13
APT Power Engineering Limited APT Power Engineering Limited APT Power Engineering Limited APT Power Engineering Limited a Complete Power Solutions a Complete Power Solutions APT APT POWER ENGINEERING POWER ENGINEERING LIMITED LIMITED (ISO 9001:2008 Certified)

APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APT Power Engineering LimitedAPT Power Engineering LimitedAPT Power Engineering LimitedAPT Power Engineering Limited

a Complete Power Solutionsa Complete Power Solutionspp

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)

Page 2: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

INTRODUCTION OF APT POWER ENGINEERING LTD:

Established in the year 1996 and dedicated to power sector.

P d b M DK N id d M DVG N id Promoted by Mr. DK Naidu and Mr. DVG Naidu

APT organization started up with repair ,troubleshooting , Erection and Commissioning

of power projects for various customers.

Later entered into a memorandum of understanding with M/s Kaluga Turbines (Russia)

from 1998 to 2003 for supply of STG.

APT POWER ENGINEERING LIMITEDAPT POWER ENGINEERING LIMITED(ISO 9001:2008 Certified)

Page 3: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APTAPT isis ASSOCIATEDASSOCIATED withwith

M/sM/s.. QingdaoQingdao JienengJieneng SteamSteam TurbineTurbine (QJPS),(QJPS), ChinaChina for Supply, Erection,

Commissioning and Testing of Steam Turbine and Generator packages on turnkey basis

in India from 5MW to 60MW. Since then APT has supplied & commissioned more than

63 machines (about 1085 MW in total) in Indian & Global market63 machines (about 1085 MW in total) in Indian & Global market.

M/sM/s.. ShangaiShangai TurbineTurbine WorksWorks CoCo.. LtdLtd..,, (STWC)(STWC) China for Supply, Erection, Testing,

Commissioning & after sales support for Turbine-Generator sets ranging from 60 mw tog pp g g

250MW. STWC has supplied more than 20 TG set in India.

•• M/sM/s.. JSDJJSDJ HeavyHeavy IndustryIndustry CoCo..,, LtdLtd../s/s..,, (JSDJ)China(JSDJ)China for the supply of WHRB boilers

for Cement and Steel industries. It is one of the leading manufacturers of boilers for

Cement plants. JSDJ has supplied boilers for lead organizations like Birla Cement and

Shree Cement Ltd.

APT POWER ENGINEERING LIMITEDAPT POWER ENGINEERING LIMITED(ISO 9001:2008 Certified)

Page 4: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APT ROLE IN CEMENT INDUSTRY:APT ROLE IN CEMENT INDUSTRY:

• APT is into Cement Industry from the year 2008, with various customers from all over India.

• 90% of the cement plants have QJPS machines in India for their WHRS projects.

• Supply , E &C and testing of STG on turnkey basis by APT

• APT provides 24X7 services and supply of all Spares and critical componentsAPT provides 24X7 services and supply of all Spares and critical components

• Our major customers are Shree Cement, My Home, Ultratech, Birla corp Shree Cement, My Home, Ultratech, Birla corp etc.

• Maintaining of equipment is very important in all industries to prevent premature break

down. APT plays an important role in maintaining the TG sets by avoiding break down

to increase the efficiency of the system by our own well experienced service team.

APT POWER ENGINEERING LIMITEDAPT POWER ENGINEERING LIMITED(ISO 9001:2008 Certified)

Page 5: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

Special Feature of QJPS TG sets:

• Specially designed for Low parameters of Cement klin WHRS boilers• Specially designed for Low parameters of Cement klin WHRS boilers

• Supplied more than 500 TG sets for Cement WHRS projects, world wide

• By virtue of our design

heavier ruggedgg less vibrations operate with wide range of inlet parameters Shaft driven main oil pump no gear box no gear box less wear and tear time taken between overhauling is more

APT POWER ENGINEERING LIMITEDAPT POWER ENGINEERING LIMITED(ISO 9001:2008 Certified)

Page 6: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

Cement Clients

APT POWER ENGINEERING LIMITEDAPT POWER ENGINEERING LIMITED(ISO 9001:2008 Certified)

Page 7: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APART FROM SUPPLY OF TG SETS APT ALSO SPECIALIST IN:APART FROM SUPPLY OF TG SETS APT ALSO SPECIALIST IN:

• Execution of EPC Contracts including detailed engineering & project execution

• Manufacturing & Supply of Balance of Plantg pp y

• Erection & Commissioning of various makes of Turbo Generators

• Overhauling of Turbine & Generator• Overhauling of Turbine & Generator

• Manufacture & Supply of critical spares, Heat Exchangers and Deaerator etc..

• Comprehensive services in Operation & Maintenance of Power Plants

• Repair and Refurbishment of Turbine, Generator, rotary equipments and its

auxiliaries.

APT POWER ENGINEERING LIMITEDAPT POWER ENGINEERING LIMITED(ISO 9001:2008 Certified)

Page 8: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

ORGANIZATION STRENGHT:ORGANIZATION STRENGHT:

• All the departments are headed with well experienced Technical Managers

• We have our own Erection , Commissioning and Testing engineers

• Our team of professional give best possible solutions and are available for consultation

24/7/365 days.

T t l i h M 700Total in house Man power-700

• Erection and commissioning – 200

• Over hauling & Trouble shooting 50• Over hauling & Trouble shooting -50

• Corporate/design - 50 including well experienced technocrats heading the various

departments.p

• Work shop maintenance – 150 & Operation and maintenance - 250

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)

Page 9: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APT WORKSHOP FACILITIESAPT WORKSHOP FACILITIESOne of its kind in Hyderabad vicinityOne of its kind in Hyderabad vicinity

APT k di i i i f ilit t d ith f ll t bli h d k h (2 it ) h i kiAPT works division is facilitated with a fully established work shop (2 units) having a working area of about 9000 sq. yards with sophisticated machineries & following facilities:

• APT is capable of machining and repairing of TG sets upto 250 MW

• Vacuum based high speed balancing machine of capacity 50 tons for rotors up to 250 MW

• Manufacture of Spares and Critical components

• Supply and manufacture of Deaerator, HP heater, condenser, cooling tower etc…

• Supply and manufacture of IBR and Non IBR piping.

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)

Page 10: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APT WORKSHOP FACILITIES50 TONN HIGH SPEED BALANCING MACHINE

• Dedicated DCS System to monitor and control completed operation parameters.

• Bently Neveda ADRE 408 DSP System connected to Shinkawas VM7 for diagnosticBently Neveda, ADRE 408 DSP System connected to Shinkawas VM7 for diagnostic

parameters of the Rotor.

I d (B l i ) V S hi l l 2 b• Imported (Belgium) Vacuum System to achieve vacuum level up to 2 mbar.

• Precession balancing accuracies in accordance to ISO/API standards

• ABB make Motor Drive Control System.

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)

Page 11: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

VACUUM TUNNEL 30 MW ROTOR HORIZONTAL LATHEVACUUM TUNNEL 30 MW ROTOR HORIZONTAL LATHE

VERTICAL LATHE DCS ROOM

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)

Page 12: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

150 MW ROTOR150 MW ROTOR

25 MW ROTOR25 MW ROTOR

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)

Page 13: APT Power Engineering LimitedAPT Power Engineering Limitedqcfihyderabad.com/.../APT-Presentation.pdf · APT ROLE IN CEMENT INDUSTRY: •APT is into Cement Industry from the year 2008,

APT APT POWER ENGINEERING POWER ENGINEERING LIMITEDLIMITED(ISO 9001:2008 Certified)