Archer Engineering Drilling Facilities Engineering
Presented by: Peter Nygaard Andersen, VP Engineering.
Stavanger, 12 April 2018
2
The cooperation between Semco and Archer extend
our delivery model and services provided
Semco and Archer has complementary capabilities,
competence and expertise
Semco providing significant knowledge and experience
especially on the “vessel” part of MODUs
Archer providing comprehensive experience on drilling
and fluid systems across most OEM systems
Joining forces entitles us to offer a one stop shop
solution providing full services
Cooperation Semco & Archer – the One Stop Shop
3
About Archer - Scale and reach
Over 5,000
employees
Own & operate
81 land rigs Operate 45 platforms
Own & operate 2 Modular
Drilling Rigs (MDR)
Surface Capabilities
• Integrated services
• Offshore Platform Drilling
• Offshore MODU management
• Offshore Modular Rigs
• Land Drilling / Rigs
• Rentals
• Engineering
• Survey & Inspection
Well integrity
& intervention
• Oil Tools
• Wireline
• Diagnostics
4
Archer Global Footprint
5
40 years of Drilling Facility
Design & Construction
Experience
Archer Engineering
150 Discipline Engineers
We combine operations experience, engineering excellence and asset management expertise to deliver highly effective and efficient drilling
and well solutions
• Engineering
• Drilling Facility Engineering & Modification Projects
• Multi Discipline Engineering Green & Brownfield
• Topside Engineering & Modification Projects
• Studies, Survey, FEED & Detail Engineering
• Project Management
• Construction Supervision
• Installation, Commissioning, Coordination
• Inspection and rope access
• Segments
• Fixed Platform facilities
• Jack up's
• Floating units
6
HPU Mudlab BOP controls
Reel station Shakers
XT Reel
MDR Heimdal Subsea BOP PP&A Concept
WO Reel
Transfer System
DES Demolition
Drilling Facility Engineering Projects Ongoing or recently executed
• Oversight and acceptance for new land based Arctic
Class Drilling Rig.
• Derrick Windwall Cladding Design
• Delivery of new BOP and Control System
• Replacement of Iron Roughneck
• CRI Upgrade and modification
• Shaker upgrades, replacement and study’s
• Upgrade of frequency converter system
• Decommission of drilling rig
• Derrick / Drill floor Light Upgrade / NoX
• Pipe handler cabin replacement and upgrade
• Casing Tong replacement
• Drill String Compensator replacement
• Standpipe & Choke manifold piping design
• Conductor Tensioning System
• Mud Pump Removal & Replacement
• Install TDS Torque Tube and Tope Drive
• HPU upgrade
• Re-certification Subsea Equipment – Diverter, Raiser
• API 4G Derrick Inspections, LOLER & DROPS
Surveys, NDT and Drill pipe and DHT Inspections
• Condition assessment on Drilling Swamp Barge in
Nigeria
7
Tailor-made design and solutions
From design to reality
Solutions
• Special Tool Design
• Client Specific
Equipment
• Lifting Appliances
• Material Handling
• Skidding Systems
• Jacking Structures
• Platform Structures
• Support Frames
• Structural Towers
• Access Platforms
• Riser Lifting Clamps
• Flow Lines
• Drain Lines
• Pipe Support
Equipment
• Process & Storage Tanks
• Pumps & Motors
• Hp Mud Systems
• Bulk & Mixing Equipment
• Solids Control
• Turbines & Compressors
• Winches & Hoists
• Drill Floor Equipment
• Bop & Subsea
• Valves
• Reels & Bunkering
• Reinjection Equipment
• Heat Exchangers
Lifting Clamps Access Platform
SDLA Tool
MPD Tower
Bunker Reel system
Gantry & BOP Crane
8
Project Model Structure Traditional vs Integrated contract model
Traditional Project Structure
• Clients holds and manages multiple contractors
• Multiple Interfaces, contracts and objectives
• Limited opportunity for efficiency, savings
• High demand on Project Manager time/focus
Archer Integrated Project Structure
• Clients retains full control and visibility
• Reduced contracts, interfaces etc.
• Single point contract for main contractor / third
parties
• No duplication or cross over of service offerings
• Reduced Contract/Contractor management
Clients
Project Management
Maintenance/Machinery
Capital Equipment &
OEM’s
Project Controls
Yard Services
Independant
Verification
Body
Engineering Marine Services
Clients
Project Controls
Yard Manage
ment
Inspection
Engineering
Independant
Verification
Body
Capital Equipment &
OEM’s
Machinery Mooring Analysis
Archer
The project model increase the execution capabilities within the Clients project department by utilizing
Archer as project execution partner.
Project
2/3/4
9
Project Execution Phases Main processes Project Execution/SPS/Reactivation
Pre Study Freeze Scope
Budgeting and
Approval
Procure Long Lead
Items
Procure Packages
Detail. Planning
Follow up OOS Documentat
ion Financial Close-out
Private and Confidential 9
Archer is capable of managing all phases of the project execution
Clients to define process and interface responsibility
Main processes Project Execution Larger Projects/SPS/Reactivation
Pre Study – Develop full project Scope of Work
Freeze Scope – Project Scope of work to define budget/schedule is frozen, additional work is emergent
Budgeting & Approval - collate estimates and quotes for Scope – AFE approval – Project Sanction
Procure LL Items – Order & Expedite for on time delivery, QA thru manufacturing process and stages
Procure Packages – Develop and issue specifications and instructions for equipment packages
Detail Planning – maintain plan to ensure schedule, update with progress and verified delivery dates
Follow Up – Expedite all equipment and services continually – visual evidence
OOS Period – Execute all scopes not possible during operation (minimise OOS Impact)
Documentation – Gather/collate all project documentation for commissioning close-out phase
Financial close-out – confirm all vendor and service invoices are closed
10
Our Mission for Clients – Benefits using Archer
Benefits using Archer
Clients don’t have to ramp up/down their own organization to secure necessary and
qualified project execution capabilities.
Both Drilling and Engineering Competence in-house - accustomed to working with drilling
organizations and drilling crews to ensure user involvement / control
Highly skilled alternative to the OEM in many areas
Efficiency and cost improvements programme executed – allowing cost effective services
Ensure successful project executions and minimize yard-stay duration
Optimize execution whilst rigs are in operation
Ensure fit for purpose solutions, at cost and according to schedule
Single point of contact
10
Summary
11
Thank You.