APV Operations
ICAO APV workshop
Bryan Jolly ATM Rulemaking Officer25 May 2011
2
Title presentation
Applicable Regulations
Applicable AMC 20 material
AMC 20-27 Baro-VNAV operations
based on FAA AC 20-129 compliance
Approval for LPV operations
Operational Approval
Regulatory material
3
Applicable Regulations
Annex III to Council Regulation (EEC) No 3922/91 (EU-OPS)
Commission Regulation (EC) No 1702/2003 (Part 21)
4
http://eur-lex.europa.eu/en/index.htm
SES Regulation
Article 2.2(c)
public or private entities providing, for the purposes of this Regulation: (i) services for the origination and provision of survey data; (ii) procedure design services; (iii) electronic terrain data; (iv) electronic obstacle data.
Regulation 73/2010
COMMISSION REGULATION (EU) No 73/2010
of 26 January 2010
laying down requirements on the quality of aeronautical data and
aeronautical information for the single European sky
5
http://eur-lex.europa.eu/en/index.htm
EASA AMCs for APV Operations
AMC Subject EASA ED Decision
AMC 20-26
Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations
DECISION 2009/019/R
Effective23 December
2009AMC 20-27
Airworthiness Approval and Operational Criteria for RNPAPPROACH (RNP APCH) Operations including APV BAROVNAVOperations
6
EASA AMCs for APV Operations
AMC Subject NPA CRD EASA ED Decision
20-28
(GNSS
LPV)
Airworthiness Approval and Operational Criteria for RNAV GNSS approach operation to LPV minima using
SBAS)
NPA 2009-04
Planned by mid 2011
Planned by end 2011
7
8
http://easa.europa.eu/regulations/regulations-structure.php
EASA requirements
OPINION OF THE EUROPEAN AVIATION SAFETY AGENCY
Nr. 01/2005
On the acceptance of Navigation Database Suppliers
EUROPEAN AVIATION SAFETY AGENGY
CONDITIONS FOR THE ISSUANCE OF LETTERS OF ACCEPTANCE FOR
NAVIGATION DATABASE SUPPLIERS BY THE AGENCY
DISCLAIMER: The letter of acceptance does not constitute a mandatory requirement
since it is not a mandatory certification attesting compliance with a binding act. The
conditions and associated guidance are applied on a purely voluntary basis at the
request of the applicant.
A.131 Scope
These Conditions establish:
(a) The procedure for the issuance of a letter of acceptance (LOA) for
organisations that translate, format and/or integrate information that originates from
State aeronautical information services (e.g. AIP) into electronic databases for
airborne navigation systems.
(b) The rights and obligations of the applicant for, and holders of, such letters of
acceptance.
A.132. Definitions
(a) Navigation Database - Data (such as navigation information, flight planning
waypoints, airways, navigation facilities, SID, STAR) that is stored electronically in a
•system that supports an airborne navigation application.
(b) Data Service Provider – An organisation (not including the State AIP
provider), which collects, originates or processes aeronautical data and provides a
navigation database in a generic format (such as ARINC 424). Such organisations are
eligible for a Type 1 LOA under these Conditions (see Guidance Para 5.7) showing
•hat the generic database has been formatted under controlled conditions.
(c) Data Application Integrator - An organisation that incorporates either State
AIP data or a generic database into a format compatible with specific target airborne
navigation equipment with a defined intended function. Such organisations require an
interface with the equipment design organisation, and are eligible for a Type 2 LOA
under these Conditions (see Guidance Para 5.7). This provides a list of equipment
models and part numbers where compatibility has been demonstrated to the Agency,
permitting the supply of navigation databases directly to end users/operators.
(d) Data Quality Requirements - A specification of the characteristics of data to
ensure that data is compatible with its intended use.
(e) Type 1 LOA – Letter of acceptance granted where a Navigation Database
•supplier complies with ED-76/DO-200A with no identified compatibility with an
•aircraft system. A Type 1 LOA confirms that the processes for producing navigation
9
http://easa.europa.eu/agency-measures/opinions.php
AMC 20-27- EASA
10
Interpreting AMC 20-27
Some confusion on the intended use …
…additional guidance on interpretation may be helpful…
11
Remember: AMC 20-27 is ONE acceptable means of compliance, not THE ONLY acceptable MoC
Interpreting AMC 20-27
12
1. Purpose
2. Background
3. Scope
4. Reference Documents
5. Assumptions
6. RNP-APCH Airworthiness Criteria
7. Functional Criteria
8. Airworthiness Compliance
9. AFM/POH
10. RNP-APCH Operational Criteria incl. appendices 2, 3, 4 and 5
11. Availability of Documents
Contents of AMC 20-27:
General information.
General information.
Airworthiness Criteria.
Operational Criteria.
Interpreting AMC 20-27
Airworthiness Criteria (Chapters 6-9)
These criteria are typically being assessed as part of the application for TC/STC approval.
It is not expected that the operator demonstrates compliance with the requirements of these chapters.
13
Interpreting AMC 20-27
Airworthiness Criteria:
Chapter 6:
Equipment Qualification (ETSO/TSO)
Accuracy (Horizontal/Vertical FTE, TSE etc.)*
Integrity
Continuity
14
These criteria are very difficult to prove for an operator. In depth knowledge of system design is required.
* There are differences with FAA AC 20-129. See separate slide(s)
Interpreting AMC 20-27
Airworthiness Criteria:
Chapter 7:
Functional Criteria for RNP-APCH
Required Functions for BARO VNAV
Recommended Functions for RNP-APCH
Recommended Functions for BARO VNAV
15
Information may be available to operators, but may not have been certified (options).
Interpreting AMC 20-27
Airworthiness Criteria:
Chapter 8:
Compliance Statement, Means of Compliance
Specific Installation Criteria & Assessments
Existing Installations
Chapter 9:
Aircraft Flight Manual/Pilot Operational Handbook
Procedures (Normal/Abnormal), Limitations
16
A DOA or similar organisation will have to demonstrate compliance with chapters 8 and 9.
Interpreting AMC 20-27
Operational Criteria:
Chapter 10:
Flight OPS Documentation (SOP) – Reference to Appendix 4
Flight Crew Training – Ref. to Appendix 5.
Aerodrome Competence/Operator Verification – Ref. to Appendix 2
Database management.
Reportable Events
17
These aspects are typically expected to be arranged by the operator.
Interpreting AMC 20-27
How about FAA AC 20-129?
AMC 20-27 has more stringent requirements for demonstration of vertical FTE (FTEz) and TSE (TSEz) than FAA AC 20-129 .
The reason is an inconsistency between AC 20-129 values and PANS OPS design criteria:
AC 20-129 allowable TSEz values exceed MOC buffer of 246 ft. at altitudes above 5000 ft.
18
Interpreting AMC 20-27
19
MOC of 246 Ft.
AMC 20-27 TSEz : 238 ft.
AC 20-129 TSEz: 335 ft.
Interpreting AMC 20-27
EASA recognises the additional burden to recertify their aircraft to the new requirements of AMC 20-27.
The potential safety issues resulting from the inconsistence between FAA AC 20-129, Attachment II of the ICAO PBN and the ICAO PANS-OPS manual is recognised .
Aircraft which have previously been demonstrated to comply with the requirements of FAA AC 20-129 may, under certain conditions, be eligible for acceptance without further demonstration of FTE values, albeit with limitations
20
Interpreting AMC 20-27
Applicable conditions
The applicant shall provide to the Agency proof that the aircraft has previously been approved to the requirements of AC 20-129.
The applicant shall provide to the Agency a document stating how the requirements of AMC 20-27 have been complied with, with the exception of FTE requirements.
The aircraft shall be equipped with a suitably scaled indicator to enable the flight crews to readily distinguish the +75ft and -75 ftboundaries. Note: +100/-50ft scale markings, alerts or attention getters may not be accepted.
The AFM shall include a limitation that RNP BARO VNAV approaches to airfields at elevations of 5000 ft. or higher are not permitted.
21
Approach Operation to LPV Minima
22
LPV
23
1. Purpose
2. Background
3. Scope
4. Reference Documents
5. Assumptions
6. Airworthiness Criteria
7. Functional Criteria
8. Airworthiness Compliance
9. AFM/POH
10. Operational Criteria incl. appendices 2, 3 and 4
11. Availability of Documents
Contents of AMC 20-28:
General information.
General information.
Airworthiness Criteria.
Operational Criteria.
LPV
European Aviation
Safety Agency
< Applicant, application>
CRI F- 02-LPV
Airworthiness Approval and Operational
Criteria for RNAV GNSS approach operation
to LPV minima using SBAS
Issue: 1
Certification Review Item Date: 15 May 2009
Page 1 of 2
REQUIREMENT(S): CS/FAR 25.1301, 1302, 1307, 1309, 1316, 1321, 1322, 1329, 1431,
1581
ADVISORY MATERIAL: - PRIMARY GROUP: 06 SECONDARY GROUP(S): 01
CATEGORY: Means of Compliance
APPLICABILITY: - ________________________________________________________________________
Statement of Issue:
<Applicant> has applied for EASA airworthiness approval of RNAV-RNAV systems in
order to enable the <….> aircraft to perform RNAV-GNSS approach operations to
LPV minima procedures (or LPV approaches) within European airspace. Given the
lack of guidance and regulatory material in this area the objective of this CRI is to
establish EASA Acceptable Means of Compliance for the approval of such RNAV-
GNSS system installations, where RNAV-GNSS approach operations to LPV minima
procedures are established.
The navigational solution for an aircraft assisted by GNSS sensors is considered to
be heavily-based on a differential-based determination of the aircraft position in the
3-dimensional airspace. Therefore, the applicability of this CRI assumes that the
Satellite Based Augmentation System (SBAS) in the intended region of aircraft
operation with adequate position determination capability is operationally available1.
This EASA CRI proposes the draft AMC 20-28 attached in the appendix A as means
of compliance for airworthiness approval for RNAV GNSS approach operation to LPV
minima using SBAS.
EASA Position:
Airworthiness approval for the approval of LPV approaches
1 At the time of issuing this CRI (May 2009) the certification process of the European SBAS
(EGNOS) for Civil Aviation use is still under development. Civil Aviation Users should therefore not use the EGNOS or similar systems which are still under development, for safety critical purposes.
EASA has drafted a generic Certification Review Item (CRI):
Based on NPA 2009-04 (AMC 20-28) criteria
Applications for Airworthiness approval can be accepted by the Agency
24
RNP-APCH with SBAS derived Guidance - EASA
25
RNP-APCH with SBAS Guidance
AMC 20-27 assumes that:
Guidance is linear, and;
VNAV is based on BARO
Industry (RTCA DO-229D) assumes that:
Guidance may be angular
VNAV may be based on SBAS (EGNOS).
ICAO PANS OPS accounts for both.
26
RNP-APCH with SBAS Guidance
EASA has drafted a generic Certification Review Item (CRI):
Based on AMC 20-27 and NPA 2009-04 (AMC 20-28) criteria
Taking into account RTCA DO-229D and PANS OPS provisions
To be applied with specific applications
EASA is considering publication of a Certification Memo
27
RNP-APCH with SBAS Guidance
Operational Aspects:
Since some of the assumptions made at the time of drafting of AMC 20-27 are invalidated, operational procedures, training, may need adaptation:
Certain procedures cannot be flown, but this is not obvious from the chart:
Angular guidance not accounted for, coded ‘B’ in ARINC 424 data
+/- 75 ft. monitoring requirement invalidated
Temperature compensation not applicable
Etc.
28
Operational Approval
29
Operational Approval
30
COMMISSION REGULATION (EC) No 859/2008
of 20 August 2008
amending Council Regulation (EEC) No 3922/91 as regards common technical requirements and
administrative procedures applicable to commercial transportation by aeroplane
Commercial Operations
Operational Approval
An operator shall ensure that an aeroplane operated in areas, or through portions of airspace, or on routes where navigation performance requirements have been specified, is certified according to these requirements, and, if required, that the Authority has granted the relevant operational approval.
31
EU-OPS 1.243(a)
Operational Approval Required from NAA
Operational Approval
Submission to include:
Reference documents used in compiling submission
Airworthiness: navigation system capability compliance statement.
Details of quality control measures for navigation data base
Standard operating procedures
Operations Manual including MEL handling, crew authorisation/validation, training programme
32
Operational Approval
Non Commercial Operation
Currently No Common EU requirement
National requirements are applicable
33