1
DA 4.00 Area calculation diagrams 1:200 @A1 313 Seven Hills Road - Seven Hills copyright cristina gomes 2017 DEVELOPMENT APPLICATION LODGED 14.09.2017 A 01 02 03 04 05 06 07 10 09 08 11 12 13 14 90.0 90.0 87.5 87.5 87.5 85.0 85.0 85.0 82.5 82.5 RL87.00 RL86.75 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m ramp @1:20 RL 86.60 RL 86.60 RL 86.60 RL 86.30 1200 3145 6000 flat RL 86.30 PL RL 85.64 3 x 3m 1000 9000 ramp @1:20 RL 86.75 1540 2070 1735 2070 RL 86.75 2000 2000 5280 flat 1500 1500 725 1010 1500 RL 90.05 1915 RL 90.70 1865 RL 90.70 ramp 1:20 RL 90.3 walkway flat ramp 1:20 3 x 3 min req. pos 16.8 sqm pos 17.90 sqm pos 19.40 sqm pos 18.90 sqm ramp 1:20 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 17 9 strg bedroom bathroom kitchen living 17 9 bedroom bathroom strg kitchen living grass RL 90.05 RL 86.80 CURTILAGE LINE RL 90.05 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 ENTRY ENTRY ENTRY ENTRY bedroom bathroom strg kitchen living 17 9 RL 88.64 RL 89.75 RL 89.75 RL 90.25 RL 90.25 RL 91.10 RL 90.70 bedroom bathroom strg kitchen living 17 9 RL 89.14 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 RL 89.14 RL 88.64 RL 90.05 1615 RL 90.05 RL 90.70 RL 90.70 RL 90.05 RL 90.05 RL 90.70 lift 1400x1600 stairs 1 RL86.75 fall 10° fall 10° RL86.75 RL87.00 4000 1000 5000 5670 2390 1540 3000 2820 2075 5000 5000 5000 5000 5615 2390 1500 3000 3775 850 5050 1000 1500 3095 1900 3000 5000 5000 5000 5000 3775 1575 1625 3600 1500 3095 1900 3015 10875 5000 5765 995 15000 500 16495 RL 90.05 90.0 90.0 87.5 87.5 87.5 85.0 85.0 85.0 82.5 82.5 FSR - level 3 1 01 02 03 04 05 06 07 10 09 08 11 12 13 14 90.0 90.0 80.0 87.5 87.5 87.5 85.0 85.0 85.0 82.5 82.5 RL87.00 RL86.75 00 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m ramp @1:20 RL 86.60 RL 86.60 RL 86.60 RL 86.30 1200 3145 6000 flat RL 86.30 PL RL 85.64 3 x 3m 1000 9000 ramp @1:20 RL 86.75 1540 2070 1735 2070 RL 86.75 2000 2000 5280 flat 1500 1500 725 1010 1500 17 9 ENTRY bedroom bathroom strg kitchen living drying area 1 6 drying area 1 6 drying area 1 6 drying area 1 6 ENTRY bedroom bathroom ldry kitchen living ENTRY bedroom bathroom ldry kitchen living ENTRY bedroom bathroom ldry kitchen living ENTRY bedroom bathroom ldry kitchen living 17 9 ENTRY bedroom bathroom strg kitchen living green roof green roof lift 1400x1600 stairs 1 drying area 4 1 drying area 4 1 drying area 4 1 drying area 4 1 bedroom bathroom ldry / storage study bedroom bathroom ldry / storage study bedroom bathroom ldry / storage study bedroom bathroom ldry / storage study RL 86.60 1610 RL 85.64 RL 85.64 RL 84.54 RL 86.60 RL 85.64 RL 86.75 RL 85.64 RL 85.64 RL 86.75 RL 85.64 RL 86.60 RL 87.70 RL 87.70 RL 87.70 RL 87.70 RL 86.75 RL 86.75 RL 85.64 RL 85.64 RL 87.00 RL 87.00 RL 87.00 RL 87.00 15 01 02 03 04 05 06 07 08 01 09 10 11 12 2420 1955 4590 5000 2790 2210 3000 1900 9160 5000 5000 5000 5000 3100 1595 2400 7400 3900 1000 3750 1050 2400 7400 14800 14700 RL 86.60 RL 86.60 RL 85.64 RL 85.64 RL 86.75 RL 86.75 RL 84.54 CURTILAGE LINE RL 86.75 90.0 90.0 80.0 87.5 87.5 87.5 85.0 85.0 85.0 82.5 82.5 FSR - level 2 2 01 02 03 04 05 06 10 09 08 11 12 13 14 90.0 90.0 87.5 87.5 87.5 85.0 85.0 85.0 82.5 82.5 RL86.75 14 09 09 14 bedroom bathroom ldry bedroom drying area 1 6 RL 84.250 UPPER GARAGE lift 1400x1600 stairs 1 5500 RL 81.650 LOWER GARAGE 1:6.7 1:4 1:8 RL 81.650 4225 300 P01 P02 P03 P09 P05 P06 1000 1000 P07 STORAGE 3775 bedroom bathroom ldry / storage study 500 kerb kerb 3725 500 5800 580 P04 P08 615 CONVEX MIRROR LOCATION RAMP @1:8 RL 84.250 RL 84.250 drying ar RL 83.60 RL 83.60 RL 83.60 RL 82.50 stairs 2 1100 5400 5400 2400 TRAFFIC SIGNAL STOP LINE PROJ. BUILDING ABOVE 16600 9065 1570 100 2795 220 3090 1840 9610 20105 13195 10455 10390 3900 1000 1000 3900 3055 1700 1700 4190 10950 3135 2690 1695 3120 01 02 03 04 05 06 07 08 01 09 10 01 02 03 04 05 06 09 08 AIN WATER TANK OSD TANK REFER TO ENGINEER'S DETAIL MAIL ROOM 90.0 90.0 87.5 87.5 87.5 85.0 85.0 85.0 82.5 82.5 FSR - level 1 (upper garage) 3 Deep Soil calculation Landscape calculation FSR calculation GFA calculation - EXISTING BUILDINGS GFA calculation - NEW TERRACES : 1110.50sqm Dwelling GFA per terrace [a] + [b] Balcony Area [not part of p.o.s] Terrace 1 99.60 sqm - Terrace 2 - Terrace 3 Terrace 4 Terrace 5 4.60 sqm Terrace 6 Terrace 7 Terrace 8 Terrace 9 Terrace 10 - - - - Total 18.80 sqm 99.10 sqm Private Open Space [p.o.s] 16.20 sqm 18.90 sqm 17.90 sqm 19.40 sqm 20.70 sqm 23.60 sqm 16.60 sqm 22.30 sqm 15.60 sqm 18.80 sqm 188.20 sqm upper level [a] lower level [b] 4.60 sqm 4.60 sqm 4.60 sqm 58.90sqm 58.90sqm 58.40sqm 58.40sqm 49.30sqm 49.30sqm 49.30sqm 49.30sqm 40.70sqm 40.70sqm 40.70sqm 40.70sqm 99.10 sqm 99.10 sqm 117.90 sqm 117.90 sqm 117.90 sqm 117.90 sqm 121.00 sqm 121.00 sqm 69.00sqm 69.00sqm 68.60sqm 68.60sqm 68.60sqm 68.60sqm 52.00sqm 52.00sqm Building GFA St. Andrews Church 117.50 sqm Church Hall 87.16 sqm The Old Rectory 382.30 sqm 586.96sqm Total Total GFA 1697.46 sqm Site Area 6127.10 sqm FSR 0.28 : 1 lower than 0.5: 1 All POS comply with the 15 sqm min area required Total Landscape area 3282.00 sqm Site Area 6127.10 sqm % landscape 53% min required 30% Total Deep Soil area 2983.30 sqm Site Area 6127.10 sqm % landscape 48.7 % min required 15% 01 02 03 04 05 06 07 10 09 08 11 12 13 14 92.5 92.5 92.5 92.5 90.0 90.0 90.0 90.0 90.0 80.0 80.0 87.5 87.5 87.5 87.5 85.0 85.0 85.0 85.0 82.5 82.5 82.5 1000 FIREEGREES RL90.50 RL87.00 RL87.00 RL88.00 RL88.00 RL89.70 RL89.70 RL84.40 14 RL86.75 RL85.00 RL84.40 RL83.40 6 RL82.40 6 92.5 92.5 92.5 92.5 90.0 90.0 90.0 90.0 90.0 80.0 80.0 87.5 87.5 87.5 87.5 85.0 85.0 85.0 85.0 82.5 82.5 82.5 1:20 1:8 1:5 1:6.7 1:20 RL84.800 RL90.400 RL90.650 RL 90950 3x3m 3x3m 3x3m 3x3m 3x3m 3x3m ramp@1:20 RL86.60 RL86.60 RL86.60 RL86.30 1200 3145 6000 flat RL86.30 PL RL85.64 3x3m 1000 9000 ramp@1:20 RL86.75 1540 2070 1735 2070 RL86.75 2000 2000 5280 flat 2630 1500 1500 725 1010 1500 1:20 1:8 1:5 1:6.7 1:20 RL84.800 RL90.400 RL90.650 RL 90950 RL90.05 1915 1000 RL90.95 RL91.28 WALKWAY 1:74 RL90.70 RL90.37 1865 RL90.70 ramp1:20 RL90.37 walkwayflat ramp1:20 3x3minreq. pos 16.8sqm bollardstostopcarsfrom drivingalongpedestrian area 2630 pos17.90sqm pos19.40sqm pos18.90sqm ramp1:20 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 17 9 strg bedroom bathroom kitchen living 17 9 bedroom bathroom strg kitchen living grass grass RL90.05 RL86.80 RL90.93 RL90.60 CURTILAGE LINE CURTILAGE LINE RL90.05 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 ENTRY ENTRY ENTRY ENTRY bedroom bathroom strg kitchen living 17 9 RL88.64 RL89.75 RL89.75 RL90.25 RL90.25 RL91.10 RL90.70 bedroom bathroom strg kitchen living 17 9 RL89.14 bedroom bathroom strg bathroom bedroom balcony balustrade 17 9 RL89.14 RL88.64 RL90.05 1615 RL90.05 RL90.70 RL90.70 RL90.05 RL90.05 RL90.70 lift 1400x1600 stairs1 RL86.75 RL87.00 fall 10° fall 10° RL86.75 RL87.00 4000 1000 5000 5670 2390 1540 3000 2820 2075 5000 5000 5000 5000 5615 2390 1500 3000 3775 850 5050 1000 1500 3095 1900 3000 5000 5000 5000 5000 3775 1575 1625 3600 1500 3095 1900 3015 10875 5000 5765 995 15000 500 16495 RL90.05 CURTILAGELINE 3x3minreq. pos16.8sqm buildingline buildingline buildingline buildingline CURTILAGELINE 21855 5775 5405 5405 5270 5705 5705 4835 5705 4700 270 5765 16495 1500 12100 3420 3090 3840 4950 12115 1345 8085 fall fall 10° fall fall 10° fall fall fall fall fall fall RL86.75 FSR DIAGRAM LANDSCAPE DIAGRAM 01 02 03 04 05 06 07 10 09 08 11 12 13 14 92.5 92.5 92.5 92.5 90.0 90.0 90.0 90.0 90.0 80.0 80.0 87.5 87.5 87.5 87.5 85.0 85.0 85.0 85.0 82.5 82.5 82.5 1000 FIREEGREES RL90.50 RL87.00 RL87.00 RL88.00 RL88.00 RL89.70 RL89.70 RL84.40 14 RL86.75 RL85.00 RL84.40 RL83.40 6 RL82.40 6 1:20 1:8 1:5 1:6.7 1:20 RL84.800 RL90.400 RL90.650 RL 90950 3x3m 3x3m 3x3m 3x3m 3x3m 3x3m ramp@1:20 RL86.60 RL86.60 RL86.60 RL86.30 1200 3145 6000 flat RL86.30 PL RL85.64 3x3m 1000 9000 ramp@1:20 RL86.75 1540 2070 1735 2070 RL86.75 2000 2000 5280 flat 2630 1500 1500 725 1010 1500 1:20 1:8 1:5 1:6.7 1:20 RL84.800 RL90.400 RL90.650 RL 90950 RL90.05 1915 1000 RL90.95 RL91.28 WALKWAY 1:74 RL90.70 RL90.37 1865 RL90.70 ramp1:20 RL90.37 walkwayflat ramp1:20 3x3minreq. pos 16.8sqm bollardstostopcarsfrom drivingalongpedestrian area 2630 pos17.90sqm pos19.40sqm pos18.90sqm ramp1:20 CURTILAGELINE 3x3minreq. pos16.8sqm buildingline buildingline buildingline buildingline CURTILAGELINE 21855 5775 5405 5405 5270 5705 5705 4835 5705 4700 270 5765 16495 1500 12100 3420 3090 3840 4950 12115 1345 8085 fall fall 10° fall fall 10° fall fall fall fall fall fall RL86.75 DEEP SOIL DIAGRAM AREA SCHEDULE LEGEND: GFA - new Terraces Private Open Space Balcony Area Landscape Area Deep Soil Area LEGEND BASIX CERTIFICATE This development application includes a Basix Certificate The Basix commitments are briefly described below. Please refer to the BASIX certificate for more detailed information BASIX COMMITMENTS - Dwellings WATER (b) The applicant must plant indigenous or low water use species of vegetation throughout the area of land specified for the dwelling in the "Indigenous species" column of the table below, as private landscaping for that dwelling. (This area of indigenous vegetation is to be contained within the "Area of garden and lawn" for the dwelling specified in the "Description of Project" table). (e) The applicant must not install a private swimming pool or spa for the dwelling, with a volume exceeding that specified for it in the table below. (g) The pool or spa must be located as specified in the table. (h) The applicant must install, for the dwelling, each alternative water supply system, with the specified size, listed for that dwelling in the table below. Each system must be configured to collect run-off from the areas specified (excluding any area which supplies any other alternative water supply system), and to divert overflow as specified. Each system must be connected as specified. [Refer to Basix Certificate table on page 7] ENERGY (b) The applicant must install each hot water system specified for the dwelling in the table below, so that the dwelling's hot water is supplied by that system. If the table specifies a central hot water system for the dwelling, then the applicant must connect that central system to the dwelling, so that the dwelling's hot water is supplied by that central system. (f) This commitment applies to each room or area of the dwelling which is referred to in a heading to the "Natural lighting" column of the table below (but only to the extent specified for that room or area). The applicant must ensure that each such room or area is fitted with a window and/or skylight. (j) The applicant must install the photovoltaic system specified for the dwelling under the “Photovoltaic system” heading of the “Alternative energy” column of the table below, and connect the system to that dwelling's electrical system. [Refer to Basix Certificate table on page 8 and 9] THERMAL COMFORT (g) Where there is an in-slab heating or cooling system, the applicant must: (aa) Install insulation with an R-value of not less than 1.0 around the vertical edges of the perimeter of the slab; or (bb) On a suspended floor, install insulation with an R-value of not less than 1.0 underneath the slab and around the vertical edges of the perimeter of the slab. (h) The applicant must construct the floors and walls of the development in accordance with the specifications listed in the table below. [Refer to Basix Certificate table on page 10 and 11] BASIX COMMITMENTS - common areas and central systems/facilities WATER (b) The applicant must install (or ensure that the development is serviced by) the alternative water supply system(s) specified in the "Central systems" column of the table below. In each case, the system must be sized, be configured, and be connected, as specified in the table. (c) A swimming pool or spa listed in the table must not have a volume (in kLs) greater than that specified for the pool or spa in the table. [Refer to Basix Certificate table on page 12] ENERGY (c) The applicant must install the systems and fixtures specified in the "Central energy systems" column of the table below. In each case, the system or fixture must be of the type, and meet the specifications, listed for it in the table. [Refer to Basix Certificate table on page 13] BASIX COMMITMENTS

Architectural Drawings - FSR , Landscape and DeepSoil ... · 1:5 1:6.7 RL 84.800 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m ramp @1:20 RL 86.60 RL 86.60 RL 86.60 RL 86.30 1200 3145

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Architectural Drawings - FSR , Landscape and DeepSoil ... · 1:5 1:6.7 RL 84.800 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m 3 x 3m ramp @1:20 RL 86.60 RL 86.60 RL 86.60 RL 86.30 1200 3145

DA 4.00Area calculation diagrams1:200 @A1

313 Seven Hills Road - Seven Hills

copyright cristina gomes 2017

DEVELOPMENT APPLICATION

LODGED14.09.2017

A

010203040506

07

100908

11121314

90.0

90.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0 82.5

82.5

RL87.00RL86.75

1:6.7RL

84.8

00

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

ramp @1:20

RL

86.6

0

RL

86.6

0

RL 86.60

RL

86.3

0

1200

3145 6000flat

RL

86.3

0

PL

RL

85.6

4

3 x 3m

1000

9000ramp @1:20

RL

86.7

5

1540

2070

1735

2070

RL 86.75

2000

2000

5280flat

1500 1500

725

1010

1500

1:6.7RL

84.8

00

RL 90.05

1915

RL 90.70

RL 90.37

1865

RL 90.70

ramp 1:20

RL 90.37

walkway fl

at

ramp 1:20

3 x

3 m

in re

q.

pos16.8 s

qm

pos 17.90 sq

m

pos 19.40 sq

m

pos 18.90 sq

m

ramp 1:20

0304050607080910

1112

1314

1516

17

17

9

strg

bedroom

bathroom

kitchen

living

17

9

bedroombathroom

strg

kitchen

living

grass

RL 90.05

RL 86.80

CURTILAGE LINE

CURTILAGE LINE

RL 90.05

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

ENTRY

ENTRY

ENTRY

ENTRY

bedroom

bathroom

strg

kitchen

living

17

9

RL 88.64

RL 89.75RL 89.75

RL 90.25 RL 90.25

RL 91.10

RL 90.70

bedroom

bathroom

strg

kitchen

living

17

9

RL 89.14

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

RL 89.14

RL 88.64

RL 90.05

1615

RL 90.05

RL 90.70

RL 90.70

RL 90.05

RL 90.05

RL 90.70

lift

1400x1600

stairs

1

RL86.75

fall

10°

fall

10°

RL86.75

RL87.00

4000

1000

5000

5670

2390

1540

3000

2820

2075

5000

5000

5000

5000

5615

2390

1500

3000

3775

850

5050

1000

1500

3095

1900 3000

5000 5000 5000 5000

3775

1575

1625

3600

1500

3095

1900 3015

1087

5

5000 5765

995

1500

050

0

1649

5

RL 90.0590.0

90.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0 82.5

82.5

FSR - level 31

010203040506

07

100908

11121314

90.0

90.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0 82.5

82.5

RL87.00RL86.75

1:5 1:6.7RL

84.8

00

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

ramp @1:20

RL

86.6

0

RL

86.6

0

RL 86.60

RL

86.3

0

1200

3145 6000flat

RL

86.3

0PL

RL

85.6

4

3 x 3m

1000

9000ramp @1:20

RL

86.7

5

1540

2070

1735

2070

RL 86.75

2000

2000

5280flat

1500 1500

725

1010

1500

17

9

ENTRY

bedroom

bathroom

strg

kitchen

living

drying area

1

6

drying area

1

6

drying area

1

6

drying area

1

6

ENTRY

bedroom

bathroom

ldry

kitchen

living

ENTRY

bedroom

bathroom

ldry

kitchen

living

ENTRY

bedroom

bathroom

ldry

kitchen

living

ENTRY

bedroom

bathroom

ldry

kitchen

living

17

9

ENTRY

bedroom

bathroom

strg

kitchen

living

green roofgreen roof

lift

1400x1600

stairs

1

drying area

4

1

drying area

4

1

drying area

4

1

drying area

4

1

bedroom

bathroom

ldry / st

orage

study

bedroom

bathroom

ldry / st

orage

study

bedroom

bathroom

ldry / st

orage

study

bedroom

bathroom

ldry / st

orage

study

RL 86.60

1610

RL 85.64 RL 85.64

RL 84.54

RL 86.60

RL 85.64

RL 86.75

RL 85.64

RL 85.64

RL 86.75

RL 85.64

RL 86.60

RL 87.70

RL 87.70

RL 87.70

RL 87.70

RL 86.75 RL 86.75

RL 85.64 RL 85.64

RL 87.00

RL 87.00

RL 87.00

RL 87.00

15

0102030405060708

01

0910

1112

2420

1955

4590

5000

2790

2210

3000

1900

9160

5000

5000

5000

5000

3100

1595

2400

7400

3900 1000

5000 5000 5000 5000 5000 5000

3750

1050

2400

7400

1480

0

1470

0

RL 86.60RL 86.60

RL 85.64RL 85.64

RL 86.75RL 86.75

RL 84.54

CURTILAGE LINE

CURTILAGE LINE

RL

86.7

5

90.0

90.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0 82.5

82.5

FSR - level 22

010203040506

07

100908

11121314

90.0

90.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0 82.5

82.5

RL87.00RL86.75

14

0909

14

bedroom

bathroom

ldry

bedroom

drying area

1

6

RL 84.250

UPPER GARAGE

lift

1400x1600

stairs

1

5500

RL 81.650

LOWER GARAGE

1:6.71:4

1:8

RL

81.6

50 4225

300

RL 84.500

P01 P02 P03

P09

P05 P06

1000

1000

P07

STORAGE

3775

RL

84.5

00

bedroom

bathroom

ldry / storage

study

500

kerb

kerb

3725

500

5800

580

P04

P08

615

CONVEX MIRROR LOCATION

RA

MP

@1:

8

RL 84.250

RL 84.250

drying areaRL 83.60RL 83.60

RL 83.60

RL 82.50

stairs 2

1100

5400

5400

2400TRAFFIC SIGNAL

STOP LINE

PROJ. BUILDING ABOVE

1660

0

9065

1570100

2795

220

3090

1840

9610

20105

1319

5

1045510390

2790 2110 2105 2795

3900 1000 1000 3900

3055

1700

1700

4190

1095

0

3135

2690

1695

3120

0102030405060708

0109

10

010203040506

07

0908

RA

IN W

ATE

R T

AN

K

OSD TANKREFER TO ENGINEER'S DETAIL

MAIL ROOM

90.0

90.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0 82.5

82.5

FSR - level 1 (upper garage)3

Deep Soil calculation

Landscape calculation

FSR calculation

GFA calculation - EXISTING BUILDINGS

GFA calculation - NEW TERRACES :

1110.50sqm

Dwelling GFA per terrace[a] + [b]

Balcony Area[not part of p.o.s]

Terrace 1 99.60 sqm -Terrace 2 -Terrace 3Terrace 4Terrace 5 4.60 sqmTerrace 6Terrace 7Terrace 8Terrace 9

Terrace 10

--

--

Total 18.80 sqm

99.10 sqm

Private Open Space[p.o.s]

16.20 sqm

18.90 sqm17.90 sqm

19.40 sqm20.70 sqm23.60 sqm16.60 sqm22.30 sqm15.60 sqm18.80 sqm188.20 sqm

upper level[a]

lower level[b]

4.60 sqm4.60 sqm4.60 sqm

58.90sqm

58.90sqm

58.40sqm58.40sqm

49.30sqm49.30sqm49.30sqm49.30sqm

40.70sqm40.70sqm40.70sqm40.70sqm

99.10 sqm99.10 sqm117.90 sqm117.90 sqm117.90 sqm117.90 sqm121.00 sqm121.00 sqm

69.00sqm69.00sqm

68.60sqm68.60sqm68.60sqm68.60sqm52.00sqm52.00sqm

Building GFASt. Andrews Church 117.50 sqm

Church Hall 87.16 sqmThe Old Rectory 382.30 sqm

586.96sqmTotal

Total GFA 1697.46 sqmSite Area 6127.10 sqm

FSR 0.28 : 1 lower than 0.5: 1

All POS complywith the 15 sqm

min area required

Total Landscape area 3282.00 sqmSite Area 6127.10 sqm

% landscape 53% min required 30%

Total Deep Soil area 2983.30 sqmSite Area 6127.10 sqm

% landscape 48.7 % min required 15%

010203040506

07

100908

11121314

92.5

92.5

92.5

92.5

90.0

90.0

90.0

90.0

90.0

80.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0

85.0

82.5

82.5

82.5

1000

FIRE EGREESRL90.50

RL87.00

RL87.00RL88.00RL88.00RL89.70RL89.70

RL84.40

14

RL86.75

RL85.00

RL84.40 RL83.406 RL82.406

92.5

92.5

92.5

92.5

90.0

90.0

90.0

90.0

90.0

80.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0

85.0

82.5

82.5

82.5

1:20

1:8 1:5 1:6.7

1:20

RL

84.8

00

RL

90.4

00

RL

90.6

50

RL

9095

0

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

ramp @1:20

RL

86.6

0

RL

86.6

0

RL 86.60

RL

86.3

0

1200

3145 6000

flat

RL

86.3

0

PL

RL

85.6

4

3 x 3m

1000

9000

ramp @1:20

RL

86.7

5

1540

2070

1735

2070

RL 86.75

2000

2000

5280

flat

2630

1500 1500

725

1010

1500

1:20

1:8 1:5 1:6.7

1:20

RL

84.8

00

RL

90.4

00

RL

90.6

50

RL

9095

0

RL 90.05

1915

1000

RL

90.9

5

RL

91.2

8

WALKWAY

1:74

RL 90.70

RL 90.37

1865

RL 90.70

ramp 1:20

RL 90.37

walkway fl

at

ramp 1:20

3 x

3 m

in r

eq.

pos

16.8 sq

m

bollards to stop cars fromdriving along pedestrian

area

2630

pos 17.90 sqm

pos 19.40 sqm

pos 18.90 sqm

ramp 1:20

0304050607080910

1112

1314

1516

17

17

9

strg

bedroom

bathroom

kitchen

living

17

9

bedroombathroom

strg

kitchen

living

grass

grass

RL 90.05

RL 86.80

RL 90.93

RL 90.60

CURTILAGE LINE

CURTILAGE LINE

RL 90.05

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

ENTRY

ENTRY

ENTRY

ENTRY

bedroom

bathroom

strg

kitchen

living

17

9

RL 88.64

RL 89.75RL 89.75

RL 90.25 RL 90.25

RL 91.10

RL 90.70

bedroom

bathroom

strg

kitchen

living

17

9

RL 89.14

bedroom

bathroom

strg

bathroom

bedroom

balconybalustrade

17

9

RL 89.14

RL 88.64

RL 90.05

1615

RL 90.05

RL 90.70

RL 90.70

RL 90.05

RL 90.05

RL 90.70

lift

1400x1600

stairs 1

RL86.75

RL87.00

fall

10°

fall

10°

RL86.75

RL87.00

4000

1000

5000

5670

2390

1540

3000

2820

2075

5000

5000

5000

5000

5615

2390

1500

3000

3775

850

5050

1000

1500

3095

1900 3000

5000 5000 5000 5000

3775

1575

1625

3600

1500

3095

1900 3015

1087

5

5000 5765

995

1500

050

0

1649

5

RL 90.05

CURTILAGE LINE

3 x

3 m

in r

eq.

pos 16.8 sq

m

building line

building line

building line

building line

CURTILAGE LINE

21855

5775

5405

5405

5270

5705 5705 4835 5705 4700 270 5765

1649

5

1500

1210

0

3420

3090

3840

4950

1211

5

1345

8085

fall 5°

fall

10°

fall 5°

fall

10°

fall 5°

fall 5° fall 5°

fall 5°

fall 5°

fall 5°

RL86.75

FSR DIAGRAM LANDSCAPE DIAGRAM

010203040506

07

100908

11121314

92.5

92.5

92.5

92.5

90.0

90.0

90.0

90.0

90.0

80.0

80.0

87.5

87.5

87.5

87.5

85.0

85.0

85.0

85.0

82.5

82.5

82.5

1000

FIRE EGREESRL90.50

RL87.00

RL87.00RL88.00RL88.00RL89.70RL89.70

RL84.40

14

RL86.75

RL85.00

RL84.40 RL83.406 RL82.406

1:20

1:8 1:5 1:6.7

1:20

RL

84.8

00

RL

90.4

00

RL

90.6

50

RL

9095

0

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

3 x 3m

ramp @1:20

RL

86.6

0

RL

86.6

0

RL 86.60

RL

86.3

012

00

3145 6000

flat

RL

86.3

0

PL

RL

85.6

4

3 x 3m

1000

9000

ramp @1:20

RL

86.7

5

1540

2070

1735

2070

RL 86.75

2000

2000

5280

flat

2630

1500 1500

725

1010

1500

1:20

1:8 1:5 1:6.7

1:20

RL

84.8

00

RL

90.4

00

RL

90.6

50

RL

9095

0

RL 90.05

1915

1000

RL

90.9

5

RL

91.2

8

WALKWAY

1:74

RL 90.70

RL 90.37

1865

RL 90.70

ramp 1:20

RL 90.37

walkway fl

at

ramp 1:20

3 x

3 m

in r

eq.

pos

16.8 sq

m

bollards to stop cars fromdriving along pedestrian

area

2630

pos 17.90 sqm

pos 19.40 sqm

pos 18.90 sqm

ramp 1:20

CURTILAGE LINE

3 x

3 m

in r

eq.

pos 16.8 sq

m

building line

building line

building line

building line

CURTILAGE LINE

21855

5775

5405

5405

5270

5705 5705 4835 5705 4700 270 5765

1649

5

1500

1210

0

3420

3090

3840

4950

1211

5

1345

8085

fall 5°

fall

10°

fall 5°

fall

10°

fall 5°

fall 5° fall 5°

fall 5°

fall 5°

fall 5°

RL86.75

DEEP SOIL DIAGRAM

AREA SCHEDULE

LEGEND:

GFA - new Terraces

Private Open Space

Balcony Area

Landscape Area

Deep Soil Area

LEGEND

BASIX CERTIFICATE

This development application includes a Basix Certificate The Basix commitments are briefly described below. Pleaserefer to the BASIX certificate for more detailed information

BASIX COMMITMENTS - Dwellings

WATER(b) The applicant must plant indigenous or low water use species of vegetation throughout the area of land specified for the dwelling in the "Indigenous species" column of the table below, as private landscaping for that dwelling. (This area of indigenous vegetation is to be contained within the "Area of garden and lawn" for the dwelling specified in the "Description of Project" table).(e) The applicant must not install a private swimming pool or spa for the dwelling, with a volume exceeding that specified for it in the table below.(g) The pool or spa must be located as specified in the table.(h) The applicant must install, for the dwelling, each alternative water supply system, with the specified size, listed for that dwelling in the table below. Each system must be configured to collect run-off from the areas specified (excluding any area which supplies any other alternative water supply system), and to divert overflow as specified. Each system must be connected as specified.[Refer to Basix Certificate table on page 7]

ENERGY(b) The applicant must install each hot water system specified for the dwelling in the table below, so that the dwelling's hot water is supplied by that system. If the table specifies a central hot water system for the dwelling, then the applicant must connect that central system to the dwelling, so that the dwelling's hot water is supplied by that central system.(f) This commitment applies to each room or area of the dwelling which is referred to in a heading to the "Natural lighting" column of the table below (but only to the extent specified for that room or area). The applicant must ensure that each such room or area is fitted with a window and/or skylight.(j) The applicant must install the photovoltaic system specified for the dwelling under the “Photovoltaic system” heading of the “Alternative energy” column of the table below, and connect the system to that dwelling's electrical system.[Refer to Basix Certificate table on page 8 and 9]

THERMAL COMFORT(g) Where there is an in-slab heating or cooling system, the applicant must:(aa) Install insulation with an R-value of not less than 1.0 around the vertical edges of the perimeter of the slab; or(bb) On a suspended floor, install insulation with an R-value of not less than 1.0 underneath the slab and around the vertical edges of the perimeter of the slab.(h) The applicant must construct the floors and walls of the development in accordance with the specifications listed in the table below.[Refer to Basix Certificate table on page 10 and 11]

BASIX COMMITMENTS - common areas and central systems/facilities

WATER(b) The applicant must install (or ensure that the development is serviced by) the alternative water supply system(s) specified in the "Central systems" column of the table below. In each case, the system must be sized, be configured, and be connected, as specified in the table.(c) A swimming pool or spa listed in the table must not have a volume (in kLs) greater than that specified for the pool or spa in the table.

[Refer to Basix Certificate table on page 12]

ENERGY(c) The applicant must install the systems and fixtures specified in the "Central energy systems" column of the table below. In each case, the system or fixture must be of the type, and meet the specifications, listed for it in the table.

[Refer to Basix Certificate table on page 13]

BASIX COMMITMENTS