n, stan

    dard a

    rchitec

    ts notic

    e boa

    rd. Al

    l

    habita

    ble ro

    oms to

    be pr

    ovided

    with n

    atural

    light an

    d vent

    ilation

    as se

    t out in

    SANS

    1040

    0-O. T

    he arc

    hitect w

    ill not b

    e held

    respo

    nsible

    for the

    qualit

    y of th

    e

    workm

    anshi

    p. The

    constru

    ction o

    f the b

    uilding

    may n

    ot com

    menc

    e witho

    ut

    approv

    al of th

    e build

    ing pla

    ns thr

    ough c

    ouncil.

    Drawin

    gs are

    prepa

    red fro

    m surf

    ace ex

    amina

    tion of

    site o

    nly. D

    epth o

    f found

    ations,

    heigh

    t of pli

    nths n

    umber

    of ste

    ps & f

    inal fin

    ished

    groun

    d level

    s to be

    deter

    mined

    by

    the co

    ntract

    or & e

    nginee

    r on s

    ite & c

    onfirm

    ed wit

    h the a

    rchitec

    ts. To

    p of al

    l

    found

    ations

    to be

    a min

    imum 5

    00mm

    below

    the

    finish

    ed gr

    ound. A

    ny cha

    nges o

    f

    levels

    deem

    ed ne

    cessar

    y on s

    ite mu

    st be fi

    rst rep

    orted

    to and

    approv

    ed by

    the

    archi

    tect. A

    ll level

    s, dime

    nsion

    s, build

    ing

    lines a

    nd ot

    her d

    ata to

    be ch

    ecked

    on sit

    e

    and a

    ny dis

    crepan

    cies a

    re to b

    e repo

    rted to

    the ar

    chitec

    t and

    engin

    eer for

    corre

    ction.

    The a

    rchitec

    t will n

    ot be

    held r

    espons

    ible fo

    r dime

    nsion

    al erro

    rs if n

    ot

    notifie

    d at th

    e time

    of co

    mmen

    cing w

    ork on

    site.

    Build

    in prec

    ast pr

    estres

    sed co

    ncrete

    lintels

    (SABS

    approve

    d) abov

    e all op

    enings.

    Depth

    of fou

    ndation

    trench

    es to b

    e a mi

    n of 50

    0mm b

    elow g

    round

    level.

    Foun

    dation

    s to be

    set o

    n firm

    suppo

    rtable

    groun

    d and

    to be c

    hecked

    & con

    firmed

    by eng

    ineer.

    New c

    oncret

    e surf

    ace be

    d to be

    a minim

    um of

    15mp

    a 100m

    m thic

    k

    on da

    mp pr

    oof me

    mbran

    e DPM

    (gunpla

    s green

    or equ

    ivalent)

    on sa

    nd bli

    nding

    on

    well c

    ompac

    ted fill

    . Top

    of conc

    rete s

    urface

    bed to

    be a m

    in of 15

    0mm a

    bove N

    GL.

    Provid

    e appr

    oved d

    pc (gu

    ndle br

    ickgrip

    or eq

    uivale

    nt ) un

    der all

    walls &

    window

    sills &

    provi

    de ver

    tical dp

    c.s to

    all cha

    nges o

    f floor

    levels

    . All s

    urface

    beds

    to be

    finishe

    d with

    30mm

    minim

    um sa

    nd ce

    ment

    scree

    d unle

    ss oth

    erwise

    detail

    ed or

    specifi

    ed. Al

    l brick

    work t

    o rece

    ive br

    ickfor

    ce eve

    ry 4 co

    urses

    all ope

    nings

    to

    rece

    ive br

    ickfor

    ce eve

    ry cour

    se for

    3 cour

    ses ex

    tendin

    g 1m p

    ast op

    ening

    on bot

    h

    sides.

    All st

    airs un

    less o

    therwi

    se de

    tailed

    to ha

    ve equ

    al rise

    rs 185m

    m maxi

    mum

    with e

    qual tre

    ads 25

    0mm m

    inimum

    . Prov

    ide ha

    ndrail

    at 90

    0mm h

    eight w

    here

    num

    ber o

    f risers

    excee

    d five

    & 1m

    high to

    balco

    nies &

    landin

    gs and

    a min o

    f

    100m

    m ba

    luster

    spaci

    ng acc

    ording

    to NB

    R. Th

    e FFL

    at cha

    nges b

    etwee

    n floo

    r

    finishe

    s must

    rema

    in con

    stant.

    contr

    actor

    to tak

    e acco

    unt o

    f diffe

    rences

    in de

    pths

    of floo

    r finis

    hes w

    hen s

    creed

    is laid

    .

    Rafte

    rs & t

    russes

    to be

    tied d

    own w

    ith gal

    vanize

    d hoop

    iron th

    readed

    throug

    h four

    cour

    ses o

    f brick

    work.

    Parap

    et wa

    lls to

    min of

    300m

    m ab

    ove ro

    of lev

    el. Pro

    vide a

    ll

    requi

    red fla

    shings

    and c

    ounter

    flashi

    ngs at

    change

    s in ro

    of leve

    ls. Ab

    utment

    s

    betwe

    en ro

    of an

    d para

    pet wa

    lls, ch

    imneys

    , roof v

    alleys

    & ridg

    es. Pr

    ovide

    approv

    ed

    insula

    tion ov

    er all

    ceiling

    s. Flat

    roove

    s to h

    ave 50

    mm ch

    ip ston

    e on r

    aised

    mesh

    grill or

    ceram

    ic tiles

    on du

    rbigum

    (sp4) w

    aterpro

    ofing to

    speci

    alist de

    tails, o

    n 50m

    m

    scre

    ed to

    falls

    to do

    wnpip

    e on 1

    70 and

    /or 25

    5mm c

    oncre

    te sla

    b to e

    nginee

    rs

    detail

    s. desi

    gn & s

    pecific

    ations

    downpi

    pes to

    be cha

    sed int

    o walls

    & pla

    stere

    d

    using

    wire

    mesh

    & plas

    ter at

    a min s

    ize of

    75

    Provid

    e inspe

    ction e

    yes (ie)

    at all ju

    nctions

    and rod

    ding eye

    s (re) t

    o all be

    nds,

    change

    s in dir

    ection

    and r

    amps.

    Provi

    de ie a

    t every

    24 me

    ters a

    long s

    traigh

    t run

    of

    drain,

    provid

    e such

    with p

    urpose

    made

    marke

    d cove

    r plate

    s at fin

    ished

    ground

    level.

    All sa

    nitary f

    ittings

    to be p

    rovide

    d with

    65mm r

    eseal t

    raps a

    nd air

    valve

    (AV).

    provid

    e 50

    anti s

    iphon

    pipe w

    here v

    ertica

    l drop

    exceed

    s 1200

    mm. D

    rains

    shall

    have

    minimu

    m fall

    1:60

    or m

    aximu

    m fall

    1:5.

    Where

    drain

    s pass

    unde

    r build

    ing,

    provid

    e adeq

    uate p

    rotect

    ion to

    ensure

    no loa

    d is tra

    nsferr

    ed to d

    rain fro

    m build

    ing.

    Drains

    must

    have

    straig

    ht runs

    where

    passi

    ng ben

    eath b

    uilding

    s. Pipe

    s to ha

    ve re's

    at eith

    er en

    d. All

    ie & re

    ,s to b

    e acce

    ssible

    . To a

    ll wash

    hand

    basin

    s & va

    nity

    basin

    s prov

    ide 32

    mm w

    aste p

    ipes. T

    o all s

    inks, b

    aths,

    showe

    rs, lau

    ndry t

    rough

    and ur

    inals p

    rovide

    38m

    m wast

    e pipe

    s.

    All ele

    ctrica

    l work

    to be

    done

    by lic

    enced

    electri

    cian a

    nd all

    work

    and t

    o be c

    arried

    out a

    ccordin

    g to SA

    BS sta

    ndards

    . Cont

    ractor

    to ens

    ure a 3

    phase

    suppl

    y &

    adequ

    ate cir

    cuit br

    eakers

    provi

    ded. E

    lectric

    ian to

    provid

    e com

    pliance

    certif

    icate.

    All ho

    t wate

    r circu

    lation

    pipes,

    and a

    ll exte

    rnally

    expose

    d pipe

    s to be

    insula

    ted

    along

    their e

    ntire le

    ngth w

    ith 25m

    m canv

    as wra

    pped fi

    bre ins

    ulation

    and s

    ealed

    with s

    ealer

    paint.

    All ex

    ternal

    ly expo

    sed pip

    es to b

    e cove

    red

    in wea

    therpr

    oof GM

    S

    jacket.

    the ar

    chitec

    t will n

    ot be

    held r

    espons

    ible for

    any d

    iscrep

    ancies

    which

    may a

    rise as

    a res

    ult of

    unapp

    roved

    plans

    by loc

    al auth

    ority a

    nd ow

    ner. pl

    ease n

    ote tha

    t the

    signed

    appro

    val of

    this pla

    n by o

    wner

    must b

    e obta

    ined b

    efore

    constru

    ction c

    an

    comm

    ence

    . all s

    pecific

    ations

    by dev

    eloper

    overid

    es pla

    ns. the

    archi

    tect m

    ust be

    inform

    ed in

    writing

    of any

    chang

    es to t

    hese p

    lans. s

    ewer

    and wa

    ter co

    nnec

    tion to

    be co

    nfirme

    d with

    engin

    eer be

    fore b

    uilding

    comm

    ences

    the co

    ntrac

    tor sh

    all pro

    vide

    all ass

    istance

    & eve

    rything

    neces

    sary to

    enab

    le the

    accur

    acy of

    the se

    tting o

    ut to

    be ch

    ecked

    . che

    cking

    of the

    setting

    out sh

    all no

    t reliev

    e the

    contr

    actor

    of his

    respo

    nsibili

    ty for

    correc

    tness

    thereo

    f & the

    contr

    actor

    shall re

    ctify a

    ny er

    rors

    in the

    works

    that

    may a

    rise fro

    m inco

    rrect s

    etting

    out w

    ithout a

    ny adju

    stment

    to the

    contr

    act s

    um. th

    e con

    tracto

    r/clien

    t may

    not cl

    aim ag

    ainst

    the ar

    chitec

    t as a

    resul

    t

    of dis

    crepen

    cies o

    r erro

    rs not r

    eporte

    d to t

    he ar

    chitec

    t befo

    re con

    structio

    n

    Discla

    imer:

    demo

    lition o

    f all w

    alls to

    be co

    nfirme

    d by s

    tructu

    ral eng

    ineer

    all dim

    ensio

    ns to

    be ch

    ecked

    on sit

    e prior

    to ord

    ering o

    r insta

    lling a

    ll wind

    ows &

    doors

    Fax.

    0 8 6

    6 1 0

    1 7 2

    6

    p o n e

    t s u i

    t e 6

    9 7 p

    r i v a t

    e b a

    g x 1

    5 3

    n i c

    k @ h o

    o d n a

    p i e r

    . c o .

    z a

    e-ma

    il.

    l a r a

    h o

    o d

    n i c

    k n

    a p i e

    r

    0 8 2

    9 0 2

    4 1 9

    9

    0 8 3

    2 6 6

    7 4 6

    2

    B.Arch

    . M.I.A

    . R.I.B

    .A.

    Reg. N

    o 7019

    Reg. N

    o ST 0

    617l a

    r a @

    h o o d

    n a p i

    e r . c

    o . z a

    e-ma

    il.

    b r y a

    n s t o

    n 2 0

    2 1

    ground

    floor

    plan

    propos

    ed new

    house

    for

    on Po

    rtion 1

    of ER

    F 314

    Wilso

    n Nkos

    i

    Sando

    wn Ex

    t. 24

    13.6.

    2014

    1

    coun

    cil sub

    missio

    n

    atrium

    serv

    er

    room

    C

    C

    A

    A

    B

    B

    C

    C

    cove

    red p

    atio

    T.O.C.

    -0,6

    80tiles

    diningT.O

    .C.

    -0,5

    10tiles

    kitche

    n

    tiles

    sculle

    ry

    T.O.C.

    -0,5

    10tiles

    pantr

    ytile

    s

    lounge

    tiles

    family

    room

    T.O.C.

    -0,6

    80tiles

    entra

    nce h

    all

    T.O.C.

    0,000til

    es

    doub

    le gara

    ge

    T.O.C.

    0,170til

    es

    study

    T.O.C.

    0,000til

    es

    staff r

    oom

    T.O.C.

    0,000til

    es

    store

    tiles

    store

    T.O.C.

    0,170tile

    s

    gues

    t wc

    tiles

    sink

    sink

    d/w

    w/m

    t/d

    gulley

    whb

    geberit

    wc

    whb

    whb

    wc

    wc

    shr

    sink

    fr

    fr

    p/b

    extra

    ctor a

    bove

    gas sto

    ve

    drivew

    ay

    pavers

    T.O.C.

    -0,8

    50tiles

    pool

    by spe

    cialist

    deep

    end

    shallow

    end

    kitche

    n layou

    t detail

    ing,

    coun

    ters a

    nd cu

    pboard

    s

    to spe

    cialist

    detail

    sto

    specia

    list de

    tails

    final ki

    tchen

    electr

    ical la

    yout

    gas br

    aai

    gas fire

    place

    gas fire

    place

    stair n

    ote:

    risers

    @ 170

    mm

    tread

    s @ 28

    0mm

    12

    3

    up

    up 12

    3

    stair n

    ote:

    risers

    @ 170

    mm

    tread

    s @ 30

    0mm

    170m

    m ste

    p dow

    n

    170m

    m ste

    p dow

    n

    170m

    m ste

    p dow

    n

    weath

    er ste

    p dow

    n

    230 f

    ire wa

    ll

    fire do

    or30

    min so

    lid

    230 f

    ire wa

    ll

    230 f

    ire w

    all

    Floor

    laid to

    1% fa

    ll

    scre

    ed &

    tiles

    laid to

    a min

    fall

    scre

    ed &

    tiles

    laid to

    a min

    fall

    shelve

    s

    line of

    cantil

    evered

    slab a

    bove

    ramp

    up to

    garage

    floor

    level

    alumin

    ium au

    tomate

    d sect

    ional h

    orizon

    tally s

    latted

    door

    rcl @

    2125m

    m ht

    rcl @

    2465m

    m ht

    line of

    cantil

    evered

    slab a

    bove

    beam

    @ 28

    05mm

    ht

    beam

    @ 28

    05mm h

    t

    line of

    rc br

    idge a

    bove

    Side s

    hower

    walls

    and f

    loor to

    be

    corre

    ctly se

    aled

    and w

    aterpr

    oofed

    water

    featu

    re

    by spe

    cialist

    paving

    infrase

    t villag

    e cobb

    le with

    a dum

    p rock

    embed

    ded r

    oad

    edge

    beam

    step d

    own

    step d

    own

    paving

    infrase

    t villag

    e cobb

    le with

    a dum

    p rock

    embed

    ded ro

    ad

    edge

    beam

    170m

    m ste

    p dow

    n

    line of

    cantil

    evered

    slab a

    bove

    D1

    D2

    D3

    D4

    slide

    slide

    fold

    fold

    slide

    paving

    infrase

    t villag

    e cobb

    le with

    a dum

    p rock

    embed

    ded ro

    ad

    edge

    beam

    insitu

    cast co

    ncrete

    stairca

    se acc

    ording

    to en

    gineer

    s deta

    ils

    gas bo

    ttle sto

    rage

    see d

    etail a

    nd no

    tesgas

    line

    gas lin

    e

    gas lin

    e

    gas lin

    e

    gas lin

    e

    propos

    ed poo

    l pump

    positio

    n to be

    confir

    med

    with p

    ool sp

    ecialis

    t

    75 r

    wdp c

    hased

    into wa

    ll usin

    g wire

    mes

    h & pla

    ster

    75 r

    wdp c

    hased

    into wa

    ll usin

    g wire

    mes

    h & pla

    ster

    75 r

    wdp c

    hased

    into wa

    ll usin

    g wire

    mes

    h & pla

    ster

    stainle

    ss ste

    el han

    drail @

    1m hig

    h abov

    e

    floor le

    vel wi

    th s/s

    balus

    ters a

    nd

    horizo

    ntal ru

    nning

    steel r

    ods

    all to

    specia

    list de

    tails

    all ba

    lustra

    des to

    comp

    ly with

    SANS

    0400

    & SAN

    S 1016

    0

    acce

    ss pa

    nels

    in Duct

    with

    100

    OVP

    acce

    ss pa

    nels

    in Duct

    with

    100

    OVP

    rcl @

    2465

    mm ht

    rcl @

    2465

    mm ht

    D10

    D11

    D11

    D11

    D12

    D13

    D11

    D11

    slide

    D18

    D18

    D18

    D19

    cupbo

    ards a

    nd she

    lving

    to spe

    cialist

    joinery

    detailing

    and s

    pecific

    ations

    cupbo

    ards a

    nd she

    lving

    to spe

    cialist

    joinery

    detailing

    and s

    pecific

    ations

    acce

    ss pa

    nels

    in Duct

    with

    100

    OVP

    steps

    upup

    1

    2

    3

    final nu

    mber

    of ste

    ps to b

    e

    deter

    mined

    on sit

    e and

    confir

    med

    with a

    rchitec

    t befo

    re con

    structio

    n

    stair n

    ote:

    risers

    @ 170

    mm

    tread

    s @ 35

    0mm

    beam

    @ 29

    75mm

    ht

    W3

    high l

    evel

    windo

    w

    W2

    W1

    W5

    W6

    W7

    W8

    W9

    W9

    W10

    shelve

    s

    cupbo

    ards a

    nd she

    lving

    to spe

    cialist

    joinery

    detailing

    and s

    pecific

    ations

    ie

    ie

    ie

    ie

    ie

    ie

    re

    re

    re

    re

    ie

    contr

    actor

    to co

    nfirm

    positio

    n of se

    wer co

    nnectio

    n

    point o

    n site

    and ad

    just sp

    line ac

    cordin

    gly

    re 1,

    5m aw

    ay fro

    m

    sewe

    r con

    nectio

    n

    contr

    actor

    to co

    nfirm

    positio

    n of se

    wer co

    nnectio

    n

    point o

    n site

    and ad

    just sp

    line ac

    cordin

    gly

    re 1,

    5m aw

    ay fro

    m

    sewe

    r con

    nectio

    n

    nbr re

    gulatio

    ns

    to be

    accor

    ding to

    the

    all plu

    mbing

    above

    groun

    d

    minim

    unm

    450m

    m inv

    ert lev

    el

    to se

    wer c

    onne

    ction

    laid to

    a min

    . fall o

    f 1:40

    100

    soil p

    ipe to

    sabs s

    tandar

    ds

    all plu

    mbing

    pipes

    to be

    900m

    m aw

    ay fro

    m walls

    nbr re

    gulatio

    ns

    to be

    accor

    ding to

    the

    all plu

    mbing

    above

    groun

    d

    minim

    unm

    450m

    m inv

    ert lev

    el

    to se

    wer c

    onne

    ction

    laid to

    a min

    . fall o

    f 1:40

    100

    soil p

    ipe to

    sabs s

    tandar

    ds

    all plu

    mbing

    pipes

    to be

    900m

    m aw

    ay fro

    m walls

    nbr re

    gulatio

    ns

    to be

    accor

    ding to

    the

    all plu

    mbing

    above

    groun

    d

    minim

    unm

    450m

    m inv

    ert lev

    el

    to se

    wer c

    onne

    ction

    laid to

    a min

    . fall o

    f 1:40

    100

    soil p

    ipe to

    sabs s

    tandar

    ds

    all plu

    mbing

    pipes

    to be

    900m

    m aw

    ay fro

    m walls

    ground

    floor

    plan

    scale

    1:50

    110

    2

    75 r

    wdp c

    hased

    into wa

    ll usin

    g wire

    mes

    h & pla

    ster

    75 r

    wdp c

    hased

    into wa

    ll usin

    g wire

    mes

    h & pla

    ster

    75 r

    wdp c

    hased

    into wa

    ll usin

    g wire

    mes

    h & pla

    ster

    230

    1435

    1151

    15

    115

    115

    1115

    230

    1770

    230

    3685

    1000

    230

    2690

    1665

    3035

    5260

    1230

    1770

    6460

    230

    6000

    1942

    0

    23014

    7

    230

    4370

    8728

    925

    345

    230

    2302

    3037

    746

    0

    4830

    9073

    1270

    230

    230

    1724

    0

    770

    345

    1000

    230

    230

    2140

    345

    230

    115

    1000

    115

    1000

    115

    5800

    1000

    1230

    230

    1460

    2370

    1341

    0

    230

    3460

    1724

    0

    230

    470

    230

    1800

    230

    3000

    460

    4800

    345

    1510

    2555

    2030

    5375

    3000

    2480

    3980

    230

    2020

    1942

    0

    345

    230

    520

    115

    2885

    1200

    345

    3000

    3540

    345

    4800

    230

    1200

    600

    1200

    230

    1000

    230

    2540

    230

    2000

    230

    3000

    230

    115

    2770

    115

    115

    2885

    230

    345

    1800

    230

    1510

    460

    230

    4170

    530

    4800

    1115

    230

    1770

    1180

    1230

    1151

    15

    3685

    115

    230

    1000

    115

    115

    1115

    230

    115

    115

    115

    230

    230

    345

    5800

    230

    1575

    230

    4770

    2302

    30

    1000

    3770

    600

    300

    1425

    300

    230

    7710

    1200

    230

    1000

    1000

    1000

    115

    115

    115

    3460

    230

    2000

    230

    230

    230

    2400

    115

    1232

    230

    230

    2700

    115

    1262

    0

    3226

    230

    2366

    560

    280

    280

    280

    280

    280

    280

    280

    280

    280

    3718

    345

    115

    230

    4370

    230

    4830

    8243

    485

    345

    1500

    345

    1270

    230

    230

    230

    460

    230

    1200

    6928

    4

    5

    gas bo

    ttle sto

    rage

    see d

    etail a

    nd no

    tes

    acce

    ss pa

    nels

    in Duct

    with

    100

    RWDP

    RW pip

    e to be

    protec

    ted fro

    m load

    D21

    slide

    100 x

    100m

    m ste

    el

    struc

    tural p

    ost

    to en

    g. spec

    ., pain

    ted

    to ma

    tch wi

    ndow

    frame

    boun

    dary w

    all

    storm

    water

    to dis

    charge

    at

    regul

    ar inte

    rvals t

    hrough

    weep

    holes

    accor

    ding to

    nbr a

    nd

    engin

    eers s

    pecific

    ations

    230

    230

    landsc

    aped p

    lanter

    acce

    ssible

    from g

    arden

    locate

    d belo

    w slab

    &

    230

    1000

    230

    3960

    gulley

    ie

  • bas honours advanced theory & practice of construction johannesburg cbd // may 2012 the major project for the advanced theory and practice of construction honours course required groups of four students to explore inter-systems performance in design and construction through re-conceptualising the design of an existing, dated inner city building. With the primary focus being on sustainability, the proposed design needed to facilitate bio-physical, socio-economic, socio-political and socio-cultural issues specific to the context. individuals were then required to design relevant details.

    CoNStrUCtioN____________________________________________________________________________

    above:second Floor planleft:Ground Floor plan Opposite page:West elevation Autocad

    Copy

    right:

    Water

    reticu

    lation

    :

    Electr

    ical no

    tes:

    D A T

    E

    R E V

    D E S

    C R I P

    T I O

    N

    J O B

    N O

    D A T

    E

    D R A

    W I N

    G

    D R A

    W I N

    G N

    OS C

    A L E

    R E V P

    R O J E

    C T

    WIL.2

    2.05.1

    4

    Wil-0

    21:5

    0

    22.05

    .14

    1

    Gener

    al note

    s:

    Settin

    g out,

    excava

    tion &

    site op

    eration

    s - SA

    NS 10

    400-G

    & F

    Struct

    ural no

    tes:

    Roof

    notes

    - SAN

    S 1040

    0 - L

    Draina

    ge - S

    ANS 1

    0400-P

    To all

    wc's p

    rovide

    100

    mm wa

    ste pip

    es.

    all ven

    ts sha

    ll finis

    h 900

    mm m

    inimum

    above

    any ro

    of finis

    h.

    provid

    e over

    flow gu

    lly at l

    owest

    point

    of drain

    age sy

    stem i

    nclude

    gully

    to

    pool if

    at low

    est po

    int.

    This d

    rawing

    is cop

    yright r

    eserve

    d and

    remain

    s the p

    ropert

    y of th

    e arch

    itect a

    ny

    change

    s to the

    intern

    al or e

    xterna

    l struc

    ture b

    y any

    other

    design

    party

    will no

    t be

    permit

    ted wi

    thout f

    irst co

    nfirmin

    g with

    the ar

    chitec

    t. No p

    art of

    this dr

    awing

    may b

    e

    copie

    d or u

    sed by

    any o

    ther p

    arty o

    r othe

    r desi

    gner w

    ithout p

    ermiss

    ion fro

    m the

    archi

    tect. A

    ll mate

    rials t

    o be S

    ABS o

    r agre

    ement

    board

    appro

    ved. A

    ll work

    to

    comp

    ly with

    the Na

    tional B

    uilding

    Regul

    ations

    (SANS

    10400)

    the app

    licable

    SABS

    code

    s & bu

    ilding

    society

    regul

    ations.

    The a

    rchitec

    ts spec

    ificatio

    n, inst

    ruction

    s, larg

    er sca

    led de

    tails d

    rawing

    s, engi

    neers

    detail

    s etc.

    shall ta

    ke pre

    feranc

    e to the

    se dra

    wings.