29
Leader’s Stage: Building a Digital Society Bringing Hope to the Distressed Areas” Areewan Haorangsi Secretary General Asia-Pacific Telecommunity (APT) APT ICT Pilot Projects for Rural Areas 1

APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

  • Upload
    others

  • View
    1

  • Download
    1

Embed Size (px)

Citation preview

Page 1: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Leader’s Stage: Building a Digital Society

“Bringing Hope to the Distressed Areas”

Areewan HaorangsiSecretary General

Asia-Pacific Telecommunity (APT)

APT ICT Pilot Projects for Rural Areas

1

Page 2: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

2

Asia-Pacific Telecommunity (APT)

APT is an intergovernmental organization for the development of telecommunication and ICT services in the Asia-Pacific region.

APT was established in 1979 by the joint initiatives of ESCAP and ITU. Currently, memberships of APT are:

• 38 Members (States)• 4 Associate Members (Territory)• 135 Affiliate Members (enterprise, agency, institute, organization,

academia, etc. active in ICT and telecommunication area in the region)

Page 3: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Geographic scope of APT (Map)

3

Page 4: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

4

APT Role

Main roles of APT are: Support development of telecommunication and ICT in Asia-

Pacific region; and Consolidate regional position for Asia-Pacific region and

propose as “APT Common Proposal” to global conferences

Page 5: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Role of APT to Support Development of Telecommunication and ICT in Asia-Pacific Region

• APT work programmes - Policy and Regulatory Forum (PRF), South Asian Telecommunication Regulations’ Council (SATRC), Policy and Regulation Forum for Pacific (PRFP), APT Telecommunication/ ICT Development Forum (ADF), APT Wireless Group (AWG)

• Capacity Building Programmes – Training, Expert Mission, ICT Development Projects and Study Visit

5

Page 6: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Strategic Plan of the APT for 2018-2020

6

Connectivity Innovation Trust Capacity Building Partnership

Page 7: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

High-Level Vision

7

APT Ministerial Conference on Broadband and ICT Development1 -2 July 2004, Bangkok, Thailand“Bangkok Agenda”

Asia Pacific Ministerial Meeting on Strengthening Regional collaboration towards Broadband Economy12 - 13 November 2009,Bali, Indonesia“Bali Statement”

Asia-Pacific ICT Ministerial Meeting on “Building Smart Digital Economy through ICT10 - 11 September 2014, Brunei Darussalam“Brunei Darussalam Statement”

Page 8: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Role of APT to Support Development of Telecommunication and ICT in Asia-Pacific Region

• APT work programmes such as Policy and Regulatory Forum (PRF), South Asian Telecommunication Regulations’ Council (SATRC), Policy and Regulation Forum for Pacific (PRFP), APT Telecommunication/ ICT Development Forum (ADF), APT Wireless Group (AWG)

• Capacity Building Programmes – Training, Expert Mission, ICT Development Projects and Study Visit

8

Page 9: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

APT Telecommunication/ICT Development Forum (ADF)

• annual forum for policy makers, regulators, and other stakeholders of telecommunication development in the region

• to address the development needs and issues for the Asia Pacific region

• to review the activities of the APT in ICT fields and discuss issues on ICT development among APT Members

9

Page 10: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Telecommunications/ ICT Development Projects

• International Collaborative Research (Extra-Budgetary Contribution from Japan)

• ICT Pilot Projects for Rural Areas (Extra-Budgetary Contribution from Japan)

• ICT Application Projects (Extra-Budgetary Contribution from Republic of Korea)

10

Page 11: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

APT ICT Pilot Projects for Rural Areas

Objective:

• To narrow down digital divide in the Asia-Pacific region by promoting and establishing pilot projects to ensure the access to ICT in rural areas and to facilitate development of ICT infrastructures/services in the region

11

Page 12: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Main feature of the ICT Pilot Projects for Rural Areas

• Maximum amount of APT support available for one project is USD 200,000. Appropriate amount of the budget for the project will be determined based on careful examination of the proposal prior to project implementation.

• The project is to be completed within 11 months• Higher priority will be given to the project with financial support

from the proposing APT Member

12

Page 13: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Examples of ICT Pilot Projects

• Construction of multi-purpose telecenters in rural areas• Introduction of new wireless technologies systems in rural areas• Other topics for contributing to ICT development in rural areas

employing emerging technologies

13

Page 14: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Nepal: Wireless Network Project and e-applications

14

Page 15: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Nepal: Wireless Network Project and e-applications (2)

15

Page 16: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Tonga: Disaster Warning and Communication Project

16

Page 17: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Tonga: Disaster Warning and Communication Project (2)

17

Page 18: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Vanuatu: Disaster Warning and Communication project

18

Page 19: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Vanuatu: Disaster Warning and Communication project (2)

19

Page 20: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Indonesia : E-health Project (Maternal Care) in Bandung

20

Page 21: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Indonesia : E-health Project (Maternal Care) in Bandung (2)

21

Page 22: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Myanmar: Cloud Network for Universities

22

Page 23: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Myanmar: Cloud Network for Universities (2)

23

Page 24: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Micronesia: Telecenter Project on Remote Islands

24

Page 25: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Mongolia: Broadband Network using the VSAT System in Rural Areas

25

Page 26: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

Mongolia: Broadband Network using the VSAT System in Rural Areas (2)

26

Page 27: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

On-going projects (2017)

• Nepal - Effective Broadband infrastructure for development of communities in Dullu Municipality, Nepal Pilot Project

• Viet Nam - Pilot project for countermeasures against cyber-attacks in Viet Nam

27

Page 28: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

• APT is now inviting APT Members to submit proposals for “ICT Pilot Projects for Rural Areas” for 2018

• Submission should be sent through the APT Members contact point by 21 September 2018

• For more information, please visit our programme website at https://www.apt.int/APTICT

Pilot projects in 2018

28

Page 29: APT ICT Pilot Projects for Rural Areas€¦ · Main feature of the ICT Pilot Projects for Rural Areas • Maximum amount of APT support available for one project is USD 200,000. Appropriate

29Contact: [email protected] Website: https://www.apt.int