23
GABLE HOME BUILDING RESEARCH COUNCIL TAFT HOUSE THOMAS McCORMICK ARCH 231: ANATOMY OF BUILDINGS PROFESSOR RANDALL DEUTSCH T.A. GREG MORSE

ARCH 231 FINAL BOOK DOCUMENTS PDF

Embed Size (px)

Citation preview

GABLE HOME

BUILDING RESEARCH COUNCIL

TAFT HOUSE

TH

OM

AS

McC

OR

MIC

K

AR

CH

23

1: AN

AT

OM

Y O

F B

UIL

DIN

GS

PR

OF

ES

SO

R R

AN

DA

LL

DE

UT

SC

H

T.A

. GR

EG

MO

RS

E

TABLE OF CONTENTSGABLE HOME

SITE PLAN............................................................................................................................................................2-3ELEVATIONS........................................................................................................................................................4-5INTERIOR PLAN...................................................................................................................................................6-7SECTIONS..............................................................................................................................................................8-9

BUILDING RESEARCH COUNCIL

OBSERVED DETAIL............................................................................................................................................11MEASURED DETAIL............................................................................................................................................12

TAFT HOUSE

MODELED DETAIL...............................................................................................................................................14CONSTRUCTION PROCESS...............................................................................................................................15-17

DREAM HOME

REVIT FLOOR PLANS.........................................................................................................................................18REVIT SECTIONS.................................................................................................................................................19REVIT INTERIOR PERSPECTIVE.......................................................................................................................20REVIT EXTERIOR PERSPECTIVE.....................................................................................................................21

GABLE HOME 1

SITE PLAN

GABLE HOME SITE PLAN 1/8"=1'-0"

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

PARKING

WINTER SOLSTICE

SUMMMER SOLSTICE

0 12 4 8

6'-3" 6' 43'-3" 6'-412" 1'-11

2"

11'-1114"

6'-1034"

3'-41316"

3'-51516"

1'-01"6'-412"37'-101

4"3'-9"

5'-41116"

20'-7"

11'-41516"

14'-2 516"

30'-11 316"

28'-71316"

2

SITE PLAN SKETCH

GABLE HOME SITE PLAN SKETCH

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

3

ELEVATIONS

GABLE HOME ELEVATIONS 1/8"=1'-0"

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

SOLAR VOLTAIC PANELS

WATER RETENTION TANKS

ELECTRICAL BOX

ELECTRICAL BOX

ELECTRICAL BOXWATER RETENTION TANKS

WATER RETENTION TANKS

6'-112"

7'-6"

3'-1 116"

9'-3"

4'-1"

2'-112" 4'-11 1

16" 2'-81516" 2'-101

2" 2'-1012" 9'-101

2" 2'-1012" 8'-2" 6'-81

2" 6'-7" 6'-3" 6'-112" 11'-111

4" 5'-5" 4'-478" 4'-45

8" 6'-412" 5'-81

4"

6'-112" 6'-11

2" 2'-10" 7' 5' 8'-5" 14'-938" 8'-0 1

16" 4'-61516" 2'-61

2" 12'-034" 2'-51

2" 4'-7" 3'-41316" 3'-711

16" 12'-034"

4

ELEVATION SKETCH

GABLE HOME ELEVATION SKETCH

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

5

INTERIOR PLAN

GABLE HOME INTERIOR PLAN 1/8"=1'-0"

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

4'-10" 2'-7" 2'-8" 3'-6" 8'-3" 7'-10" 8'-3"

2'-7"

3'-1"

1'-658"

2'-878"

2'-2"

3'-10" 2'-7" 14'-8" 2'-7" 2'-7" 7'-7" 2'-3"

9"

2'-3"

9"

2'-3"

4'-11"

3'BEDROOM HALLWAY

CLOSET

BATHROOM

KITCHEN

LIVING AREA

MICROWAVE OVEN

BREAKER

WATER HEATER

CLOTHES WASHER/DRYER

11'-314"7'-7"9'-9"

2'-10"

2'-1012"

6'-612"

2' 2'-9" 2'-6"

1'-7"

2'-7"

2'-512"

SINK

STOVETOP

2'-2" 2'-2"

1'-11" 1'-11" 2'-558"

REFRIGERATOR

3'-518"

1'-738"

DISH WASHER

6

GABLE HOME INTERIOR PLAN SKETCH

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

INTERIOR PLAN SKETCH 7

SECTIONS

GABLE HOME SECTIONS 1/8"=1'-0"

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

SECTIO

NSEC

TION

ROOF APEX16'-0"

WALL HEIGHT7'-0"

7'

4'-9"

3'-9"

2'-1"

4'-5"

2'-11"

6'

1'-4"

2'-11"

4'-712"

2'-10"

4'-2"

8

SECTION SKETCHES

GABLE HOME SECTION SKETCHES

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

9

BUILDING RESEARCH COUNCIL 10

OBSERVED DETAIL

BUILDING RESEARCH COUNCILOBSERVED DETAIL DRAWING

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

11

MEASURED DETAIL

BUILDING RESEARCH COUNCILMEASURED DETAIL 1:20

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

SCALE: 1:20

0 1 2 4 6

12

34

56

78

9

10

1112

13

14

DOUBLE TOP PLATE

VAPOR BARRIER

2x6 WOOD STUD

VERTICAL BOARD SIDING

BATT INSULATION

CARPET

SUBFLOOR

2x8 FLOOR JOIST

SOLE PLATE

END JOIST

SIDEWALK

DOUBLE SILL PLATE

POLYETHYLENE BARRIER

CONCRETE FOUNDATION

1

2

3

5

4

6

7

8

910

11

12

13

14

12

TAFT HOUSE 13

MODELED DETAIL

TAFT HOUSEMODELED DETAIL

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

14

CONSTRUCTION PROCESS

TAFT HOUSECONSTRUCTION PROCESS

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

Stage 1: Concrete foundation system placed into site. A base of gravel is poured before layers of sand, a mois-ture barrier and the 4 inch concrete slab are installed.

Stage 2: Brick ledge installed on top of concrete retaining walls. Windows placed into brick ledge.

Stage 3: Balloon framing is installed. Floor joists are installed. Firestops are placed in between studs. Over-sized headers installed for first floor window openings. Cripple installed with second floor window headers.

Stage 4: Wood rafter framing installed. Header and fascia installed around rafters.

Stage 6: Ceiling Joists placed between rafters.Insu-lation installed within walls and Ceilings.

Stage 5: Wall sheathing installed before roof sheathing. Louvered vent placed into gable end wall.

15

CONSTRUCTION PROCESS

TAFT HOUSECONSTRUCTION PROCESS

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

Stage 7: Tyvek paper placed on top of plywood sheath-ing. Tyvek paper used for walls while 15 pound as-phalt-saturated felt used for roof.

Stage 8: Windows placed into framing. Stage 9: Asphalt shingle roofing installed above as-phalt-saturated felt.

Stage 10: Horizontal board siding installed into ply-wood sheathing.

Stage 11: Dry wall installed on interior walls. Finishing dry wall panels placed onto ceilings. Wood flooring in-stalled.

16

CONSTRUCTION VIEWS

TAFT HOUSECONSTRUCTION VIEWS

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

Interior View

Exterior view with floor to floor heights.

17

DREAM HOME REVIT FLOOR PLANS

DREAM HOMEREVIT FLOOR PLANS

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

18

DREAM HOME REVIT SECTIONS

DREAM HOMEREVIT SECTIONS

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

19

DREAM HOME REVIT INTERIOR PERSPECTIVE

DREAM HOMEREVIT INTERIOR PERSPECTIVE

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

20

DREAM HOME REVIT EXTERIOR PERSPECTIVE

DREAM HOMEREVIT EXTERIOR PERSPECTIVE

ARCHITECTURE 231RANDALL DEUTSCH

GREG MORSEFALL 2014

THOMAS McCORMICK

21