Approaching BIM/FM Integration: Filling the Gaps for Success Summit Technology (HK) Limited

Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Embed Size (px)

DESCRIPTION

Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong) Ltd

Citation preview

Page 1: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Approaching BIM/FM Integration:Filling the Gaps for SuccessSummit Technology (HK) Limited

Page 2: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Current Design/Construction/FM Relation

Design/ConstructionFacility

Management

Page 3: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Missing Piece

Page 4: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Current Facility Management Practice

• As-built Drawings

• Operation & Maintenance Manual (O&M Manual)

• Computerized Maintenance Management System (CMMS)

Page 5: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

As-built Drawings

• Inaccurate Drawings

• Contradicting Drawings

• No Drawings

Page 6: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Operation & Maintenance Manual

• Thousands or more Pages

• Disorganized Information

• Low Resolution

• No Correlation with As-built Drawings

Page 7: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

CMMS

• Require Significant Effort to Input

• Require Lengthy Development

• Usually Only a Text Based System

• Usually Decoupled with Drawings and Manuals

Page 8: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Here Comes

Mr. BIM

Page 9: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Two Scenarios

Without As-built BIM With As-built BIM

Page 10: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Building BIM Models from Scratch

We have the following means to build BIM model:

• CAD Drawings

• Printed Drawings

• Point Cloud

• Site Visit

Page 11: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Sample Point Cloud

Page 12: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Site Visit

Page 13: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Preparing BIM for FM Use

BIM models created from Design and Construction phase should already have correct geometric information, we need only to insert the following:

• Level of Development (LOD)

• Building Information

• O&M Manual

Page 14: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Correlated Information

GeometryTextual Information

Page 15: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

BIM Viewer

Not all FM personnel is familiar with BIM, thus, raise the need for a BIM viewer to perform the basic functions:

• Suitable to facilitate BIM as a standalone FM tool

• Usually utilize some form of game engine

• Allow users to navigate through the BIM model

• Grant Users easier assess to information

• It is a useful intermediate point

Page 16: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

With BIMFacility

ManagementDesign/Construction

Page 17: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

What is COBie?

• COBie is a data format for storing and organizing building model information

• Internationally Recognized for Information Exchange

• Implemented in over 30 Commercial Off-The-Shelf Software systems

• Included in National BIM Standard – United States™ Version 2 and will be included in Version 3

• BS 1192-4 is the code of practice for using COBie

Page 18: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Structure of COBie

Category Description

Contact Personnel and Companies

Facility Site and Facility Information

Floor Vertical levels and Exterior Areas

Space Rooms/Spaces

Zone Sets of Space Sharing a Specific Attribute

TypeTypes of Equipment, Fixtures, Products,

and Materials

Component Individually Named or Scheduled Items

System Sets of Components Providing a Service

Attribute Specific Properties of Referenced Item

Page 19: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Compiling Data

We have the following means to compile data:

•Manual Input

•Use COBie Extension for Revit

Page 20: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

COBie Datasheet

Page 21: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

COBie as an Adapter

Page 22: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Export COBie to CMMS

Use CMMS Import Plugin to Import COBie

Import NWD from Revit into CMMS

3D Model

COBie

CMMS

Page 23: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

CMMS Plug-in

Page 24: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

CMMS from BIM

Page 25: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Connecting Design/Construction and FMFacility

ManagementDesign/Construction

Page 26: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

BIM/FM Integration Process

BIM COBie CMMS

Page 27: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Future Research

BIM

COBieCMMS

Page 28: Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, Project Manager, Summit Technology (Hong Kong) Ltd Mr. Tom Lee, BIM Engineer, Summit Technology (Hong Kong)

Thank you