project 1: The object of this project was to create a sequence of spaces that lead up a wooden arma-ture. The assignment called for the investigation of spaces through the folding of planes using sheet metal. Also the spaces were designed in relation to a dancer’s movement of his leg.

concept 1: The spacial rhythm and sequence is similar to the dancer’s rotation of his leg backwards and around going from an inside to outside position. As one moves up the path there is a constant feeling of tension and anxiety created by the expansion and contraction of the spaces as well as the play of light which fi lters downs and suggest the point of release.

project 2: The assignment was to design three elements of a dwelling, the entrance, stairs and porch based off of a fi ctitious client from a short story. The dwelling is in a complex surrounded by two other houses.

concept 2: The character of this dwelling was a notorious gangster that had a secret softer side, which was a love for pets. The concept for this project was that the main residence is hidden away in an under-ground complex while the front is only a huge false facade. All the elements were designed to conceal the presences of the character which will allow him privacy.

space + body + movement

Page 4: Architecture Portfolio 2009

undergraduate

Page 5: Architecture Portfolio 2009

structure + investigation project: The object was to construct a double cantilever structure, out of solid square mild steel sec-tions, that would have the highest possible strength to weight ratio when loaded evenly from both side. To test its effectiveness the structure was put in a device that gradually put stress on it until it failed. This experiment was conducted three times, after each one, a detail analysis was done to assess the weak-ness and strenght of the structure in order to improved the effi ciency of the subsequent model.

test 1: The structure failed due to the bending of the cantilevered arms under compression forces

test 2: The cantilevered arms were strengthen by using a diamond shaped structure that resisted bend-ing in the arms considerably. However, the failure was at the tip of the right arm.

test 3: The structure was lightened and refi ned using triangulation of the trusses. It again failed at the same point. This maybe as a result of the unequal loading or inconsistencies in construction.

Page 6: Architecture Portfolio 2009

visitors + studio

project: This studio was comprised of four visiting critics from different parts of the world. Each professor taught 3 week design studios that they produced. All the projects were located on the Convento site, which is the oldest cultivated land in North America, and each were con-cerned with the revitalization of this area.

undergraduate

Page 7: Architecture Portfolio 2009
Page 8: Architecture Portfolio 2009

undergraduate

Page 9: Architecture Portfolio 2009

desert + sanctuary

project: This project basically called for a structure which is composed of two cubes that demonstrated the qualities of heavy and light as well as make a con-nection between the earth and the sky.

concept: This project signifi ed a gate-way that connects the city to the natural landscape of the cultural center. The cube are arranged in a symbiotic relationship where the light airy one is cantilevered off the grounded cube and shades it.

Page 10: Architecture Portfolio 2009

undergraduate

Page 11: Architecture Portfolio 2009

dwelling + investigation

Page 12: Architecture Portfolio 2009

Co-rd limited

Page 13: Architecture Portfolio 2009

15'-0

"

B15

'-0"

C15

'-0"

DA

9'-2"

0215'-0"

0301

15'-0

"

DC

15'-0"

0302K

itche

nette

Customer Services

up

up

Pw

d.

Pwd. Rm

GROUND FLOOR PLANScale: 1/8" = 1'-0"

MEZZANINE LEVELScale: 1/8" = 1'-0"

dn.

OPEN SPACE

OFFICE14'8" x 8'7"125.89 S.F.

FurnitureShowroom

Page 14: Architecture Portfolio 2009

Co-rd limited

Page 15: Architecture Portfolio 2009

HeliosHall

up

A A

up.

up

FEMALE

TICKETS/�CONCESS

up

ADMIN. OFFICE

MALE

5200 x 4300

3350 x 1800

5200 x 2550

5200 x 2550

2100

5400

118975500

25212

roller shutter doors

pond

stor

age

ramp up

B

B

4500

C

C

sliding panel

sliding panel

GREENROOM PDW

BLACK BOX THEATRE11700 x 11700 approx. 176 seats

5568

6080

D D

REHEARSAL RM. 2

VOID

1200

0

dn.

REHEARSAL RM. 1

MALEFEMALE

MU

LTI-M

ED

IA B

ALC

ON

Y

STORAGE RM.

15635

9000

A A

1800

3500

11972

7650 x 43507650 x 4350

3500 x 3200 2900 x 3200 4450 x 3200

B

B

sliding panel

sliding panel

up

dn.VOID

LOFT

STORAGE6080

5568

ground fl oor

fi rst fl oor

Page 16: Architecture Portfolio 2009

alum. framed �casement window

6216

TOP OF CANOPY

2642

300

ELEVATION BSCALE=1:100

1121

3200

1402

3048

1800

1732

350

721

3984

TOP OF PARAPET WALL

signage

alum. shop �front doors

alum. framed �fixed glass panels

dotted outline �of roof inside

metal framed �canopy

applied textured �wall finish by specialist

2083

180

BUILDING 1 BUILDING 2 BUILDING 3

signage

dotted outline of �exst. roof inside

GROUND FLOOR

FIRST FLOOR

TOP OF PARAPET WALL

TOP OF RING BEAM

TOP OF RC GUTTER

2758

TOP OF PARAPET WALL

3700

3180

verify width on site

700

alum. framed �fixed glass panels

100 x 150mm RHS�columns to support �metal canopy

1732

350

3048

420mm h x 2400mm wide �plycem boards @ 471mm�centres fixed to parapet wall

alum. sections fixed �to blockwall, see �detail section c

Co-rd limited

Page 17: Architecture Portfolio 2009

AdvancePlaza

������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

landscaped�area

TPTP

30

29

28

PAVED ROAD

TUMPUNA ROAD

TPTP

Chain Link Fence

151617181920212223242526

1 2 3 4 5 6 7 8 9

10

11

12

13

14

loadingzone

PROPOSED BUILDING

SERVICE YARD

CURRENTLY IN CONSTRUCTION

ENTRANCE

EXIT

service walkway

1526

16780

Verify on site

proposed guard booth

proposed entrance feature

proposed traffic barrier

(Asphalt finish)PROPOSED CAR PARK

ENTRY

ENTRY

Proposed �signage

220008547

1200

079

21

1748

137.06sq.m

377.8sq.m

1

2

3

1687

5596 3303 24300

683

5400

4259

8100

4255

5436

(Asphalt finish)

dotted outline of �construction zone

173° 55'18.29

83° 52'15.30

173° 55'18.32

83° 56'30.45

173° 52'10.06

landscaped�area

EXIT LOBBY

SHOP 1

SHOP 2

EXIT

6080.3 32438 13532

2500 2500 2500

landscaped�area

landscaped�area

SITE PLANSCALE=1:250

land

scap

ed�

area

landscaped�area

27

31 32 33 34 35 36 37 38

BU

ILD

ING

1B

UIL

DIN

G 2

BU

ILD

ING

3

up

STAIR #1

STAIR #2

up

Ver

ify o

n si

te

4048 1710 5500 5405

1646 service walkway

1 2 3 4 5 6 7 8 9 10 11 12 13T&TECTranfomer

EXISTING PARKING

grass pavers

1799

EXISTING FURNITURE PLUS BUILDING

PROPOSED �ADDITION

ENTRYElectrical panel

ENTRYexst. landscaping�to remain

WA

LKW

AY

(bru

shed

gra

no fi

nish

)

WALKWAY(brushed grano finish)

��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

��������������������������������������������������������������������������������������������������������������������������������������������

paved area PROPOSED �PARKING AREA

......

......

.

EXST. PAVED ROAD

TUMPUNA ROAD

TP

TP

Chain Link Fence

chain link fence

Chain Link Fence

83° 52'25.24

ADJACENT �PROPERTIES

FURNITURE PLUS (EXISTING)

CURRENTLY �UNDER�CONSTRUCTION

paved area

t&tec �transformer

EXST. WAREHOUSE�TO REMAIN

EXST. WAREHOUSE�TO REMAIN

173° 55'18.29

83° 52'76.14

83° 52'15.3083° 52'

67.54

174° 47'36.73

174° 47'10.06

174° 47'36.58

173° 55'18.32

83° 56'30.45

173° 52'10.06

173° 52'16.55

173° 52'18.47

173° 52'18.81

173° 52'17.68

173° 52'10.03

173° 52'19.78

173° 52'18.29

83° 52'13.87

83° 52'16.49

83° 52'61.08

83° 52'34.26

174° 51'38.16

174° 51'9.97

174° 59'36.39

PROPOSED�BUILDING

MASTER PLAN

construction zoneco

nstru

ctio

n zo

ne

SCALE=1:500

���������

Page 18: Architecture Portfolio 2009

������������������������������������������������������

�������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

����������������������

��������������������������������������������������������������������������������������������������������

��������������

First Floor Level 1

58450

Ground Floor Level

55600

First Floor Level 2

59650

Top of parapet (south)

63550

����������

������������

���������������������������������

����������������������������������������

��������������������

��������

��������

������

����������������

��������������������������������������������������������������

4050

3000

������������������������������������������������������������������������������������������������������������������������������������������������

LIVING ROOM/DINING

BEDROOM 2

BEDROOM 1 BEDROOM 2

����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

������������

������������������������������������������������������������������������������������������������������������������������������

��������������������������

������������

����������������������������������������������������

PATIO

conc. slab on polythene d.p.c on 50mm sand binding on 150 compacted hardcore refer to eng. drawings

conc. roof slab with waterproof membrane on screed

parapet wall behind

3900

150

2846

.415

3.6

900

882

1200

3700

200

gypsum ceiling

2650

200

gypsum ceiling

2082

������������������������������������������������������������������������������������������������������

2700

150

4050

LIVING ROOM/ DINING

12

34

56

78

900

900

3338

.1

conc. slab on polythene d.p.c on 50mm sand binding on 150 compacted hardcore refer to eng. drawings

200mm thk retaining wall to eng details

200mm thk. retaining wall to eng. details

400 x 75 thk. (mm) conc.coping all round top ofparapet to detail later

400 x 75 thk. (mm) conc.coping all round top ofparapet to detail later

external stair wall behind�

Roof Floor Level

62650

900

Top of parapet

63550

�������

First Floor Level 1

58450

Ground Floor Level

55600

First Floor Level 2

59650

BATH

KITCHEN

1200

3000

2850

1200

2400

2950

650

532

1500

832

1200

2032

������������������������������������������

closet

conc. slab on polythene d.p.c on 50mm sand binding on 150 compacted hardcore refer to eng. drawings

conc. roof slab with waterproof membrane on screed

parapet wall behind

gypsum ceiling

gypsum ceiling

free standing wallrendered and painted

CORR.

3900

LIVING/DINING

150

2850

900

BEDROOM #2

free standing wall rendered and painted

window canopy to detail later (type)

300

Roof Floor Level

62650

900

Co-rd limited

Page 19: Architecture Portfolio 2009

BrievesApartments

150

150

50ø m.s pipe

6mm thk. m.s plate

nuts and bolts equally spaced

Canopy: Detl. 2Scale: 1:5

Canopy: Detl. 3Scale: 1:5

50

50

50mm ø m.s pipe

6mm thk. m.s flat

50mm ø m.s pipe

6mm ø thk. m.s flat50mm ø m.s pipe

R 25

R 15

60°

50mm ø m.s pipeDETL. 1

DETL. 2 DETL. 3

24ga. galvanize

25 x 50(mm) r.h.s

50mm øm.s. pipe

300

425

Canopy: End ElevationScale: 1:10

Page 20: Architecture Portfolio 2009

Co-rd limited

Page 21: Architecture Portfolio 2009

���������

��������

��������

�����

����

����

������������������

������������

�����

������������������

���������

������

������

5400

����������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

���������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

���

������

������

��������

������� ��������

������������������������������ ����������������������

���������������������� ����������������������������

������������������

������������������

�������

��������

��

��������������������

������������������

�������������������������������������

������������������������������������

����������� ����������������������������������������

����������

up

����������

up.

����������

�� ��

���

���

dnstair no 2 stair no 3

�������

��

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

B

A

��������

BERM BERM

BERMBERM

������

��

�������

����������

������

EXTERNAL WORKS PLAN�SCALE: 1:200

��

������������

������������������������������

����������

up

express pak/�compactor to�specs.

3815

3024

4930

BERM

BERM

������������������

������

������������

�����

������������������

����������������������

����

������������������������������

���

����

clean-out catchment

lamp fixture

bench

tap

mattewell

����

LEGEND

����

����������������������

����

����������������������

������������������

3200

1800

5733573354005733 5733 5733 5400

������������������

����

����

5733 5733

������������������

����������������������������������������

������������������

����

57335733

������

�������� berm

��

����

���������

floordrain

6060

r.w.d.p.

r.w.d.p.

r.w.d.p.r.w.d.p.r.w.d.p.

r.w.d.p.r.w.d.p.r.w.d.p.

r.w.d.p.

r.w.d.p.

r.w.d.p.r.w.d.p.

r.w.d.p. r.w.d.p.r.w.d.p. r.w.d.p.

r.w.d.p.�to drain�conc. roof

underground pipe

swail swailswail

swail swail swailswail

swail

swail

��������������������������������������������������

������������������������������������������������������������������������

ground floor level

698

���������������������������������������������������������������������

face of building

metal lath and plastered boarder

EARTH BERM�WITH VEGETATION

EARTH BERM & SIDEWALK DETAIL�SCALE: 1:25�

900 min

grass

450 angle of slop will vary �depending on ground �level10

0

100 mm �conc. curb

50 mm thk. �conc. slab cover

1700

gravel

600 x 600 x 75 mm conc. cover

������������������������������

������������������������������������

������������������������������

������������������������������

���������������������������������

��������������������

600

500

800

171

grano surface

150 150

100mm dia pipe

150mm thk. x 800mm sq conc. box

150mm conc. pavement

CLEAN-OUT CATCHMENT�SCALE: 1:25�

������������������������������������������������������������������������

��������������������������������������������������������

���������������������������������

����������������������������������������������������

��������������������������������������������

���������������

������������

������������������

fine sand

6 mm polyethylene�

35mm sq. r.h.s. frame�with fibreglass grating�infill. Mounted with approx.�75mm space all around

12mm dia. re barwelded to a 75mm x 6 thkm/s plate screwed to wall

ELEVATION OF OPENING IN LOBBY�SCALE = 1:25

floor level

203 thk. blockwall

1779.2

dotted line indicates�bench behind

508

projecting slab1666

964

1233

2" conc. �cap

1373

����������������������������������������������������

������

��������������������������������������������

������������������������������������������������������������

1982

X

��������������

����������������������������������������������������

������

1219

457

��������������

1219 conc slab

fixed grille�

built-in cedar�timber seat

PLAN OF SEAT IN LOBBY �(TYPICAL FOR FIRST.SCCOND & THIRD FLOORS)�SCALE = 1:50

SECTION X-X �(TYPICAL FOR FIRST.SCCOND & THIRD FLOORS)�SCALE = 1:50

floor slab

50 x 100 green heart�fascia with rounded edges

50 x 100 cedar�support quick fixed to wall

50 x 100 cedar�timber slats with rounded�top edge screwed and plugged�to supporing frame

12mm gaps

drip groove�refer to A-102

������� 25

0

964

1373

2" formed conc. cap

610

202.

8

150

line of support

fixed grille

4" conc. wall

120.

00°

120.00°

120.00°

75

75

35 mm sq. �r.h.s frame

6 thk. m.a platequickfixed to wall

12 mm dia.rebar welded to plate

weld

SECTIONAL ELEVATION�SCALE = 1:5 SIDE ELEVATION

SCALE= 1:5

projecting �slab�

projecting �canopy�refer to A-102

projecting �slab�

projecting �slab�

projecting �plastered cornice �refer to A-102

rendered and painted �blockwork

50 x 254 conccoping

610

2743

386147753861

8 9 11

100 mm dia. r.w.d.p.�bracketed to wall

r.w.d.p.

7

SOUTH ELEVATION 8-9�scale: 1:100

611

1521

fixed�grille

fixed�grille

fixed�grille

UWIMilnerHall

������������������������������������������������������������������������������

762

100

1067

��������������������������

��������������������������������������

������������������

300

500

600

50

������������������������������������������������������������������������������

900

100

1200

����������������������������������������

300

600

50

698.4

������������

��������������������������������������

������������

��������������������������������������

������������

�������������������

������������

�������������������

175

175

175

175

38

3838

38

75 752525

175

25

125 125

������������������������������������������

300

600

38

38

125

25mmx50 dtpp framing

25mm mdf door faces �w/ plastic laminate finish�w/ double locks

solid surface counter top

solid surface counter top

25mmx38mm solid surface�bullnose edge

25mm mdf vertical face �w/ plastic laminate finish

25mm mdf shelf�w/ plastic laminate finish

50mm x 100 dtpp frame�w/ painted finish

25mmx38mm solid surface�bullnose edge

25mmx50 dtpp framing

20mmx20mm stop

25mm mdf shelf�w/ plastic laminate finish

20mmx20mm stop

solid surace counter top

solid surface counter top

25mmx38mm solid surface�bullnose edge

25mm mdf vertical face �w/ plastic laminate finish

25mmx38mm solid surface�bullnose edge

25mm mdf drawer face �w/ plastic laminate finish

50mm x 100 dtpp frame�w/ painted finish

25mmx50 dtpp framing

drawers:13mm mdf vertical and�horizontal faces w/ plastic laminate finish

solid surface counter top

solid surface counter top

25mmx38mm solid surface�bullnose edge

25mmx38mm solid surface�bullnose edge

vertical face �see detail

25mmx50 �dtpp framing

Section a-aScale: 1:10

Section c-cScale: 1:10

Section b-bScale: 1:10

������������������������������������������������

������������������������������������������������

��������������������

������������������������������������������������������������������������

����������������

25mm mdf

12 mdf panel w/ aluminium laminate

12mm sq. aluminium rods

12 x 50mm blocking w/ cedar laminate

25mmplywoodbacking

panel

467 300

25mm mdf counter top�w/ 3mm solid surface veneer

Reception CounterScale: 1:25

C-C

SK20

C-C

SK20

A-A

SK

20

A-A

SK

20

B-B

SK

20

dotted line ofcupboard storage

below

B-B

SK

20

dotted line indicates mdf panels w/ aluminium laminate

500

450

dotted line of drawer

storage below

2 no. black plasticgroments fitted in counter top

1966

1700

������������������������������

����������������������������������������

������������������������������

��������������������

��������������������

��������������������

������������������������������

������������������������������

����������������������������������������

������������������������������

����������������������������������������

������������������������������

������������������������������

��������������������

������������������������������

����������������������������������������

����������������������������������������

����������������������������������������

����������������������������������������

3 no. 200 4no.100 6no.150 3no.100 4no.200

laminated panels

12mm wide aluminium rebates

1/2" aluminium channels

Reception Counter Elevation (Flatten)Scale: 1:25

12mm rebate finished w/ cedar veneer

cedar rebates facing strips

����������������������������������������

100

125

620

136

220

cedar laminate facing strips

solid surface counter topcedar facing

1/2" wide aluminiumchannel

project administration

Page 22: Architecture Portfolio 2009

Co-rd limited

Page 23: Architecture Portfolio 2009

KingResidenceproject administration

Page 24: Architecture Portfolio 2009

bamboobus shelter

Page 25: Architecture Portfolio 2009

MCArchitects

Page 26: Architecture Portfolio 2009

St. Annsshop

Page 27: Architecture Portfolio 2009

MCArchitects

Page 28: Architecture Portfolio 2009

177Apartments

Page 29: Architecture Portfolio 2009

MCArchitects