ECRB MINUTES May 24, 2017 TO: All Engineering Criteria Review Board Members FROM: Lawrence J. Goldzband, Executive Director (415/352-3653; [email protected]) Rafael Montes, Senior Staff Engineer (415/352-3670; [email protected]) SUBJECT: Approved Minutes of May 24, 2017, BCDC Engineering Criteria Review Board Meeting 1. Call to Order. The meeting was called to order by the Chair, Dr. Roger Borcherdt at 1:00 p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were present: Dr. Roger Borcherdt, Board Chair, Robert “Bob” Battalio, PE, Professor Mary Catherine Comerio, Richard B. Dornhelm, PE, Lou Gilpin, PhD, CEG, and William Holmes, SE. The following Board Members were not present: Professor Martin Fischer, James “Jim” French, PE, GE, Professor Jack Moehle, Frank Rollo, PE, GE. BCDC Staff Members present were: Mr. Brad McCrea, Regulatory Director, Ms. Jaime Michaels, Chief of Permits, Rafael Montes, Senior Staff Engineer and Board Secretary and Elena Perez, Permit Analyst. The audience included the following: Cleve Livingston, Laconia Development LLC, Sam Yao (Simpson Gumpertz & Heger - SGH), Jeff Fippin (ENGEO), Pedro Espinosa (ENGEO), Todd Bradford (ENGEO), Jason White (BKF Engineers), Justin Aff (CMG Landscape Architecture), Maximo Argo (SGH), Luther Greene (RYC), C. Michael Lederer (Brickyard Cove) Mr. Montes addressed the meeting's agenda as well as some housekeeping items at the start of the meeting; those included location of restrooms, exits and several other items. Chair Borcherdt called for introductions. During introductions Board Member Battalio stated that Environmental Science Associates had done work for the City of Richmond. He asked the applicant if they felt he should recuse himself from the project review and discussion. Mr. Livingston, the project representative, stated they would have no objection to getting Mr. Battalio's input on this project and would appreciate it.

Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

ECRBMINUTESMay24,2017

TO: AllEngineeringCriteriaReviewBoardMembers

FROM: LawrenceJ.Goldzband,ExecutiveDirector(415/352-3653;[email protected])RafaelMontes,SeniorStaffEngineer(415/352-3670;[email protected])

SUBJECT:ApprovedMinutesofMay24,2017,BCDCEngineeringCriteriaReviewBoardMeeting

1. CalltoOrder.ThemeetingwascalledtoorderbytheChair,Dr.RogerBorcherdtat1:00p.m.,intheBeniciaConferenceRoomat455GoldenGateAvenue,SanFrancisco,California.

ThefollowingBoardMemberswerepresent:Dr.RogerBorcherdt,BoardChair,Robert“Bob”Battalio,PE,ProfessorMaryCatherineComerio,RichardB.Dornhelm,PE,LouGilpin,PhD,CEG,andWilliamHolmes,SE.

ThefollowingBoardMemberswerenotpresent:ProfessorMartinFischer,James“Jim”French,PE,GE,ProfessorJackMoehle,FrankRollo,PE,GE.

BCDCStaffMemberspresentwere:Mr.BradMcCrea,RegulatoryDirector,Ms.JaimeMichaels,ChiefofPermits,RafaelMontes,SeniorStaffEngineerandBoardSecretaryandElenaPerez,PermitAnalyst.

Theaudienceincludedthefollowing:CleveLivingston,LaconiaDevelopmentLLC,SamYao(SimpsonGumpertz&Heger-SGH),JeffFippin(ENGEO),PedroEspinosa(ENGEO),ToddBradford(ENGEO),JasonWhite(BKFEngineers),JustinAff(CMGLandscapeArchitecture),MaximoArgo(SGH),LutherGreene(RYC),C.MichaelLederer(BrickyardCove)

Mr.Montesaddressedthemeeting'sagendaaswellassomehousekeepingitemsatthestartofthemeeting;thoseincludedlocationofrestrooms,exitsandseveralotheritems.

ChairBorcherdtcalledforintroductions.

DuringintroductionsBoardMemberBattaliostatedthatEnvironmentalScienceAssociateshaddoneworkfortheCityofRichmond.Heaskedtheapplicantiftheyfeltheshouldrecusehimselffromtheprojectreviewanddiscussion.

Mr.Livingston,theprojectrepresentative,statedtheywouldhavenoobjectiontogettingMr.Battalio'sinputonthisprojectandwouldappreciateit.

Page 2: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

2

ECRBMINUTESMay24,2017

2. ApprovalofDraftMinutesforMarch21,2017,EngineeringCriteriaReviewBoard(ECRB)Meeting.

MOTION:BoardMemberComeriomovedapprovaloftheminutes,secondedbyBoardMemberHolmes.

BoardMemberDornhelmnotedonpage2,thesecondparagraphfromthebottommentionedtheAlamedaNavalWeaponsStation.HestateditwastheAlamedaNavalAirStationorNavalAviationDepot,notaWeaponsStation.

BoardChairBorcherdtcorrectedpage15asfollows:

Strikethelastparagraphbeginningwith"HerequestedtheBoard'scomments..."andreplaceitwithtwoshortsentencessaying:"TheBoardunanimouslyrecommendedthataletterbedraftedtoacknowledgethecontributionsoftheCSMIPprogram.TheChairvolunteeredtodraftaletterforreviewbytheBoardthatwouldbesenttotheExecutiveDirectorofBCDCforconsideration."

Inthesecondparagraphchange"TheChairacknowledged"to"TheBoardacknowledged"becausetherewasquiteabitofdiscussionamongtheBoardMembersastothatitem.Alsomovethelastsentenceinthatparagraphbeginningwith"Hementionedbrieflytheongoingwork..."totheprecedingparagraph.

Inthefirstparagraphstrikeoutthewords"disclosedhisintervention"andreplacethatwith"indicatedhisparticipationattheinvitationofBCDC."

Attheendofthatsentencealsoaddthephrase"asdocumentedinthetechnicalspecificationlettersprovidedbyCSMIPandtheapplicant."

VOTE:Themotioncarriedunanimously.

3. ApprovalofLetterofAcknowledgementforOutstandingContributionsofCSMIP.

MOTION:BoardMemberDornhelmmovedapprovaloftheletter,secondedbyBoardMemberGilpin.

VOTE:Themotioncarriedunanimously.

4. BoardDiscussion:LatitudeProject(formerlyreferredtoastheTerminalOneProject)(Pre-Application).BoardChairBorcherdtannounced:WehadanovervieworintroductiontothisprojectatameetingonJune7,2016,whichwasajointmeetingbetweentheECRBandtheDesignCriteriaReviewBoard.SowiththatsaidIwillturnitovertotheApplicant.

Mr.LivingstonaddressedtheBoard:Welookforwardtogettingyourinputandguidanceontheengineeringcriteriaissuesthatwearedealingwithonthisproject.

ThisisaprojectthatwillinvolvetherepurposingoftheTerminalOnewharfthatisover100yearsold.ThatrepurposedwharfwillserveasthecenterpieceforawaterfrontparkthatwillextendthelengthoftheshorelineoftheTerminalOneProject.

Page 3: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

3

ECRBMINUTESMay24,2017

ThestructuralengineeringissuesthatwillberaisedbythisrepurposingofthewharfwillbeaddressedbySimpsonGumpertz&HegerandwehavetworepresentativesfromSGHheretoday,SamYaoandMaxArgo.Theywillbepresentingadiscussionabouttheconditionassessmentthattheyperformedonthewharfandtheshorelineprotectionandinadditiontheywillbesharingtheirthoughtsregardingtheresultsofthestructuralanalysisthattheyhaveperformedonthewharf.

TheyhavebeenworkingverycloselywithourgeotechengineerENGEO.HeretodayfromENGEOwehaveJeffFippin,PedroEspinosaandToddBradford.Jeffwillbesharingwithyousomethoughtsaboutthegeotechnicalanalysisthattheyperformedonthesiteandwillalsobediscussingthedeep-soilmixingtechnologythatwewillbeusingtostabilizetheshoreline.

Inaddition,ENGEOandSGHhavebeenworkingwithourcivilengineeringteamthatisfromBKFtodotheanalysisthatisgoingtobecriticaltotheimprovementofthesite.WehaveheretodayfromBKFJasonWhitewhowillbesharingwithyousomethoughtsthatwehaveregardinghowwearegoingtobedealingwiththefloodriskthatisassociatedwiththedevelopmentofthesiteaswellaswithsealevelrise.

AndthenfinallywehavewithustodayJustinAfffromCMG.CMGisthelandscapearchitectontheprojectandIthinkitisfairtosaythatthesuccessofthisprojectwilllargelydependuponthecreativityofCMGintermsofcomingupwithimprovementsthatwillsignificantlyanddramaticallyenhancethepublicaccesstotheshoreline.

Iwouldliketorunthroughsomeslidesthatwillgiveyousomehistoricalcontextforthisprojectandalsowillsetthelanduseplanningstageforthediscussionofengineeringcriteriathatwillfollow.

ThisfirstimageisarepresentationanditshowsthelocationoftheprojectsiteinRichmond.Thesiteislocatedona13-acreportionoflandthatextendsintotheBay.Itisaveryunusualsite,auniquesite,becauseitprovidesnotonlypanoramicviewsoftheentiretheBaybutitalsoprovidesdirectandintimateopportunityforconnectingwiththeshorelineenvironment.

ThisistheRichmondBridge.OverontheeastoftheprojectsiteistheRosietheRivetermuseumandthereconditionedFordplant.Thisiswherethenewferryterminalwillgo.Sothepropertyisextremelywell-situatedintermsoftheregionaltransportationgrid.

Thisisanaerialviewwiththelandplanthatweareproposingsuperimposedupontheadjacentpropertyareas.Again,thisprojectsiteishighlyunusualinthesensethatitissurroundedonthreesidesbynaturalelements.

Theportfacilitythatexistedonthesitewasoriginallyconstructedin1915.Thereisa94,000-square-footwarehousethatstillexistsonthesite.ThispropertyisallbuiltonfillandthereweresomeadditionalindustrialrelatedusesalongtheshorelinebutBrickyardCovewasundevelopedatthetime.

Page 4: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

4

ECRBMINUTESMay24,2017

TheYachtClubhasbeenbuiltimmediatelyadjacenttotheTerminalOnesiteandthentheCovehasbeendevelopedintoaresidentialenclavetotheeastoftheRichmondYachtClub.

ThisisapictureofthesiteaftertheRichmondRedevelopmentAgencytookstepstopreparethesiteforredevelopment.In2002theRichmondRedevelopmentAgencyremovedthestoragetanksyousawinthepriorpictureandtheytookstepstoremediatetheexistingcontaminationonthesite.Thoseactivitiescontinueduntil2008andthesitehasremainedrelativelyunchangedfrom2008.

Althoughthestoragetankshavebeenremovedthesiteislargelystillcoveredbyhardscapeelements,foundationsforthetanksandothermaterialsthatwillneedtoberemovedasthepropertyisredeveloped.

Therearereallytwomajorelementsofthisproject.Oneisaresidentialdevelopmentthatconsistsof316residentialunits.

Therewillbe295condominiumflatsandthoseflatswillbelocatedinfivefour-andfive-storybuildingsthatarespreadacrossthesite.

ThesecondmajorcomponentoftheprojectisthewaterfrontparkandthatparkwillextendfromtheintersectionofDornanDriveandBrickyardCoveRoaddowntothesouthandwraparoundtheresidentialportionofthesiteandcomebackinandreconnectwithBrickyardCoveRoad.

Itincludesacoupleofveryimportantfeatures:

One,anextensionoftheBayTrail,whichwillpickupBrickyardCoveRoadhereandrunalongtheoutsideofthelooproadwaythatwewillbeconstructingtoprovideautomobileaccesstothewaterfront.TheBayTrailwillrunalongtheoutsideofthatlooproadrepurposingthewharfintoapublicparkfeaturethatwillbethecenterpieceofthiswaterfrontpark.

Allofthedevelopmentwithinthe100-footshorelinezoneisintendedtoaccommodatethepublicandpublicaccess.

Wearecurrentlyworkingonimprovementsforthewharf.Wewouldliketohaveawooddeckhereanditwillprovideanelevatedplatformforviewingandperhapssomepicnicactivities.

Wewillhavealittle,informalamphitheaterhere.Itisjustasmall,informalareawhereyoucouldhaveaweddingorsomethingofthatnature.

Wewillhaveaturfareawhichwillsupportsomeinformalactivitiesandagardensectionofthedeckthatwillprovidesomealmost-nativehabitatforviewingandsitting.

SowiththatwhatIwouldliketodoisturnthepodiumovertoSamYao.Samwillintroducethevariouselementsoftheprojectthatweareheretodaytodiscuss.

Mr.Yaomadethefollowingpresentation:Clevejustgaveanoverviewoftheproject,heisfromLaconia.

Page 5: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

5

ECRBMINUTESMay24,2017

CMGisgoingtotalkalittleaboutthelandscaping,that'saworkinprogress.

ThenthegeotechENGEOisgoingtopresentthegeotechnicalexplorationfindingsandIwilltalkaboutthestructuralconditionofthewharf.

ThenJasonWhiteisgoingtodiscussthefloodingandsealevelriseissues.

Iwillthenpickitupwiththeshorelineprotectionassessment.

Justin,doyouwanttosaysomethingaboutit?

Mr.Affreplied:ThelandscapedesignforthewharfisagreatamenityforprovidingpublicaccesstothewaterfrontaswellasavarietyofotheramenitiesthatClevedescribed.

Themainprogramspacessitwithinthehistoricfootprintofthewarehouseanditisplannedtoraisethatupbetween18and24inchestoacceptsoil,structuralelementsforthedeckanddrainage.ThisdesignwaspresentedtotheBCDCDRBapproximatelyoneyearagoandwearecurrentlyrevisingthedesignaswecoordinatewiththestructuralandgeotechnicalengineersandwewillbecomingbacktotheBCDCDesignReviewBoardwithinthenextfewmonthstopresentthereviseddesign.

Mr.Fippincommented:IamJeffwithENGEOandIwilltalkaboutthegeotechnicalaspectsoftheproject.

ENGEOhascompletedreportsatthesitein2003,2014and2016andanothergeotechnicalengineerworkedonthesiteinthelate'90s.

Somostrecentlyweperformedthreedeepborings,onebehindthewharf,oneinthemiddleofthewharfthrougharockdikeandoneoutnearthewater'sedgeaswellassomeCPTstobetterinformtheshorelineconditionsfromageotechperspective.

Sobasedonallthatdatawecreatedthiscross-section,whichisveryrepresentativeofwhatweseeacrossthesite.Thesitewasbuiltabout1915;sowhentheyfirstdevelopedthesitetheyreclaimedtheland.Allofthesiteatthewharfandthebacklandsareallreclaimedland;filloverwhatusedtobetheBay.

Tofirstreclaimthesiteadredgingprocesswasperformed;aslotcutwasmadeandthenitwasbackfilledwitharockdike.Thereisanas-builtthatshowsyoungBaymudbelowthebottomoftherockdike.Toconfirmthatwedrilledthroughtherockdikeandconfirmedthattherewas10feetofsoilbelowtherockdike,whichmatchesverywellwithwhattheas-builtdocumentsshow.Sotheyplacedtherockdikeandthenputfillbehindit,whichisamixreallyclosetotherockdike,itisamixofBaymuddredgedfromhereandrockfromthehillsidecut.Asyoumovefurtherinlanditismostlyrockcut.

Inthiscrosssectiontheoriginalshorelineis1,000feetbeyondtheedgetotheright.BedrockatthesiteisprimarilyrocksassociatedwiththeFranciscancomplex.

Page 6: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

6

ECRBMINUTESMay24,2017

Wedidsomeslopestabilityanalysis.Underastaticconditionthisslopeisplentystablebutunderseismicloading,underthedesignearthquakeunderthecurrentCaliforniaBuildingCodeweidentifiedbothwithcircularandnon-circularfailuresurfacesafailuresurfacethatwantstotravelalongtheyoungBaymudandgowellbackintothesitehundredsoffeetandcouldperhapsdisplaceontheorderoffeet,whichwouldbeunacceptableforboththewharfaswellasthestructuresthatwewanttobuildbehind;soourmitigationforthatistobuildabuttressinthegroundbydoingdeep-soilmixingbehindtherockdike.Therockdikeessentiallywrapsaroundtheentireshoreline.

Itisrelativelyofsimilarconfiguration.Soitessentiallyformstheentireshorelineandthenriprapwasplacedatopit.Sotherockdikeitselfisamix.Itisamixofsandandgravel.

Weknowfromtheas-builtthattheycutaslotthatlookedlikethis.Thebathymetryshowsthatthereissoiltheresowehavejustputinsoilthathasverylowstrengthandatinybitofweightinourmodelingbecauseweknowthatitwasin-filledprobablythroughaccretion.Inourstrengthmodelingthathasverylowstrength.Andwedrovethroughittoo;wehaveaboringthatwasoverhereandencounteredverylowstrength,verylowdensitysoil.

Sobecauseoftheextremelysoftsoilatthesiteandthecomplexityofhavingrelativelyshallow,relativelyhardbedrock,wedidasiteresponseanalysistodetermineifthesoftsoilwouldaffectthegroundshakingatthesiteforstructuralanalysis.

WefollowedASCE7-10procedureswherewecameupwithatargetspectrumthatrepresentedbedrockbasedonthedesignspectrumfromtheBuildingCode,selectedfiverepresentativegroundmotionsthatarecommonlyusedinthearea,matchedthemtothetargetspectrumandthendidone-dimensionallinearequivalentsiteresponseanalysisandcameupwithdifferenttimehistoriesatthegroundsurfaceastheytraveledthroughthesoilcolumn;andthencomparedthoseperthebuildingCodetothe80percentmappeddesignresponsespectrumandcameupwiththeenvelopingcurvethatdoesn'tgobelowthe80percent.

SowhatweseeisthatifyouweretocomparethesiteclassE;atthereallylowperiodsthepeakgroundaccelerationisslightlybelowthetargetspectrum.Intheperiodsofinterestofthestructure,somewherearound0.75ofasecondouttoabout2secondstheaveragespectrumisgreaterthantheCode.ThenatreallylongperiodsitwantstobelowerthantheCodeandwejustmatchittotheCode.

Ithinkitissoftsoiloverstiffrock.ItcomesupwithsomethingthatintheperiodofinterestofthisstructureishigherthanwhattheBuildingCodewouldtellyou.WethinkwegotthespectrumdialedinreallywellandthenSGHusedthatfortheirstructuralanalysis.

Mr.Livingstoncommented:IthinkwhatwesaidattheJune7thpresentationswerethatwehadnotfoundtheas-builts.BKFwentthroughtheirfilesandfoundas-builtplans.

Mr.Yaocontinued:Iwilldiscussourassessmentoftheexistingstructuralconditions.

Page 7: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

7

ECRBMINUTESMay24,2017

Thewharfifabout550feetby91feetandrightnowthereisawarehouseontopofthat.

Thestructureisaverythinconcretedeck,about5inches,supportedonbeamsandgirdersandsupportedbyover500piles.

Thisisageneraloverviewcross-sectionofthewharf.Thosepilesareessentiallyona10feetgrid.Therearesometimberpiles,batteredtimberpiles.Essentiallyit'smeanttobedesignedfortakingtheberthingloads.Itusedtobeberthingalotofshipsandbarges.

Thebackofthestructureseismicdesignisacolumnsupportingapilecapandsupportingatimberpile.

Onthelandsideofthewharfthereisabulkheadwall,aconcretebulkheadwalldividedbythe20inchby20inchsquarecolumns.

Thisisthetypicalbandsinthemiddle.Thosebeamsarerunningtransverseandlongitudinalandhaveacoverconnectedwiththepileunderneathandthatisthepilecaprunning.

Ifyoulookatthespiralsonthosepiles;thoseareverymuchclosetoourmoderndesigns100yearslater.Backthentherewasnoconceptofhinge.

Sowehaveallthedetails.Weknowthewharfverywell.

Wedidacorethroughthedeck,throughthepileandthroughthebeam.Thepilesstartingfromthemeanlowwateruptotheundersideofthedeck,includingsomeofthebeams,hadshotcreteforprotection.

Youseesomeofthecoreswehavetakenarefromtheconcretepiles.Herewefoundtherebarandwearecoringbetweentherebar.Thatistherealconcretepile.

Thisisthecorethroughtheback.Wehaveasphaltonthetopandtheconcreteonthedeck.

Thestrengthisnotrealhighbutitisprettycommonbythestandardof1915,3,000/4,000psi.

WeratedeachpileaccordingtotheAmericanSocietyofCivilEngineersManualofPracticeforratingthepiles.Asyoulookatthis,thosearethestandardsoftheindustry.

Ifweratedthepileasmoderatedeteriorationitmeansthatyouwouldseecracksoverit.

Butifitismajoritmeansthatyouseespalls,youhaveverylargecrackscomingupbutitdoesnotshowtherebar.

Onceyouhaveamajorspallexposingtherebarwecallitsevere.Severeisawiderange.Youcanshowthattheconcretespallexposedtheoldrebaruptothewholesection.Asweshowherethewholesectionofconcreteisgone.

Page 8: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

8

ECRBMINUTESMay24,2017

Soitisaverywiderangebuttheratingsfollowthestandard.Thisisthesummaryofthepileratingswefound.

Thisistheshotcrete,hereistheshotcrete.Butrightinthefrontthereisnoshotcrete.Myguessisbythetimetheydidtheshotcreteitwasalreadybroken,essentiallybroken.Butthispartisvery,veryneartothewharf,therewasnotshotcrete.Iwouldsay60to70percentofthepilesinthetidalzonewereshotcretedtoprotecttheconcretebecausethetidewentupanddown.Butthisiswayabovethetide.

Wedidnotcuttherebar.Butbasedonthecoreswehavetaken,passingthroughtheshotcretetogettothereinforcedconcrete,thestrengthisgood,theconcretewasnotdeteriorated.Wedidnotlookattherebar.Butatthispointthemajorityofthepileshad4to7inchesofshotcreteprotectingthem.Iftheshotcretestayedaroundfor10,15yearsthereisasignificantcorrosionoftherebar,thatshotcreteisnotgoingtobeabletocontainexpansionofthecorrosion,itisgoingtocrack.

Wecannotsaythatpartiallycorrodedrebarwasprotectedfromfurthercorrosiononcetheyputtheshotcretein.However,theconcretetestingshowsthatthechlorides,thesaltintrudingintothepilesexceededthethresholdforthestartingofcorrosionwithinthosepiles.

Thetestingreportwegotbacksaidthatthereisnothingirregularintheoriginalconcretepile.

SoIwanttogiveasummaryoftherating:33pilesareMinor.ThemajorityofthepilesareinModeratecondition.ThenwehavegotMajordeteriorationofabout20percentofthepiles.ThentheSeveredeteriorationislessthan5percent,about30pilesareinSeverecondition.

Itisveryhardtotelltheconditionsofthetimberpiles.Butingeneralouranalysisdoesnotnecessarilydependonthetimberpiles.Weunderstandthosetimberpilesstayaroundfor100years.Wearenotintentionallyassigningasignificantvariancetothosetimberpiles.

Thetimberpileswereputinfortheberthingloads.

WelookedattheSevereconditionofcertainpiles.AmongtheSevereratingofpilesthereisawiderangeofconditions.Aswemoveaheadtofinalizeourdesignwewanttokeepthisinmind.

Wewilldeterminelaterhowmanyneedtobereplaced.Rightnowwearejustpresentingtheconditions.Itwillverymuchdependonwhatwedowiththewharf,howmuchlandscapingisontopofthis.ButingeneralwewouldliketorepairtheSeveredamagedpilestomeetthesafetyrequirementsoftheCaliforniaBuildingCode.

Fromastructuralperspective,withoutinformationfromthegeotech,fromastructuralperspectiveweareworkingwiththelandscapingarchitecttotrytocomeupwitha35percentdesignbutwearenotthereyet.

Page 9: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

9

ECRBMINUTESMay24,2017

Mr.Montescommented:MyassessmentisthatitwillcomebacktotheECRBforafullassessmentofthegeotechnicalandstructuralaspects.

Mr.Yaoadded:IwouldsaythatwhatwepresenttotheDesignCriteriaReviewBoardtodayiswhatwearegoingtostickwithfora35percentdesign,75percentdesignanda100percentdesign.Iwillcomebackandpresenttheseismiccriteriaandjustthedesigncriteria.Wearegoingtostickwiththataslongasyouapproveit.Butthe35percentresults,typicallyyouarelookingforacceptance,approval.Wearenotquitethereyetbutwearealmostthere.

Wearelookingforyourinputnowatour35percentdesignstage.

BoardMemberBattalioasked:Forthosepilesthataremoderatelydamagedwouldyouanticipatethattheymayprogresstoamoreseverelevelofdamagethroughspallingorotheractionduringthelifeoftheproject?

Mr.Yaoreplied:Laconiahiredustofinishthedesign.Iwillserveasthestructuralengineerofrecord.IwouldmakeaformalrecommendationtoLaconiathatyouneedtohaveperiodicalinspectionstomonitorthedeteriorationofthepiles.Ofcourseallthepilesdeteriorate,someofthemfaster,someofthemslower.EventheCaliforniaBuildingCode,Chapter31F,doeshavearecommendationbasedontheconditionofthepile,howoftenyouneedtodoapileinspection.SowewillaspartofourdesignpackagegivearecommendationtoLaconiaforinspectionandgivethemallthepileinspectionrecordswemadesoeitherwedoitorsomebodyelsecandoit;that'sthebase.

BoardMemberBattalioclarified:Sotheassumptionthenisthatthemoderatelydeterioratedpileswouldhaveacapacityorwhatever,exceedingwhateverdesignlevelisrequired?

Mr.Yaoagreed:Thatiscorrect.Wethinkthattheshotcrete,thestrengthisreasonablyhigh.Theshotcretecontainedawiremesh.Butourstructuralassessmentignoredtheshotcrete,justassumedtheoriginalconcretepileswith4,000psistrength,sothatisourbase.Buthoweveryoudohaveshotcreteinacertainportionofthepiles;thatisagivenfact.Ithinkthatingeneralthatthepilesthatdonothavesectionloss,theyprobablyhavethecapacitytocarrytheloads.Butyouhaveacertainamountofsectionloss.Youaregoingtoreducethepilecapacity.Thatisthewaywewouldapproachit.

All30pilesoverhereonthistableareratedSevere.ButwithintheSevereratingthereisadegreeofdeteriorationsowedivideditintothreecategorieswithintheSevererating,the30piles.Only3pileshavesectionlossofover50percent,another3pileswithsectionlossof25to50percent,andtherestofthemarelessthan25percent.

BoardMemberHolmescommented:IamjustlookingatthedescriptionofMajor.Itincludesmultiplecracksanddisintegrationduetochemicaldeterioration.Thatsoundslikesomethingthatmaybeshouldnotwaitforinspection,itsoundslikethatshouldbefixedordeteriorationstoppedimmediately.

Page 10: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

10

ECRBMINUTESMay24,2017

Mr.Yaoagreed:Iagreewithyou,Mr.Holmes.Ithinkthatwhenweapproachthepilerepairweworkwiththeowner.Youstudynotjustthestrengthrepairbutstartwithyourpreventativemeasuresearly.Actuallylong-termyouaresavingmoney.Buttheirapproach,peoplejustsay,"Ionlyrepairwhatisnecessary."Sowewillworkouttheoptions.Aslongasitismeetingthesafetyrequirementwehavemultipleoptionsforthemtochoose.Butmypersonalexperienceisthatifwetakethepreventativemeasuresearly,actuallylong-termyousavemoney,yousavemoneybymaintaining.

BoardMemberHolmesasked:WhatdoestheASCEguidethatyouaretakingthisfromsuggestaboutMajor?

Mr.Yaoexplained:TheASCEguidedoesnotrecommendasetmeasurefortheMajorcategory.ASCEisjusttohaveapples-to-applescomparison,everybodyisgoingtorateitthesameway,haveveryspecificcriteria,youratethisMajor,youratethisSevere,youratethisModeratesowehaveacommonlanguage.

In2005thatinspectionwasverybrief,wasnotratedaccordingtostandardindustrypracticetodaysoitisveryhardtomakeacomparison.Butingeneralwedoseethatthestructuredoesunderstandablydeteriorateoverthelast11years.

BoardMemberHolmescontinued:Butjustlookingatthesedescriptions,IcanseeModeratebeingputoffandinspected,thatmakesalotofsense,butthedescriptionofMajordidnotappealtomethatway.

Mr.Yaoadded:Well,thestructuralassessment,itisdebatableiftheMajordeteriorationconstitutesamajordefectonthestructuralcapacity.ButingeneralweliketoaddressthisbeforeitbecomesSevere.Sothatismyexperience.Thefirstoptionissomeownersdonotwanttodothat,theywanttodelay.Thatisanoption,stillmeetingtheBuildingCode.

Weareintheprocessofdoingacapacityanalysiswithseismicload.

BoardMemberBattaliostated:Iguessthequestionwaswhetherornottheproposedloadingislessthanthewharfloading.IguessitmightbeverticallybutIdonotknowaboutthelateral.

Mr.Yaoreplied:Well,thisisaveryimportantpointIhadplannedtoaddresslaterbutsinceyoubroughtitupIwilljustsaythis:Thiswharfwasdesignedforvery,veryheavyindustryloads.Forthefuturepublicaccesswewillneverseesuchhighloads.

Butsayingthat,thepublicsafetyshouldnotbeputindanger,westillneedtomeettheBuildingCode;butthewharfisverysturdy.Itwasdesignedforloadsseveraltimeshigherthanwhatweplanfor.Sotheloadswearegoingtoputonthewharfaremuchlighter.

WetakethewholethingintoconsiderationbutwearegoingtoprovethatwearemeetingtheBuildingCode.Wewillstillkeepthewharfhealthy,atleastforseveralyearsforthenextinspection.Thatisthegoal.

Iwillpresentdatarelatingtoseismicloadabitlater.

Page 11: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

11

ECRBMINUTESMay24,2017

BoardMemberDornhelmcommented:SoIinferfromthisthatthedevelopmentremainsresponsibleforthemaintenancewhichincludesthefutureinspectionsofthewharfsothatweknowthatwhatwearecountingonbeingdonetoprotectthepublicspaces,ratherthanjusttheprivatespaces,willbeaddressedintheplanthatyouprepare.

Mr.Livingstonstated:Thatiscorrect.

Mr.JasonWhiteofBKFEngineeringaddressedtheBoard:Iwilltalkalittlebitaboutsealevelriseandfloodingatthesite.

WeperformedananalysisaspartoftheEIRfortheprojectfordesigningthesiteelevationsrelativetofuturesealevelrise.

ThebasisforanalysiswasanupdatedFEMAFIRMpanelissuedin2015whichsettheworst-casebasefloodelevationforthesiteat11feetforZoneVE,whichisazonethatissubjecttoinducedvelocityactionbya3-footorhigherwave.Sothat11-footbasefloodelevationisthestartingpointforoursiteelevation.

ThenwhatwedidiswetookalookatdatafromBCDCandNOAAforpredictedsealevelrise.Thatreportindicatedthatsealevelrisewaspredictedtoriseby16inchesby2050and55inchesby2100.

Sowhatwehavedoneiswehavedesignedthesitetothemid-centuryandwewouldintendtoemployadaptivemeasuresaftermid-centuryifsealevelriseoccurredbeyondthatorwhenitbecomesanissue.

Sothat16inchesby2050plusthebaseloadelevationof11feetgivesusastartingpointof12.3feet.ThenwewentwiththeBuildingCoderecommendationfor2feetabovethatsoourminimumfinishedfloorelevationforthesiteis14.3feet;so3.3feetabovethebasefloorelevationof11feet.Weareactuallyacoupleoftenthshigherthanthat,weareat14.5feet.

InadditionwehavetheBayTrailaroundtheperimeterofthesite,whichwearealsosettingat14.5feet;theBayTrailwhichconnectstothewharfpark.TheBayTrailwillbeat14.5feet.Currentlythewharfsitsatanelevationofapproximately13feet.WiththelandscapingimprovementsthatJustinmentionedwearegoingtobeplusanother18inchesto24inches,whichwillputus14.5feetto15feet.

Mr.Affadded:Exceptforatthewatersidepart.

Mr.Whiteagreed:Correct.Thepublicimprovements,BayTrail,themajorityoftheparkarealsoatthe14.5footelevation.

BoardMemberComeriohadaquestion:IsthereareasonwhythatpieceattheBaysideislower?I'mconfused.Whyisthat?

Idon'tknowhowdeepitis.Whyisthatprominent?Iamcurious,whyisitatalowerlevel.

Page 12: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

12

ECRBMINUTESMay24,2017

Mr.Affexplained:Theideaistokeepthis15footwidepromenadeattheBaysideatthatlowerlevel.Ithinkwearegoingtohaveaspartoftheimprovements,intherangeofimprovementswearegoingtohaveanadditional6inchesofconcretetoppingslabontopofthat,soitwillgetraisedupalittlebit.

Partofthedesignideafortheparkwastohavethisraisedsectionsitatthehistoricfootprintofthewharfwarehouse.Oneelementofthatisitmarkingthehistoricaluseofthesite.

Mr.Fippinadded:Thepromenadekindofmimicstheexistingwalkwaybetweenthewharfandthebuilding.

Mr.Affcontinued:Idon'tknowfromthepointofviewofsealevelriseifthereisaproblemifweget55inchesofsealevelrisein50yearstherewillbesomeovertoppingofthatslabonthatedge.

Mr.Livingstoncontinued:Ithinkthemainideawastocreatesortofanactivepromenadealongthewaterfrontwherepeoplecouldwalkandstrollandbasicallytakeadvantageofaccessdirectlytothewaterandbehindthatcreatethesesortofdifferentelementsthatwouldfocusondifferentusesoftheland,againwithinthebuildingfootprintoftheexistingwarehouse.Soitwastotryandcreateapromenadethatwouldbecomplementedbywhatwecommonlyrefertoasroomsthatarebuiltwithinthefootprintthatwouldbemorepassiveuse.

BoardMemberBattaliocommented:Idohavesomequestionsorcomments.Letmejustgiveyouaheads-uponacoupleofmythoughtsandwecanaddressthemwheneveryouwant.

Firstofall,the16inchesandthemid-centurytimehorizonareconsistentandmaybealittlehigher,the16inchesisalittlehigherthansomeofthemorerecentguidelinesandsothatisfinebutthemid-centurytimehorizonseemsalittleshortforadevelopmentthatwillprobablybetheremuchlongerthanthat.

SoIguessfromthatperspective,giventhat16inchesisalittlehighformid-centurywithrecentguidance,theactualamountisprobablylowbecauseyoureallyshouldbelookingfartherintothefuture.Alotofwhatweareseeingnowispeopleusingsomewherearounda3footvalueofsealevelrise,whichissomewhereinthe2070to2100ormaybeevenalittlelaterthan2100timeframe.Maybeitishighbyalittlebitbutthatisthewaytheseaisgoing.

Sothatconcernsmealittlebitthatyouareusing16inchesandjustifyingthatas2050,whichIthinkisbothlowandsoon,inmyview.

Mr.Whiteclarified:Weareusingthe16inchesplus2feet.

BoardMemberBattalioreplied:Yes.Idonotknowwhereyougotthe2feetbutthegoodthingaboutaddingthose2feet,whichisprobablysomethingyoudidearlyonwhichisgreat,asanengineerIthinkthatwassmart,butyouarestillacoupleoftenthsofafootorhalfafootshyofadding3feetplussomesortoffreeboard.

Page 13: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

13

ECRBMINUTESMay24,2017

Youknow,it'sfunny,whenwedesignbeamsandthelikeweusuallyfigureoutwhatweneedandover-designalittlebit.Ithinkfreeboardisnotabadidea,evenifweareaddinginsealevelrise.ThereisnotsuperclarityinthepracticeonallthatbutIwouldassumefromwhatIhaveseenthata3footsealevelriseasadesigncriteriawouldbeconsistentwithwhatIamseeingelsewhereintheBayandthensomeleveloffreeboardabovethat,whichmeansthatyour14.3isalittlelowbecause11+3+1wouldbe15.Nothingisthatprescriptivebutthatismyfirstthought.

Thesecondthoughtistheshoreelevationawayfromthewharfisat8feet.IguessthatisNAVDormeanoverthewater,whichiskindofclose.Sothatmeansthatpartoftheshoreisover-toppedwitha100yeardesignoraFEMAfloodeventrun-upof11feet.Sothatmeansyouhavewaterrushinglandward,sothatneedstobeaddressed.

Mr.Whiteanswered:Right.AndIthinkSGHhassomeimprovementsthattheyareproposing.Theycanspeaktothatinamoment.

BoardMemberBattaliocontinued:OntheadaptationwearereallylookingforalittlemoredetailthanwhatIhaveseensofar.Maybewewillhearaboutthatintermsofhowyouadapt.Ithinkthereisareferencetoawallontheedge,whichisoneadaptationstrategy.Butaproblemwithawall,especiallytheedge,isthatitisovertoppedandthenyouhavewaterontheothersideofthewall.

Whatsomepeoplearedoingishavingaplacewherethewatercanovertopandrunback.Theadaptationstrategyshouldactuallylooklikeitfitsandhavesomesortofconventiontoitsothatitlooksfeasible.Nottosayitisnotbutwedonotknowwhatitis.Justsayingthereisawall,inmyminditisawall,block,drainageone-way;ifitisovertoppeditcannotgetout.Anditismorelikelytobeovertoppedifitisseaward.Andithastobehigher,whichobstructstheviews,whichinmymindmeansthat50yearsfromnowitmightnothappen.

Mr.Livingstoninquired:Whenyousuggestthatweusethe3footcriteriaasadesigncriteria;areyoutyingthattoanyparticularperiodoftime?

BoardMemberBattalioexplained:Yes,Iwouldsaythatthereisariskthatcouldbeachievedorrealizedbyatimeframesomewherebetween2070or2130.Butdonotholdmetothat,Iwouldhavetolookatthecurves.Wealltalkaboutwhatisgoingtohappenatcertaintimehorizonsbuttheotherwaytolookatitistotakeacertainheight,thenyouhaveaverywiderangeofpotentialtimehorizonsdependingonwhatoccurs;wedonotreallyknow.

ButwhatIamseeingisthat-andthisisconsistentwithwhattheECRBhastoldotherfolksbeforeyouall-isthatthe3feetseemstobereasonable.Itisthemid-rangeprojectionfromtheNationalResearchCouncil2012report,whichwasadoptedbythestatein2013,theOceanProtectionCouncil,isabout3feetbytheyear2100atthemid-rangeprojected.Sothatiskindofwherethe3footcomesin.

Butifyoulookatsomeofthenewguidanceorothernumbersorthenewinformationthatisnotguidance,thatmaynothappenuntillater.Andthereisalwaysawhat-ifkindofworstcaseandthenitcouldhappenalotsooner.Icannotbemorespecificthanthatintermsoftiming.

Page 14: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

14

ECRBMINUTESMay24,2017

Mr.Affaskedforclarification:Whenyousaid11+3+1,isthe1feetfreeboard?Whatisthe1?

BoardMemberBattalio:Yes,Iwasthinkingfreeboard.IthinkonethingtolookatiswhatFEMArequiresofthefinishedfloorelevationorlowerstructuralmember,whichwouldbeyourconditionatsomefuturetimewithcertaincriteriaandwhetherornottheyactuallyrequirefreeboard.

TheotherpointaboutafreeboardisonasitelikethisIamsurethereisgoingtobeslopesandmaybeevensomeuncertaintyatcertainplaces.

Mr.Aff:Becausewewouldbeathalfafoot.Weareat14.5forthoseelevations.

Mr.White:Isyourrecommendationforthe3feetplus1footoffreeboard?IsthatforthebuildingelevationortheBayTrailorthewharforalloftheabove?

BoardMemberBattalio:Thesearemycomments,IamnotsuretheBoardhasactuallyprovidedyouarecommendation.Thepublicaccessareacanaccommodatesomeovertopping.Oneoftheadaptationmeasurescouldbetocloseitduringanextremeeventinthefuture.Alotoffolksarelookingataccommodatingsomeofthefloodingintheshorelinebandthatisalsousedforpublicaccessandrecreationalviewing.

ChiefofPermitsJaimeMichaelscommented:TheCommission'scurrentpoliciesonpublicaccessdorequirethatitremain,toparaphrase,usable,eveninextremefloodingsituations.Thosepoliciesmaychangeoverthenextfewyearsbutwewouldwantthispublicaccesstoremainusable.

BoardMemberBattalioasked:Evenduringa100yearevent?

Ms.Michaelsreplied:Ideally.Itmaynothappenbutideally.Thatiswhatweareadvising.Andweknowthatwehavesomeworktodotomakesureitisapplicable.

BoardMemberBattaliocontinued:Inmymindthereissomerelaxationofdesigncriteriaforpublicaccessifitisonlyoccasionallyimpactedandstillreusable.

SeniorEngineerMontescitedpolicy:PolicyNumber5ofthepublicaccesspoliciesoftheBayPlanreads:

"[p]ublicaccessshouldbesited,designed,managedandmaintainedtoavoidsignificantadverseimpactsfromsealevelriseandshorelineflooding."

Ms.Michaelsadded:It'sthegoal.

Mr.Whitecommented:Theshorelinetrailcouldeventuallybecomealevee.Itcouldberaisedtoprovideprotection.

BoardMemberComeriospoke:Yourplanshowsthepromenadeatalowerelevationandyouneedbeawareofaccessanddesignissuesasyouuseitforpedestrians.Thiswillaffectallofyourotherdesigncriteria.

Page 15: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

15

ECRBMINUTESMay24,2017

RegulatoryDirectorBradMcCreacommented:ItwouldbehelpfultogettheBoard’sadviceonhowmuchflexibilitywehaveatthewharf’sedgeforpotentialelevations.

Mr.Yaocontinued:SGHdidasiteinspectionanddidsomeengineeringassessmentsoftheshorelineprotection.Iwilladdresstheshorelineprotectionthatexistsnow.

Theexistingriprapcanbedividedintothreeareas.Thefirstareaisdirectlyunderthewharfanditiscategorizedas,“light”;thatis,200poundsorless.Ifyougonorthwestyouhaveprettybigriprap;one-quartertooneton.Thesoutheastsidealsohasthissizeofriprappresent.

Themostexposedareaistothenorthwest.Theslopesinthisareavaryabit.

Mr.Montesasked:Areyoudescribingthedikebeingusedasshorelineprotectionasriprap?

Mr.Yaoreplied:Yes-correct.WeranawaveanalysisandthebathymetryisbaseduponNOAA’sDigitalElevationModel(DEM)forSanFranciscoBay.

TheCaltransShorelineManualrequiresprotectionofalightorsmallsizeriprapforthesite.Wehavedeterminedthattheriprapattheexistingsiteisadequatefora100yearstorm.

BoardMemberBattalioobserved:Youhavetwodifferentconditionshere;youhavetheshorelineandyouhavethewharf.Atthesoutheastpartoftheshoreyouarelookingatitmorestructurallyfromanerosionprotectionperspective.Thequestionthengoesbacktothefloodmanagementforthestructuresontheshore.

Mr.Yaoreplied:Ourscopeofworkinvolvesprotectingtheriprap.

BoardMemberBattalioadded:Iftheprojectreliesontheshoreprotectionthroughitsprojectlifeitalsoneedstoconsidersealevelriseandtheincreasedovertoppingpotential.Structuralfailurepotentialneedstobeaddressedifthesoilbehinditismobilized.

Wewouldalsoexpectthegeotechtotakealookatthedifferentslopestoseehowstableitmightbe.

WhateverdesigncriteriaisusedfortheBayTrailshouldalsoextendtotheaccesscorridorweseeherethatgoestotheshoreline.

Mr.Yao:WewillcertainlyconsiderthevariouscommentstheBoardhasmaderegardingelevations,wavesandassociatedriskswhendoingouranalysis.

BoardMemberBattalioadded:Itseemsthatthewaterisrelativelydeepsotheaddeddepthofsealevelriseshouldnotaffectyourwind-wavegenerationoryourtransformations.Butitdoesaffecttheelevationofthetotalwaterlevel,thewaverun-up,becausewhateveryourrun-upvalueis,itisnowonahigherpeg.Soitdoesrelatetothecrestofthestructureandthepotentialforerosionofthesoilbehindthestructure,whichisactuallypartofthestructuralperformance.

Mr.Yaoreplied:Yes,Iunderstandthat.

Page 16: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

16

ECRBMINUTESMay24,2017

BoardMemberBattaliocontinued:AlsotheFEMAworkispublicnow,theydidpublishmodelwaveheightsandwaterlevelsandstuffsoyoucouldalwaysjusttakealookatthat,althoughIhadnocommentonyourmodeling.

Mr.Yaoanswered:Althoughthecriteriahavedesignforit,thesitehashistoricallyneverrecordeda100-yearstormasyet.

BoardMemberBattaliostated:IthinkIunderstandwhereyouaregoingwiththat.IdonotknowtowhatresolutiontheFEMAanalysiswasdoneandtowhatextenttheyconsideredthewavecrestelevationorthewaverun-upatthewharf,whichisdifferentthantheshore.Thatwouldbeuptoyoutoevaluateifyoufeltitwaspertinenttoyourcriteria.

Mr.Yaocontinued:ThedesigncodewefollowisCaliforniaBuildingCode2013,ASCE61-14.ASCE61-14isSeismicDesignofPiersandWharves.Weusethemasareferenceandnotadesigncode.AndthenASCE7-10,everybodyknowsthatistheloaddesigncriteria.AndthenNCHRP611,thatiswhatENGEOusedfordesigningtheseismiccriteria.Sowehavejustfourdesigncodes.

Mr.Yaowentintovaryingdetailandexplanationofdifferentcodesandcriteriausedfortheproject.

Mr.Yaostated:Forseismicloadweused100percentinonedirectionplus30percentintheotherdirection.Wealsolookedatkinematicload.TheCaliforniaBuildingCodeallowedustocombinethemtogether.

BoardChairBorcherdtasked:SowheredoestheDSMsitwithrespecttothefailurecircle?

Mr.Yaoexplained:TheDSMissittingoverherebutthereisamuchbiggercirclebehinditifyoudonotviewtheDSM.ButthiscircleassumestheDSMhasalreadyoccurred.

BoardChairBorcherdtinquiredfurther:IsthereevidencewithrespecttohowyouexpecttheDSMtorespond?Anumberofdifferentthingscouldtranspire.Howdoyouexpectittorespondifitexperiencesalargeearthquake?

Mr.Affreplied:Sothesizethatwehavegivenit,ouranalysisindicatesthatitisgoingtodisplacelessthan4inches,thesoilbehinditaswellastheDSMitself.

BoardChairBorcherdtcontinued:TheDSMisalargemassthatismuchdenserthanthesurroundingsoftsoil.Fromonepointofviewitcouldreflectseismicenergyinthesensethatasseismicwavescomein,ifitisalargeenoughstructureitislikegoingfromsoftsoiltohardrock,therewillbeatendencyforittoreflecthigh-frequencyseismicenergy.Sothequestionis;howwillthatmoveasthegroundarounditmoves?

Mr.Yaoreplied:Ihaveworkedonseawallsinotherprojects.Thatisaverycommontechnologynow,designedmethodology.Ithasinterconnectedbuttresses.

Buttresseshavebeenacommonwayofdealingwithittolimitthemovementoftheground.

Page 17: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

17

ECRBMINUTESMay24,2017

Mr.Espinosaadded:DSM,wehaveuseditonTreasureIslandandotherprojectsthatwehavepresentedtotheECRB.Basicallyitisastaticmodelwhereyoulookatitintwo-dimensionalasagravityrole.SowebelievethatitwillbeasimilarcasebecausewehavesimilarsoilwiththeyoungBaymud.

BoardChairBorcherdtopined:IwouldthinktheDSMwouldbestrongerthanthesoil.

Mr.Espinosaagreed:Correct.Buttheincoherenceofthewaves,theyarenotstrongenough.Thatincoherencedoesnotcreateashearissueonthebuttressandthebuttresswillnotbreakbecauseofthat.

BoardMemberHolmesinquiredabouttheDSMaswell:ThesoilinfrontoftheDSMiswhatismoving?

Mr.Affresponded:Thatiswhatismoving,yes.Sothesoilbehinditismovingmaybesomebutsignificantlylessthanthatsoilwhichismovinginfront.ButtheamountofmovementismuchlessthanwhatwepredictedwithouttheDSMbuttressbecauseweshortenedthefailuresurface.Wehavealotlessdrivingforceandweareincludingthepinningforcesfromthestructure.

Mr.Montesinquired:SoafteragroundmotionwilltheDSMcrackandthenyouhavetoredoitorwhathappens?

Mr.Espinosaexplained:Itisusuallydesignedforthedesignearthquakesoitwouldnotcrackunderthedesignearthquake.Thatishowthemajorityofthebuttressesaredesigned.InthiscasewedonotforeseeanyareaswhereyouaregoingtolosetheshorelineandtheDSMisgoingtostaycantilever.

Mr.Fippinstated:SotherearefourdifferentchecksthatFHWArequiresthatendupdeterminingthewidthofyourbuttress.Thatishowwecomeuptothe1-to-1depthtowidthratio.

Mr.Espinosaadded:Itisdesignedfortheearthquakeanditisdesignednottocrack.

Mr.Fippincommented:Theperformanceofthesoilinfrontofthewharfisreallythecriticalsituationhere;whichis,howmuchisthesoilgoingtomovebelowthewharf?WecanmakethatDSMbuttress300feetwideanditwouldnotmakethesoilbelowthewharfmoveanyless.

BoardMemberHolmesstated:Iunderstandtheprocess.IamnotfamiliarwiththedesignofDSM.

Mr.Affresponded:Right.MyresponsetothatwouldbethatweareviewingthisfromtheperspectiveofprotectionofthethingsthatarebehindtheDSMbuttress;thatisaslopestabilityissue.Andtypicallyslopestabilityorsoilsthatarenotliquefiablesoilsisperformedatthesameseismiclevelthatthestructuresthatareaffectedbytheslopeisperformed.

BoardMemberGilpinstated:Pseudo-staticanalysisofslopestabilityisusuallyafactorofsafety1.1or1.2.

Page 18: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

18

ECRBMINUTESMay24,2017

BoardMemberHolmesobserved:Itisnotthefactorofsafety,itiswhatearthquakeareyouconcernedwith.

Mr.Yaocontinued:Somuchforthekinematicloadevaluation;wejustexplainedthemethodology.

IcametotheBoardandpresentedthesamemethodologylasttimeontheBrooklynBasin;themethodologyessentiallywasacceptedonthatwharf;andMr.Holmes,youwerethere,Iremember.SoIamgoingtoskipthisnow.

Inertialloadsareessentiallyanon-linearpushover.Wehavethreepointstodefinetheperformanceofthestructure:oneisinitialyieldingofthestructure;thesecondisLevel1performance,thatisrequiredforimmediateoccupancy;andLevel2iswhenthestrainlimitofthematerialisreached,theconcretestrainlimitasdefined.Atthatlimittheconcreteisgoingtobecrushedsowearegoingtostayawayfromthat.

Basedonthiswefigureoutthedemand.Thedemandisexplicitbecauseitisanonlinearanalysis.Itisanexplicititeration.Essentiallyitisthatweguessthedisplacement,wereachtheequivalentenergybehindthis.Itisaniterationprocessuntilthestiffnessisconvergedandtheysay,hey,thisisthedemand,thedisplacementdemand,andcomparedwiththecapacity,theLevel2displacementcapacity,whatisthedemandforcapacityratio?Thatisessentiallytheamount.

Wearestillinteractingwiththelandscapearchitect.Theinertialloadanalysisheavilydependsonhowmuchweightyouaddontopofthewharf.Ofcoursethelandscapearchitectwantstodogoodwork;theywanttomaketheparkbeautifulbutalsoaddalotofweightonit.

ButwhatIcanpresenttotheBoardtodayisthatbasedonthisanalysis,theinitialanalysiswithsomeassumptionsoflandscapedesign,whatwefoundoutisthatthisslopecomingdownhasripraponitandbelowtheriprapisabunchofgravelfilloverhere.Basedonthisanalysisthatlastfourrowsofthepilesattract80percentofthelateralloads.Thepilesinthefront,theyarejustgoingalongfortheride.Butthestressesareonthosepiles;thelastthreerowsarecritical.Theycouldpotentiallyshearoff.SothatiswhatIamtryingtosayhereisthatthiscolumn,20inchby20inchcolumn,plusanothertwoorthreerowsofpiles,arecriticaltotheseismicresistance.

Now,incasethelandscapedesignexceedsthecapacityofthewharf;thenwhatarewegoingtodo?Iamgoingtopresenttoyoutheanticipatedrecommendedoption.Wehaven'treachedaconclusionyetbutIwanttopresentit.

BoardMemberHolmesopined:Alsoyougetabigtorsionfromthat.Youhaveabigtorsioncausedbythefactthattheentireloadgoestothosebackpiles.Themassiswayoutheretowardsthemiddleandthenresistanceisallonthebackside.

Mr.Yaoasked:Youaretalkingabouttorsionfortheearthquakeintheotherdirection?

BoardMemberHolmesreplied:Yes.

Page 19: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

19

ECRBMINUTESMay24,2017

Mr.Yao:Wecounted100percent/30percent,then100percent/30percent;yes,soyouareright,thereissometorsion.Butthewharfislong,550feetlong,soallthose500-somepilesareresistingthistorsion.

Iagreewithyou,thecenterofgravityandcenterofresistancearenotaligned.

BoardMemberHolmesasked:Butstiffnessfortorsionisthesameasstiffnessforlongitudinal,right?

Mr.Yao:Thatiscorrect;Iagreewithyou,thankyou,butIhadtosimplifythepresentation.Thisiscoveredinour3Danalysis,100percentinonedirection,30percentintheotherdirectionand100percentinthisdirection,30percentintheotherdirection.

BoardMemberHolmespressedforclarification:Arethose4pilesessentiallymodeledthesameordoyouactuallyshowthatthatfirstpilealmosthasnolengthandthenthenextonehasalittlemore,thenextonehasalittlemore.Youaresayingthatloadistakenbythose4piles.Itseemsliketheloadwouldallbetakenbythefirstpile.

Mr.Yaoexplained:Thefirstpiletakesalotofloadbutkeepinmind,thosearerock.Thoseareripraprockssotheyareprettystiffresistance.Yes,thereisadistribution.Obviouslythiscarriesthemaximumloadsandthisisslightlyless,thisisslightlylessandthisisslightlyless.ButwedidseethesethreeformhingeswherethereisaLevel1hinge,level2hinges.Thejuryisstillout,arewegoingtoneedtheLevel2performance?ItverymuchdependsonhowmuchweightweputonitsoIamnotgoingtogiveyoutheconclusionasofyet,weareinteractingwiththelandscapearchitect.

BoardMemberHolmescommented:Iamfamiliarwithhillsideconcreteframesthathavethesameproblem;theuppercolumnwantstotaketheentireloadanditisveryhardtomakethemwork.

Mr.Yaoagreed:Youareright.

Anticipatedstructuralretrofitstrategies.ThisstrategyhasbeenusedinotherterminalsrightaftertheLomaPrietaearthquakesoitisapprovedandtrueandforthisprojectitisprobablytheeasiesttodo.Asweapproachthisweneedtohaveaconcreteoverlayontheexistingdeckanyway.Theconcreteoverlayisfordrainagepurposes.Thestormwaterrunoffneedstobedrainedtosomeplaceelse.AndalsotheBayTrail,youhavepeoplegoingbackandforthonthisplusthewaveslammingforcesandotherforcescomingalong.A5inchconcretedeckwithmaybesomecracksonitisbarelymakingit.

Whatweproposeisoneoftwostrategies.

Oneisthatyouhaveawarehousesittingoverhere,youhaveawarehousesittingoverhereandyouhaveanotherwarehousesittingoverhere.Thosewarehousesaregoingtomoveawaysowehavetheexistingpiles,thousandsofexistingpiles.Wecouldhaveaconcreteoverlaytotiethiswharftothebacksoallofthosepilesarehelpingtheselastfewrowsofpilestoresist;sharetheloadsandreducetheloaddemandonthosepilesandwharves.

Page 20: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

20

ECRBMINUTESMay24,2017

Orweignorethosepilesandjustdriveanewpileandtieittothedeckandsharetheloadandthisnewpilewearegoingtodesigntotaketheloads.Byanalysiswewillbeabletodesignit,makesurethatnoneofthewharfpileswillfail.SothatisthestrategyIlookforifwearegoingtomoveforward.

IftheexistingwharfdoesnotmeettheBuildingCoderequirementsIproposeoneofthetwostrategiesmovingforward.

BoardChairBorcherdtasked:Thelengthofthewharfis550feet,Ithink.That'salmostthewavelengthofaonesecondwavetravelinghorizontally,likeasurfacewave.Sohaveyoutakenintoaccountthedifferentialmotionsthatyouwouldexpectoverthelengthofthewharf?

Groundmotionscouldbehighononeendandlowontheotherendorviceversaasthewavepropagates.

Mr.Yaoanswered:Iunderstand.WedidthosethingsontheRichmond/SanRafaelBridge,ontheBayBridge.Butthestandardofengineeringpracticeassociatedwithwharvesandpiers,wedonotgetthatsophisticationandtheBuildingCodedoesnotrequireit.Thereisenoughstructuralconservatisminourapproachtoit.

Butmaybethereare56bandsandthemajorityofthebandsaregoingtohaveapile.Wehavenotchosenthepile,wehavenotdoneit,butaftertheLomaPrietaEarthquakethePortofOakland,allthosewharves,wewouldgobackanddrivenewpilesandtiethisbackandtheyarestillinuserightnow.

Therearethreewarehousesshownhere.Twowarehousesaretotallyonland.Thereisanotheronethatdoesn'tshowherethatistotallyonland.Oneissittingonthewharf.Sothosewarehousesaresittingonotherpilessotherearealotofpilessittingoverhere.IfIneeditIjusttiethiswharftothosepilesbecausethosewarehousescanberemoved.

Someofthepilesaregoingtobebadandwearegoingtorepairthem.Wearegoingtocoverthoseareas.Wherethereisseveredamagewearegoingtorepairthem.

Mr.Affspoke:ADSMbuttresswouldbebasicallyconstructedbydoingoverlappingcolumnsofdeep-soilmixingthatrunperpendiculartotheshorelinenorth/southingeneralandbasicallycreatecounter-fortsthatareinthegroundthathelptoresistsoiltryingtomovetowardsthewater.Itwouldgoalongtheentireshorelineband.Itwouldgoinbothdirectionsbeyondthewharftoprotectthelandbehindandincreasetheslopestabilityperformanceoftheentireshoreline.

BoardMemberComerio:Soarethosejustin-betweenthoseexistinglandsidepiles?

Mr.Aff:WewouldtrytocentertheDSMbetweenexistingpilesinthegroundandwewouldhavealayoutthatwouldminimizeavoidances;thatis60feetdeepby60feetwide.

BoardChairBorcherdtasked:WilltheDSMgointoBCDCjurisdictionzone.Willitbewithinthe100footshorelineband?

Page 21: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

21

ECRBMINUTESMay24,2017

Mr.Affreplied:Thebestperformancehappensifitoccursasclosetotherockdikeaspossibletomakethefailuresurfacesassmallaspossible,whichwouldpushyouwhereverthehighwaterlineisonthiscross-section.Youareprobablystartingsome30feetfromthebeginningofBCDCjurisdiction.

BoardChairBorcherdtadded:ThatisprettystandardtechnologyforinstallingtheDSM;ithasbeendoneinquiteafewplaces.

Mr.Affstated:TheydiddoalotofitatthePortofOakland.

BoardChairBorcherdtsurmised:Butjuststandingbackandlookingatthebigpicturenow,ifwethinkaboutthisfromaBCDCperspective,itseemstomethatbasicallytheprincipalthingthatistranspiringintheBCDCjurisdictionzonewillbetheconstructionoftheDSMzoneasazonetohelpresistlateralmovementorsoilfailureandcontainanymovementthatmighttakeplacelandwardofthat.Theotheraspectoftheprojecthastodowiththesafetyofthewharfstructureanditspublicsafetyissueassociatedwithahighoccupancyrateatdifferenttimes.Sofromanengineeringcriteriapointofviewitisimportantthatthepublicsafetyissuewithrespecttothewharf,thesealevelriseissue,andotherengineeringcriteriabeaddressed.

ConstructionoftheDSMwillneedtoprovideasmuchlateralresistanceaspossible.IamnotsurewhatotherinputyouwouldwantfromtheBoardwithrespecttotheconstructionoftheDSM.IamcuriousastohowtheDSMwillrespondwithrespecttothesurroundingsoilandifthereisanyhistoricalevidenceoranymeasurementsthathavebeenmadeinthepastwithrespecttohowaDSMresponds.

IraisethatquestionthinkingintermsofthesoftsoilsinJapanandtheartificialfillsandthequaywallsthatwereinstalledtoretaintheliquefiablesoils.ItturnedoutthataftertheKobeearthquaketheporepressuresdidreallybuildupprettyhighbehindthequaywallsresultinginsomefailures.IamwonderingwhetherthatsamekindofthingmighthappeninsomeinstanceswithrespecttotheDSM.Idon'tknow,thatisjustaquestion.

Mr.Espinosaexplained:MostofwhatwearetryingtoretainistheyoungBaymudfailuresordeepfailures,softsoilfailuresduetothelateralpressuresfromtheearthquake.WedonotexpectporepressurebuildupontheyoungBaymuds,whichismostoftheDSM.Thereisgoingtobesomepressurebuilduponsomeofthefillthatmightbepotentiallyliquefiable.ButinthoseareasweareclosingthecellsoftheDSM,whichhasshowninthesameearthquake,intheKobeearthquake,wherebuildingsthatwerefoundedonconnectedcellsofDSM,liquefactionwaspreventedunderneaththosebuildings,whererightinfrontofthatbuildingeverythingliquefiedandwentoffshore.Sothatisourschemeforthisshorelineprotection.

BoardMemberGilpinasked:Couldyoutalkabouttheliquefactionpotentialfortherockdike?Howdidyousetupthecharacteristicsforunderstandingit?

Page 22: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

22

ECRBMINUTESMay24,2017

Mr.Bradfordanswered:Thematerialidentifiedwithintherockdikewaseitherthepreviouslymentioned15poundmaxsizecobblesintermixedwithdredgematerialandyoungBaymud.Sotherewasnotanythingthatweidentifiedasbeingpotentiallyliquefiablewithintherockbankitself.

BoardMemberGilpininquiredfurther:Sothereisnopossibilityofsandorconcentrationsofthegranularmaterial?

Mr.Bradfordreplied:Theonlythingthatweidentifiedinanyoftheexplorationsalongthiscross-sectionwasthesortofteal-coloredclayeysand;anditwasonlyidentifiedinthefarthest-mostboringthatwasdoneactuallyoutatthetipofthewharf.Sowedonothavedatapastthewharfsoweconservativelyinterpolatedthatasbeingplainer.

BoardMemberGilpincommented:ButifyouaresamplingagravellylayeritisreallyhardtofindthesandlayerbecauseyouarepushinggravelinfrontofitorCPTs,whatever.

Mr.Bradfordreplied:Wedidgrabsampleswithintherockdike,wedidnotjustsimplycorethroughitandthat'showwewereabletoidentifysortofamatrixwithinthat.

BoardMemberGilpinasked:Itisapileofgarbage,right,basically?

Mr.Bradfordresponded:Sure.ButitwasdevelopedwiththedredgematerialthatwaspulledoutoftheincisionlayerwithintheyoungBaymud.

BoardChairBorcherdtcontinued:IwouldliketoaskBoardMembersiftheyhaveanyadditionalcommentsbutfirst,Brad,youraisedapointearlierandsoIwaswonderingwhatyouwouldrecommendintermsofwhatyouwouldliketoseecommentedonfurther.

Mr.McCreaexplained:Thequestionsthatareoutlinedinthestaffreportyouhaveinfrontofyou,onpage8,areagreatstart.

BoardMemberHolmesinquired:Whatdoyouknowaboutthepilesunderthelandsidewarehouse?

Mr.Yaoreplied:Thosearetimberpilesthatwereinstalledlaterbecausethestructures,thosetwowarehousesonthelandsidewerenotconstructedin1919butinthe1930sand1940s.

BoardMemberHolmesasked:Oneoftheretrofitschemesyouwouldhavetoinvestigateisthosepiles,right,becauseyouaregoingtotietothem?

Mr.Yaoreplied:That'sright,weneedtoinvestigate.Butthoseareburiedintheground.Thisisoneoftwoschemes.Ifweeventuallyadoptourschemewedoneedtoinvestigate.

BoardMemberHolmesadded:TheothercommentIhaveisInoticedinthewrite-uphereyouareusingaknowledgefactorof1onthepiles.

Mr.Yao:Ontheconcretepilesitis1.Onthetimberpilesitis0.7.

Page 23: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

23

ECRBMINUTESMay24,2017

BoardMemberHolmescontinued:IthinkyouhavedoneasgoodaninvestigationasyoucandobutIamnotsureyouhavecompleteknowledgeof1,whichimplieslikeanewbuildingwhereeverythingisinspected.Youhavegotallthismajordamage,youdonotknowwhatthelevelofdeteriorationis,soIamnotsureyouhaveperfectknowledgeofthepiles.

Mr.Yaoexplained:Well,thereareguidelines.Wedidconcretecorings.Wedidpileratings.Itwasactuallyconservativebecauseweignoredtheshotcrete.Ithinkweknowenough.Wehavetheoriginaldesigndrawings.Wecansubstantiatewhywearesayingit.

BoardMemberHolmesclarified:Itisnotwhattherebarandconcreteis,itishowmuchdeteriorationisthere,ismyconcern.

Mr.Yaoexplained:Butthetruthisweignoredthe6inchshotcretesothatissignificant.Inmyviewitisconservativeinourassessmentofthepiles.Thatshotcrete,itdoescontributetothestrengthofthepile,especiallyinthosehingeareas.Mostofthosepilesdohave4to6inchshotcretearoundit.

BoardMemberHolmes:Ithinkthatadvantagemaybedifferentthanaknowledgefactor.

Mr.Yaostated:Wecouldgotheotherway,countingfortheshotcreteandreducetheknowledgefactor.

BoardMemberComeriocommented:Thisisaverythoroughpresentation.TheonethingthatisabsolutelymissinghereisaplanoftheareathatiswithintheBCDCjurisdiction,whichiswhywewereaskingallthosequestionsattheendaboutthoselastfewslides;graphicquestionscameupbecauseyouneedtoseewherethoseDSMsareplanned.Youneedtoseewheretheysitrelativetothoseexistingpilesorthatexistingbuildingwhichisbeingremoved.Wearenotseeingthoselayersandithasmadeithardertounderstandsomeofyourpresentation.

Itisreallyaminorpointbutitwouldreallyhavehelpedtohavehadthat.Itwouldhavehelpedtounderstandhowthepromenadeworksandconnectsattheend.LookingatthesedrawingsandIknowyouarenotveryfarwiththedesignyet,Iunderstandthat.Butjusthavingasenseofhowthatalllinkstothelandattheedgeofthepropertywouldbehelpful.Sojusthavingthat,aplanviewwithallofthoseelements,includingtheonesthataretoberemovedandtheonesthataregoingin,andseeingthoselayerswouldbeveryhelpful.

Mr.Livingstonstated:Wewillbringsomethinglikethatbacktoyounexttimeweseeyou.

Mr.Montesadded:PartofitwasmymistakebecauseoriginallytheyweregoingtopresentalotofthelandscapingandthenIthoughtthatbecausetheECRBwantedtozeroinontheseismicandfloodingthattheywouldconcentratemoreonthatportion.

BoardMemberComerioexplainedfurther:Thatplanhelpsusunderstandtherelationships.

Page 24: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

24

ECRBMINUTESMay24,2017

Mr.Affaskedforclarification:Justtoclarify,youarenotaskingforthelandscapeplan,youareaskingfortheplanviewshowingwheretheDSMbuttressis,wherearethepiers,wherethepilesare,wherearethenewproposedpilesgoingtobe,wherethefourcriticalrowsofpilesare,allthosethings.

BoardMemberComerioadded:Wherethingsaregoingtoberemoved.Obviously,asyougoforwardwiththedesignyouwouldhavethelandscapedesignontopofthat.Inordertounderstandsomeoftheseismiccriteria,understandingthefullbaselayerandplanaswellasin-sectionisveryhelpfulbecauseyoucannotalwaysseehowallthepiecesrelatetoeachother.

BoardMemberDornhelmcommented:Idothinkithasbeenverythoroughanditwouldbewonderfulwhentheoldwarehousefacilityfinallygiveswaytoadelightful,urbanwaterfrontasyouareproposing.ButmyonlyreservationhastodowiththeearlyassumptionoftheLevel2criteria.Thatyouarecomfortablethatwhenyousay"nocollapse"doesthatmeaninsuchaneventthestructureisalossandthendoesthatmeanthedevelopmentwilltakeontheresponsibilityofcleaningthesite?Itisallpublicusesthatarebeingriskedinthiscaseandwewanttoknowifsomethingwillcomebackafterthesiteiscleaned.OrcanyourepairthewharfifithasgonetoaLevel2?

Mr.Yaoreplied:Everymajorstructureisfacingthatquestionrightafteramajorearthquake.Obviouslythedevelopmentisgoingtohireaqualifiedengineertogobackandinspectthemandseehowmuchitisgoingtocosttoretrofit/restorethestructure'sintegrity.Howmuchtojusttearthemdownandrebuildanewone.Iwanttosaythatthemajorityofthewharvesandpiersweexperiencetheformer,goingbackandretrofittingthemandrestoringthemifyouhaveanearthquakesimilartotheLomaPrietaEarthquake.

BoardMemberDornhelmstated:Thatisyourdesignearthquake.ItismuchhigherthanLomaPrieta.Soyouaredesigningitfornocollapse.

Mr.Yaoexplained:Thedesignofthepilesisveryclosetothemoderndesign.SoIthinkthehingedoesperformduringamajorearthquakeandprovidealotofductilitytothestructure.Ofcourse,ifweadoptoneoftheretrofitoptionsIthinkitcansustainamuchhigherearthquakeandstillbecomerepairableinthefuture.Butitisreallyoutofourscopetoreallyassessreparabilityofthewharf.Iappreciatethecomment;asoneofthepublicIwanttoknow.Butatthisstagewearelookingatjustonepoint.Abigearthquakelineisonepointandwedesignforitandmakesurethepublicissafe.

BoardMemberHolmesasked:Theelevationhereofthebeamsundertheplatform.Idonotseeanypositivereinforcingcontinuous.Areyouassumingthetopfixityofthepilesoristhatapininyourmodel?"

Mr.Yaoexplained:Thebeamisextendingtypically18inches.

BoardMemberHolmescontinued:Ijustdonotseeanybottomreinforcing.Itisbentuptobecomenegativereinforcing,atleastinthis.Itisasmalldiagram.Butistherebottomsteelgoingrightthroughtheconnect?

Page 25: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

25

ECRBMINUTESMay24,2017

Mr.Yaoreplied:Therearesome.Thereareabandofrebarstherebuttherearesomecontinuousspotsalso.

BoardMemberHolmesinquired:Andareyouconsideringthediagonalsections?

Mr.Yaoreplied:No.Thecoverorthetransferisignoredfornowinouranalysis.

BoardMemberHolmesopined:Thatcouldbeamistake.

Mr.Yaoanswered:Butitisconservative.

BoardMemberHolmesdisagreed:Idonotthinkthatisconservativeatall.Caltransfoundouttheyhadsomedecorativechamfersonthecolumns.Theythoughttheywouldfalloffinanearthquakeanditturnsouttheyformedahingerightatthebottomwheretheydidnotexpectit.Rightbelowthechamfer.SoIwouldtakealookatthat.

Mr.Yaoreplied:Iwilltakealookatthat,okay.Iwillletyouknownexttime.

BoardMemberComeriocommented:Asthedesignisdevelopeditisgoingtobeimportanttoustounderstand.Thecriterionislifesafetybutwhatistheegress?Aretheregapsbetween?Dowehaveanygapsopeningupinthewharf?Dowehaveanygapsopeningupbetweenthewharfandthesoil?Howdopeoplegetoffthewharfintheimmediateaftermathofanearthquake?Whatdoyouanticipatethestructuralmovementsothatwecanbeassuredthatthereissafeegress?

Mr.Yaoreplied:Ithinkwearepreparedforthat.BecausethelasttimeyoumadethesamecommenttoourcompanyregardingtheAlamedaLandingProject.

ButthisprojectisdifferentfromAlamedaLandingbecauseItalkabout4inchdisplacement,literally4inchdisplacement.Themaximumgapyoucaneverfindis4inchessopeoplecanjuststepoverthis4inchgap;egressisnotanissue.AlamedaLandingisamuchlargerdisplacement,16inchesor20-someinches.Thatpotentiallyhasafallhazard.Butwearetalkingabout4incheshere.

BoardChairBorcherdtcontinued:IftherearenofurthercommentsIthinkwewouldliketothankyouforyourclearpresentationandyoureffortanddesiretocomebeforetheBoardandreceivecomments.Wehopeourcommentsarehelpfulandwelookforwardtoseeingasuccessfulproject.

Mr.Yaocommented:Ihaveaquickquestionhere,Chairman.WethinkthatwegavetheBoardanintroductionfromanengineeringperspectivesopossiblythenextpresentationwillbeshorter.Doyouwantustogothroughthesamepresentationordowejustmakeitmoreconciseinresponsetoyourcomments?

BoardChairBorcherdtresponded:TheBoardactuallyprovidesadvicetoBCDC.Weareaskedtofocusontheengineeringcriteriathatwillbeusedfortheproject,withaparticulareyetowardtheBCDCjurisdictionzone,safetyoffills,andvariousBCDCpolicies.

Page 26: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

26

ECRBMINUTESMay24,2017

Inthatregard,asImentionedearlier,itseemstomethatthecriticalaspectsofthisprojecthadtodowiththesafetyofthewharf,especiallyfromthepointofviewofpublicsafety,theimpactofsealevelrisewithrespecttothedesigncriteriabeingapplied,andthenalsotheresponseortheusefulnessoftheDSMtotheassignedpurpose,whichistorestrainpotentialfailuresalongtheboundaryofthedevelopmentzone.

SoifyouweretocomebacktotheBoardthenitwouldseemtomethatthiswoulddependonBCDCwithrespecttowhatyouwantustoprovideadditionalcommentsonthecriteria.Butitdoesseemtomethattherearestillanumberofissueswithrespecttothesafetyofthewharfthatarestillinthedesignstage.Usuallywhenweseeaprojectat35percentweusuallyseeitlater.Butthisprojectisalittlebitdifferentfromthatpointofviewandsoitisreally,Ithink,dependsonwhatBCDCwantsfromtheECRB.

Mr.Montesstated:MyviewoftheassessmentthatyouprovidedtodayisyouprovidedsomegoodinputregardingMary'scommentsontheoverlaysofdifferentlandscapeversusseismiclayoutaspects.Billraisedthequestionsaboutthechamferzonewherethehingeonthepilescandevelop.Sothosearequestionsthatcanbeansweredatthenextmeeting.

Alsokeepinmindthatthegeotechswerenotheretodaysoitwillbegoodtohavethemgivetheirinputonthefullgeotechnicalreview.

Regardingthesealevelrise,IthinkthatBobBattalioandRichardDornhelmraisedsomeverygoodpointsabouttheelevationofthewharf,whethertheBayTrailwillbecomealeveeinthefuture.

BoardMemberBattaliocommented:Ifeltthatalongertimehorizonandagreateramountofsealevelrisewouldbemoretypical.Somethingontheorderof3feetwouldbegoodtoaddresswhetherornotthereisafreeboardincluded.IpersonallylikefreeboardsbutIamsureyouhaveotherconsiderations.

Theadaptationstrategyshouldhavealittlemoredescriptionsothatwewouldunderstandwhattheimplicationsaretothepublicaccessareaaswellastheefficacyofprotectingthedevelopment.

Mr.Montesadded:Onemorenote,Bob.TheStateisabouttopublishthenewguidanceonsealevelriseandperhapsyouaremorefamiliarthananyoneelseaboutthat.

BoardMemberBattalioreplied:Iknowsomethingaboutit.Iamnotinvolvedinthedecisionprocess.IdonotbelievethatisgoingtocomeonuntilJanuaryof2018.IwilljustsaywhatIhaveheardisthattheprojectionsaresimilartoormaybeslightlylowerthantheexistingguidanceforthemediumandhighcurve,thelowcurvepeoplearenotreallypayingattentionto.Butrelativetotheguidancecitedinyourapplication,thenewguidancemightbealittlebitlowerbutthenthereisthisveryhighpotentialthatismuchhigher.

Mr.Montesremarked:After2050.

Page 27: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

27

ECRBMINUTESMay24,2017

BoardMemberBattaliocontinued:Soitissomewhatconfusing,Ithink,soitisgoingtobeinterestingtoseewhatcomesoutoftheactualpolicy.Iwouldsaythatthe3feetissomethingthatIamstickingtowhatwehavebeensaying.Ithinkthe3feetisareasonablecriterionfordesignandthenanadaptiveplanforsomethingontheorderof5to6feetwouldbereasonable.Idonotknowthatthe9to10feetthatpeoplearetalkingaboutissomethingthatwearereadytorecommendpeoplehavingtodesignforatthispoint.

BoardChairBorcherdtadded:Comingbacktoyouroriginalquestionwhichwastalkingaboutwhetheryouneededtogothroughthefullpresentationagain.IwouldthinkthatfromthepointofviewofefficiencyofbothyourtimeandourtimeIthinkthebasicswillbesufficient,sinceyouhavealreadypresentedtheoverallpictureataprecedingmeetingIwouldthinkyournextpresentationcouldbemuchbrieferandaddressedtoonlythosespecificissuesthatareofrealsignificancehere.Ithinktheissueswithrespecttothisparticularprojectareprettyclear.

Ms.Michaelscommented:IwanttoasktheBoardsomething.Ican'trememberifwehavebeenbringingriskassessmentstotheBoardforsealevelriseforyoutoseeandconsider.Thiswillbethesubjectofamajorpermitapplicationandforallmajorpermitapplicationstheprojectproponentshavetoprepareaformalriskassessmenttoaddresssealevelriseandfloodingfortheprojectsite.AndIjustcannotrememberatthispointifwehavebeenbringingthoseformallytotheBoard.

Mr.Montesstated:Wehavebroughtitonceortwice;onceforTesoro.

Ms.Michaelscontinued:Wewillgobackandfigureoutwhetherornotwehavebeenbringingthemtoyou;andifwedothatwouldmaybebeapartofthenextpresentationifoneispreparedbythattime.

BoardChairBorcherdtasked:Fromapermitpointofviewdoyouseeanyoftheengineeringcriteriathatneedanyadditionalcomment?

Ms.Michaelsreplied:Intermsofwhatmightbeintheriskassessment?

BoardChairBorcherdtanswered:Yes.

Ms.Michaelsexplained:Well,becausesealevelriseisanissueatthesiteandtheprojectwillinvolvesomefillintheBaytheywillhavetoprepareone.

AtaminimumwehavetoreceivethatandconsideritandIjustcannotremembernowifwehavebeenbringingittoyou.

BoardMemberBattaliostated:Iwouldliketoseeit;Ihavenotseenit.Ithinktotheextentthatweareadvisingonsealevelrisecriteriaitwouldbehelpful.

Ms.Michaelsreplied:Ithasnotbeenpreparedyetbutwewillbeworkingwiththeprojectproponentstodothat.

Page 28: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

28

ECRBMINUTESMay24,2017

Mr.Livingstoncommented:WoulditbepossibletogetthetwoBoardMemberswhoarenotpresentandhavethegeotechnicalexpertise,toprovideuswithsomewrittencommentsorinputsonthevariousreportsandotherdocumentationthatwehavesubmitted?AndthereasonIammakingthatrequestisitwouldbeveryhelpfultousifweknewwhattheconcernsoftheBoardwereaswemoveintothisnextstageofdesigningourmitigationsolutionstotheproblemsthathavebeenidentified.Justtomakesurethatwearenotmissinganythingfromtheirperspective.

Mr.Montesresponded:Iunderstandyourconcerns,butunfortunatelyweareboundbythelawsthatprecludeindividualsorafewmembersoftheECRBfromgivinginputunlesstheyhappentobealltogetherinapublicforum.

Mr.Espinosaasked:Weretheyabletoreviewthematerialssincethematerialwasgiventothem?

Mr.Montesexplained:No,sincetheywerenotgoingtoparticipateinthemeeting.Thereforetheywerenotabletoviewthematerialunlesstheycommittedtobeinthemeeting.

BoardChairBorcherdtadded:WehavetomeettheOpenMeetingActrequirements.ThisisapublicmeetingsobasicallyanyinteractionwiththeBoardMembershastotakeplaceinapublicforum.

Mr.Montescontinued:Wehavetohaveanotherpublicmeetingwheretherewillbethegeotechsinvolvementandthentheinformationwillbedistributedtoallofthemforanotherpublicmeeting.IbelievethenextpublicmeetingwillbeinAugustbutIwillhavetodouble-checkonthat.

BoardMemberGilpinasked:Coulditaddressjustthegeotechaspectsoftheproject?

Mr.Montesreplied:Forthenextmeeting?

BoardMemberGilpinanswered:Iftheywantedtobringjustthegeotechpartsofwhatwelookedattodayordoesithavetoopenupthewholeproject?

Mr.Montesresponded:No.Wehavetogatherupthewholeteam.

BoardMemberGilpinexplained:Iunderstandthat.Butitcouldbeanagendaitematthenextmeetingthatisjustfocusedongeotechissuesforthisoneproject,inadditiontotheotherprojectthatwearegoingtolookat.

Mr.Montesagreed:Sure,yes,wecanhavethegeotechaspectbutyouallhavetobehere.

Mr.Fippincommented:Ithinkthattheprimaryconcernisthatiftherearesignificantcommentsthatrequireathirdvisit.IbelievetheApplicantwouldliketoshortenthetimeperiodofreview.

Mr.Livingstonstated:RightnowBCDCisbasicallyourcriticalpathsoweareveryfocusedondoingtheanalysisthatECRBbelievesisimportanttosupporttheproposalthatwearegoingtobemakingfromaplanningandsafetyperspective.

Page 29: Approved Minutes of May 24, 2017, BCDC Engineering ... · p.m., in the Benicia Conference Room at 455 Golden Gate Avenue, San Francisco, California. The following Board Members were

29

ECRBMINUTESMay24,2017

WearealsoveryinterestedingettingtheinputfromtheBoardsothatwecanprepareourformalapplicationandgetthatsubmittedandgettheprocessgoingfortheformalconsiderationofthatapplication.

WewerehopingtobeabletogetinfrontoftheECRBatthismeetingandgetyourfullinputsothatwecangobackandsubmitourformalapplicationbasedonthatinputwiththeadditionalworkthatwearegoingtobedoingasdescribedbySamandJeff.ButIdon'twanttowaituntilaftertheAugustmeetingtoputthatformalapplicationtogetherandgetitsubmitted.

Mr.Monteshadasuggestion:Ihaveanidea.TheAlamedaLandingthatcametotheBoardinMarch,youcanlookattheminutes.YoucanlookatJimFrench'scommentsregardingtheDSMandgeotechnicalaspectofit,sothatcouldgiveyouanidea.

Mr.Livingstonagreed:Rafael,Ithinkthatisagreatidea.BecauseatyourrecommendationIdidsitinonthatmeetingandIknowthatthereweresomecommentsmadeontheDSMthatIthinkwouldberelativelyapplicablehere.Sothatwillgiveussomethingtogowith.

Mr.Montesadded:Icanalsoprovideyouwithsimilarprojectsthathadthetwogeotechsinvolved,TreasureIslandandsomeotherones.

Ms.Michaelsstated:AlsoIwanttoaddthatyoudonotneedtowaituntiltheBoardseesthisprojectfurtherforyoutosubmityourpermitapplication.Wewillacceptitatanytimeandthiscangoonparallelalongwiththatprocess.

Mr.Livingstoncontinued:HopefullywewillbereadytocomebacktotheBoardforasecondreadingwithourwholeprograminplaceandresponsestotheconsiderationsandconcernsthathavebeenraisedtodaybythatAugustmeeting,soperhapswecangetonthatagendatofollowuponthismeeting.

Weverymuchappreciatetheinputandtheopportunitytopresenttheproject.Weareprettyexcitedaboutmovingthisprojectforward.WehavegottenmostoftheapprovalsthatweneedandBCDCisthelastthresholdweneedtogetacrosssoweareveryanxioustoworkwithyouonthat.

BoardChairBorcherdtadded:Itlookslikeaniceproject,thankyouforcomingin.

5. Adjournment.Therebeingnofurtheroldornewbusiness,themeetingwasadjournedat3:56p.m.

Respectfullysubmitted,

RAFAELMONTES,P.E.BoardSecretary

Approved,withnocorrections,attheEngineeringCriteriaReviewBoardMeetingAugust8,2017.