DETAILS OF THE PROJECTS UNDERTAKEN YEAR 2007 - 2008 Sewage Treatment Plant Saudi Aramco, Rahima (12 mgd)Expansion of Sewage Treatment Plant, RahimaExpansion of Sewage Treatment Plant, Saudi Aramco, Rahima. The existing Sewage Treatment Plant (STP) is located within the Municipality of Rahima, adjacent to existing Saudi Aramco Airport. The Plant serves both Rahima and RasTanura. The scope of this project is to expand the capacity of existing STP from 6.6 MGD to 12 MGD. The contract includes an option to extend the "Tarut Bay Outfall". During all phases of construction the plant will continue to serve normal flow. YEAR 2007 – 2010 Central Processing Facilities (GOSP-4) Expansion of Shaybah Central Processing Facilities (Gas And Oil Separation Plants).

ARAMCO PROJECTS SAUDI ARABIA

Embed Size (px)

Citation preview

Page 1: ARAMCO PROJECTS SAUDI ARABIA

DETAILS OF THE PROJECTS UNDERTAKEN

YEAR 2007 - 2008

Sewage Treatment Plant Saudi Aramco, Rahima (12 mgd)Expansion of Sewage Treatment Plant,

RahimaExpansion of Sewage Treatment Plant, Saudi Aramco, Rahima.

The existing Sewage Treatment Plant (STP) is located within the Municipality of

Rahima, adjacent to existing Saudi Aramco Airport. The Plant serves both

Rahima and RasTanura. The scope of this project is to expand the capacity of

existing STP from 6.6 MGD to 12 MGD. The contract includes an option to

extend the "Tarut Bay Outfall". During all phases of construction the plant will

continue to serve normal flow.

YEAR 2007 – 2010

Central Processing Facilities (GOSP-4) Expansion of Shaybah

Central Processing Facilities (Gas And Oil Separation Plants).

Page 2: ARAMCO PROJECTS SAUDI ARABIA

Nesma & Partners awarded by SNC-Lavalin/Saudi Aramco for the total

construction of GOSPs (Gas/Oil Separation Plants) including all utilities and

support facilities to support the operations such as electricity, instrument air,

nitrogen, water treatment, etc. The project located close to UAE border, is part

of Saudi Aramco’s plan to raise the Kingdom’s crude capacity to 12.5 million

bpd. The expansion is to process new capacity from the onshore oil field and is

aimed to increase the field’s output from 250,000 barrels per day to about

800,000 bpd of extra light Arabian crude. Nesma shall execute the total

construction works including but not limited to all civil and infrastructure,

heavy foundations, buildings, structural steel erection, mechanical/equipment

erection, piping fabrication/erection, heavy lift, electrical, instrumentation,

painting, insulation, pre-commissioning and assistance to final commissioning.

Nesma’s scope is also covered construction of temporary camps and office

facilities for use by SNC-Lavalin and SAUDI ARAMCO designated personnel.

The temporary facilities include portable buildings of accommodations, offices,

common support facilities, recreation and sports facilities, access roads,

landscaping,etc.

YEAR 2011 – 2012 SHADE CORPORATION DAMMAM

Dhahran North Sports Facility. Construction of 2790 sqmtr sports & fitness

Facility in Dharan north. This includes 760 sqmtr Gymanjim, 1030sqmtr

Page 3: ARAMCO PROJECTS SAUDI ARABIA

swimming pool, 300sqmtr fitness room, including locker rooms & 50Vehicles

parking Area. Owner : Saudi Aramco.

YEAR 2011 – 2012 SHADE CORPORATION DAMMAM

North Park Flyover Bridge. Constructed concrete 2 lanes x 4 spans bridge.

This is over existing Dharan Abquaiq highway. Owner : Saudi Aramco.

Page 4: ARAMCO PROJECTS SAUDI ARABIA

SALVA BRIDGE