Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Approaches to Historic Bridge Rehabilitation Case Study #1 1

Approaches to Historic Bridge Rehabilitation Case Study #1

  • Upload
    theta

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

Approaches to Historic Bridge Rehabilitation Case Study #1. Hays Street Bridge Rehabilitation Patrick Sparks, P.E. Case Study #1. Hays Street Bridge Rehabilitation. San Antonio, Texas - viaduct over railroad, connecting historic neighborhood to downtown - PowerPoint PPT Presentation

Citation preview

Page 1: Approaches to Historic Bridge Rehabilitation Case Study #1

Hays Street Bridge Rehabilitation

Patrick Sparks, P.E.

Approaches to Historic Bridge Rehabilitation

Case Study #1

1

Page 2: Approaches to Historic Bridge Rehabilitation Case Study #1

Hays Street Bridge Rehabilitation San Antonio, Texas - viaduct over railroad, connecting historic

neighborhood to downtown Length: 1400-LF (1000-LF approach + 355-LF trusses) Date and Truss Spans:

1881 Whipple w/ Phoenix patent – 225-ft 1881 Pratt through - 130-ft

Case Study #1

2

Page 3: Approaches to Historic Bridge Rehabilitation Case Study #1

San Antonio River

East side historic neighborhood

Downtown

Hays Street Bridge

Union Union Pacific RRPacific RR

3

Page 4: Approaches to Historic Bridge Rehabilitation Case Study #1

Hays Street Bridge Rehabilitation Completed: 2010 Construction Cost: $3.2 M Design Team:

Sparks Engineering, Inc. - Prime

Bender Wells Clark – Landscape Architects

Garcia & Wright – Civil Joshua Engineering -

Electrical Client/Owner: City of San

Antonio Contractor: Jay-Reese

Contractors

Case Study #1

4

Page 5: Approaches to Historic Bridge Rehabilitation Case Study #1

Significant Issues Associated With Project Deteriorated and obstructive concrete

approaches Iron truss evaluation using nondestructive

methods Corrosion of floor beams, U-bolts, stiffeners, pins,

lateral struts built-up columns.

Case Study #1

5

Page 6: Approaches to Historic Bridge Rehabilitation Case Study #1

Deteriorated and Obstructive Concrete Approaches

Obstruction High level of

deterioration Major cost item Street clearances Accessibility compliance Historic significance? 30-ft width

Case Study #1

6

Page 7: Approaches to Historic Bridge Rehabilitation Case Study #1

How the Deterioration & Obstruction Issue was Resolved

New Concrete Approaches: Cast-in-place concrete

Reduced width to 15-ft Single piers, 40-ft spacing Concrete through girder

Case Study #1

7

Page 8: Approaches to Historic Bridge Rehabilitation Case Study #1

Evaluation and Rehabilitation of Iron Trusses 1881 Pratt and Whipple

designs Phoenix wrought iron columns Cast-iron joint blocks Wrought iron eyebars Early laminated steel pins “Pneumatic Impact” method

by Vern Mesler

Case Study #1

8

Page 9: Approaches to Historic Bridge Rehabilitation Case Study #1

Floor beams, u-bolts, stiffeners, pins, lateral struts, built-up columns

Case Study #1

9

Page 10: Approaches to Historic Bridge Rehabilitation Case Study #1

Lessons Learned/ConclusionsSensitive and appropriate reconstruction of

1910 approaches saved money, made the project feasible, and improved the outcome for all stakeholders

Nondestructive evaluation was essential for unique 1881 cast-iron/wrought iron trusses.

Appropriate repair and preservation techniques were targeted, cost effective, not overly conservative, and durable.

Case Study #1

10