Page 1: April 5, 2007

April 5, 2007

Networks Integration Management Office

Mission Support Process

Networks Integration Management

Office; Code 450.1

Page 2: April 5, 2007

Page 2NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

Network Integration Management Office Functions

The Network Integration Management Office (NIMO) provides its spacecraft and scientific customers with a complement of mission

services. The group provides best value tracking and data acquisition options, assistance with mission-unique communications requirements, and assistance in requirements definition.

The NIMO provides Principal Investigators and Mission Formulation Managers with options and planning assistance to effectively meet the

mission tracking and data acquisition (T&DA) needs. The NIMO also supports the mission throughout the life cycle for its T&DA needs - from trade studies and cost analysis during the formulation phase, to project

management during development and operations. In addition, the NIMO provides Network Integration Managers (NIM) with the ability to secure

contract vehicles and services to implement and operate their mission most effectively.

Page 3: April 5, 2007

Page 3NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Personnel & Assignments

Direct Civil Servants

Leslie Ambrose – Space Science

Mark Ambrose – Agreements & Reimbursable Manager

Jim Bangerter – Human Space Flight

Evette Brown-Conwell – ELV

Dick Harris – Contracts

Al Levine – Loading & Feasibility

Lynn Myers – Earth Sciences

Tammy Wang – Resource Analyst

Matrixed Civil Servants

John Weiss – Estimation

Dick Nefzger – Video

YY Bae – Compatibility

Chris Schwartz – L&F & ELV

Page 4: April 5, 2007

Page 4NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

Networks Integration Manager (NIM) Assignments

Designations: (C) Proposed Funding Cancellation; (D) Demo; (E) Engineering; (H) JSC Lead; (J) JPL Lead; (K) KSC Lead; (M) MSFC Lead; (P) Post-Science; (X) Information only; (Z) Pre-Formulation; * DAS candidate

Science Mission Directorate Space Operations Mission Directorate - Human Space Flight -

Jim Bangerter 301-286-7306

[email protected]

Space Sciences Leslie Ambrose/301-286-7767 [email protected]

Earth Sciences Lynn Myers/301-286-6343

[email protected]

Space Ops Mission Directorate Evette Conwell

301-286-9809 [email protected]

Operational International Space Station (Core(H)_Utilization)

(M) MeteoSat-7 (H) MeteoSat-8 (MSG-1) (H) Space Transportation System (H)

Implementation

ATV (ESA (H)

) HTV (JAXA)

(H) Formulation

CEV (M) (study)

ARES-1

Space Ops Mission Directorate Mark Ambrose

301-286-7433 [email protected]

Non-Reimbursable - Implementation

SBR (F-15 Aircraft) (D) (E) SBR (NSR-Terrier MK70) (D) (E)

Reimbursable - Formulation

Note: Mission name in ITALICS (no PSLA generated)

Operational

ACE Balloons Project Chandra XRO (J) CHIPsat (UNEX-1) Cluster-II FAST (SMEX-2) FUSE (MIDEX-0) GALEX (SMEX-7) GeoTail Gravity Probe-B HST IMP-8 Polar

RHESSI (SMEX-6)

Rossi XTE SAMPEX (SMEX-1)

(P) SOHO Spitzer (SIRTF) (J) SWAS (SMEX-3) (E) Swift* (MIDEX-3) TIMED (STP) TRACE (SMEX-4) WIND WIRE (SMEX-5)

(P) WMAP (MIDEX-2)

Implementation

AIM (SMEX-9) C/NOFS (CINDI)*

GLAST* IBEX (SMEX-10) LRO SDO Solar-B (M) STEREO (STP)

(J) TACSat-2 (Roadrunner)

TASS Demo (E) THEMIS (MIDEX-5)

Formulation

Constellation-X (Z) GEC (STP) (C) (Z) GM-RBM JWST (J) MMS (STP) WISE (MIDEX-6)

Operational

ACRIMSAT (J) CALIPSO CHAMP COBE (E) EO-1 EOS-Aqua EOS-Aura EOS-IceSat EOS-Terra ERS-2 GOES (9 thru 13) GRACE-1, -2 Jason-1 (J) Landsat-5, -7 NOAA-15, -16, -17 -18 Orbview-2

QuikScat

RadarSat-1 (J)

SAC-C

SciSat-1

SORCE TOMS/EP TRMM

Implementation

Glory GOES-O, -P NOAA -N Prime NPP OCO SAC-D/Aquarius

Formulation

GOES-R GPM*

NPOESS-1

Reimbursable - Implementation

Atlas DoD (ELV) Atlas ER (ELV) (Lockheed) Atlas WR (ELV) (Lockheed) DARPA/Orbital Express (Boeing)* H-IIA ETS VIII (ELV) (JAXA) Minotaur (OSP SLV ELV) P-3 (USNavy/DoD) Pegasus (ELV) (OSC) Sea Launch (Boeing)

SELENE (JAXA) Textron/Minuteman III (USAF)

Reimbursable - Formulation

MDA (DST) MDA (LeClair)

Non-Reimbursable - Operations

Delta NLS (K)

Atlas NLS (K)

Non-Reimbursable - Implementation

Demosat MPE SOAREX (D)

Non-Reimbursable - Formulation

Page 5: April 5, 2007

Page 5NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Access Methods

ProjectsProposal

Teams

Telephone E-mail Walk in

NIMO

Page 6: April 5, 2007

Page 6NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

External Interface to the Infrastructure

ESCDGSFC

Sp

ace

Net

wo

rk

Gro

un

d N

etw

ork

Lu

na

r N

etw

ork

NIS

N

Flig

ht

Dy

n. F

ac.

De

ep

Sp

ace

Ne

t

NIMO

NA

SA

No

n-N

AS

A NASA

Page 7: April 5, 2007

Page 7NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Major Process Steps

Customer & Code 450

agree to work together

GSFC Code 450 Network Integration ManagementMajor Steps

Define requirements

Configure

Test

Provide services

Evaluate

START

END

Formulation

Implementation

Operations

Page 8: April 5, 2007

Page 8NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Major Process Steps Details - Example

Receive/compile high-level customer

requirements

START

Create new or revise existing

MOA (if needed)

Preliminary feasibility assessment

Capableof meeting

req’ts.?

Negotiate with customer to refine

requirements

Yes

No

Yes

Customer requests network services

2 5 2 3

22

1

Conduct preliminary feasibility

assessment

Feasible?Negotiate

requirements

Reach satisfactory agreement?

No

NoYes

6

6

2

1

§ Prepare RF ICD§ Assess loading§ Assess coverage§ Prepare initial link

budgets (ELV)

6

8 3

Analyze requirements

8 6

DOCUMENTS

Memorandum of Agreement (MOA)

RFICD

Need MOA?

Needed for reimbursables, exchange of svcs., or collaboration

between orgs. or agencies

Yes

No

Receive funds (reimbursable missions only)

Military Interagency Purchase Request

(MIPR) or Purchase Order (PO); WBS

2

2

Reimbursable?

Yes

2

Formulation

2A 2B

NASA customer?

Yes

ANo

A

No

1

2

1

1

Coverage, Analysis, &

Loading Report

2

21

2C

2 NIMO Network Integration Manager

4 NENS Compatibility Test Engineer

5 PAAC II Agreements Coordinator

6 Network Loading & Scheduling

PROCESS LEGEND

7 NENS Network Operations Manager

8 RF Interface Manager

1 Customer

3 NENS Mission Commitment Engineer

9 PAAC II Support

S Service Providers

4

2

2

Code 450 Configuration-Controlled

Report

DOCUMENT LEGENDCustomer-Supplied

NENS-Controlled

1

2

3

4

Updated: 12/1/06

※ ※

Page 9: April 5, 2007

Page 9NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Mission Process Products

Memorandum of Agreement

Visibility and Loading Analysis - 1

Project Support Level Agreement

Visibility and Loading Analysis - 2

Networks Requirements Document

Networks Requirements Review

Radio Frequency ICD

Compatibility Test

Plan

Test

Quick Look Report

Final Report

Compat. Test Review

Customer Integration Test

Plan

Testing

Network Operations Support Plan

Customer Data Flows & Simulations

Visibility and Loading Analysis - 3

Mission Operations Readiness Review

Mission Operations

Post Launch Report/Lessons Learned

The NIMO mission development process exists, and is constructed, to assure, to

the maximum extent possible, communications connectivity and data

delivery to every mission on every contact.

Page 10: April 5, 2007

Page 10NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Process Timeline

ID Task Name Duration Start Finish Predecessors

1 Start 0 days Mon 1/1/07 Mon 1/1/07

2 RF Link Analysis 4 wks Mon 1/1/07 Fri 1/26/07 1

3 Feasibility Assessment 1 2 wks Mon 1/29/07 Fri 2/9/07 2

4 MOA 0 days Thu 3/1/07 Thu 3/1/07 2,3

5 Project CDR 0 days Fri 2/9/07 Fri 2/9/07 2,3

6 DMR 0 days Fri 2/9/07 Fri 2/9/07 2,3

7 PSLA 4 wks Mon 8/6/07 Fri 8/31/07 6

8 RF ICD 1 12 wks Mon 6/11/07 Fri 8/31/07 5

9 Feasibility Assessment 2 2 wks Mon 2/18/08 Fri 2/29/08 8

10 NRD 44 days Mon 3/3/08 Thu 5/1/08 6,8,9,7

11 Draft 4 wks Mon 3/3/08 Fri 3/28/08

12 Review (NRR) 0 days Fri 3/28/08 Fri 3/28/08 11

13 Update 1 wk Mon 3/31/08 Fri 4/4/08 12

14 Approve 0 wks Thu 5/1/08 Thu 5/1/08 13

15 Compatibility Test 175 days Fri 5/2/08 Thu 1/1/09 8,9,10

16 CTV Test Plan 2 wks Fri 5/2/08 Thu 5/15/08

17 CTV Testing 2 wks Tue 10/21/08 Mon 11/3/08 16

18 Compatibility Test Report 4 wks Fri 12/5/08 Thu 1/1/09 17

19 RF ICD 2 (DCN) 4 wks Fri 1/2/09 Thu 1/29/09 15

20 Customer Integration Test 142 days Fri 1/2/09 Mon 7/20/09 15

21 Customer Integration Test Plan 4 wks Fri 1/2/09 Thu 1/29/09

22 Customer Integration Testing 12 wks Tue 3/31/09 Mon 6/22/09 21

23 Customer Integration Test Report 4 wks Tue 6/23/09 Mon 7/20/09 22

24 NOSP 4 wks Mon 7/6/09 Fri 7/31/09 20FF

25 MORR 0 wks Fri 7/31/09 Fri 7/31/09 24

26 Launch 0 days Tue 9/1/09 Tue 9/1/09 25

27 Lessons Learned/Post-Mission Report 3 wks Mon 10/12/09 Fri 10/30/09 26

1/1

3/1

2/9

2/9

3/28

5/1

7/31

9/1

Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 22006 2007 2008 2009 2010

Page 11: April 5, 2007

Page 11NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

Backup

Page 12: April 5, 2007

Page 12NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Process Flow (cont.)

DOCUMENTS

Implementation

Establish contract (PSLA) & project

schedule

§ Complete RF ICD

Execute compatibility

test

3

2 3

Decline service

2

Reach satisfactory agreement

?2

Yes

No

4

END

Customer provides detailed

requirements1

9

2A 2C

Networks Requirements

Document (NRD)

Project Service Level Agreement

(PSLA)

1

1 2

7 8

2B

1

New capability?

No

Coordinate implementation of

new capability

Yes

2 NIMO Network Integration Manager

4 NENS Compatibility Test Engineer

5 PAAC II Agreements Coordinator

6 Network Loading & Scheduling

PROCESS LEGEND

7 NENS Network Operations Manager

8 RF Interface Manager

1 Customer

3 NENS Mission Commitment Engineer

9 PAAC II Support

S Service Providers

S

2

Code 450 Configuration-Controlled

Report

DOCUMENT LEGENDCustomer-Supplied

NENS-Controlled

1

2

3

4

2

Compatibility Test Report

Compatibility Test Plan

3

4

2 3

2

Assign priority

1 6

S

1

9

9

Create NRD(due L-1 year)

2 39

1S

Plan compatibility test to

demonstrate RF compatibility &

capability

Generate quick look report

Prepare Compatibility Test

Report

Review test results

2 3 4 8

4

4

3Updated: 12/1/06

Page 13: April 5, 2007

Page 13NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO Process Flow (cont.)

※※ ※※

Operations Launch and/or commence operations

Closeout

END

2 3

7 § Assess lessons learned

§ Prepare post-mission report (ELV only)

§ Submit final invoice (reimbursable only)

9

DOCUMENTS

Lessons Learned report

Post-launch report (ELV only)

2 NIMO Network Integration Manager

4 NENS Compatibility Test Engineer

5 PAAC II Agreements Coordinator

6 Network Loading & Scheduling

PROCESS LEGEND

7 NENS Network Operations Manager

8 RF Interface Manager

1 Customer

3 NENS Mission Commitment Engineer

9 PAAC II Support

S Service Providers

3 S

S

Code 450 Configuration-Controlled

Report

DOCUMENT LEGENDCustomer-Supplied

NENS-Controlled

1

2

3

4

4

4

Perform customer

integration test

Configure customer & NIMO

data & systems

Yes

Config. test successful/complete?

Resolve configuration

issues

No

Yes

1

3

Re-test

2 31

3

7

7

7

4

Validate (Operations

Readiness Review, other reviews as

required)

7

Prepare NOSP

7

9

9

S

SS

S 7 S 1 32

S

7 S

(May be parallel activities)

Capability/compatibility confirmed?

Negotiate with customer to refine req’ts., equipment,

methods

No

2 3 4

2 3

4 8

1

Operations Readiness Review

(ORR) Package

Network Test Report

Network Test Plan

3

4

Customer reviews

1

2

Network Operations

Support Plan (NOSP)

2

3

Updated: 12/1/06

Page 14: April 5, 2007

Page 14NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO PSLA Contents (Present)

Section A. Customer Information

Section B. Customer Requirements and Standard Services

B.1 GSFC Networks/Data Services

B.1.1 Ground Network Services

B.1.1.1 Customer Requirements

B.1.1.2 Services Provided

B.1.2 Space Network (SN) Services

B.1.2.1 Customer Requirements

B.1.2.2 SN Data Formatting and Interface

B.1.2.3 Services Provided

B.1.3 Customer Integration and Test

B.1.4 Satellite Laser Ranging (SLR) Services

B.1.5 Radio Frequency (RF) Interface Control Document (ICD)

B.2 Deep Space Network (DSN) Services

B.3 Flight Dynamics Services

B.3.1 Customer Requirements

B.3.2 Services Provided

B.4 Range Services – Not Applicable

B.5 NASA Integrated Services Network (NISN) Services

Section C. Unique Customer Requirements for Non-Standard Services

Section D. Service and Schedule Summary

D.1 Funding Responsibility

D.2 Estimated Services for Future Years

Section E. Projected Documentation Set

Page 15: April 5, 2007

Page 15NIMO MSR (September 1 – September 30, 2006)

NETWORKS INTEGRATION MANAGEMENT OFFICE

NIMO PSLA Contents (Future)

SECTION A. Customer Information

SECTION B. Customer Requirements And Standard Services

B.1 GSFC Networks/Data Services

B.1.1 Ground Network Services

B.1.2 Space Network Services

B.1.3 Customer Integration And Test

B.1.4 Satellite Laser Ranging (SLR) Services

B.1.5 Radio Frequency (RF) Interface Control Document (ICD)

B.2 Deep Space Network (DSN) Services

B.3 Flight Dynamics Services

B.4 Range Services

B.5 NASA Integrated Services Network (NISN) Services

SECTION C. Unique Customer Requirements For Non-Standard Services

C.1 AFSCN Requirements

SECTION D. Service And Schedule Summary

D.1 Funding Responsibility

D.2 Estimated Services For Future Years

D.2.1 Project Schedule

SECTION E. Network Integration Documentation Set