Upload
jalene
View
90
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier). 13-October-2008. MTCC. M agnet T est and C osmic C hallenge. Summer/Autumn 2006. Goals: Test a “vertical slice” of all aspects of final CMS on the surface Commission the CMS magnet Measure the magnet field map. ECAL. - PowerPoint PPT Presentation
Citation preview
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
13-October-2008
Cosmic Results 2
MTCC
2
HCAL
Magnet
Tracker
Muon chambers
barrel & endcap
ECAL
Summer/Autumn 2006
Goals:
Test a “vertical slice” of all aspects of final CMS on the surface
Commission the CMS magnet
Measure the magnet field map
Magnet Test and Cosmic Challenge
Cosmic Results 3
Golden MTCC event
Run 2605 / Event 3981 / B=3.8 T / 27.08.06, 22hMuon traversing DT, RPC, HCAL, ECAL, Tracker
HCAL
HCAL
ECALTracker
Cosmic Results 4
Cosmic Muon Measurements
4
B=0 B=4T
Momentum Distribution (4T)
Behavior of detectors in the magnetic field was verified using MC and physical
observables
Cosmic muon charge ratio
measurement from MTCC
CMS NOTE-2008/016
Cosmic Results 5
Field map
• Measured during MTCC ‘06
• Finite element calculation of field in entire detector volume performed (at 2, 3, 3.5, 3.8, 4 T)
• Field map with 12-fold phi-symmetry provided for physics
• Analysis of field mapper data: – Calibration corrections of order 10-4 in gain and
offset derived, to produce field model that agrees better than 5*10-5 with measurements and with Gauss' law in tracker volume (note: original calibration ~5*10-4 !) [PhD thesis V.Maroussov, Purdue University, May 2008.]
∆
B = 0...
3.8T map
Z (m) R (m)
δBz
(T)
Cosmic Results 6
First cosmic muon
triggers underground
Upgrade to final DAQ software architecture
First coincidence of 2 subsystems
Reached scale of ’06 Magnet Test &
Cosmic ChallengeFinal DAQ hardware,
final services
Muon Tracks in Si-Strip Tracker
Subdetector and trigger considered separately - 19 items, each equally weighted - box size represents approx. fraction included (25%, 50%, 75%, 100%)
With exception of some parts of RPC, all CMS detector and trigger system ready for LHC
% C
MS
ALL CMS with exception of ½ RPCE
Start of full week exercises
(CRUZET 1)
Global Runs
Cosmic Results 7
Fraction of CMS Systems in Global Runs
Fraction of Live Front Ends in CMS Global Runs
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Fra
ctio
n
HCAL
ECAL
DT
CSC
RPC
StripTrackerPixelTracker
Mu
on
Cabling complete, final power & cooling
become available
Cooling ready for Strip Tracker
Pixel system and ECAL endcaps
installed
Cosmic Results 8
“Integrated (cosmics) luminosity”Events collected by CMS in global runs during 2008
Cruzet3
Cruzet4
Cruzet2
Cruzet1
September 10
DAYS after March 31, 2008
Cosmic Results 9
DT Cosmic Muon Movie
Cosmic Results 10
CRUZET: Cosmic Muon Coincidence
ECAL
HCAL
DT and RPC
Cosmic Results 11
CRUZET: showering muon
Energy: ~290 GeV
Cosmic Results 12
z (a
t su
rfac
e) [
cm]
x (at surface) [cm]
Tag & Probe with cosmics
“X-ray” image of the shaft using cosmic rays
linea
r sc
ale
Probability to find at least one segment at the probe side
[deg]
TOF-compensated cosmic trigger: di-muon-like signal in DT
Probe muon trigger and reconstruction
12
Cable chimney
Soft muons
absorbed
TOPBOTTOM Cosmic rays extrapolated to the
surface (80m)
Cosmic Results 13
CRUZET ECAL Barrel Occupancy– Cosmic signal is reconstructed as cluster in 5x5 region
with seed crystal(s) above a threshold (~100 MeV)• 2M events selected from 13.6M logged events (15% of muon triggers)• 61K crystals, O(100) events/crystal in top-bottom regions
TOP BOTTOM
EB
+E
B-
Supermodules intentionally left susceptible to noise for diagnosis
HV problem caught by prompt analysis team
Masked trigger tower
Cosmic Results 14
in detector units
in
det
ect
or
units
Reconstructed clusters matching muon tracks
(DT triggered events)
ECAL
e/ trigger tested by triggering on m.i.p. signal
synchronized to muon & HCAL triggers
Trigger acceptance
Trigger acceptance
Track-cluster association
trigger: 290 GeV cluster!
14I. Mikulec
3x3 energy deposit for cosmic muons – confirms absolute energy scale to few %
GeV/cm
Cosmic Results 15
CRUZET3 Global Tracks: Tracker + Drift Tubes
Prerequisites:
infrastructure, -trigger, DAQ integration,
r/o synchronization,
muon calibration, reconstruction/tracking, etc. ...
Global Run Jul08 Tracker
ECAL
HCAL
Muon System
Tracker
15
Cosmic Results 16
CRUZET3: Global Tracks
Tracker
ECAL
HCAL
Muon System Di-muon Trigger:
• Drift-Tube coinc. in top+bottom, each 2 station segments
Muon signals traced through• muon system• Tracker TOB+TIB• ECAL• HCAL
Global track fit
Data being used for alignment
16
Cosmic Results 17
CRUZET4: Endcap ECAL
Cosmic Results 18
CRUZET4: ECAL Endcap
Cosmic Results 19
CRUZET4: Endcap ECAL
19
DT
Endcap ECAL
Barrel ECAL
HCAL
Cosmic Results 20
Tracker/Pixel
20
Aug08: all parts of Tracker integratedFirst cosmic tracks with Pixels
Pixel
Cosmic Results 21
Testing the muon High-Level Trigger
• Routinely running High-Level-Trigger menu (+ dedicated cosmic muon trigger path)
• Global fit with “L3” tracker track, seeded from “L2” muon track, seeded from “L1” trigger candidate:
Run 58733, event 1741135
0T
Cosmic Results 22
Standard MuonID sequence (Cruzet III)
• Part of the standard muon ID
• 90k events with tracker track (B off)
• Tracker tracks are extrapolated outward and matched to
– Muon segments
– Calorimeter deposits
0T
Calorimeter only!
Muon compatibility
No. of matched segments
Δx between track extrapolation and muon segment in station 1 (cm)
Cosmic Results 23
Cosmic Shower Events:
• 0.02% rate of events with >100 segments in ~10M cosmic events at 0T
• Event-by-event spread in phi compatible with multiple scattering → all events compatible with ~parallel muon shower
Cosmic Results 24
Muon multiplicity
Analyzed events spanning 5 orders of magnitude in muon multiplicity !
illustrates versatility and robustness of detector and software
Run 50908event 1057286541 segments
Cosmic / Beam Halo O(1) muon
Cosmic ShowerO(10-100) muons
Beam “splash” eventO(105) muons
Analysis using: tracks ... segments ... hits cosmic charge ratio shower origin shower energy and shape
... ... ...
Cosmic Results 25
8.1 GeV
25
3.1 GeV
Dedicated muon reconstruction
• Navigation + seeding optimized for cosmic and beam halo muons
– not pointing at IP, traversing whole CMS– using default propagator + Kalman Filter fit, updated to
work both with B on and off
6.2 GeV
12.6GeV
38.1GeV3T
CMS Note -2008/001
Cosmic Results 26
Cosmic-Muon Momentum Spectra
• Measuring the momentum:
– Using centrally RECOed data from run 60302:
Muon system Only Tracker only
Momentum (GeV/c) Momentum (GeV/c)
Short run at 3T