APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

Embed Size (px)

Citation preview

Page 1: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

APS Underground Distribution Cable Replacement Project

Scott GudemanManager Const Projects and Support Svcs

September 27, 2012

Page 2: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

2

Agenda

• UG Distribution Cable Historical Overview• Cable Replacement Program• Replace Vs. Repair• Where We Are Today• Future Direction

Page 3: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

UG Distribution Cable Historical Overview

Page 4: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

4

Background

• APS began installing direct buried underground primary distribution cable in the 1950’s and continued until the mid 1980’s.

• The majority of direct buried underground primary cable in the APS distribution system is a 165-180 mil XLPE, non-jacketed type cable.

Page 5: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

5

Cable Failures

• In the mid-1980’s, we started to experience a steady increase in direct buried underground cable failures.

• There were 0.3 failures for every circuit mile of underground cable, accounting for 24% of the Company’s overall SAIFI rating.

Page 6: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

6

Cause of the Failures

• The direct buried XLPE primary cable had reached the end of its useful life. Although manufacturer’s projected a 30-year life expectancy; we were realizing 16 years.

• Contributing factors to cable failures were installation practices, mechanical failures, water trees, accessory failures, manufacturing defects, corrosion, or system overload.

• As a result, APS began to install 220 mil, TRXLPE, Jacketed UG cable in conduit in 1986 and fully transitioned to full conduit primary and secondary system in 1988.

Page 7: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

Cable Replacement Project

Page 8: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

8

Cable Replacement Project

• The Underground Distribution Cable Replacement Project began in 1992 with the goal of replacing all direct buried underground cable in the APS System.

• It has continued since then with the same objective, yet with changing funding levels and business drivers to achieve that goal.

Page 9: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

9

Cable Replacement Plan Business Drivers

The Business Drivers used to determine which cable runs to replace:

• Customer Satisfaction• Critical Customers and Key Accounts• Operating Demands and Priorities• Number of Faults per Run• Reliability (SAIFI)• Cost Containment

Page 10: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

11

Replacement Approaches

Utilize a combination of quick response and planned tactics:

– Accelerated Replacement (AR) 1-1/0A– Quick Hitters (QH) 3-1/0A– 750A and 1/0A Planned Replacement Work– Corroded Neutral Planned Replacement Work– Locate and Repairs– Service/Secondary Replacement

Page 11: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

12

Quick Response Cable Replacement – AR’s and QH’s

Three Phase 3-1/0A CableSingle Phase 1/0A Cable

– <= 500’– Not in major street– Not in private easement– Use blanket permit with municipalities– Contract out all excavation and conduit installation– APS crews install and terminate wire– Typically a 7 working day turnaround on jobs with guards

Page 12: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

13

Planned Feeder Cable Replacement - 750A

750kCmil Feeder Cable

– Jobs are scoped, designed, routed and permits acquired

– Budget status determines when job is released for construction

– A limited number of jobs are on the shelf so that we can react quickly

– Contract all excavation and conduit installation– APS crews install and terminate wire

Page 13: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

14

Planned Cable Replacement – Corroded Neutral Cable

1/0A or 3-1/0 in Northern Regions

• Concentric Neutral on DB cable has sacrificed itself due to corrosive soil conditions

• Jobs to replace multiple runs prioritized by Districts• Jobs are scoped, designed, routed and permits acquired• Budget status determines when job is released for

construction• A limited number of jobs are on the shelf so that we can

react quickly• Contract all excavation and conduit installation• APS crews install and terminate wire

Page 14: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

15

Locate & Repair

Single Phase or Three Phase Circuits

– >500’– In major street– In private easement– Needs a permit to replace– Other complications such as limited access

Page 15: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

16

Service/Secondary Cable Replacement

Includes both service and secondary direct buried low voltage (<600 volts) cable runs

• Added emphasis in 2011 to replace rather than repair service/secondary faults

• Typically, no guards since we can put a service kit on the house

• All work is completed by a contractor. They excavate, install conduit and conductor, and re-landscape

Page 16: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

Replace Vs. Repair

Page 17: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

18

Replace Vs. Repair Primary Cable

• Philosophy is a balanced approach between Replace and Repair

• Mean time between faults accelerates with each failure

– 2nd Time Fault Recurrence – 3.58 years– 3rd Time Fault Recurrence – 2.13 years– 4th Time Fault Recurrence – 1.21 years– 5th Time Fault Recurrence – 1.40 years– 6th Time Fault Recurrence – 0.56 years

Page 18: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

19

Replace Vs. Repair Primary Cable

• Average cost for Repairs (2011)– $3,800 for 1/0A– $5,800 for 750A

• Average Replacement Cost (2011) per work order– $10,190 for 1/0A– $60,108 for 750A

• Can replace 1/0A for less than the cost to repair it three times.

Page 19: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

Where We Are Today

Page 20: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

21

How Much Direct Buried Cable Was Installed?

• It was estimated that we installed about 5,000 trench miles of direct buried underground primary cable

• We have replaced approximately 2,300 trench miles through July 2012

Page 21: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

22

Cable Replacement Year to DateMetro Primary Cable Replacement Summary

Project Year Trench Miles Replaced Total Expenditures88 thru 91 289.57  

1992 117.92 $22,922,839 1993 121.26 $27,888,119 1994 180.78 $27,568,844 1995 138.33 $23,578,462 1996 127.70 $19,597,170 1997 148.50 $19,662,976 1998 155.59 $18,866,000 1999 132.83 $16,815,172 2000 130.76 $17,857,885 2001 127.79 $18,476,340 2002 114.71 $16,507,908 2003 75.91 $8,014,052 2004 66.16 $10,448,000 2005 64.18 $11,068,871 2006 55.68 $12,345,972 2007 54.36 $13,940,602 2008 44.12 $15,031,960 2009 30.83 $14,601,760 2010 47.23 $13,120,202 2011 49.21 $16,316,439 2012 25.65 $11,563,707

Total 2,299.07 $356,193,280

* 2012 = Jan - Jul

Page 22: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

23

Estimated Direct Buried Cable Remaining Trench Miles (Aug 2012)

Division 1-1/0A 3-1/0A 3-750A Total

Metro 1444 133 55 1632

NE 288 111 3 402

NW 360 54 4 418

SE 93 25 3 121

SW 135 14 2 151

Total 2320 337 67 2724

Page 23: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

Future Direction

Page 24: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

25

Going Forward

The Cable Replacement Program will focus on:

• Replacing all of the direct buried 750A feeder cable in the next 4-5 years

• Replacing all identified corroded neutral primary cable (estimated 67 trench miles) in next 7-8 years

• Continue with AR and QH program

Page 25: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

26

Going Forward

• Continue the balanced approach to replace and repair both primary and secondary/service

• Advocate funding cable replacement at the same levels as 2012– Primary - $22M– Svc/Sec - $3.5M

Page 26: APS Underground Distribution Cable Replacement Project Scott Gudeman Manager Const Projects and Support Svcs September 27, 2012

Questions?