268
AR No. IR No. EIELSON AFB ALASKA NOTES: Administrative Record Cover Sheet

AR No. IR No. EIELSON AFB ALASKAalaskacollection.library.uaf.edu/eafbsc/cd1/AR679-1.pdf · the united states air force . installation restoration program . site safety and health

  • Upload
    lyminh

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

  • AR No.

    IR No.

    EIELSON AFB

    ALASKA

    NOTES:

    Administrative Record

    Cover Sheet

    kfindlayTypewritten Text679

    kfindlayTypewritten Text5702

  • THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM

    SITE SAFETY AND HEALTH PLAN for

    SS67 and WP45/SS57 EIELSON AIR FORCE BASE, ALASKA

    Prepared for: Air Force Civil Engineer Center

    Contract No. W911KB-11-D-0005

    Final

    November 2012

  • THE UNITED STATES AIR FORCE INSTALLATION RESTORATION PROGRAM

    SITE SAFETY AND HEALTH PLAN for

    SS67 and WP45/SS57 EIELSON AIR FORCE BASE, ALASKA

    Prepared for: Air Force Civil Engineer Center

    Contract No. W911KB-11-D-0005

    Final November 2012

  • (intentionally blank)

  • TABLE OF CONTENTS

    SECTION PAGE

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc i HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    ACRONYMS AND ABBREVIATIONS ...................................................................................v

    1.0 INTRODUCTION AND PURPOSE .......................................................................... 1-1

    1.1 PROJECT PURPOSE AND SCOPE .............................................................. 1-2

    1.2 SAFETY AND HEALTH POLICY STATEMENT....................................... 1-3

    2.0 ORIENTATION AND TRAINING............................................................................ 2-1

    2.1 BASIC OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION TRAINING ..................................................................................................... 2-1

    2.1.1 First-Aid and Cardiopulmonary Resuscitation Training..................... 2-1

    2.1.2 Bloodborne Pathogen Training ........................................................... 2-1

    2.2 SITE-SPECIFIC HEALTH AND SAFETY TRAINING............................... 2-2

    2.2.1 Hearing Protection Training................................................................ 2-2

    2.2.2 Respiratory Protection Training.......................................................... 2-2

    2.2.3 Personal Protective Equipment ........................................................... 2-2

    2.2.4 Hazard Communication ...................................................................... 2-3

    2.3 DAILY SAFETY MEETINGS....................................................................... 2-3

    2.4 VISITOR TRAINING..................................................................................... 2-3

    2.4.1 General Requirements......................................................................... 2-3

    2.4.2 Training Requirements........................................................................ 2-4

    2.4.3 Additional Visitor Requirements ........................................................ 2-4

    2.5 SITE SANITATION ....................................................................................... 2-4

    2.6 DISCIPLINARY ACTIONS........................................................................... 2-4

    2.7 SPECIAL MEDICAL TRAINING................................................................. 2-5

    2.8 SUPPLEMENTAL TRAINING ..................................................................... 2-5

    3.0 MEDICAL SURVEILLANCE PROGRAM .............................................................. 3-1

    3.1 MEDICAL SURVEILLANCE ....................................................................... 3-1

    3.2 EMPLOYEE CONSULTATIONS ................................................................. 3-1

    3.3 SUBCONTRACTOR PERSONNEL.............................................................. 3-2

    4.0 SS67 AND WP45/SS57 GENERAL PROJECT TASKS........................................... 4-1

    4.1 PLANNED FIELD ACTIVITIES................................................................... 4-1

    4.1.1 MULTI INCREMENT® and Surface-Water Sampling ........................ 4-1

  • TABLE OF CONTENTS (Continued)

    SECTION PAGE

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc ii HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    4.1.2 Soil Borings .........................................................................................4-2

    4.1.3 Monitoring Well Installation................................................................4-2

    4.1.4 Soil Vapor Sampling............................................................................4-2

    4.2 SS67 AND WP45/SS57 HAZARD ELEMENTS ...........................................4-2

    4.2.1 Wildlife ................................................................................................4-3

    4.2.2 Uneven Terrain and Ice........................................................................4-3

    4.2.3 Weather Conditions .............................................................................4-4

    4.2.4 Chemical Hazards ................................................................................4-4

    4.2.5 Utility Lines .........................................................................................4-5

    4.2.6 Lifting and Moving ..............................................................................4-5

    4.2.7 Heavy Equipment.................................................................................4-5

    4.2.8 Traffic ..................................................................................................4-6

    4.2.9 Fire and Hot Work ...............................................................................4-6

    4.2.10 Garrison Slough and Other Water Bodies ...........................................4-6

    4.2.11 Debris...................................................................................................4-7

    4.2.12 Earthquakes..........................................................................................4-7

    4.2.13 Noise Protection...................................................................................4-7

    4.2.14 Cold and Heat Stress............................................................................4-8

    4.2.15 Darkness During Winter Work ............................................................4-8

    4.2.16 Hand and Power Tools.........................................................................4-9

    4.2.17 Wet Feet ...............................................................................................4-9

    4.2.18 Bloodborne Pathogens .........................................................................4-9

    5.0 PROJECT ORGANIZATION AND RESPONSIBILITIES .......................................5-1

    5.1 SITE MANAGER HEALTH, SAFETY, AND ENVIRONMENT RESPONSIBILITIES ......................................................................................5-1

    5.2 SITE SAFETY AND HEALTH OFFICER RESPONSIBILITIES.................5-2

    5.3 EMPLOYEE RESPONSIBILITIES (JACOBS AND SUBCONTRACTOR) 5-3

    5.4 SUBCONTRACTOR RESPONSIBILITIES...................................................5-4

    5.5 VISITOR RESPONSIBILITIES......................................................................5-5

    6.0 SAFE PLANS OF ACTION........................................................................................6-1

  • TABLE OF CONTENTS (Continued)

    SECTION PAGE

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc iii HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    7.0 HEALTH, SAFETY, AND ENVIRONMENTAL PROCEDURES AND STANDARD OPERATING PROCEDURES ................................................................................... 7-1

    8.0 AIR MONITORING PLAN........................................................................................ 8-1

    9.0 PERSONAL PROTECTIVE EQUIPMENT .............................................................. 9-1

    9.1 HEARING PROTECTION............................................................................. 9-1

    9.2 EYE PROTECTION ....................................................................................... 9-2

    9.3 PROTECTIVE CLOTHING........................................................................... 9-2

    9.4 LEVELS OF PERSONAL PROTECTIVE EQUIPMENT ............................ 9-3

    9.4.1 Modified Level D................................................................................ 9-3

    9.4.2 Level C................................................................................................ 9-3

    10.0 SITE CONTROL ...................................................................................................... 10-1

    10.1 SITE CONTROL PROCEDURES ............................................................... 10-1

    10.2 WORK ZONES............................................................................................. 10-1

    10.3 BUDDY SYSTEM........................................................................................ 10-1

    10.4 COMMUNICATIONS.................................................................................. 10-2

    10.5 SITE SAFETY AND SECURITY................................................................ 10-2

    10.6 EQUIPMENT AND VEHICLE DECONTAMINATION............................ 10-2

    10.7 PERSONNEL DECONTAMINATION ....................................................... 10-3

    10.8 WASTE HANDLING AND DISPOSAL ..................................................... 10-3

    11.0 INSPECTIONS ......................................................................................................... 11-1

    11.1 SITE INSPECTIONS / SAFETY EVALUATION ...................................... 11-1

    11.2 EQUIPMENT INSPECTIONS ..................................................................... 11-1

    11.2.1 Vehicle Inspections ........................................................................... 11-1

    11.2.2 Daily/Shift Inspections and Tests...................................................... 11-2

    11.3 SAFETY OBSERVATION REPORTS........................................................ 11-2

    11.4 SAFE PLAN OF ACTION ASSESSMENT................................................. 11-3

    12.0 EMERGENCY PROCEDURES............................................................................... 12-1

    12.1 HOSPITAL ROUTE ..................................................................................... 12-1

    12.2 EMERGENCY COMMUNICATION.......................................................... 12-1

    12.3 EMERGENCY MEDICAL TREATMENT ................................................. 12-2

  • TABLE OF CONTENTS (Continued)

    SECTION PAGE

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc iv HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    12.4 INCIDENT AND ACCIDENT REPORTING ..............................................12-2

    12.5 EXPOSURE TO BLOODBORNE PATHOGENS .......................................12-3

    12.6 EARTHQUAKE ............................................................................................12-3

    12.7 EVACUATION .............................................................................................12-4

    12.8 SPILL OR RELEASE PROCEDURES.........................................................12-4

    13.0 REFERENCES ..........................................................................................................13-1

    TABLES

    Table 5-1 Project Organization ..................................................................................5-1

    Table 8-1 Air Monitoring Requirements and Action Levels for WP45/SS57 ...........8-3

    ATTACHMENTS

    Attachment A-1 Project-Specific Contacts and Maps

    Attachment A-2 Hazard Communication Program

    Attachment A-3 Hazards Associated with the Contaminants of Potential Concern

    Attachment A-4 Activity Hazard Analysis

    Attachment A-5 Project-Specific Forms

    Attachment A-6 Health, Safety, and Environmental Procedures and Policies (on CD)

    Attachment A-7 Material Safety Data Sheets

    Attachment A-8 Alaska Department of Labor Physical Agent Data Sheets

    Attachment A-9 Response to Comments

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc v HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    ACRONYMS AND ABBREVIATIONS

    ADEC Alaska Department of Environmental Conservation

    AFB Air Force Base

    AFCEC Air Force Civil Engineer Center

    AHA Activity Hazard Analysis

    CFR Code of Federal Regulations

    COPC contaminant of potential concern

    DCE cis-1,2-dichloroethylene

    DRO diesel-range organics

    GRO gasoline-range organics

    HAZWOPER Hazardous Waste Operations and Emergency Response

    HSE Health, Safety, and Environment

    HSEP Health, Safety, and Environmental Procedure

    HSM Health and Safety Manager

    IDW investigation-derived waste

    Jacobs Jacobs Engineering Group Inc.

    LNAPL light nonaqueous-phase liquid

    MI MULTI INCREMENT® (a registered trademark of EnviroStat, Inc.) MIP membrane interface probe

    MSDS Material Safety Data Sheet

    OFR Office of the Federal Register

    OSHA Occupational Safety and Health Administration

    PADS Physical Agent Data Sheet

    PCB polychlorinated biphenyl

    PID photoionization detector

    PM Project Manager

    POL petroleum, oil, and lubricants

    PPE personal protective equipment

    ppm parts per million

    SM Jacobs Site Manager

    SOR Safety Observation Report

    SPA Safe Plan of Action

  • ACRONYMS AND ABBREVIATIONS (Continued)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc vi HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    SSHO Site Safety and Health Officer

    SSHP Site Safety and Health Plan

    TBD to be determined

    TCE trichloroethylene

    USACE U.S. Army Corps of Engineers

    UXO unexploded ordnance

    °F degrees Fahrenheit

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 1-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    1.0 INTRODUCTION AND PURPOSE

    This Site Safety and Health Plan (SSHP) has been prepared by Jacobs Engineering Group Inc.

    (Jacobs) for the Air Force Civil Engineer Center (AFCEC) for field activities related to the

    SS67 and WP45/SS57 source areas at Eielson Air Force Base (AFB), Alaska. This work,

    scheduled to begin in late 2012, will be performed under Contract No. W911KB-11-D-0005,

    Task Order 07, administered by the U.S. Army Corps of Engineers, Alaska District (USACE).

    This SSHP governs the conduct of the work described in the Quality Assurance Project Plan

    Remedial Investigation Source Area SS67 (Air Force Center for Engineering and the

    Environment [AFCEE] 2012a) and the Quality Assurance Project Plan Supplemental

    Remedial Investigation Source Areas WP45/SS57 (AFCEE 2012c) prepared by EA

    Engineering, Science, and Technology, Inc.

    The overall purpose of this SSHP is to create a site health and safety program that effectively

    identifies, evaluates, controls, and reduces health and safety hazards. This SSHP discusses

    issues and procedures to be followed during mobilization, fieldwork, and demobilization. This

    SSHP is written to comply with applicable sections of the Code of Federal Regulations

    (CFR), Title 29, Sections 1904, 1910.120 and 1926.65; Office of the Federal Register (OFR)

    Hazardous Waste Operations and Emergency Response (OFR 2005); and the U.S. Army

    Corps of Engineers (USACE) Safety and Health Requirements Manual EM 385-1-1 (USACE

    2008). The Health and Safety Manager (HSM) and the Site Safety and Health Officer (SSHO)

    are required to be familiar with the following information:

    Applicable federal, state, and local regulations

    Health, Safety, and Environmental Procedures (HSEP) developed by Jacobs (to be available onsite)

    Procedures contained in the work plans for this project (AFCEE 2012b and 2012c)

    Requirements found in the USACE EM 385-1-1 Safety and Health Requirements Manual (USACE 2008)

    This SSHP will be reviewed and updated as necessary to reflect current site conditions and

    operations. Modifications due to changing field conditions will require approval of

    individuals identified in Section 5.0. Copies will be made available to all personnel at the job

    site. Each supervisor, lead person, laborer, operator, and visitor will be held accountable and

  • responsible for working safely and following procedures and guidance set forth in this SSHP.

    The SSHO will be responsible for the onsite implementation of this SSHP.

    1.1 PROJECT PURPOSE AND SCOPE

    This SSHP addresses activities to be conducted at SS67 and WP45/SS57 The scope of work

    includes characterization of sediment contamination at SS67 and characterization of soil,

    groundwater, and soil vapor contamination at WP45/SS57. Work will include

    sediment/soil/groundwater/soil vapor sampling, advancing borings, installation of monitoring

    wells, and screening with a membrane interface probe (MIP). These activities are discussed in

    detail in the work plans (AFCEE 2012b and 2012c).

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 1-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 1.2 SAFETY AND HEALTH POLICY STATEMENT

    Jacobs’ obligation is to provide a safe and secure work environment. It is our goal to take

    safety to the next level … BeyondZero.® Below is the Jacobs Corporate Safety Mission

    Statement.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 1-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 1-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 2-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    2.0 ORIENTATION AND TRAINING

    Prior to the start of activities, all personnel working on this project and any new person

    visiting or conducting work on this project shall be briefed on this SSHP. Personnel shall

    commit to following applicable procedures by signing the Site Project Safety and Health

    Agreement Sign-Off Sheet (Attachment A-5, Exhibit 1), indicating they have been briefed

    and understand the requirements contained in this SSHP.

    Personnel assigned to or regularly entering the project site shall have received the training

    required in accordance with 29 CFR 1910.120 and other Occupational Safety and Health

    Administration (OSHA) regulations, as listed in this section.

    2.1 BASIC OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION TRAINING

    General site workers must have completed the 40-hour Hazardous Waste Operations and

    Emergency Response (HAZWOPER) training course. Onsite management personnel must

    have an additional 8 hours of specialized supervisory training. Workers must have initial

    training or completed refresher training (8 hours) within the past 12 months. Training will be

    documented.

    2.1.1 First-Aid and Cardiopulmonary Resuscitation Training

    At least two onsite employee will be currently certified in first-aid and cardiopulmonary

    resuscitation, with training equivalent to that provided by the American Red Cross.

    2.1.2 Bloodborne Pathogen Training

    Personnel trained in first-aid and expected to administer first-aid will receive training in

    controlling exposures to bloodborne pathogens. This training will address the following

    topics:

    Bloodborne pathogen standards

    Description of the risks of exposure and how bloodborne pathogens are transmitted

    Management and employee responsibilities

  • Protection methods against exposure and decontamination procedures

    Post-exposure procedures

    Labeling and color-coding of infectious waste

    2.2 SITE-SPECIFIC HEALTH AND SAFETY TRAINING

    Site-specific health and safety training will be conducted prior to field activities at each site.

    In particular, the training will stress emergency response procedures and will cover the

    chemical, biological, and physical hazards of the site and site operations.

    2.2.1 Hearing Protection Training

    Site personnel with the potential for exposure to noise levels exceeding 85 decibels will be

    provided with training that addresses the following topics:

    Physical and psychological effects of high noise exposure

    Noise exposure limits

    Selection, use, and limitations of hearing protection devices

    2.2.2 Respiratory Protection Training

    In accordance with 29 CFR 1910.134, all site personnel required to use respiratory protection

    devices will have received equipment-specific training. This training covers the use,

    limitations, inspection, maintenance, and cleaning of respiratory protection devices required

    for use under the conditions of this SSHP. Site-specific briefing/training will reinforce

    knowledge as necessary.

    2.2.3 Personal Protective Equipment

    In accordance with OSHA 29 CFR 1910, Subpart I (Personal Protective Equipment [PPE]),

    PPE will be provided, used, and maintained in a sanitary and reliable condition. PPE will be

    of construction, design, and material to provide employees protection against known or

    anticipated hazards. PPE will be selected that properly and appropriately fits the employee.

    See Section 9.0 for a discussion of PPE requirements.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 2-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 2.2.4 Hazard Communication

    In order to comply with 29 CFR 1910.120, Hazard Communication, the Hazard

    Communication Program (Attachment A-2) has been established. Employees will be briefed

    on this program and will be provided with a physical copy for review.

    2.3 DAILY SAFETY MEETINGS

    Each day, a safety tailgate meeting for onsite employees (Jacobs, subcontractors, and

    government employees) will be conducted prior to beginning work. The safety tailgate

    meeting will identify potential hazards and risks that may be encountered during that day’s

    activities. Additional discussions in the use of safety equipment, emergency medical

    procedures, emergency assistance notification procedures, Safety Observation Reports (SOR)

    (Attachment A-5), and accident prevention will serve to ensure that the work can and will be

    carried out in a safe and effective manner. The safety tailgate sign-in sheet (in Attachment

    A-5) will be used to document the meeting.

    2.4 VISITOR TRAINING

    Site visitors are defined as persons who are not employed at the project site, who do not

    routinely enter restricted work areas, or whose presence is of short duration (e.g., 1 to 2 days

    at one time or one time per month). Visitors may include client personnel, Jacobs personnel,

    commercial vendors, political representatives, and auditors or inspectors from local, district,

    or federal agencies. Visitors shall be escorted at all times unless they meet the training

    requirements set forth in Section 2.2.

    2.4.1 General Requirements

    The following requirements apply to visitors whose purpose is to observe site conditions or

    field activities without entering the exclusion zone:

    The SSHO will be notified of the nature and duration of the visit before visitors are permitted to enter the site.

    The visitors’ log will be completed, including the individual’s name, date, and the name of the company or agency represented.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 2-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • The site visitor will be escorted by a Jacobs representative at all times while in the area.

    Visitors will comply with specific health and safety requirements, as applicable.

    2.4.2 Training Requirements

    Visitors will receive site-specific training to ensure that potential hazards and risks are

    identified. This training will consist of a safety briefing by the SSHO that will include:

    Location and description of potential hazards and risks

    Required PPE

    Areas of the site that are closed to visitors

    The site evacuation plan and emergency procedures

    Hazard communication

    Other topics as deemed appropriate

    2.4.3 Additional Visitor Requirements

    Site visitors wishing to enter an exclusion zone during site operations will be subject to the

    same medical surveillance and OSHA training requirements as assigned site personnel.

    Documentation of training and medical surveillance will be presented to the SSHO prior to

    entry into the exclusion zone.

    2.5 SITE SANITATION

    Regular housekeeping will occur regularly to provide a clean and uncluttered work

    environment. Drinking water will be available onsite for consumption by field personnel.

    Toilets will be either present on site or transportation to an offsite toilet facility will be

    provided as the site is normally an unattended location.

    2.6 DISCIPLINARY ACTIONS

    If an employee fails to comply with established safety rules and regulations as presented in

    this SSHP, or corporate policies and procedures, the individual will be subject to the

    disciplinary actions outlined in the Jacobs personnel policy manual, which may include any of

    the following actions:

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 2-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • Verbal warning

    Written warning

    Suspension with or without pay

    Termination of employment

    The seriousness of the safety infraction and the frequency or past history of the employee’s

    safety violations shall be considered in determining the appropriate disciplinary action.

    2.7 SPECIAL MEDICAL TRAINING

    Special medical training is not anticipated for this project. Such training will be evaluated, as

    necessary, for each work assignment.

    2.8 SUPPLEMENTAL TRAINING

    Supplemental training is not anticipated for this project. Such training will be evaluated, as

    necessary or as required because of changes in site conditions.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 2-5 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 2-6 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 3-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    3.0 MEDICAL SURVEILLANCE PROGRAM

    Jacobs will use the services of an occupational physician with specialized training in

    occupational medicine to oversee the implementation of the medical monitoring program. The

    HSM or a designee will coordinate with the occupational physician to ensure that the

    necessary information is communicated concerning the operations to be performed, PPE

    requirements, and medical monitoring results. Jacobs will rely on the occupational physician

    to determine the medical examination and surveillance requirements.

    3.1 MEDICAL SURVEILLANCE

    Each Jacobs employee is responsible for completing a monthly Hazardous Material Exposure

    and Field Activity Report and for notifying management if an incident or exposure occurs.

    Jacobs Anchorage Health and Safety Office ensures distribution of blank forms to appropriate

    employees, collects completed forms, and forwards completed forms to Corporate HSE for

    review and retention.

    Field personnel shall participate in a medical surveillance program. Field workers will provide

    the SSHO documentation (e.g., a physician’s letter) of their participation in the medical

    program and evidence that they are current. Workers with medical limitations, as well as

    employers of subcontract employees, are responsible for notifying the SSHO of said

    limitations so work tasks will be appropriately assigned. Section 2.0 presents additional

    OSHA and site-specific health and safety training requirements.

    3.2 EMPLOYEE CONSULTATIONS

    Each person in the medical surveillance program will receive a summary letter from the

    physician reporting the results of her/his physical. This letter will confirm that an individual is

    physically qualified to work on the project or will identify the reasons why the individual is

    not qualified.

  • 3.3 SUBCONTRACTOR PERSONNEL

    Subcontractors are required to submit certification of training and medical clearance for all

    personnel prior to mobilization.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 3-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    4.0 SS67 AND WP45/SS57 GENERAL PROJECT TASKS

    The SS67 and WP45/SS57 sites area located on Eielson AFB, approximately 24 miles

    southeast of Fairbanks, Alaska. SS67 is a portion of Garrison Slough that flows from the

    southern portion of Eielson AFB northward eventually exiting across the northern boundary

    of Eielson AFB. The SS67 portion of Garrison Slough passes through the developed portion

    of the base near Building 2350 and is predominantly channelized. WP45/SS57 is located in

    the central, developed portion of Eielson AFB adjacent to the main taxiway and encompasses

    an area of approximately 11 acres.

    4.1 PLANNED FIELD ACTIVITIES

    Fieldwork is anticipated to begin in November 2012. The two sites share several safety

    requirements due to similar environmental and weather conditions. Workers must be familiar

    with work in cold weather, the equipment to be used, and must wear appropriate PPE,

    including hard hats, safety glasses, gloves, high-visibility safety vests, and safety-toe boots.

    For site SS67, fieldwork will consist of collecting MULTI INCREMENT® (MI) sediment

    samples and surface-water samples to evaluate contamination by polychlorinated biphenyls

    (PCB), organochlorine pesticides, and mercury. For site WP45/SS57, fieldwork will consist

    of subsurface screening, drilling to obtain soil cores and install monitoring wells, and soil,

    groundwater, and soil vapor sampling to evaluate trichloroethylene (TCE), cis-1,2-DCE, and

    benzene contamination.

    4.1.1 MULTI INCREMENT® and Surface-Water Sampling

    Planned activities include collection of 40 MI samples and 3 surface-water samples. Sampling

    will involve use of survey equipment and hand tools to locate and collect sediment and soil

    samples from surface and near-surface sediment.

    In 1997, an item of unexploded ordnance (UXO) was identified at SS67 and removed. A

    subsequent geophysical survey in 2007 did not identify any additional UXO. Any metal

    debris identified by the geophysical survey was removed.

  • Prior to site work, reporting on the UXO removal and the subsequent geophysical survey will

    be reviewed by a UXO technician and a geophysicist in relation to HSEP 9.5 Unexploded

    Ordnance (included in Attachment A-6) to determine whether additional surveying is needed.

    4.1.2 Soil Borings

    Planned soil borings are be drilled at 20 locations. Workers will follow the procedures

    outlined in this SSHP for work around heavy equipment (Section 4.2.7).

    4.1.3 Monitoring Well Installation

    Planned monitoring wells will be installed at 26 locations to 25 to 300 feet below ground

    surface (bgs) to extend the current monitoring network. Workers will follow the procedures

    outlined in this SSHP for work around heavy equipment (Section 4.2.7).

    4.1.4 Soil Vapor Sampling

    To evaluate the potential for vapor intrusion, five indoor, five outdoor, and five sub-slab soil-

    gas samples are planned. Ground-penetrating radar will be used to check for utilities before

    installing sub-slab sampling points.

    4.2 SS67 AND WP45/SS57 HAZARD ELEMENTS

    The following potential hazards associated with work at SS67 and WP45/SS57 have been

    identified:

    Wildlife

    Uneven terrain and ice

    Weather conditions

    Chemical hazards

    Utility lines

    Lifting and moving

    Heavy equipment

    Traffic

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • Fire

    Garrison Slough and other water bodies

    Debris

    Earthquakes

    Noise

    Cold and heat stress

    Darkness during winter work

    Hand and power tools

    Wet feet

    Bloodborne pathogens

    4.2.1 Wildlife

    Large mammals such as bear and moose as well as smaller mammals may be found in the

    area. These animals are not accustomed to human presence. Prudence should be exercised in

    any potential animal encounter. Workers will maintain a safe distance from wild animals, and

    avoid surprising them. When a bear is sighted, workers will calmly contact the SSHO, Jacobs

    Site Manager (SM), and/or co-workers in the area as soon as possible. Workers will be

    familiar with and follow HSEP 7.4 Working Safely around Wild Animals (in Attachment A-6).

    4.2.2 Uneven Terrain and Ice

    Work at SS67 will involve walking on wetland terrain that may be hummocky and difficult to

    traverse. Developed terrain at both sites may have hidden obstacles. During the winter

    months, ice may be encountered due to changing weather conditions, stream overflow, spilled

    water, and other reasons. Regardless of the terrain, caution must be taken when traversing

    areas by foot. The specific terrain should be considered when generating safe plans of action

    (SPA) for project tasks. Efforts will be made to use existing paths and trails when possible.

    Strap-on traction aids and/or traction sand may be needed to mitigate ice hazards.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 4.2.3 Weather Conditions

    Due to the potential for rapidly changing weather in Alaska, personnel should be fully advised

    of the need to dress warmly and in layers with a waterproof and/or windproof outer shell, as

    appropriate. Insulated safety footwear will be required for winter work. The need for adequate

    clothing will be discussed at project planning meetings and site safety orientations.

    Another hazard of the rapidly changing weather is that of electrical storms. In accordance

    with USACE EM 385-1-1, when conditions are such that lightning is observed, all drilling

    equipment operations shall cease. A period of 30 minutes between subsequent observations

    shall be observed prior to resuming work.

    Daily limits for working in windy conditions will be set during the morning safety tailgate

    meetings and will vary depending on project task, type of wind (gusty or steady), and wind

    chill factor.

    4.2.4 Chemical Hazards

    The following chemical contaminants are suspected or known to be present onsite:

    Trichloroethylene (TCE)

    cis-1,2-Dichloroethylene (DCE)

    Benzene

    Polychlorinated biphenyls (PCB)

    Organochlorine pesticides

    Mercury

    Attachment A-3 presents the hazards associated with the contaminant listed above.

    Attachment A-7 contains Material Safety Data Sheets (MSDS) for the chemical hazards listed

    above as well as chemicals brought to the site (i.e., gasoline and diesel) and solvents (i.e.,

    methanol) associated with sample preservation. If any additional contaminants are found, the

    field team will ensure that the appropriate MSDSs are available onsite.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 4.2.5 Utility Lines

    Utility lines including electric, communication, water, and sewer may be present in drilling

    areas. These features will be located prior to commencing any drilling or other intrusive

    activities. If utilities are identified in the area, Jacobs HSEP 7.3.3 Utility Clearance (in

    Attachment A-6) will be followed.

    4.2.6 Lifting and Moving

    Using proper technique to lift and move heavy pieces of equipment is important to reduce the

    potential for back injury. The following precautions should be implemented when lifting or

    moving heavy objects:

    If mechanical devices are not available, ask another person to assist you.

    Bend at the knees, not the waist. Let your legs do the lifting.

    Do not twist while lifting.

    Bring the load as close to you as possible before lifting.

    When carrying heavy objects, be sure the path you are taking is free of obstructions and all slip, trip, and fall hazards.

    Use mechanical devices to move objects, investigation-derived waste (IDW), or generators that are too heavy to be moved manually.

    4.2.7 Heavy Equipment

    Working around drilling equipment is one of the more significant hazards associated with

    activities at WP45/SS57. This section addresses the general safety procedures to apply while

    working around heavy equipment.

    Before any machinery or mechanized equipment is used, it will be inspected and certified to

    be in safe operating condition. Jacobs will designate a competent person to be responsible for

    the daily inspection of all machinery and equipment. Only designated and qualified personnel

    will operate machinery and mechanized equipment. Equipment deficiencies that affect safe

    operation will be corrected prior to continuing operation. The SM will determine the

    competent operator prior to the start of any heavy-equipment operations.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-5 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 4.2.8 Traffic

    Personnel will exercise vigilance to avoid vehicles and make eye contact with operators when

    working or passing nearby. If work will be conducted within a road right-of-way, a specific

    traffic control plan will be generated according to the Manual on Uniform Traffic Control

    Devices for Streets and Highways (U.S. Department of Transportation [DOT] 2009).

    4.2.9 Fire and Hot Work

    Fire extinguishers (Type ABC or BC) will be provided for each vehicle used onsite that are

    less than 5 years old and will be inspected prior to placement in a vehicle. Smoking is

    prohibited on the job site. Flammable and combustible liquids (such as fuel) will be stored in

    approved (OSHA and National Fire Protection Association Code 30) containers. A safety can

    or approved system will be used for dispensing flammable or combustible liquids; it will be

    stored in flammable storage cabinets or appropriate storage areas separated from occupied

    buildings. Flammable material will be separated from oxidizers by at least 20 feet. Vehicle

    fueling tanks will be grounded, and there will be bonding between the tank and vehicle being

    fueled. Spills will be cleaned up immediately and then reported, and wastes will be disposed

    of properly.

    Hot work (e.g., welding, brazing, high-speed grinding, and warming tooling with a weed

    burner) will require a permit issued in accordance with the Eielson AFB Fire Prevention

    Program. Permit issuers must be trained by the Fire Prevention Program. Call the Fire

    Prevention Program at 907-377-1293 to arrange for training.

    4.2.10 Garrison Slough and Other Water Bodies

    Personnel entering Garrison Slough will exercise extreme caution. The work area along the

    slough is a low-lying area next to a channelized water course generally about 1 foot deep.

    Hummocky terrain with dead vegetation may cover low spots, increasing the danger of slips,

    trips, and falls. The nearby water course presents a risk of hypothermia during work in the

    winter months if a person falls in. If the water course is frozen over, personnel will not move

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-6 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • out onto the ice where there is a chance that the water beneath may be more than a few inches

    deep.

    Summer sediment sampling may encompass stretches of the Chatanika River, Piledriver

    Slough, the Chena River, and/or another body of water to be identified in the final Quality

    Assurance Project Plan for SS67. Such work will be guided by Jacobs HSEP 15.3 Work Over

    or Adjacent to Water (in Attachment A-6). Near-shore sediment sampling in water up to about

    1 foot deep while wearing waders is probable. Key safety features of such work include

    wearing an appropriate personal flotation device, avoiding areas of strong current, having a

    throwable rescue line, and using the buddy system. If work over water is necessary (e.g., from

    a small boat), a detailed activity hazard analysis (AHA) for that activity will be developed

    before mobilizing for that work.

    4.2.11 Debris

    Sharp objects including glass, metal, and wood debris may be present around the sites and

    near several of the off-site monitoring wells. Employees should be cognizant of these

    potential hazards and mitigate them as they are identified.

    4.2.12 Earthquakes

    Earthquakes are the most likely natural disaster on Eielson AFB. Personnel will be familiar

    with the emergency evacuation routes and contacts provided in Attachment A-1. Muster

    points and procedures will be covered at site-specific safety orientations and reviewed

    periodically during daily safety tailgate meetings. After the earthquake has subsided, contact

    the Jacobs Anchorage home office and inform them of the status of the team.

    4.2.13 Noise Protection

    Noise in excess of 85 decibels is expected during use of drill rigs, soil borings, and

    monitoring well installation. Foam ear plugs and ear muffs will be available. Employees

    should be cognizant of these potential hearing hazards via the AHA/SPA process and mitigate

    them as necessary.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-7 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 4.2.14 Cold and Heat Stress

    The SS67 and WP45/SS57 sites are located in the interior near Fairbanks, Alaska. Early

    winter temperatures average -2 to +12 degrees Fahrenheit (°F) with extremes of -45 to +49°F,

    and winter storms can bring wind and precipitation. Employees should be aware of the

    fluctuations in climatic conditions and dress themselves in the appropriate clothing beneath

    their PPE, including but not limited to thermal underwear, hats, gloves, jacket, insulated

    safety-toe boots, and other winter gear.

    During summer work, ambient temperatures above 80°F are common. Employees wearing

    impervious coveralls, Tyvek® suits, or similar protective equipment should be aware of the

    potential risk of heat stress.

    When ambient air temperature falls below 30F or above 80F, the SSHO will monitor and

    recommend work/rest regimens to the SM. Work/rest regimens will be based upon the

    guidelines in the Threshold Limit Values for Chemical Substances and Physical Agents and

    Biological Exposure Indices (American Conference of Government Industrial Hygienists

    2006). Additional guidance is provided by Jacobs HSEPs 11.4 Cold Stress Control and 11.05

    Heat Stress Control (in Attachment A-6).

    4.2.15 Darkness During Winter Work

    Artificial lighting will be needed during morning and afternoon hours for outdoor work. As a

    point of reference, on 1 December, sunrise is at 10:17 and sunset is at 14:58, providing 4

    hours 41 minutes of relatively strong illumination, and twilight provides an additional 2 hours

    and 30 minutes of weaker light. Artificial lighting includes personal light-emitting diode

    headlamps, battery- or propane-powered lanterns, light plants powered by diesel generators,

    and similar devices.

    To maximize worker visibility in darkness, upper-body outerwear will include reflective

    strips. For winter work, the base color of the outerwear may be black (most visible against

    snow) or high-visibility yellow, orange, or pink.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-8 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 4.2.16 Hand and Power Tools

    Tools shall be inspected and in good working condition prior to being brought onto the project

    site. The use of power tools may be required during fieldwork. The proper tool should always

    be selected for the specific task. Shields, guards, and other safety mechanisms should always

    be left in place and operational. Use of power tools will be in accordance with the operating

    manual and manufacturer’s instructions. Tools will be inspected prior to use to protect against

    breakage and potential injury.

    4.2.17 Wet Feet

    Personnel entering Garrison Slough may wear rubber boots or waders (safety toes not

    required). This footwear should be inspected prior to use for absence of leaks and proper fit.

    4.2.18 Bloodborne Pathogens

    Employees shall minimize the risk of exposure to bloodborne pathogens by practicing a

    combination of good personal hygiene, proper PPE, and safe work practices.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-9 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 4-10 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 5-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    5.0 PROJECT ORGANIZATION AND RESPONSIBILITIES

    This section identifies project organization and personnel responsibilities for the management

    and implementation of this SSHP. It is the responsibility of each person to ensure that project

    personnel comply with safety rules and requirements. The following assignments have been

    established to assist with the maintenance of a safe project site:

    Table 5-1 Project Organization

    Organization Title Name Telephone USACE Contracting Officer’s Representative Scott Kendall 907-753-5661 USACE Project Manager Meseret Ghebresllassie 907-753-2670 AFCEC Project Manager Pat Roth 907-552-7893

    USAF Program Coordinator Kelly McGovern 907-751-3350 Project Manager Kevin Maher 907-751-3429 Health and Safety Manager Randall Jones 907-751-3332

    Site Manager Sarah Belway 907-356-1280

    Site Safety and Health Officer* TBD Technical Lead Katie Bloom 907-751-3360 Project Geologist Dave Ward 907-751-3389 Lead Sampler Ida Petersen 907-451-0550

    Jacobs

    Project Chemist David Summerville 907-751-3342

    Note: TBD = to be determined *SSHO resume and qualifications will be provided to USACE for review.

    The Jacobs Project Manager (PM) has overall responsibility for coordinating with the HSM to

    ensure that the project assignment goals are completed in a manner consistent with this SSHP.

    The SM or SSHO will be the on-site designated competent persons while work is occurring.

    5.1 SITE MANAGER HEALTH, SAFETY, AND ENVIRONMENT RESPONSIBILITIES

    The SM shall have completed training outlined in Section 2.0 Orientation and Training. The

    SM has the following responsibilities:

    Understand Jacobs Health, Safety, and Environment (HSE) policies and procedures and this SSHP. Site management may, if the need arises, apply additional HSEPs or more stringent work practices.

  • Effectively communicate and implement HSE policies and procedures, and the information contained within this SSHP.

    Provide the resources necessary to maintain a safe and healthful work environment and ensure implementation of HSE policies and procedures.

    Assign clear responsibilities to achieve a safe and healthful work environment.

    Verify that subordinates and subcontractors are executing these responsibilities properly.

    Enforce HSEPs and issue disciplinary actions and/or contractual actions when required.

    Ensure that HSE deficiencies identified in audits and inspections are promptly corrected.

    Implement Jacobs’ BeyondZero® process.

    5.2 SITE SAFETY AND HEALTH OFFICER RESPONSIBILITIES

    The SSHO reports administratively to the SM and functionally to the Jacobs Alaska

    Operations HSM. The credentials of the SSHO will be submitted for USACE review. As a

    member of the site management staff, the SSHO has the following responsibilities:

    Support and advise site management in its duty to implement HSE policies and procedures.

    Ensure the adequacy of Jacobs HSEPs to address site hazards.

    Assess compliance with HSE policies and procedures, promptly communicating concerns and recommendations to the SM for action.

    Take immediate action on any imminent danger observed.

    Review and approve PPE, safety equipment, and first-aid supplies.

    Educate site management in the application of HSE policies and procedures.

    Ensure HSE orientation of site employees and subcontractor personnel.

    Ensure prompt and adequate treatment for injured employees and subcontractor personnel.

    Ensure adequate investigation and analysis of accidents and incidents (non-injury and injury).

    Provide HSE information for the education of management, supervision, and employees concerning:

    - Accident analysis (cause, trends, results, and corrective action); - Analysis of inspection results and needed corrective actions; - Safe work procedures; and - HSE training requirements.

    Communicate and promote HSE excellence recognition programs.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 5-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • Ensure preparation, submittal, and/or maintenance of required HSE recordkeeping documentation such as inspection reports, training records, SPAs, SORs, injury logs, and accident investigation reports.

    Provide HSE evaluations of employees and supervisors to management as requested.

    5.3 EMPLOYEE RESPONSIBILITIES (JACOBS AND SUBCONTRACTOR)

    Employee acceptance of the HSE policies and procedures is the ultimate key to success of the

    HSE program. Each Jacobs and subcontractor employee has the following responsibilities:

    Comply with procedures established for his/her safety and health and for preservation of the environment.

    Assist management and supervision in the positive development of coworker attitudes toward HSE and workplace morale.

    Suggest improvements in methods or procedures to prevent incidents and protect the environment.

    Stop, or bring attention to management, any unsafe acts or conditions and any potentially harmful environmental practices.

    Immediately correct imminent danger situations (e.g., exposure to falls from elevations, electrocution hazards, exposure to unprotected excavations).

    Notify supervisor when there is insufficient understanding of: - Task(s) to be performed; - HSEPs; or - Assigned safety equipment.

    Promptly report to supervisor personnel or property incidents or accidents, no matter how minor.

    Learn the approved HSE safe practices for each work task and practice them.

    Ask for assistance from the supervisor or the HSE department when unsure of a work task or its safe practice.

    Participate in and maintain an active interest in the HSE program.

    Be attentive to safety discussions led by the supervisor and request explanations of points not understood.

    Never bypass the function of a safety device.

    Immediately flag safety device malfunctions to warn others of the hazard and promptly report the malfunction to the appropriate supervisor.

    Promptly report any potential work-related injury or illness to the appropriate supervisor, no matter how minor the injury.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 5-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • Never attempt to perform a job alone when good judgment indicates assistance is needed.

    Inspect, use, and maintain the PPE provided.

    Never participate in clowning, scuffling, practical joking, or horseplay of any kind on the job.

    Be cautious in walking or moving around the work area to avoid slips, trips, or falls. Be especially cautious when weather conditions create a potentially slippery walking surface. Running is prohibited.

    Plan work and try to anticipate all potential hazards.

    Observe safe practices off the job as well as on the job.

    5.4 SUBCONTRACTOR RESPONSIBILITIES

    Subcontractors shall perform the following specific duties:

    Follow the requirements set forth in this SSHP.

    Attend Supervising for Safety training, preferably at Jacobs prior to mobilization, but at a minimum before site work commences.

    Attend a site-specific orientation.

    Agree to abide by this SSHP by signing the Site Project Safety and Health Agreement Sign-Off Sheet (Attachment A-5, Exhibit 1) before working onsite. This sign-off sheet will be retained by the SSHO.

    Provide the SSHO with MSDSs and physical agent data sheets (PADS) copies for any hazardous chemicals brought onsite or physical exposures related to the subcontractor’s activities onsite.

    Provide the SSHO with copies of required training certifications and medical authorizations to work onsite, including those required by 29 CFR 1910.120(e) and (f) (OFR 2005).

    Develop SPAs that address specific hazards (e.g., underground utilities, traffic control) associated with tasks to be performed for each phase of work, including developing and providing specific work procedures to Jacobs for review of potential hazards.

    Ensure that workers are trained in safe and proper use of tools they may use.

    Appoint an onsite Competent Safety Representative for each job site.

    Provide necessary PPE to employees and ensure its proper use.

    Maintain necessary records and submit required reports.

    Conduct daily safety briefings.

    Obtain work permits as required.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 5-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • Conduct safety inspections on a daily basis, report discrepancies using the SOR form, and promptly correct unsafe conditions.

    Conduct regular inspections of equipment. Defective or unsafe equipment must be immediately repaired or red-tagged and taken out of service.

    Provide inspection documentation and corrective actions to the SSHO on a daily or other agreed upon basis.

    Provide subcontract information and subcontractor safety program requirements, as necessary.

    The SM will inform the subcontractor foreman or leader of any safety and health violations.

    The SSHO, SM, or any other Jacobs employee can direct the subcontractor to cease work if

    conditions are imminently dangerous. Work may resume when the unsafe condition is

    corrected and approved by the SSHO or SM. Repeated violations could cause termination of

    the subcontract.

    5.5 VISITOR RESPONSIBILITIES

    A visitor entering a controlled area at the site must:

    Provide the SSHO with copies of required training certifications and medical authorizations, as required by 29 CFR 1910.120 (e) and (f) (OFR 2005);

    Provide the SSHO with MSDS and PADS copies for any hazardous chemicals brought to the site by the visitor and physical agents caused by the visitor’s activities; and

    Comply with the provisions of this SSHP.

    Visitors must obtain clearance from the SSHO and sign the visitor check-in log before

    entering controlled areas. Visitors will receive a job-specific safety briefing and will be

    escorted at all times in controlled areas. Visitors in areas requiring PPE must have the

    appropriate training and PPE to gain entry. Jacobs is not responsible for distributing or

    obtaining PPE for visitors.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 5-5 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 5-6 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 6-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    6.0 SAFE PLANS OF ACTION

    AHAs (Attachment A-4) have been developed in accordance with the USACE Safety and

    Health Requirements Manual (USACE 2008). These AHAs may not depict actual site

    conditions. As personnel undertake specific activities, SPAs will be developed after

    identifying actual site conditions and hazards. The SPA process will verify that protective

    measures are in place to mitigate incidents and that required resources are available for the

    specific activities. The SPAs will be developed by all parties involved in the activities (e.g.,

    Jacobs and subcontractor personnel).

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 6-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 7-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    7.0 HEALTH, SAFETY, AND ENVIRONMENTAL PROCEDURES AND STANDARD OPERATING PROCEDURES

    This SSHP brings together site- and task-specific corporate procedures (Jacobs HSEPs and

    project-specific standard operating procedures) and CFR requirements to create a concise and

    relevant document designed for usability by members of the project team. In case of conflict

    among the corporate procedures, the most stringent shall apply. The Jacobs HSEPs, located in

    Appendix D-6 and on JNet, present typical situations and hazards for frequently executed

    project tasks. HSEPs should be consulted when building an SPA for a task; if an HSEP does

    not exist, the SPA will require particular attention to detail.

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 7-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 8-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    8.0 AIR MONITORING PLAN

    Under supervision of the SSHO, air monitoring will be conducted where contaminant-bearing

    vapors or dust (Section 4.2.4), lead dust, or petroleum, oil, and lubricants (POL) may be

    present. Table 8-1 provides air monitoring requirements and action levels for the WP45/SS57

    site; no breathing hazards are anticipated at the SS67 site. The type and extent of monitoring

    will depend upon site-specific conditions and the contaminants encountered at the sites. If a

    change in conditions is observed at either site, additional monitoring may be required.

    Breathing-zone as well as areal monitoring will be conducted to verify that the field team is

    using appropriate types and levels of PPE. Air monitoring results will be documented in the

    field logbooks or on monitoring forms. Monitoring instruments will be calibrated in

    accordance with manufacturer instructions. Calibrations will be documented in the field

    logbooks or on calibration forms.

    Field crews will use a photoionization detector (PID) equipped with a 10.6-electron-volt lamp

    as the primary method of monitoring. Based on historical monitoring data, the PID is

    considered protective of site personnel. This method is not considered complete but is the

    most readily available indicator of organic vapors in the atmosphere. Prior to PID use,

    background levels must be established by monitoring outside the exclusion zone or controlled

    area and upwind of the site. The PID reads in units of parts per million (ppm), and the

    readings should be sustained for one minute to determine exposure.

    Although the PID method is not sensitive enough to detect harmful levels of benzene, benzene

    has not been detected directly in the breathing zone at WP45/SS57. If the PID detects organic

    vapors (readings greater than 1 ppm above background) in the breathing zone at a site where

    benzene is a known contaminant of concern, the breathing zone shall be tested with a direct-

    reading instrument for benzene. If benzene is detected, personnel will wear passive

    dosimeters and will modify procedures in accordance with Table 8-1.

    Section 9.4 of this document provides general PPE recommendations and describes the

    various levels of respiratory protection. The AHAs contained in this SSHP (see Attachment

    A-4) address the required PPE for potential exposure for specific activities. Conditions that

  • exceed action levels in Table 8-1 will require an upgrade of PPE until monitoring

    demonstrates otherwise. The SSHO, with the assistance of trained field personnel, will

    identify these conditions.

    Laboratory analysis will be considered when specific contaminants of concern have been

    identified, or no other method is available to monitor worker exposure. If samples are to be

    submitted to a laboratory, a blank sample filter will be submitted for quality control purposes.

    Results of the monitoring must be communicated to workers formally within 15 working days

    after receipt of the results. Off-site analysis is not anticipated for this project.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 8-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 8-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    Table 8-1 Air Monitoring Requirements and Action Levels for WP45/SS57

    Instrument and Target

    Gas Tasks Action Levels PPE or Response Frequency

    1 Calibration2

    PID for VOCs (except methane), minimum 10.6 electron volts, calibrated with isobutylene

    All tasks 0-10 ppm breathing zone (check for benzene @ 1 ppm) 10-25 ppm breathing zone 25-50 ppm breathing zone >50 ppm breathing zoneMeasurements are relative to background

    Level D Level C Level B; stop and re-evaluate Stop work; re-evaluate

    Monitor the breathing zone at the beginning of operations and whenever site conditions change. Levels C and B require continuous monitoring.

    Daily

    Direct-reading instrument or colorimetric tubes for benzene

    All tasks 25 ppm breathing zone

    Level D, 5 minutes Level C Level B; stop and re-evaluate Stop work; re-evaluate

    Monitor if VOCs are detected in the breathing zone at greater than 1 ppm. Passive dosimeters will be used if benzene is detected.

    Daily; for tubes. Check the pump for leaks prior to use.

    Combustible gas meter

    As required

    >10% lower explosive limit (Oxygen must be >15 percent for the lower explosive level reading to be accurate.)

    Stop work; re-evaluate (explosion hazard)

    Continuous monitoring of a confined space. Screening during excavation or before performing hot work if combustible gases could be present in more than trace concentrations.

    Daily

    Oxygen meter Confined space entry

    23.5%

    Provide alternate air source (Level B) Explosion hazard, stop work, re-evaluate

    Screening before entering confined space.

    Daily

    Notes: 1 Air monitoring shall be documented in field logbooks or on monitoring forms. 2 Calibrations shall be documented in the field logbooks or on calibration forms. Calibrate before first use and check calibration

    at the end of the day or if readings seem questionable. For definitions, see the Acronyms and Abbreviations section.

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 8-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 9-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    9.0 PERSONAL PROTECTIVE EQUIPMENT

    Workers are required to protect themselves from chemical and physical hazards, which for

    this project are described in Sections 4.2.1 through 4.2.17. In accordance with OSHA 29 CFR

    1910, Subpart I (Personal Protective Equipment), appropriate PPE will be provided for each

    worker, properly sized, and used and maintained in a sanitary and reliable condition. PPE will

    be of design, material, and construction to protect workers from known or anticipated hazards.

    In general, field personnel shall wear the following PPE when onsite:

    Safety glasses with side shields or wrap-around design

    Hard hat

    Safety-toed boots

    High-visibility vest

    Gloves appropriate for the task

    Additional PPE (neoprene boots, impervious gloves, Tyvek® coveralls) may be required for

    specific tasks or if conditions change. Additional information is contained in Jacobs HSEPs

    13.6 Eye and Face Protection, 13.3 Head Protection, 13.5 Foot Protection, and 13.4 and

    Protection (all in Attachment A-6).

    9.1 HEARING PROTECTION

    Adequate hearing protection is required in all areas that may expose workers to high levels of

    noise. This includes work areas around drill rigs and various other forms of noise-generating

    equipment. Loud noises are considered to be any noise over 85 decibels. From an arm’s

    length away, if you have to raise your voice to be heard, you may need hearing protection.

    Hearing protection includes one or a combination of the following:

    Engineering controls (where feasible)

    Ear plugs

    Ear muffs

  • 9.2 EYE PROTECTION

    Eye protection (safety glasses with side shields or wrap-around design) is required in all work

    areas. Eye protection may include the following devices:

    Safety glasses with side protection (basic protection; the minimum required when onsite)

    Chemical goggles (splash, dust, and foreign-object protection for the eyes)

    Face shields with safety glasses or goggles (splash, dust, and flying-particle protection for the whole face)

    Additional details and types of eye protection are described in Jacobs HSEP 13.6 Eye and

    Face Protection and may be needed for unanticipated tasks (e.g., welding).

    Fogging is a known problem of eye protection that is exacerbated by cold weather. Mitigation

    measures include applying an anti-fog treatment to the lenses or shield and selecting safety

    glasses that provide maximal ventilation while still meeting industry standards.

    9.3 PROTECTIVE CLOTHING

    Clothing sufficient to protect workers from contact with substances such as petroleum or heat

    and cold is required. When gross contamination is encountered (i.e., during drilling and

    sampling), clothing required for preventing contact with hazardous substances may include

    the following items:

    Rain gear or Tyvek® coveralls (poly-coated for liquid contact)

    Neoprene boots or poly-coated Tyvek® booties

    Nitrile gloves, nitrile gloves over cotton gloves, or leather gloves over nitrile gloves

    Cut-resistant gloves (e.g., when using a self-retracting utility knife or handling opened core sleeves)

    Additional details and types of hand protection are described in Jacobs HSEP 13.4 Hand

    Protection.

    Hands are difficult to keep warm when working in extremely cold weather. Mitigation

    measures include engineering controls to create a warmer workspace (e.g., portable shelters

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 9-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • with heaters), the use of chemical heating packs inside gloves (and boots), and taking warm-

    up breaks as necessary to maintain dexterity.

    9.4 LEVELS OF PERSONAL PROTECTIVE EQUIPMENT

    Activities at SS67 and WP45/SS57 will most likely be conducted using modified Level D

    protection. Level C may be used if action levels are exceeded (Table 8-1), but this is highly

    unlikely. If air monitoring results indicate that Level B or higher is needed, then the work

    procedures will be re-evaluated and modified to reduce exposure before continuing.

    9.4.1 Modified Level D

    Modified Level D PPE will be used for most fieldwork conducted for this project. A work

    uniform affording minimal contaminant protection is needed, for nuisance levels only. The

    following constitute modified Level D equipment and may be used as appropriate:

    Work clothes (e.g. coveralls)

    Task-appropriate gloves

    Safety-toe boots

    Boots, outer, chemical-resistant (disposable) (optional, as applicable)

    Boot-covers, outer, chemical-resistant (disposable) (optional, as applicable)

    Safety glasses with side protection (chemical splash goggles or face shield as applicable)

    Hard hat

    High-visibility outer wear (vest or jacket)

    Bug jacket (optional, for summer work in vegetated areas)

    Escape mask (optional, as applicable)

    Additionally, workers’ clothing will need to provide adequate protection from cold during

    winter work.

    9.4.2 Level C

    Level C PPE is not anticipated to be required during this field effort but may be used at the

    discretion of the SSHO or if action levels (Table 8-1) are exceeded. Level C is appropriate

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 9-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • when the concentration(s) and type(s) of airborne substance(s) are known and the criteria for

    using air purifying respirators are met. The following equipment added to the modified

    Level D ensemble constitutes Level C PPE:

    Full-face or half-mask air-purifying respirator (National Institute of Occupational Safety and Health [NIOSH]-approved) with cartridges appropriate for the contaminants encountered

    Hooded chemical-resistant clothing (overalls, two-piece chemical-splash suit, disposable chemical-resistant overalls) (optional, as applicable)

    Gloves, outer, chemical-resistant (optional, as applicable)

    Gloves, inner, chemical-resistant (optional, as applicable)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 9-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 10-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    10.0 SITE CONTROL

    10.1 SITE CONTROL PROCEDURES

    Site controls will be implemented as described in HSEP 7.3.2 Site Controls (Attachment A-6).

    Effective site control procedures will reduce the potential exposure of the project team, other

    workers in the vicinity, and the surrounding environment to onsite hazards through measures

    such as:

    Limiting site access only to essential personnel;

    Establishing work zones within the site;

    Conducting operations in a manner that minimizes the exposure of personnel and equipment and eliminates the potential for off-site dispersion; and

    Establishing decontamination procedures for personnel and equipment.

    10.2 WORK ZONES

    Clearly delineated work zones help ensure that:

    Site personnel are adequately protected from existing hazards;

    Specific activities and hazards are confined to the appropriate areas; and

    Personnel can be accurately and quickly located and evacuated during an emergency.

    Personnel will use HSEP 7.3.2 Site Controls as a guideline when establishing work zones;

    vehicles will be arranged to provide efficient evacuation due to wildlife or other emergencies.

    10.3 BUDDY SYSTEM

    Jacobs’ policy is that all site work will be performed using the buddy system. Team members

    will keep in visual contact with each other at all times. The buddy must be capable of

    executing the following tasks:

    Assisting his/her partner

    Monitoring the partner for signs of chemical or other exposures (e.g., heat or cold)

    Periodically verifying the integrity of the partner’s PPE

  • Notifying the SSHO when emergency help is needed

    Keeping the SM informed of location and expected time of return

    10.4 COMMUNICATIONS

    Verbal communication at the sites could be impaired by onsite background noise caused by

    heavy equipment and the use of PPE. Hand signals will be established and communicated to

    personnel. Communication with off-site personnel will be via cell phone.

    10.5 SITE SAFETY AND SECURITY

    Site security is essential to prevent unauthorized, unprotected, or unqualified people from

    being exposed to site hazards and protect established and safe working procedures. Site safety

    and security will be maintained by ensuring that any visitors to the site sign the visitors log

    and are given a site-specific briefing, and stopping work immediately if unauthorized

    personnel attempt to or succeed in accessing the work area. In this case, the worker shall

    notify the SSHO, SM, and PM immediately.

    10.6 EQUIPMENT AND VEHICLE DECONTAMINATION

    Equipment used onsite will undergo decontamination prior to leaving the site to eliminate

    contaminant migration from the site as well as the potential for cross-contamination of sites.

    Gross decontamination includes the removal of potentially contaminated materials by use of a

    shovel or other hand tools and stiff bristle brushes for equipment contaminated by soil and by

    wiping visible contamination from equipment contaminated by water or free product.

    Materials removed during gross decontamination will be accumulated and managed with

    similar waste streams.

    Equipment used onsite will be completely decontaminated before it is moved to another site

    and prior to its return, before it is used in another well, or when it is no longer required onsite.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 10-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • 10.7 PERSONNEL DECONTAMINATION

    Decontamination protects workers, the public, and the environment by limiting exposure to

    harmful substances and preventing the spread of contamination. At areas where an exclusion

    zone is necessary, all personnel exiting the exclusion zone will follow decontamination

    procedures. Under no circumstances (except emergency evacuation) will personnel be

    allowed to leave the exclusion zone before decontamination. The SM or PM may approve

    simplification of the procedures in the field when a determination has been made that

    adequate decontamination can be achieved with less effort.

    Decontamination procedures for the sites are as follows:

    1. Wipe gross contamination off clothes and equipment. 2. Scrub boots and gloves in decontamination solution or detergent water, if necessary. 3. Step across to the next station and remove coveralls and gloves. Deposit in container with

    plastic liner. Remove coveralls (if applicable) after gloves.

    4. Remove respirator and avoid touching face with fingers (if applicable). 5. Wash hands and face thoroughly.

    10.8 WASTE HANDLING AND DISPOSAL

    Disposal of all wastes will be in accordance with state and federal requirements, as specified

    in the site-specific supplemental work plans (AFCEC 2012a and 2012b).

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 10-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 10-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 11-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    11.0 INSPECTIONS

    11.1 SITE INSPECTIONS / SAFETY EVALUATION

    The SSHO and site personnel will inspect the site daily for conditions that may vary from

    those expected in the SPAs. Changes will be addressed by amending the applicable SPA. Any

    changes should be reviewed with the SM and site personnel.

    11.2 EQUIPMENT INSPECTIONS

    Any machinery or mechanized equipment shall be inspected and tested by a competent person

    to ensure that it is in safe operating condition prior to use at the site. Inspections and tests will

    be performed in accordance with the manufacturer’s recommendations and documented.

    Records of tests and inspections will be maintained at the project office. Jacobs’ Standard

    Equipment Inspection Form (Attachment A-5, Exhibit 14) will be used to document the

    inspections.

    11.2.1 Vehicle Inspections

    Motor vehicles owned or rented by Jacobs or subcontractors will be inspected prior to use.

    Deficiencies found during the inspection will be noted and corrected prior to equipment use.

    Attachment A-5, Exhibit 13 contains a rental vehicle inspection form. Vehicles that cannot be

    brought to safe operating condition will not be used. In addition to pre-use inspections, the

    vehicle’s primary driver will be responsible for ensuring that scheduled and periodic

    maintenance occurs to maintain safe operable condition. At no time will anyone operate a

    vehicle believed to be unsafe. The vehicle should be equipped with safety equipment

    including the following items:

    Portable eyewash bottles

    First-aid kit

    Type A-B-C fire extinguisher

  • 11.2.2 Daily/Shift Inspections and Tests

    Machinery and equipment shall be inspected daily (when in use) to ensure safe operating

    conditions as described below:

    Tests shall be conducted at the beginning of each shift during which equipment is to be used to determine that brakes and operating systems are in proper working condition and that required safety devices are in place and functional.

    Whenever any machinery or equipment is found to be unsafe, or when a deficiency affecting the safe operation of equipment is observed, the equipment shall be immediately taken out of service and its use prohibited until unsafe conditions have been corrected.

    A tag indicating that the equipment shall not be operated and that the tag shall not be removed will be placed in a conspicuous location on the equipment. Where required, lockout/tagout procedures will be followed.

    The tag shall remain in its attached location until it is demonstrated to the individual who found the equipment unsafe that the equipment is safe to operate.

    When deficiencies are corrected, the machinery or equipment will be re-tested and re-inspected before being returned to service.

    11.3 SAFETY OBSERVATION REPORTS

    Site personnel, not just the SSHO, will complete an SOR form (Attachment A-5, Exhibit 19)

    when real or potential unsafe acts or unsafe conditions have been identified. The success of

    this program increases when SORs completed by non-HSE specialists exceed those completed

    by HSE specialists. This ensures that all personnel are developing safety-conscious attitudes.

    SORs will not be used for disciplinary purposes because they are intended to help

    communicate unsafe acts or conditions.

    SORs shall also be used to encourage and reward safe behavior. Providing positive

    reinforcement of a job or task well-executed is far more encouraging than recognizing unsafe

    behavior. Encouragement can be rewarding for the whole project, enticing the team to create a

    better and healthier work environment. Additionally, SORs can be used to communicate a

    better way of performing a task.

    Any corrective measures shall be documented on the SOR form.

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 11-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • SORs shall be submitted to the SSHO within 24 hours of completion. Completed forms will

    be maintained with project records and a copy or record of SORs will be forwarded to the

    Jacobs Anchorage HSE Group weekly.

    11.4 SAFE PLAN OF ACTION ASSESSMENT

    Management and HSE personnel will routinely monitor and assess the development and

    implementation of SPAs. This assessment will be made using the SPA assessment form

    (Attachment A-5, Exhibit 18) or other means that achieves the same result. The monitoring

    and assessment will be based on three criteria:

    Relative risks and activities, (e.g., working in extreme temperatures, confined space entry, lockout/tagout work)

    Complexity of the task

    Locations and varieties of tasks

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 11-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • (intentionally blank)

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 11-4 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 12-1 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

    12.0 EMERGENCY PROCEDURES

    This section describes pre-emergency planning, emergency equipment and supplies,

    emergency procedures, emergency response and accident follow-up, evacuation information,

    contacts, post-incident notifications, recordkeeping, and vehicle accident procedures.

    Attachment A-1 lists contact names and numbers in case of an emergency as well as a map of

    the hospital location and route that will be posted on site.

    12.1 HOSPITAL ROUTE

    The Fairbanks Memorial Hospital is approximately 24 miles away and is located at 1650

    Cowles Street, Fairbanks. The hospital may be reached by exiting Eielson AFB and traveling

    north on the Richardson Highway. Take the ramp to AK-3/ Denali Park/ Nenana, and then

    merge onto the Robert Mitchell Expressway. Turn right onto Lathrop Street and then right

    onto 19th Avenue. Fairbanks Memorial Hospital is on the left. Attachment A-1 contains a map

    of the suggested route.

    12.2 EMERGENCY COMMUNICATION

    In addition to communication methods described in this SSHP, the following communication

    and contact methods will be used:

    Cell phone

    Air horn blast

    The following visual hand signals will be used:

    Clutching throat = Personal distress

    Arm waving and pointing towards the exit direction = Evacuate the area

    When calling for an emergency response, by cell phone, report the following information:

    Your name

    Your company’s name

    Type of emergency and perceived severity

    Location of accident or injury

  • Time of incident

    Type of first-aid or response being given

    DO NOT HANG UP until the operator or emergency dispatcher has received the complete

    information and directs you to hang up.

    Notify the SSHO or SM and your supervisor immediately after hanging up the phone. Further

    information or assistance may be needed from you to complete the accident investigation

    process.

    12.3 EMERGENCY MEDICAL TREATMENT

    Should a person become injured and require treatment beyond onsite first-aid, an

    Authorization for Medical Treatment form (Attachment A-5, Exhibit 7) will be taken to the

    medical facility treating the employee. The SM and/or SSHO will complete the top portion of

    the form, and the doctor at the medical facility will complete the bottom portion of the form.

    12.4 INCIDENT AND ACCIDENT REPORTING

    The SM and SSHO will be notified promptly of any accidents. After ensuring that any injured

    personnel are receiving proper medical treatment and that such treatment has been duly

    authorized (Section 12.3, above), the SM will notify the HSM and the PM as soon as possible

    that an incident or accident has occurred. The PM will notify the client immediately in the

    event of a fatality, personnel admitted to a hospital, or property damage in any amount.

    The SM will provide the following information as it becomes available:

    Project name and number

    The location and circumstances of the accident

    Name and employer of any victims, and nature and extent of their injuries

    The name and address of the medical facility providing treatment

    The name of the attending physician or other medical professional

    SSHO name and phone number

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 12-2 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • In the aftermath of an incident or accident, the SM in consultation with the HSM and PM will

    determine whether there is a need for drug testing of any of the involved personnel. The SM

    will ensure that steps have been taken to secure the scene with no movement of material or

    equipment until the onsite portion of the investigation (photos, sketches, and measurements)

    is complete, and obtain signed statements from all witnesses.

    For accidents involving vehicles and heavy equipment, procedures in HSEP 5.2 Vehicle

    Accident (in Attachment A-6) shall be followed and a Vehicle Accident Report will be

    completed (Attachment A-5, Exhibit 12). For other accidents, use the Accident/Incident

    Investigation Report form (Attachment A-5, Exhibit 11). The accident investigation will be

    conducted in accordance with HSEP 5.1 Accident and Incidents Investigation and Reporting

    (in Attachment A-6).

    Daily records of all first-aid treatments not otherwise reportable will be maintained on the

    first-aid register and furnished to the HSM weekly.

    12.5 EXPOSURE TO BLOODBORNE PATHOGENS

    The following procedures will be implemented when a potential exposure to bloodborne

    pathogens occurs:

    The SSHO will be notified immediately whenever a first-aid incident occurs.

    If the SSHO determines that a potential exposure occurred, the SSHO will provide a report to the HSM and the PM that includes:

    - A description of the incident, including date and time.

    - Names of all first-aid providers who rendered assistance and a description of the type of barrier used by each.

    - A summary of exposure(s) and post-exposure prophylaxis to ensure that proper post-exposure evaluation occurred and that follow-up procedures were made immediately available (a Jacobs policy requirement).

    The report will be recorded on the first-aid register.

    12.6 EARTHQUAKE

    In the event of an earthquake, move to an open area away from equipment, structures, or

    utility poles if outdoors, or take cover beneath a desk or at least move away from book

    I:\AE-HTRW\TO07-Eielson RI\WP\SSHP\SSHP Eielson RI.doc 12-3 HTRW-J07-05F45701-J10-0002 FINAL 11/7/2012

  • shelves and office equipment that could