14
Approaches to Developing National Estimates UNAIDS Reference Group on Estimates, Models and Projections

Approaches to Developing National Estimates

  • Upload
    xylia

  • View
    40

  • Download
    0

Embed Size (px)

DESCRIPTION

Approaches to Developing National Estimates. UNAIDS Reference Group on Estimates, Models and Projections. Approaches to Developing National Estimates. Estimate should be owned by the National AIDS Control Program National consensus workshop Involve key experts - PowerPoint PPT Presentation

Citation preview

Page 1: Approaches to Developing National Estimates

Approaches to Developing National Estimates

UNAIDS Reference Group on Estimates, Models and

Projections

Page 2: Approaches to Developing National Estimates

Approaches to Developing National Estimates

Estimate should be owned by the National AIDS Control Program

National consensus workshop• Involve key experts• Bring all expertise about surveillance

data• Improve surveillance system

Release of estimate can be advocacy opportunity

Page 3: Approaches to Developing National Estimates

National Workshop

Surveillance methodology Surveillance data Discussion and agreement on

methodology Agreement on major trends Review of results How to use results Key dissemination messages Public seminar

Page 4: Approaches to Developing National Estimates

Methodology Generalized epidemics

• Urban/rural• Province• Site specific with district mapping• Consider characteristics of sites

Concentrated epidemics• National or provincial• Risk groups to include• Estimation of risk group size

Range of estimates

Page 5: Approaches to Developing National Estimates

Kaporo

Mbalachanda HC

St. John’s Hosp.

Rumphi DH

NkhataBay DH

St. Anne’s Hosp.Kamboni HC

Mchinji DH

Lilongwe CH

Ntcheu DH

Thonje HC

Kasina HC

Mangochi DH

Nsanje DH

Mianga HC

QECH

Gawanani HC

Milepa HC

Mulanje M. Hosp.

HIV Sentinel Sites

Urban

Semi-urban

Rural

HIV Sentinel Sites in Malawi

Page 6: Approaches to Developing National Estimates

Region District Urban site Rural siteNorth Chitipa Kasoba/Kaporo Mbalachanda-Kaporo

Karonga Nkhata Bay Kasoba/KaporoRumphi Rumphi MbalachandaNkhata Bay Nkhata Bay Mbalachanda-KaporoMzimba Rumphi MbalachandaMzuzu City St. John's St. John'sLikoma Nkhata Bay-Kaporo Nkhata Bay-Kaporo

Central Kasungu Mchinji KamboniNkhotakota Nkhotakota KamboniNtchisi Thonje-Mchinji ThonjeDowa Mchinji ThonjeSalima Mchinji-Nkhotakota Nkhata Bay-KaporoLilongwe Lilongwe KasinaMchinji Mchinji KamboniDedza Ntcheu KasinaNtcheu Ntcheu Kasina

South Mangochi Mangochi GawananiMachinga Mangochi GawananiBalaka Mangochi-Ntcheu GawananiZomba Blantyre Gawanani-MilepaChiradzulu Mulanje MilepaBlantyre Blantyre Milepa-MiangaMwanza Mchinji GawananiThyolo Mulanje MiangaMulanje Mulanje MiangaPhalombe Milepa MilepaChikwawa Nsanje Milepa-MiangaNsanje Nsanje Milepa-Mianga

Page 7: Approaches to Developing National Estimates

Agreement on Trends

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

1990 1995 2000

Nyeri

Page 8: Approaches to Developing National Estimates

Agreement on Trends

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

1990 1995 2000

MeruNyeriThikaMaraguaNjambini

Page 9: Approaches to Developing National Estimates

Is prevalence declining?

0

5

10

15

20

25

30

35

Phi=1.49; SSQ=0.013096 Data

Page 10: Approaches to Developing National Estimates

Is prevalence declining?

0

5

10

15

20

25

30

35

1980 1983 1986 1989 1992 1995 1998 2001 2004 2007

Phi=1.49; SSQ=0.013096 PHI=100; SSQ=.013466 Data

Page 11: Approaches to Developing National Estimates

New Sites

0%

5%

10%

15%

20%

25%

1990 1995 2000

Site ASite BSite CSite DSite ESite F

Page 12: Approaches to Developing National Estimates

New Sites

0%

5%

10%

15%

20%

25%

1990 1995 2000

Site ASite BSite CSite DSite ESite FFit all

Page 13: Approaches to Developing National Estimates

New Sites

0%

5%

10%

15%

20%

25%

1990 1995 2000

Site ASite BSite CSite DSite ESite FFit allFit old

Page 14: Approaches to Developing National Estimates

New Sites

0%

5%

10%

15%

20%

25%

1990 1995 2000

Site ASite BSite CSite DSite ESite FFit allFit oldAdjusted