Metropolitan Transportation Authority One Gateway Plaza 213 .922 .2000 Tel metro.net Metro TO: THROUGH: FROM: SUBJECT: ISSUE BOARD OF DIRECTORS \:/ ARTHUR T. LEAHY \ Los Angeles, CA 90012-2952 CHIEF EXECUTIVE OFFICER MARTHA WELBORNE, FAIA APRIL 8, 2011 EXECUTIVE DIRECTOR, COUNTYWIDE PLANNING CALL FOR PROJECTS GRANTS SUBJECT TO LAPSE ON JUNE 30, 2011 The Board adopted a Timely Use of Funds Policy and a Lapsing Policy for the Call for Projects. These policies require that sponsors receiving Call for Projects grants execute agreements within six months of Board recertification and obligate, allocate or expend their dollars within a three year period. This report provides the list of projects that are out of compliance with these adopted policies and whose funds are subject to lapse on June 30, 2011. BACKGROUND Every July, the Board recertifies fiscal year funding for projects programmed through the Call for Projects. For projects funded with Proposition C local sales tax dollars, a Memorandum of Understanding (MOU) must be executed by December 31,2010 . For sponsors whose projects are funded with Regional Surface Transportation Program (RSTP), Regional Improvement Program (RIP), Congestion Mitigation and Air Quality (CMAQ) funds or State Transportation Improvement Program Transportation Enhancement (STIP TE) funds, a Letter of Agreement (LOA) must be executed by this same deadline. For projects that received a time extension, we require that an Amendment be executed by November 30, 2010. As of March 31, 2011, there are 7 projects without an executed MOU or LOA. Attachment A contains the list of the projects. Also on an annual basis, we review the status of each project whose funds are subject to lapse at the end of the fiscal year. For those projects whose federal, state or local funds are not obligated, allocated, or expended, sponsors are notified that their projects may be subject to deobligation.

April 8, 2011 - Call for Projects Grants Subject to Lapse ...boardarchives.metro.net/BoardBox/BB2011/2011_04_Apr/April_2011_C… · call for projects grants subject to lapse ... city

  • Upload
    lamanh

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Metropolitan Transportation Authority One Gateway Plaza 213 .922.2000 Tel metro.net

Metro

TO:

THROUGH:

FROM:

SUBJECT:

ISSUE

BOARD OF DIRECTORS

\:/ ARTHUR T. LEAHY \

Los Angeles, CA 90012-2952

CHIEF EXECUTIVE OFFICER

MARTHA WELBORNE, FAIA ~

APRIL 8, 2011

EXECUTIVE DIRECTOR, COUNTYWIDE PLANNING

CALL FOR PROJECTS GRANTS SUBJECT TO LAPSE ON JUNE 30, 2011

The Board adopted a Timely Use of Funds Policy and a Lapsing Policy for the Call for Projects. These policies require that sponsors receiving Call for Projects grants execute agreements within six months of Board recertification and obligate, allocate or expend their dollars within a three year period. This report provides the list of projects that are out of compliance with these adopted policies and whose funds are subject to lapse on June 30, 2011.

BACKGROUND

Every July, the Board recertifies fiscal year funding for projects programmed through the Call for Projects. For projects funded with Proposition C local sales tax dollars, a Memorandum of Understanding (MOU) must be executed by December 31,2010. For sponsors whose projects are funded with Regional Surface Transportation Program (RSTP), Regional Improvement Program (RIP), Congestion Mitigation and Air Quality (CMAQ) funds or State Transportation Improvement Program Transportation Enhancement (STIP TE) funds, a Letter of Agreement (LOA) must be executed by this same deadline. For projects that received a time extension, we require that an Amendment be executed by November 30, 2010.

As of March 31, 2011, there are 7 projects without an executed MOU or LOA. Attachment A contains the list of the projects.

Also on an annual basis, we review the status of each project whose funds are subject to lapse at the end of the fiscal year. For those projects whose federal, state or local funds are not obligated, allocated, or expended, sponsors are notified that their projects may be subject to deobligation.

As of March 31, 2011, there are 96 potential projects with programmed funds that are subject to lapse on June 30, 2011. Attachment B contains the list of the projects. We formally notified these sponsors of their upcoming lapse date. We anticipate that as the Deobligation process continues, some projects may be removed due to their most up-to-date status.

NEXT STEPS

We will continue working with the project sponsors to ensure timely completion of the agreements. For those sponsors subject to lapse, we will continue working with them to ensure timely completion of their projects. For those projects that continue to be out of compliance with the adopted Timely Use of Funds Policy and Lapsing Policy, sponsors will be given an opportunity to appeal the proposed deobligation of funds to our Technical Advisory Committee (TAC) in June 2011. TAC will then make a recommendation to staff on whether the project should be deobligated. Projects subject to deobligation will be brought to the Board for consideration in July 2011.

ATTACHMENTS A. List of Projects without an executed MOU or LOA B. List of Projects subject to lapse on June 30, 2011

ATTACHMENT A

CFP# Agency Project Title Type of

Agreement

CROSS-TOWN TRANSIT CONNECTOR AND F1455 BURBANK SERVICE EXPANSION LOA

INITIAL PURCHASE OF 4-40' CNG BUSES FOR FA144 GLENDALE GLENDALE BEELINE LOA

HAHN'S TROLLEY AND SHUTTLE TRANSIT F1427 LA COUNTY VEHICLES LOA

RANCHO VISTA BL GRADE SEPARATION AT F1104 PALMDALE SIERRA HWYIRR TRACKS MOU

BIKEWAY IMPROVEMENTS ON FOOTHILL F1503 SAN DIMAS BLVD. AT SAN DIMAS WASH LOA

SAN GABRIEL BL-LAS TUNAS INTERSECTION F1100 SAN GABRIEL IMPROVEMENTS MOU

SAN GABRIEL BL-BROADWAY INTERSECTION F1101 SAN GABRIEL IMPROVEMENTS MOU

3/31/201 1

ATTACHMENT B

Amount Lapse

CFP# Agency Project Title Subj ect to Lapse

Date

US 101/REYES ADOBE RD INTERCHANGE F1l71 AGOURA HILLS IMPROVEMENT PROJECT $ 1,156 6/30/2011

VALLEY BOULEVARD ROADWAY CAPACITY F1l95 ALHAMBRA IMPROVEMENTS $ 1,114 6/30/2011

COUNTY CLUB DRIVE BIKEWAY F1501 AVALON IMPROVEMENT PROJECT $ 880 6/30/2011

BALDWIN PARK METRO LINK FA141 BALDWIN PARK TRANSPORTATION CENTER $ 984 6/30/2011

CITY OF BELL GARDENS SIGNAGE F1734 BELL GARDENS PROGRAM $ 122 6/30/2011

I-5/SR-134 CONGESTION MANAGEMENT F1326 BURBANK PROJECT $ 55 6/30/2011

F1502 BURBANK SAN FERNANDO BIKEWAY $ 698 6/30/2011

WASHINGTON BLVD. WIDENING AND Fll07 COMMERCE RECONSTRUCTION PROJECT $ 77 6/30/2011

COMPTON TMOC & RETROFIT OF CITY 6297 COMPTON TRAFFIC SIGNAL SYSTEM $ 475 6/30/2011

COMPTON MLK TRANSIT CTR EXPANSION 8223 COMPTON MULTI-MODAL TRANS BLD. $ 708 6/30/2011

REAL-TIME MOTORIST PARKING F1717 CULVER CITY INFORMATION SYSTEM DEMONSTRATION $ 133 6/30/2011

STATE RTE-60/LEMON AV PART. F1l21 DIAMOND BAR INTERCHANGE (ON-&OFF-RAMPS) $ 1,130 6/30/2011

BELLFLOWER BL AT IMPERIAL HWY Fll19 DOWNEY IMPROVEMENTS $ 371 6/30/2011

PARAMOUNT BL AT FIRESTONE BL Fl120 DOWNEY IMPROVEMENTS $ 1,092 6/30/2011

FLORENCE AVENUE TRAFFIC SIGNAL F1328 DOWNEY COMMUNICATION SYSTEM $ 1,438 6/30/2011

FOOTHILL 8111B TRANSIT EXPANSION OF COUNTYWIDE BSP $ 1,028 6/30/2011

GATEWAY GOODS MOVEMENT NHS ACCESS DESIGN 7193 CITIES COG & IMPLEMENTATION - PHASE II $ 6,556 6/30/2011

COMPRESSED NATURAL GAS FUELING AND 8221 GLENDALE MAINTENANCE FACILITY $ 3,767 6/30/2011

Fll06 INGLEWOOD LA BREA AV INTERSECTION REALIGNMENT $ 2,908 6/30/2011

LA CANADA PEDESTRIAN/EQUESTRIAN CROSSWALKS -F1608 FLINTRIDGE DESCANSO & VERDUGO $ 24 6/30/2011

ALAMEDA ST./N. SPRING ST. ARTERIAL

4293 LA CITY REDESIGN $ 2,946 6/30/2011

1 of 5 3/31/2011

ATTACHMENT B

Amount Lapse CFP# Agency Project Title Subject to

Lapse Date

6304 LA CITY HYDE PARK EAST ATSAC $ 390 6/30/2011

ARBOR VITAE ST. - LA CIENEGA BLVD. TO 6408 LA CITY AIRPORT BLVD. $ 175 6/30/2011

SEPULVEDA BLVD./BURBANK BLVD. 6418 LA CITY WIDENING $ 1,384 6/30/2011

NATIONAL BLVD. FR. SAWTELLE BLVD. TO 6419 LA CITY SEPULVEDA BLVD. $ 503 6/30/2011

VALLEY BLVD. GRADE SEPARATION PHASE 6427 LA CITY II $ 9,092 6/30/2011

TAMPA AVE BRIDGE REPLACEMENT AND 8031 LA CITY WIDENING (HBRR) $ 1,857 6/30/2011

BURBANK BLVD. WIDENING - LANKERSHIM 8046 LA CITY BLVD. TO CLEON AVENUE $ 9,700 6/30/2011

BALBOA BLVD AND VICTORY BLVD 8047 LA CITY INTERSECTION IMPROVEMENTS $ 859 6/30/2011

CAHUENGA BLVD WIDENING - MAGNOLIA 8048 LA CITY BLVD TO LANKERSHIM BLVD $ 3,406 6/30/2011

SAN FERN RD WIDENING - AVE 26 & 8052 LA CITY UNION PACIFIC DRIVEWAY NEAR ELM ST $ 737 6/30/2011

SKIRBALL CENTER DRIVE WIDENING - 1-8054 LA CITY 405 FWY TO MULHULLAND DR $ 273 6/30/2011

MOORPARK AVENUE WIDENING -8055 LA CITY WOODMAN AVE TO MURIETTA AVE $ 3,976 6/30/2011

LA TIJERA BRIDGE WIDENING OVER 1-405 8058 LA CITY FREEWAY $ 6,739 6/30/2011

MAGNOLIA BLVD. WIDENING - CAHUENGA 8087 LA CITY BLVD. TO VINELAND AVE. $ 2,220 6/30/2011

8075/ CESAR CHAVEZ AVE./LORENA ST/INDIANA F1209 LA CITY STINTERSECTIONIMPROVEMENTS $ 5,014 6/30/2011

8090/ F1135 LA CITY VERMONT AVENUE BRIDGE WIDENING $ 3,827 6/30/2011

F1128 LA CITY BALBOA BL WIDENING AT RINALDI ST $ 121 6/30/2011

WIDENING SAN FERNANDO RD AT BALBOA F1129 LA CITY RD $ 172 6/30/2011

SAN FERNANDO RD-FLETCHER DR TO SR-F1130 LA CITY 2, ELM ST TO 1-5 FWY $ 207 6/30/2011

SAWTELLE BOULEVARD WIDENING AT F1167 LA CITY VENICE BOULEVARD $ 272 6/30/2011

F1302 LA CITY ATCS - WESTWOOD/WEST LA $ 420 6/30/2011

2 of 5 3/31/2011

ATTACHMENT B

Amount Lapse

CFP# Agency Project Title Subject to Lapse

Date

ATSCS - SANTA MONICA FWY CORRIDOR F1303 LA CITY PHASE 2 $ 799 6/30/2011

ATSCS - SANTA MONICA FWY CORRIDOR F1304 LA CITY PHASE 1 $ 794 6/30/2011

F1309 LA CITY ATCS - ECHO PARK/SILVER LAKE $ 605 6/30/2011

ATSAC/ATCS - COLISEUM/FLORENCE Fl336 LA CITY PROJECT $ 1,322 6/3012011

HIGHWAY-RAIL GRADE CROSSING Fl338 LA CITY IMPROVEMENT SYSTEM $ 1,634 6/30/2011

F1339 LA CITY ATSAC - FOOTHILL $ 498 6/30/2011

Fl345 LA CITY ATCS - LOS ANGELES $ 3,053 5/10/1908

Fl535 LA CITY BICYCLE WAYFINDING SIGNAGE PROGRAM $ 251 6/30/2011

CENTURY CITY URBAN DESIGN AND Fl6l2 LA CITY PEDESTRIAN CONNECTION PLAN $ 275 6/30/2011

EXPO LINE STN STREETSCAPE PROJECT-F16l3 LA CITY EAST CRENSHAW TO JEFFERSON $ 458 6/30/2011

EASTSIDE LIGHT RAIL PEDESTRIAN F1615 LA CITY LINKAGE $ 420 6/30/2011

WASHINGTON BLVD TRANSIT F1630 LA CITY ENHANCEMENTS $ 286 6/30/2011

LOS ANGELES CITY COLLEGE (LACC) F164l LA CITY PEDESTRIAN ENHANCEMENTS $ 139 6/30/2011

LOS ANGELES TRADE-TECH INTERMODAL F1645 LA CITY LINKS WITH BUS & METRO $ 173 6/30/2011

LOS ANGELES VALLEY COLLEGE (LAVC) F1657 LA CITY BUS STATION EXTENSION $ 75 6/30/2011

DOWNTOWN L.A. ALTERNATIVE GREEN F1704 LA CITY TRANSIT MODES TRIAL PROGRAM $ 439 6/30/2011

HOLLYWOOD INTEGRATED MODAL F1708 LA CITY INFORMATION SYSTEM $ 413 6/30/2011

EXPERIENCE LA.COM WEB 2.0 F1720 LA CITY INTERACTIVE TRANSIT MAPPING $ 133 6/30/2011

F1725 LA CITY WIFI ON THE GOLD LINE $ 815 6/30/2011

F1846 LA CITY ANGELS WALK NORTH HOLLYWOOD $ 153 6/30/2011

8084/ WINNETKA AVENUE BRIDGE WIDENING Flll5 LA CITY AND REHABILITATION (HBRR) $ 2,502 6/30/2011

3 of 5 3/31/2011

ATTACHMENT B

Amount Lapse CFP# Agency Project Title Subject to

Lapse Date

(ACCESS REGIONAL INTEGRATION OF PARATRANSIT F1716 SERVICES) RESOURCES $ 424 6/30/2011

LA CITY (PORT F1199 OF LA) SOUTH WILMINGTON GRADE SEPARATION $ 2,553 6/30/2011

EAST SAN GABRIEL VALLEY SOM PILOT 2314 LA COUNTY PROJECT $ 1,360 6/30/2011

SELAC-TRAFFIC SIGNAL 2316 LA COUNTY SYNCHRONIZATION CORRIDORS PROJECT $ 239 6/30/2011

WEST SGV SIGNAL SOM & BUS SPEED 2318 LA COUNTY IMPROVEMENTS $ 450 6/30/2011

GATEWAY CITIES TRAFFIC SIGNAL 4221 LA COUNTY CORRIDORS PROJECT, PHASE II $ 2,503 6/30/2011

SOUTH BAY SIGNAL SYNCHRONIZATION 4242 LA COUNTY IMPROVEMENTS, PHASE III $ 2,905 6/30/2011

6294 LA COUNTY SGV FORUM TRAFFIC SIGNAL CORRIDORS $ 2,138 6/30/2011

SAN GABRIEL COG (WEST SGV SIGNAL) 4243LK LA COUNTY ALSO PROJECT # 4244, 4245 $ 7,817 6/30/2011

SOUTH BAY FORUM TRAFFIC SIGNAL Fl311 LA COUNTY CORRIDORS PROJECT $ 20 6/30/2011

GATEWAY CITIES FORUM TRAFFIC SIGNAL F1312 LA COUNTY CORRIDORS, PHASE V $ 10 6/30/2011

EASTSIDE LIGHT RAIL BIKE INTERFACE F1511 LA COUNTY PROJECT $ 184 6/30/2011

4094B LA COUNTY EL PUEBLO PED IMPROVEMENTS $ 130 6/30/2011

INGLEWOOD AVE CORRIDOR WIDENING F1198 LAWNDALE PROJECT $ 1,019 6/30/2011

DOWNTOWN SHORELINE DR. TRAFFIC 6322 LONG BEACH MANAGEMENT SYSTEM $ 1,093 6/30/2011

PIER B STREET INTERMODAL RAIL YARD 8094 LONG BEACH EXPANSION $ 770 6/30/2011

ATLANTIC AVE SIGNAL SYNCHRONIZATION F1334 LONG BEACH & ENHANCEMENT PROJECT $ 2,706 6/30/2011

OCEAN BL. SIGNAL SYNCHRONIZATION F1341 LONG BEACH AND ENHANCEMENT PROJECT $ 1,406 6/30/2011

BICYCLE SYSTEM GAP CLOSURES & F1530 LONG BEACH IMPROVED LA RIVER BIKE PATH $ 103 6/30/2011

LONG BEACH CITYWIDE BICYCLE SAFETY F1531 LONG BEACH AND AWARENESS PROGRAM $ 69 6/30/2011

MANHATTAN NASH/DOUGLAS & ROSECRANS AVE 8056 BEACH INTERSECTION IMPROVEMENTS $ 357 6/30/2011

4 of 5 3/31/2011

ATTACHMENT B

Amount Lapse

CFP# Agency Project Title Subject to Lapse

Date

MONTEREY F1736 PARK WAYFINDING PROGRAM $ 110 6/30/2011

FI RESTONE BLVD BRIDGE WIDENING F1219 NORWALK OVER SAN GABRIEL RIVER $ 298 6/30/2011

PASADENA ITS MASTER PLAN F1320 PASADENA IMPLEMENTATION - PHASE II $ 380 6/30/2011

RANCHO BIKE COMPATIBLE RDWY SAFETY AND F1506 PALOS VERDES LINKAGE ON PALOS VERDES DR $ 56 6/30/2011

SAN SAN FERNANDO DOWNTOWN PEDESTRIAN F1640 FERNANDO IMPROVEMENT PROJECT $ 324 6/30/2011

SANTA I-5/MAGIC MT. PKWY (SR-126) 6363 CLARITA INTERCHANGE RECONSTRUCT. $ 729 6/30/2011

SANTA SIERRA HWY (CMP ROUTE) OVER THE 6364 CLARITA RAILROAD $ 788 6/30/2011

SANTA FE VALLEY VIEW GRADE SEPARATION @BNSF 8092 SPRING TRACKS $ 14,489 6/30/2011

F1534 SANTA MONICA BIKE TECHNOLOGY DEMONSTRATION $ 52 6/30/2011

SANTA MONICA REAL TIME BEACH F1728 SANTA MONICA PARKING SIGNS $ 66 6/30/2011

DEL AMO BOULEVARD EXTENSION (GRADE 4314 TORRANCE SEPARATION) $ 10,673 6/30/2011

CRENSHAW BL AT 182ND/I-40S ON/OFF Fl112 TORRANCE RAMP CAPACITY ENHANCEMENTS $ 788 6/3012011