31
APPROPRIATION BILL, 2011 THE APPROPRIATION BILL, 2011 A Bill for An Act of Parliament to authorize the issue of a sum of money out of the Cons ol idat ed Fund and it s app lic ati on towards the ser vic e of the year ending on the 30th June, 2012 and to appropri ate th at sum and a sum vote d on account by the National Assembly for certain public services and purposes ENACTED by the Parliament of Kenya, as follows— Short title. 1. This Act may be cited as the Appropriation Act, 2011.  Issue of KSh. 742,660,672,336 out of the Consolidated Fund for service of the year ending 30t h June, 2012 and appropr iation of the mon ey granted. 2. (1) The Tr easu ry ma y issue out of th e Consolidated Fund and apply towards the supply granted for the service of the year ending on the 30th June, 2012, the sum of Kenya Shillings seven hundred and fo rt y-two billion, six hundred and sixty million, six hundred and seventy-two thousand, three hundred and thirty-six, and that sum shall be deemed to have been appropriat ed as fr om th e 1st Jul y, 2011, fo r th e services and purposes specified in the Schedule. (2) The sum granted out of the Consolidated Fund by subsection (1) includes the sum of Kenya Shill ings three hundred and si xt y ei ght bi lli on, thr ee hun dr ed and sixteen mi lli on, one hun dr ed www.kenyalaw.org

Appropriation Bill 2011

Embed Size (px)

Citation preview

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 1/30

APPROPRIATION BILL, 2011

THE APPROPRIATION BILL, 2011

A Bill for

An Act of Parliament to authorize the

issue of a sum of money out of 

the Consolidated Fund and its

application towards the service

of the year ending on the 30th

June, 2012 and to appropriate

that sum and a sum voted on

account by the National

Assembly for certain public

services and purposes

ENACTED by the Parliament of Kenya, as

follows—

Short title.

1. This Act may be cited as the Appropriation

Act, 2011.

  Issue of KSh. 742,660,672,336 out of theConsolidated Fund for service of the year ending30th June, 2012 and appropriation of the moneygranted.

2. (1) The Treasury may issue out of the

Consolidated Fund and apply towards the supply

granted for the service of the year ending on the

30th June, 2012, the sum of Kenya Shillings sevenhundred and forty-two billion, six hundred and

sixty million, six hundred and seventy-two

thousand, three hundred and thirty-six, and that

sum shall be deemed to have been appropriated as

from the 1st July, 2011, for the services and

purposes specified in the Schedule.

(2) The sum granted out of the Consolidated

Fund by subsection (1) includes the sum of Kenya

Shillings three hundred and sixty eight billion,

three hundred and sixteen million, one hundred

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 2/30

APPROPRIATION BILL, 2011

and seventy-two thousand, nine hundred and

thirty-eight, authorized by the National Assembly

on the 16th June, 2011, in accordance with Article

222 of the Constitution.

Appropriations in aid.

3. In addition to the sum granted by section 2, there

may be applied, for the several services and purposes

specified in the Schedule, the sums specified out of any

money directed to be applied as appropriations in aid

under section 13(2A) of the Government Financial

Management Act, 2004 (No.5 of 2004)

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

Vote

No. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of State for Provincial

Administration and Internal Security,

including general administration and

planning, field administration services,

Administration Police Services,

Government Press, Kenya Police and

General Service Unit…………..…. 55,940,175,169 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the State Houses; Nairobi,

Mombasa and Nakuru: State Lodges;

Sagana, Kisumu, Eldoret and

Kakamega. The estimate also includes

expenses related to presidential press

services and policy analysis and

research…………… 1,275,000,000 2,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

5,051,543,783 46,000,000

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 3/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

of the Ministry of State for Public

Service, including general

administration and planning and

Government training

institutions……….........

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Foreign

Affairs, including general

administration and planning,

diplomatic representation,

coordination and liaison services and

international organizations........... 7,275,006,500 787,000,000

The amount required in the year ending 30th

June, 2012, for the salaries andexpenses of the Office of the Vice-

President and Ministry of Home

Affairs, including general

administration and planning, Prison

Services, Probation and Aftercare

Services and Betting Control and

Licensing Board……………….... 13,742,576,088 —

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses for the Ministry of State forPlanning, National Development and

Vision 2030, including general

administration and planning,

statistical services, regional

cooperation, data collection, policy

analysis and

research...........................

2,794,188,070 12,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

17,930,446,184

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 4/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

expenses of the Office of the Deputy

Prime Minister and Ministry of 

Finance, including general

administration and planning, financial

policy, debt management, Directorate

of Public Procurement, GovernmentInformation Technology Services,

banks and financial institutions,

Insurance Regulatory Authority,

Kenya Revenue Authority, Department

of Government Investment and Public

Enterprises, parastatals reform

programme and Kenya Investment

Authority…………......…. . —

The amount required in the year ending 30th

June, 2012, for salaries and expensesof the Ministry of State for Defence,

including general administration and

planning and expenses of the Kenya

Armed Forces………. 52,016,698,310 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Regional

Development Authorities, including

general administration, planning and

regional development………… 794,211,390 —

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses for the Ministry of  

Agriculture, including general

administration and planning,

regulatory management of inputs and

outputs in agriculture, promotion of 

agriculture and private sector

development, facilitation of agriculture

extension and research services,information management for

8,365,686,239 175,293,410

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 5/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

agriculture sector, monitoring and

management of food security, crop

and pest control and protection of 

natural resource base for

agriculture………

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Medical Services,

including general administration and

planning, medical equipment, curative

health, health training, Kenyatta

National Hospital, Moi Teaching and

Referral Hospital, medical supplies

and grants to non-governmental

hospitals…….............…

23,804,876,317 3,824,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Office of the Deputy Prime

Minister and Ministry of Local

Government, including general

administration and planning andgrants to local

authorities…………………………..... 1,078,837,059 17,301,900,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Roads,

including general administration and

planning, roads, transport and staff 

training

services….............................. 2,298,650,563 25,147,500,000

The amount required in the year ending 30th

June, 2012, for the salaries and

3,974,814,032

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 6/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

expenses of the Ministry of Transport,

for including general administration

and planning, Kenya Railways, Kenya

Ferries Services, Kenya Civil Aviation

Authority and Kenya Maritime

Authority…… 62,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Labour, including

general administration and planning,

industrial relations, Directorate of 

Occupational Health and Safety

Services, human resource planning

and development, Directorate of 

Industrial and Vocational Training and

micro and small scale enterprisedevelopment……………….....…… 1,631,292,074 89,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Trade,

including general administration and

planning, promotion of trade, internal

and external trade services, Export

Promotion Council, Business Premises

Rent Tribunal and Kenya Institute of 

BusinessTraining..........................................

................... 1,588,002,798 215,455,588

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Justice,

National Cohesion and Constitutional

Affairs, including general

administration and planning, Law

Reform Commission, National Anti-

Corruption Steering Committee,Directorate of Legal Affairs, Truth,

1,900,101,208

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 7/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

Justice and Reconciliation

Commission, National Cohesion and

Integration Commission, reforms and

legal

training………....................................

.............. 157,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Gender,

Children and Social Development,

including general administration and

planning, children services, gender

and social services…………………… 4,012,218,079 9,490,000

The amount required in the year ending 30th

June, 2012, for the salaries andexpenses of the Ministry of Livestock

Development, including general

administration and planning,

regulatory management of livestock,

livestock development and veterinary

services………… 3,684,768,650 24,482,300

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses for the Ministry of Water

and Irrigation, including generaladministration and planning, rural,

urban and special water programmes,

flood control and land reclamation,

development of irrigation schemes

including Bura Irrigation Scheme,

National Irrigation Board and National

Water Conservation and Pipeline

Corporation………………………………….. 4,074,870,261 1,923,722,596

The amount required in the year ending 30th

June, 2012, for the salaries andexpenses of the Ministry of  

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 8/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

Environment and Mineral Resources,

including general administration and

planning, mineral development,

Department of Resource Survey and

Remote Sensing and environmental

management andprotection.......................................

.................... 2,342,243,681 203,400,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of  

Cooperative Development and

Marketing, including general

administration and planning,

provincial administrative services, co-

operative supervision and promotionalservices, co-operative audit and

education services and training

programme…….................................

............... 1,092,416,280 13,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Cabinet Office, including

general administration and planning,

National Economic and Social Council,

Office of Public Communications,coordination and liaison services and

Directorate of e-

Government....................................

................... 1,309,477,333 1,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of East

African Community, including general

administration and planning, regional

integration and contribution toregional and international

1,014,864,944

1,000,000

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 9/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

organizations……...

The amount required in the year ending 30th

June, 2012,for the salaries and

expenses of the State Law Office,

including general administration and

planning, legal services and Registrar-

General's services………………….. 1,336,010,659 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of running the Judiciary, including

general administration and planning,

Judicial Service commission, Supreme

Court, Court of Appeal, Council on

Administration of Justice, Auctioneers

Licensing Board, Judicial TrainingInstitute, High Court of Kenya,

Magistrates and Kadhis

Courts………............. 6,362,509,531 —

The amount required for the year ending 30th

June, 2012, for salaries and expenses

of the Public Service Commission, for

recurrent expenditure including

general administration and

planning………………………………. 645,723,590 4,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Kenya National Audit

Office, including general

administration and audit

services……………...............................

......... 1,437,660,000 110,000,000

The amount required in the year ending 30th

June, 2012, for the National

Assembly, for recurrent expenditureincluding general administration and

8,857,053,181 4,000,000

www.kenyalaw.org

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 10/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

planning…………........…..

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Energy, including

general administration and planning,

renewable energy development,

electric power development and

petroleum exploration and

distribution…........ 2,371,500,319 —

The amount required for the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Education,

including general administration and

planning, early childhood education,

primary education, schools for thehandicapped, secondary education

and adult

education……...................................

................ 34,310,762,551 3,227,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Information and

Communications, including general

administration and planning,

information and news services, KenyaNews Agency, rural press, film

production, Kenya Institute of Mass

Communication, Kenya Yearbook

Board, Brand Kenya, Film

Commission, Kenya Film Censorship

Services and Media Council of 

Kenya…………............ 1,839,087,117 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Interim Independent Electoral

www.kenyalaw.org

10

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 11/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

Commission, including general

administration and planning, civic and

parliamentary by-elections, general

elections, funding of political parties

and field

services……..................................................... 11,431,881,094 7,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Kenya Anti-Corruption

Commission, including general

administration and planning and

expenditure related to research,

education policy and preventive

services, investigations, asset tracing

and recovery and legalservices……………...............................

........... 1,609,030,000 8,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of State for

Special Programmes, including

general administration and planning,

relief and rehabilitation, national

disaster operations, National Aids

Control Council and disasteremergency response coordination…… 7,919,766,199 3,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

for the Ministry of Lands, including

general administration and planning,

land adjudication and settlement,

Survey of Kenya, Lands and Physical

Planning services………………....… 2,167,326,538 —

The amount required in the year ending 30thJune, 2012, for the Salaries and

367,900,000

www.kenyalaw.org

11

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 12/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

expenses for the Commission on

Revenue Allocation, including general

administration and planning, legal and

public affairs, research and policy

development and county coordination

services —

The amount required in the year ending 30th

June, 2012, for the Ministry of State

for Immigration and Registration of 

Persons, for salaries and other

expenses including general

administration and planning, refugee

services, field administration services,

civil registration, national registration

of persons and immigration

services………….........................

3,920,956,854 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of State for National

Heritage and Culture, including

general administration and planning,Kenya National Archives and

Documentation Service, Non-

Governmental Organizations

Coordination Board, National

Museums of Kenya, national cultural

services and Kenya Library

Services………….......… 1,744,617,996 21,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Youth Affairs andSports, including general

administration and planning, co-

5,832,563,616

www.kenyalaw.org

12

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 13/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

ordination of sports, National Youth

Service and youth development and

training… 69,500,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Higher

Education, Science and Technology,

including general administration and

planning, technical education, higher

education support services, university

education and National Council for

Science and

Technology……………..........................

.. 25,874,893,712 15,392,000,000

The amount required in the year ending 30thJune, 2012, for salaries and expenses

for the Ministry of Housing, including

general administration and planning,

government estates management,

housing development and Rent

Restriction Tribunal……………............. 1,195,311,158 485,000,000

The amount required in the year ending 30th

June, 2012 for salaries and expenses

of the National Security Intelligence

Service, including generaladministration and planning,

operations, training and expenditure

related to liaison

services……………………………….. 13,146,113,300 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Tourism, including

general administration and planning,

development and promotion of 

tourism, Kenya Tourist Board, KenyaUtalii College and Bomas of Kenya… 1,557,548,460 11,000,000

www.kenyalaw.org

13

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 14/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

The amount required for the year ending 30th

June, 2012, for the salaries and

expenses of the Teachers Service

Commission, including general

administration and planning…………

 

105,832,

600,670 80,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Office of the Prime Minister,

including general administration and

planning, coordination services, public

sector reforms, Performance

Contracting, Efficiency Monitoring Unit

and Inspectorate of State

Corporations……...............................

............. 1,810,994,950 1,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Public

Health and Sanitation, including

general administration and planning,

medical equipment, preventive

medicine and promotive health and

oversight over sanitation

services……………….............................

......... 10,912,491,857 58,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Forestry

and Wildlife, including general

administration and planning, forestry

development and Kenya Wildlife

Service….........................................

.................. 4,062,166,921 1,091,120,000

The amount required in the year ending 30th

June, 2012, for the salaries andexpenses of the Ministry of Fisheries

1,262,096,299 —

www.kenyalaw.org

14

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 15/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

Development, including general

administration and planning and

fisheries development……………………….

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Ministry of Nairobi

Metropolitan Development, including

general administration and planning,

development of Nairobi metropolitan

infrastructure, development of 

efficient water supply, waste

management system and slum up-

grading…...

290,899,822 1,000,000

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Ministry of Development of 

Northern Kenya and other Arid Lands,

including general administration and

planning, land resource management,

infrastructural development, livestock

development, industries and watersupply………………………........................

... 311,093,089 2,000,000

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses for the Ministry of Public

Works, including general

administration and planning, Supplies

Branch, Architectural, Electrical and

Mechanical Departments…………………. 1,545,810,526 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

1,788,066,492 126,000,000

www.kenyalaw.org

15

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 16/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

of the Ministry of Industrialization,

including general administration and

planning, industrial development,

Kenya Bureau of Standards, Kenya

Industrial Research and Development

Institute, Kenya Industrial PropertyInstitute and Kenya Industrial Training

Institute………

The amount required in the year ending 30th

June, 2012, for the Directorate of 

Public Prosecution, for recurrent

expenditure including general

administration and

planning.........................................

................... 355,000,000 —

The amount required in the year ending 30th

June, 2012, for the salaries and

expenses of the Human Rights and

Equality Commission, including

general administration and planning,

human rights and gender

equality………….. 324,500,000 —

The amount required in the year ending 30th

June, 2012, for salaries and expenses

of the Commission for theImplementation of the Constitution,

including general administration and

planning……………………………......... 524,000,000 —

The amount required in the year ending 30th

June, 2012 for salaries and expenses

of the National Police Service

Commission, including general

administration and planning and the

Independent Police Oversight

Authority…....................................................... 250,000,000 —

www.kenyalaw.org

16

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 17/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

SUB TOTAL ... ... ... ... ... ... ... ... ... ... KSh. 482,190,901,515 70,695,863,894

Development Expenditure KSh. KSh.

The amount required in the year ending 30th

June, 2012, for the Ministry of State

for Provincial Administration and

Internal Security, for capital

expenditure including general

administration and planning, field

administration services,

Administration Police, Government

Press, Kenya Police and General

Service Unit………………………… 4,584,470,000 150,000,000

The amount required in the year ending 30th

June, 2012, for State House, for

capital expenditure on buildings,

extensions and renovation to existing

buildings at the State Houses and

Lodges…………………………. 423,000,000 —

The amount required in the year ending 30th

June, 2012, for the Ministry of State

for Public Service, for capitalexpenditure, including general

administration and planning and

Government training

institutions…………….. 690,055,460 24,000,000

The amount required in the year ending 30th

June, 2012, for the Ministry of Foreign

Affairs, for capital expenditure

including general administration and

planning, and diplomatic

representation…………………… 870,032,000 22,487,000

www.kenyalaw.org

17

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 18/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

The amount required in the year ending 30th

June, 2012, for the Office of the Vice

President and Ministry of Home

Affairs, for capital expenditure

including general administration and

planning, Prison Services, Probationand Aftercare Services and Betting

Control and Licensing

Board…………………

1,918,000,000 —

The amount required in the year ending 30th

June, 2012, for the Ministry of State

for Planning, National Development

and Vision 2030, for capital

expenditure including general

administration and planning, national

development planning policy and

research, statistical services, National

Council for Population and

Development and Constituency

Development Fund……………. 24,479,214,914 3,414,550,621

The amount required in the year ending 30th

June, 2012, for the Office of theDeputy Prime Minister and Ministry of 

Finance, for capital expenditure

including general administration and

planning, financial policy, debt

management, Directorate of Public

Procurement, Government

Information Technology services,

banks and financial institutions,

Insurance Regulatory Authority and

Kenya Revenue Authority. The

estimate also includes expenditurearising from Department of  

33,218,421,680

4,067,307,821

www.kenyalaw.org

18

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 19/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

Government Investment and Public

Enterprises, parastatals reform

programme and Kenya Investment

Authority…......................................

...............

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Regional Development Authorities, for

capital expenditure including general

administration, planning and regional

development………...... 3,852,000,000 2,481,200,000

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Agriculture, for capital expenditure

including general administration andplanning, regulatory management of 

inputs and outputs in agriculture,

promotion of agriculture sector

development, facilitation and supply

of agriculture and extension research,

information management for

agriculture sector, monitoring and

management of food security, crop

and pest control and protection of 

natural resource base for

agriculture……..

9,222,896,480 2,126,258,067

The amount required in the year ending 30th

June, 2012, for the Ministry of Medical

Services, for capital expenditure

including general administration and

2,336,000,000

www.kenyalaw.org

19

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 20/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

planning, buildings, medical

equipment, housing projects, curative

health, health training, Kenyatta

National Hospital, Moi Teaching and

Referral Hospital, medical supplies

and grants to non-governmentalhospitals…..................... 2,098,503,594

The amount required in the year ending 30th

June, 2012, for the Office of the

Deputy Prime Minister and Ministry of 

Local Government, for capital

expenditure including general

administration and planning, and

development projects within local

authorities…………........ 5,471,140,000 646,000,000

The amount required in the year ending 30th

June, 2012, for the Ministry of Roads,

for capital expenditure including

general administration and planning,

Roads and Transport Departments

and staff training…… 41,612,101,790 31,812,101,168

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Transport, for capital expenditure

including general administration andplanning, Kenya Railways, Kenya

Ferry Services, Kenya Civil Aviation

Authority and Kenya Maritime

Authority…… 7,326,000,000 6,931,336,000

The amount required in the year ending 30th

June, 2012, for the Ministry of Labour,

for capital expenditure including

general administration and planning,

industrial relations, Directorate of 

Occupational Health and SafetyServices, human resource planning

555,883,000

www.kenyalaw.org

20

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 21/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

and development, Directorate of 

Industrial and Vocational Training and

micro and small scale enterprise

development…………….......…….. 611,109,000

The amount required in the year ending 30th

June, 2012, for Ministry of Trade, for

capital expenditure including general

administration and planning, internal

and external trade services, Export

Promotion Council, Export Processing

Zones Authority and Kenya Institute

of Business Training……………....

430,000,000 184,384,800

The amount required in the year ending 30th

June, 2012, for the Ministry of Justice,

National Cohesion and Constitutional

Affairs, for capital expenditure

including general administration and

planning, governance, justice, law and

order sector reform programme and

legal training…....................... 114,850,000 925,500,000

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Gender, Children and Social

Development, for capital expenditure

including general administration and

planning, children services, gender

and social services………………..

……………… 3,283,470,690 685,949,812

The amount required in the year ending 30th

June, 2012, for the Ministry of Livestock Development, for capital

expenditure including, general

4,108,836,530 269,750,000

www.kenyalaw.org

21

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 22/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

administration and planning, livestock

development and veterinary

service….........................................

The amount required in the year ending 30th

June, 2012, for the Ministry of Water

and Irrigation, for capital expenditure

including general administration and

planning, rural, urban and special

water programmes, flood control and

land reclamation development of 

irrigation schemes, National Irrigation

Board and National Water

Conservation and Pipeline

Corporation.....................................

................ 20,758,482,986 17,159,980,958

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Environment and Mineral Resources,

for capital expenditure including

general administration and planning,

mineral development, Department of 

Resource Survey and Remote Sensing

and environmental management and

protection…

3,951,867,685 153,882,847

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Cooperative Development and

Marketing, for capital expenditure

including general administration and

planning, professional administrative

services, cooperative management

andtraining..........................................

368,000,000 —

www.kenyalaw.org

22

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 23/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

...................

The amount required in the year ending 30th

June, 2012, for the Cabinet Office, for

capital expenditure, including general

administration and planning, National

Economic and Social Council,

coordination and liaison services, and

directorate of e-

Government…………………. 185,000,000 4,000,600,000

The amount required in the year ending 30th

June, 2012, for the Ministry of East

African Community, for capital

expenditure including general

administration and planning, Regional

Resource and IntegrationCenters…………..... 9,000,000 65,400,000

The amount required in the year ending 30th

June, 2012, for the State Law Office,

for capital expenditure including

general administration and planning,

legal services and Registrar-General's

services…………… 42,810,000 —

The amount required in the year ending 30th

June, 2012, for the Judiciary, forcapital expenditure including general

administration and planning,

construction and refurbishment of 

court houses………….......................

…...... 2,519,000,000 —

The amount required in the year ending 30th

June, 2012, for the National

Assembly, for development

expenditure including general

administration andplanning……………......... 1,600,000,000 -

www.kenyalaw.org

23

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 24/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Energy, for capital expenditure

including general administration and

planning, renewable energy

development, electric powerdevelopment and petroleum

exploration and

distribution…...................................

.......……

23,924,291,950 39,849,350,650

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Education, for capital expenditure

including general administration and

planning, early childhood education,

primary education, schools for the

handicapped, secondary education

and adult

education….....................................

.................. 3,945,000,000 1,670,500,000

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Information and Communications, forcapital expenditure including general

administration and planning,

information and news services, Kenya

News Agency, rural press, Film

Production Department and Kenya

Institute of Mass Communication…….

…………….................... 5,359,008,186 1,200,000

The amount required in the year ending 30th

June, 2012, for Kenya Anti-Corruption

Commission, for capital expenditureincluding general administration and

200,000,000 32,000,000

www.kenyalaw.org

24

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 25/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

planning…………

The amount required in the year ending 30th

June, 2012, for the Ministry of State

for Special Programmes, for capital

expenditure including general

administration and planning, flood

mitigation, disaster emergency

response coordination and National

Aids Control

Council...........................................

................... 3,559,606,200 1,579,610,000

The amount required in the year ending 30th

June, 2012, for the Ministry of Lands,

for capital expenditure including

general administration and planning,land adjudication and settlement,

Survey of Kenya, Lands and Physical

Planning Department……………...... 1,172,944,125 131,226,100

The amount required in the year ending 30th

June, 2012, for the Ministry of State

for Immigration and Registration of 

Persons, for capital expenditure

including general administration and

planning, refugee services, field

administration services, civilregistration, national registration of 

persons, immigration services and

national population register……

2,387,400,000 —

The amount required in the year ending 30th

June, 2012, for the Ministry of Statefor National Heritage and Culture, for

capital expenditure including general

686,000,000

www.kenyalaw.org

25

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 26/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

administration and planning, Kenya

National Archives and Documentation

Services, Non-Governmental

Organization Coordination Board,

National Museums of Kenya, national

cultural services and Kenya NationalLibrary Services……… —

The amount required in the year ending 30th

June, 2012, for the Ministry of Youth

Affairs and Sports, for capital

expenditure, including general

administration and planning, co-

ordination of sports, National Youth

Service and youth development and

training…………. 3,753,230,000 19,000,000

The amount required in the year ending 30th

June, 2012, for the Ministry of Higher

Education Science and Technology, for

capital expenditure including general

administration and planning, technical

education, higher education support

services, university education and

National Council for Science and

Technology…………............................

.... 6,714,000,000 5,140,271,453

The amount required in the year ending 30th

June, 2012, for Ministry of Housing,

for capital expenditure including

general administration and planning

government estates management,

housing development and Rent

Restriction Tribunal……………… 2,319,353,300 —

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Tourism, for capital expenditure,including general administration and

www.kenyalaw.org

26

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 27/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

planning, development and promotion

of tourism, Kenya Utalii College,

Kenyatta International Conference

Centre, Kenya Tourist Development

Corporation, Bomas of Kenya, Kenya

Tourist Board and Catering andTourism Development Levy

Trustees…………………………………… 1,209,000,000 32,983,603

The amount required in the year ending 30th

June, 2012, for the Office of the Prime

Minister, for capital expenditure

including general administration and

planning, Efficiency Monitoring Unit,

public service reforms and other

capital expenses………..... 670,165,560 554,279,200

The amount required in the year ending 30th

June, 2012, for the Ministry of Public

Health and Sanitation, for capital

expenditure including general

administration and planning, medical

equipment, preventive medicine and

promotive health and oversight over

sanitation

services………………............................

.......... 12,954,515,110 8,325,968,136

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Forestry and Wildlife, for capital

expenditure, including general

administration and planning, forestry

development and Kenya Wildlife

Service…… 3,004,912,000 484,000,000

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Fisheries Development, for capitalexpenditure including general

2,946,105,175 370,369,026

www.kenyalaw.org

27

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 28/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

administration and planning and

fisheries development…………………...

The amount required in the year ending 30th

June, 2012, for the Ministry of Nairobi

Metropolitan Development, for capital

expenditure including general

administration and planning,

metropolitan planning and

development and social

infrastructure……… 1,980,700,000 —

The amount required in the year ending 30th

June, 2012, for the Ministry of 

Development of Northern Kenya and

Other Arid Lands, for capital

expenditure including generaladministration and planning, land

resource management, infrastructural

development, livestock development,

industries and water

supplies……………………………..............…

2,130,684,000 20,850,000

The amount required in the year ending 30th

June, 2012, for the Ministry of Public

Works, for capital expenditure,

including general administration and

planning, Supplies Branch,

Architectural, Electrical and

Mechanical

Department.....................................

................... 4,961,000,000 —

The amount required in the year ending 30thJune 2012, for Ministry of  

Industrialization, for capital2,661,322,000

www.kenyalaw.org

28

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 29/30

APPROPRIATION BILL, 2011

SCHEDULE—(Contd.) (ss. 2 and 3)

(1) (2) (3) (4)

VoteNo. No.

Service or Purpose Supply Appropriations

in aid 

Recurrent Expenditure KSh. KSh.

expenditure, including general

administration and planning, industrial

development, Kenya Industrial

Research and Development Institute,

Kenya Industrial Estates and Kenya

Industrial TrainingInstitute………...................................

............... 39,523,000

SUB TOTAL ... ... ... ... ... ... ... ... ... ... KSh. 260,469,770,821

136,081,432,85

6

GRAND TOTAL ... ... ... ... ... ... ... .. .... KSh.

742,660,672,336

206,777,296,75

0

MEMORANDUM OF OBJECTS AND REASONS

Clause 2 of this Bill provides for the issue out of the

Consolidated Fund of the sum of KSh.

742,660,672,336 required to meet public

expenditure during the financial year ending on the

30th June, 2012. This sum includes the amountauthorized by the National Assembly on the 16th

June, under Article 222 of the Constitution. The

clause also appropriates the money granted for the

services and purposes specified in the Schedule,

which is based on the estimates for the 2011/2012

financial year.

Clause 3 makes provision for appropriations in aid of 

those service and purposes.

Dated the 1st September, 2011.

www.kenyalaw.org

29

8/3/2019 Appropriation Bill 2011

http://slidepdf.com/reader/full/appropriation-bill-2011 30/30

APPROPRIATION BILL, 2011

UHURU KENYATTA,Deputy Prime Minister and  

Minister for Finance.

30