Archer Engineering Drilling Facilities Engineering Presented by: Peter Nygaard Andersen, VP Engineering. Stavanger, 12 April 2018

Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

Archer Engineering Drilling Facilities Engineering

Presented by: Peter Nygaard Andersen, VP Engineering.

Stavanger, 12 April 2018

Page 2: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

2

The cooperation between Semco and Archer extend

our delivery model and services provided

Semco and Archer has complementary capabilities,

competence and expertise

Semco providing significant knowledge and experience

especially on the “vessel” part of MODUs

Archer providing comprehensive experience on drilling

and fluid systems across most OEM systems

Joining forces entitles us to offer a one stop shop

solution providing full services

Cooperation Semco & Archer – the One Stop Shop

Page 3: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

3

About Archer - Scale and reach

Over 5,000

employees

Own & operate

81 land rigs Operate 45 platforms

Own & operate 2 Modular

Drilling Rigs (MDR)

Surface Capabilities

• Integrated services

• Offshore Platform Drilling

• Offshore MODU management

• Offshore Modular Rigs

• Land Drilling / Rigs

• Rentals

• Engineering

• Survey & Inspection

Well integrity

& intervention

• Oil Tools

• Wireline

• Diagnostics

Page 4: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

4

Archer Global Footprint

Page 5: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

5

40 years of Drilling Facility

Design & Construction

Experience

Archer Engineering

150 Discipline Engineers

We combine operations experience, engineering excellence and asset management expertise to deliver highly effective and efficient drilling

and well solutions

• Engineering

• Drilling Facility Engineering & Modification Projects

• Multi Discipline Engineering Green & Brownfield

• Topside Engineering & Modification Projects

• Studies, Survey, FEED & Detail Engineering

• Project Management

• Construction Supervision

• Installation, Commissioning, Coordination

• Inspection and rope access

• Segments

• Fixed Platform facilities

• Jack up's

• Floating units

Page 6: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

6

HPU Mudlab BOP controls

Reel station Shakers

XT Reel

MDR Heimdal Subsea BOP PP&A Concept

WO Reel

Transfer System

DES Demolition

Drilling Facility Engineering Projects Ongoing or recently executed

• Oversight and acceptance for new land based Arctic

Class Drilling Rig.

• Derrick Windwall Cladding Design

• Delivery of new BOP and Control System

• Replacement of Iron Roughneck

• CRI Upgrade and modification

• Shaker upgrades, replacement and study’s

• Upgrade of frequency converter system

• Decommission of drilling rig

• Derrick / Drill floor Light Upgrade / NoX

• Pipe handler cabin replacement and upgrade

• Casing Tong replacement

• Drill String Compensator replacement

• Standpipe & Choke manifold piping design

• Conductor Tensioning System

• Mud Pump Removal & Replacement

• Install TDS Torque Tube and Tope Drive

• HPU upgrade

• Re-certification Subsea Equipment – Diverter, Raiser

• API 4G Derrick Inspections, LOLER & DROPS

Surveys, NDT and Drill pipe and DHT Inspections

• Condition assessment on Drilling Swamp Barge in

Nigeria

Page 7: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

7

Tailor-made design and solutions

From design to reality

Solutions

• Special Tool Design

• Client Specific

Equipment

• Lifting Appliances

• Material Handling

• Skidding Systems

• Jacking Structures

• Platform Structures

• Support Frames

• Structural Towers

• Access Platforms

• Riser Lifting Clamps

• Flow Lines

• Drain Lines

• Pipe Support

Equipment

• Process & Storage Tanks

• Pumps & Motors

• Hp Mud Systems

• Bulk & Mixing Equipment

• Solids Control

• Turbines & Compressors

• Winches & Hoists

• Drill Floor Equipment

• Bop & Subsea

• Valves

• Reels & Bunkering

• Reinjection Equipment

• Heat Exchangers

Lifting Clamps Access Platform

SDLA Tool

MPD Tower

Bunker Reel system

Gantry & BOP Crane

Page 8: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

8

Project Model Structure Traditional vs Integrated contract model

Traditional Project Structure

• Clients holds and manages multiple contractors

• Multiple Interfaces, contracts and objectives

• Limited opportunity for efficiency, savings

• High demand on Project Manager time/focus

Archer Integrated Project Structure

• Clients retains full control and visibility

• Reduced contracts, interfaces etc.

• Single point contract for main contractor / third

parties

• No duplication or cross over of service offerings

• Reduced Contract/Contractor management

Clients

Project Management

Maintenance/Machinery

Capital Equipment &

OEM’s

Project Controls

Yard Services

Independant

Verification

Body

Engineering Marine Services

Clients

Project Controls

Yard Manage

ment

Inspection

Engineering

Independant

Verification

Body

Capital Equipment &

OEM’s

Machinery Mooring Analysis

Archer

The project model increase the execution capabilities within the Clients project department by utilizing

Archer as project execution partner.

Project

2/3/4

Page 9: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

9

Project Execution Phases Main processes Project Execution/SPS/Reactivation

Pre Study Freeze Scope

Budgeting and

Approval

Procure Long Lead

Items

Procure Packages

Detail. Planning

Follow up OOS Documentat

ion Financial Close-out

Private and Confidential 9

Archer is capable of managing all phases of the project execution

Clients to define process and interface responsibility

Main processes Project Execution Larger Projects/SPS/Reactivation

Pre Study – Develop full project Scope of Work

Freeze Scope – Project Scope of work to define budget/schedule is frozen, additional work is emergent

Budgeting & Approval - collate estimates and quotes for Scope – AFE approval – Project Sanction

Procure LL Items – Order & Expedite for on time delivery, QA thru manufacturing process and stages

Procure Packages – Develop and issue specifications and instructions for equipment packages

Detail Planning – maintain plan to ensure schedule, update with progress and verified delivery dates

Follow Up – Expedite all equipment and services continually – visual evidence

OOS Period – Execute all scopes not possible during operation (minimise OOS Impact)

Documentation – Gather/collate all project documentation for commissioning close-out phase

Financial close-out – confirm all vendor and service invoices are closed

Page 10: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

10

Our Mission for Clients – Benefits using Archer

Benefits using Archer

Clients don’t have to ramp up/down their own organization to secure necessary and

qualified project execution capabilities.

Both Drilling and Engineering Competence in-house - accustomed to working with drilling

organizations and drilling crews to ensure user involvement / control

Highly skilled alternative to the OEM in many areas

Efficiency and cost improvements programme executed – allowing cost effective services

Ensure successful project executions and minimize yard-stay duration

Optimize execution whilst rigs are in operation

Ensure fit for purpose solutions, at cost and according to schedule

Single point of contact

10

Page 11: Archer Engineering - Semco Maritime...Apr 12, 2018  · About Archer - Scale and reach Over 5,000 employees Own & operate 81 land rigs Operate 45 platforms Own & operate 2 Modular

Summary

11

Thank You.