Parallel Session 1 – Station Design 1
Arak High speed Railway Station
Transport and Mobility Study
M. Zanjanipour, A. Ghanbari, P. Pashin
HSL Project Dep. of RAI
High Speed Rail Expert
Existing
Under construction
Planned
Arak
Iranian Railways
Ridership: 21 millions
System length: 12,998 kilometers
Stations numbers: 360
Freight: 31 million tons
Distance from Arak Station to Tehran: 260
km
RAILWAY SYSTEM AND PROVISIONS
WIDE AREA ANALYSIS
Legend:
Route: Malayer – Teharan - Mashad
Route: Teharan – Ahvaz - Khorramshahr
Arak Station Train Schedule:
2 trains a day | train no. 182, 183
9 trains a day | train no. 118, 119, 130,
131, 132
11 TRAINS A DAY | 7 TRAINS LINES
Train Station
To Tehran
To Tehran
Arak
Province: Markazi Province
Population: 526,182
Area: 55,750 sqm
Length of new line: 117 km
Low income
Residential
Residential
WIDE AREA ANALYSIS
PROJECT LOCATION (TEHRAN-QOM-ARAK HIGH SPEED RAIL)
To Ahvaz
4
EXISTING STATION AND RAILWAYS
1470 m2
Main Station Building
6080 m2
Police Office & Mosque Area
2720 m2
Offices/ Depository
6760 m2
Trains Depot
Residence
Low income
Residence
New
Residence
P
Spontaneous parking lots
Reserved parking lots
P Local roads
Secondary roads
Taxi station Taxi Primary roads
LAND USE ANALYSIS | MAIN FUNCTIONS WIDE AREA ANALYSIS LAND USE ANALYSIS | POINTS OF INTEREST
Persian Gulf Hwy 56
Secondary roads
Primary roads
Railway
Station’s path from Hwy
EXISTING ROAD NETWORK WIDE AREA ANALYSIS
The catchment area (isochronal) analysis maps the
streets covered in 45 minutes by car from the train
station, taking in consideration the current vehicular
traffic within the area.
Most of the city area is covered up to 25 minutes.
CATCHMENT AREA ANALYSIS | BY CAR | MULTIPLE MODES WIDE AREA ANALYSIS
By Bike By Car
0 - 5 min
6 – 10 min
11 – 15 min
By Walk
PHASE 1 : SUGGESTED DESIGN FOR STATION
South part of the city
Residential
The City
The City
South part of the city
Residential
PHASE 2 : FUTURE BUILDING EXPANSION
South part of the
city
Residential
The City
The City
South part of the
city
Residential
PHASE 3 : FUTURE DEVELOPMENT
PHASE 1
Improving both private and public (buses)
transport
Reconfiguration of road access
The proposed new road parallel to Chahar
Sarbaz
The parking area results well connected
with the urban surroundings
A bus terminal, taxi stop and a drop-off/
pick-up area are proposed in the station
forecourt to enhance intermodal
connectivity between rail and other
transport modes
Go to north entry point Existing situation
Proposed Connections
WIDE AREA ACCESSIBILITY ACCESS AND CIRCULATION SYSTEM
P
Station’s exit
towards West
Access to/from
West-South-
East (higway)
Access to/from
East-North
FUTURE DEVELOPMENT
Reconfiguration of the southern access
Proposing a new connection from the
south linking the railway station to the
Persian highway from the station from
the eastward and west ward of road
Linking between the highway and railway
station
Additional parking and drop-off area in
the south part
Go to north entry point Existing situation
Proposed Connections
Pedestrian link
Station’s exit
towards West (higway)
Station’s entrance
from East (higway)
P
P
Station’s exit
towards West (higway)
Access
to/from West
Access to/from
East-North
CIRCULATION SYSTEM ACCESS AND CIRCULATION SYSTEM
Drop-off/ Pick-up path Pedestrian path | Kiss & Ride Bus Taxi
Existing building New building | technical area Existing building New building | technical area
Bus path Taxi path
Existing building New building | technical area Existing building New building | technical area
Bus verification
Existing building New building | technical area
The suggested access system proposal is geometrically
verified against potential critical maneuver to ensure a
sufficient space for car and bus circulation. The analysis is
carried out considering a travel speed between 10 km/h and
15 km/h, for private car 10km/h for buses, turning radius
stands at 10m.
GEOMETRICAL VERIFICATION
12 m
2.5 m
10 m
kerb to kerb
turning radius
Vehicle dimensions
ACCESS AND CIRCULATION SYSTEM
The parking area counts 154 angled parking places, served through a counterclockwise
loop.
PARKING LAYOUT ACCESS AND CIRCULATION SYSTEM
New Building | Technical area