    Applications and Systems Analysis

  • 8/2/2019 Applications and Systems

    2/23

    1

    Target Architecture

    The IB Operations Strategy

    The IT target applications and systems architecture is driven by the IB Operations Strategy

    Revenue generation, control and efficiency improvementsdrive the future IT landscape

    To support the Ops Strategy pillars the IT investments requiredto define the architecture have to be prioritised based on:

    1. Revenue generation

    2. Control3. Efficiency

    ClientService

    Control &Compliance

    ProductivityImprovement

    Cost Control

    IB Operations Strategy is based on 4 pillars

  • 8/2/2019 Applications and Systems

    3/23

    2

    Target ArchitectureThe Operations Strategic IT Architecture

    Develop common Pre-Settlement functions across asset classes.

    Consolidate the settlement processing platforms to the best of breed per asset class.

    Create common services for the external connectivity, static data, etc.

    Consolidate the cash & position liquidity activities.

    Standardize the control functions with intelligent exception handling and process management tools to integrate the process chainacross all the asset classes.

    To achieve the revenue generation, the control and efficiency improvements the following principles have to be applied:

  • 8/2/2019 Applications and Systems

    4/23

    3

    Target Architecture

    The High-level IT Target Architecture

    Bold/Italic: Applications

    Static Data

    MasterfilesMistral

    ops|static

    CorporateEventsCAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE / ClearvisionStructures -Structured Trade Register / TeamWorksDocumentation -TrACE / Saperion / InboundReporting - ARIES

    ETDGMI OTC DerivsSummit Flow products(Securities,FX/MM) +

    Commodities

    Calypso +CATS

    LendingACBS

    Cash / Liquidity Mgmt -Cash NavigatorPayments -DKIB Payment Service

    Banking -Quartz + PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Cross Common Services Process ManagementSettlement Processing

    The following diagram shows the potential IT target architecture by the end of 2008:

    Cross Asset Services

  • 8/2/2019 Applications and Systems

    5/23

    4

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Cross Common Services Progress and Next Steps*

    Service Progress to Date Main Next Steps

    Static Data/Reference Data Ops|static implemented as source of

    detailed counterparty Ops|static subscribers extended to cover:

    Calypso Sec / Calypso FX / CATS /

    Kondor / Fidessa / Martini / RIBS

    Bulk of systems now using other strategiccomponents (e.g. Masterfiles / HierarchyManager) some specific exceptions

    (POSTS / GMI / RIBS)

    Continue extending core static components

    Extend usage of ops|static across other flows

    Potential project to merge Mistral into ops|static

    Migrate maintenance of DKSL counterparty

    data to ops|static as part of LCS

    Look to leverage ops|static further as a datasource for FBAS / IDE

    The IT Ops projects aim to create common services for the external connectivity, static data, and corporate events.

    The projects are primarily focussing on improving the static data services.

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    6/23

    5

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Cross Asset Services

    The IT Ops projects related to the cross asset services aim at creating common services by:

    Supporting the development of high margin structured transactions business through better management of structured transactions.

    Developing a flexible platform to create, distribute, store, and process documents.

  • 8/2/2019 Applications and Systems

    7/23

    6

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Cross Asset Services Progress and Next Steps*

    Product Progress to Date Main Next Steps

    Structures Delivered Structured Trade Register

    Implemented various tools, interfaces and

    checks to ensure & improve data quality inthe STR

    Established Process Managementplatform and workflows

    Established a scalable architecture with

    improved control around structures

    Enhancements for wider product cover andfunctionality

    On-going initiatives to deal with new structuresand improve processes

    Make method and technology available for otherinitiatives

    Documentation OTC Conf Engine (using Documentum)developed providing document workflowfor complex derivatives confirmation

    Transaction Confirmation Engine (TraCE)for document dispatching via SWIFT, fax,mail or print

    Saperion (Carsys) electronic archive

    integrated to Conf Engine, TraCE andTeamWorks

    Inbound suite introduced 2007 to convert

    inbound fax / text to structured electronicdata for automated processing. Links toTraCE / Saperion

    Complete integration (e.g. further availability ofWeb Services)

    Further rollout for document related workflows

    and wider coverage of documents in the archive

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    8/23

    7

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Settlement Processing Benefits and Disadvantages

    Based on the principle of consolidating the settlement processing platforms the following benefits and disadvantages have been indentified:

    Benefits:

    Overall lower IT cost base only 1 infrastructure to support / 1 vendor to manage.

    A single and consistent application framework across business functions allowing greater flexibility of IT development.

    Less need for service providers results in a cleaner architecture and in reduced maintenance.

    Common skills and knowledge for production applications result in flexibility to move users across functions & asset classes due toa shorter learning curve.

    Optimisation of the overhead on standard functions maintaining holiday calendars / static / market data and standard interfaces.

    Disadvantages:

    Vendor concentration risk.

    Interdependencies across business streams and more formality in change.

    Increased operational risk in event of failure.

  • 8/2/2019 Applications and Systems

    9/23

    8

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Settlement Processing Interim Solution

    To consolidate the settlement processing platforms a 2 step approach has been chosen:

    An initial consolidation within each product group is planned. The following architecture is aimed at:

    The decommissioning of all the applications and consolidation into Calypso is planned approximately by the end of 2012:

    ETD

    GMIOTC Derivs

    SummitSecurities,FX/MM +

    CommoditiesCalypso +

    CATS

    Lending

    ACBS

    ETD

    Calypso*

    OTC Derivs

    Calypso

    Securities,FX/MM +

    Commodities

    Calypso

    Lending

    Calypso*

    To reduce the operational risk the transformation of the settlement platform requires a phased approach

    1

    2

    * Most probable evolution

  • 8/2/2019 Applications and Systems

    10/23

    9

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Settlement Processing Main Projects

    FX / MM and commodities onto Calypso FX / MM and global rollout in parallel with ANLOS decommission

    OTC derivatives onto Summit

    European Securities processing onto AE / Calypso Securities / CATS

    Complete the migration of EMP business from Ubitrade to Clearvision / GMI and rollout to emerging markets

    Consolidation of lending business onto ACBS

    Calypso was the strategic choice established in 2002 based on:

    The breadth of asset class covered

    A more advanced open technology

    The vendor relationship.

    5 main projects are required to develop the initial parallel consolidation of the settlement processing platforms:1

    2

  • 8/2/2019 Applications and Systems

    11/23

    10

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Settlement Processing Progress and Next Steps*

    Product Progress to date Main Next Steps

    ETD Clearvision / GMI installed in London

    Reliance programme completed(Swapclear / Repoclear, clearing strategy)

    Decommissioning of legacy Derivate Pool

    Completion of migration of remaining DK FFTbusiness onto GMI/Clearvision

    Support for US FCM project in NY on GMI

    OTC Derivatives Summit installed for interest derivatives2000 to replace Devon 2.34

    Extended for Credit Derivatives 2004 andhybrid structures with MUST module 2005

    Migration of FX-Derivatives & Equity Derivatives

    Decommissioning of legacy infrastructure

    Roll out to St. Petersburg/Moscow

    FX/MM Calypso installed for FX / MM 2001 2003

    Roll out to DrKW Ltd 2005

    Roll out to DK Japan Securities 2007

    London Calypso Securities Programme: POSTS /RIBS replaced by Calypso

    Global Corporate Actions processing solutionbased on CATS/CAM

    Lending ACBS deployed in Ldn, NY, Lux 2003

    User operations centrlised into

    Luxembourg 2006

    Focus on standardizing the ACBS processing

    Support for the Global SAP pilot project in LX

    Support for Secondary Loan Trading

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    12/23

    11

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    The IT Ops projects related to the payment and liquidity management aim to consolidate the cash & position liquidity activities by:

    Providing a state of the art Cash (intraday & overnight liquidity) Management solution based on Cash Navigator allowing regional

    Operations hubs.

    Providing a common payment platform for all DKIB business areas.

    To achieve these goals*:

    GPP was chosen as the DKIB standard and installed at DrKW Ltd as part the of AIMS decommission and integrated with CashNavigator as part of the London rollout

    A further rollout is planned to support Calypso / Summit rollouts, and a tactical use to overcome operational risk in manual payment

    processing in selected sites

    The ANLOS decommission has chosen a new Banking package Temenos T24 with payment functionality to suite Corporate Bankingrequirements direct debits / mass payments / local clearing / SEPA compliance and International Cash Management support

    Target Architecture

    Payment & Liquidity Management

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    13/23

    12

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Payment & Liquidity Management Progress and Next Steps*

    Product Progress to Date Main Next Steps

    Cash & Liquidity Management Cash Navigator live in FFT

    Roll out to London 3 entities to replace

    ANLOS / POSTS / manual processing,integrated with GPP

    Global roll out to be prioritized

    Payments Global PayPlus (GPP) installed in DrKW

    Introduced to other London entities with

    Cash Navigator for sweeping and manualpayments

    Manual payment processing automatedwith Teamworks process

    Rollout with Calypso FX/MM

    Alignment with Bridge (Bridge) project to

    establish one standard payment and receiptgateway for all DKIB business including CBrequirements (mass payments / SEPA)

    One gateway to SWIFT & Clearing systems

    Banking Quartz in Ldn 2005 as part of AIMSdecommission

    Introduce a new core banking solution TemenosT24 to replace Quartz 2009 and ANLOS

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    14/23

    13

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Process Management

    The IT Ops projects related to the process management aim to standardise the control functions and to provide an enterprise widesolution for managing manual work arising from non STP process flow.

    To achieve these goals*:

    The controls process will evolve to a proactive, error avoidance intelligent exception process by creating one single technology

    platform based on City Networks Enterprise Reconciliation with a common integrated exception handling based on CityNetworks

    Proactive and encompassing intelligent process improvement using TeamWorks business process management.

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    15/23

    14

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Process Management Progress and Next Steps*

    Process Progress to date Main Next Steps

    Controls GRASS deployed to cover mostintersystem reconciliations

    GMT platform (CityNetworks EnterpriseReconciliation & Proactive (investigationtool)) chosen as strategic tool andimplemented in London for Cash recs

    2007

    1st use of GMT for real time paymentmonitoring at Bundesbank clearing

    account in conjunction with CashNavigator

    Deployment of first case exceptionhandling in Proactive Nov 2007

    Consolidate processing on to GMT platform

    Business Process Mgt Teamworks selected and live for managingmanual aspects of processing structuredtransactions and manual payments 2006 /

    2007

    Development of Smart Exception Manager aspart of LCS program

    Roll out to other asset classes

    * more detailed information can be found in the file - Ops IT Strategy Apps landscape V5 4.ppt provided by John Orton

  • 8/2/2019 Applications and Systems

    16/23

    15

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Main IT Projects London Cash Securities

    Description

    Benefits

    3 main initiatives:

    Develop one single securities platform based on Calypso

    Build a prototype Smart Exceptions Management (SEM) model

    Develop a Crest self clearing model for FFT and a Clearstream self clearing model for London

    Deadline (approx.)

    3 main initiatives:

    1. April 2009

    2. Aug. 2008

    3. Oct. 2008

    Rationale

    Legacy POSTS and RIBS systems are expensive to run and maintain. Consolidation onto the Calypso standard will reduce runningcosts and enable business and operational efficiencies

    Total cost reduction will be9.9m p.a. across Capital Markets, Operations and Technology (net of incremental new Calypso sustaining

    costs) following delivery of this project

    The imperative for cost reduction has been illustrated by Mercer Oliver Wyman, Z/Yen benchmarking and internal IT and Operationsanalysis. This heightens the need for a major reduction in operational and technology costs to which this programme contributes

    significantly

    Total Cost of Ownership 24,039k EUR Return on investment 200%

    NPV 19,768k EUR Payback period 63 months

    Source: LCS PMO 11th Dec 2007 v0 1 MI.ppt

  • 8/2/2019 Applications and Systems

    17/23

    16

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Description

    Target Architecture

    Main IT Projects FX/MM Calypso

    Benefits

    The transfer of FX and MM processing from ANLOS to Calypso, realising operational synergies.

    The transfer of FX sell off process from Finance to Front Office, reducing operational risk

    Deadline (approx.)

    FX: Nov. 2007

    MM: Apr. 2008

    Rationale

    This will provide benefits to both Finance (resolve audit point of moving FX sell-off to Front Office) and Operations (increased control ofthe settlement processes and removal of manual intervention which is an Operational Risk)

    Total Cost of Ownership 982k EUR Return on investment 123%

    NPV N/A Payback period 24 months

    Source: PMO FX MM Calypso 2007-07-10.ppt

  • 8/2/2019 Applications and Systems

    18/23

    17

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Description

    Target Architecture

    Main IT Projects GMT

    Benefits

    The implementation is based on the further roll out of the GMT platform

    Roll out further Cash Rec investigation processes in London

    Implement and roll out Interest Claims New World, a globally consistent interest claims processcovering all relevant business areas in London and Frankfurt

    Replacement of SkonIT in FFT for the investigation and reporting of stock and cash breaks

    Develop new EMP intersystem reconciliations and related investigation workflows

    Deadline (approx.)

    June 2008

    Sep. 2008

    Dec. 2008

    Dec. 2008

    Rationale

    Increase control and operational risk

    Reduce operational costs

    Implement streamlined and transparent processes

    Alignment with GMT strategy platform

    Total Cost of Ownership 1,236k EUR Return on investment 315%

    NPV 3,158k EUR Payback period 12 months

    Source: GMT Europe Dresdner Kleinwort PMO Project presentation 20071129 review.ppt

  • 8/2/2019 Applications and Systems

    19/23

    18

    StaticDataMasterfiles

    Mistralops|static

    CorporateEvents

    CAM

    ClientConnectivityops|tracker

    Trade capture / allocation / enrichment -AE /ClearvisionStructures - StructuredTrade Register /TeamWorksDocumentation -TrACE/Saperion /InboundReporting -ARIES

    ETDGMI

    OTC DerivsSummit

    Flow products(Securities,FX/MM)+

    Commodities

    Calypso+CATS

    LendingACBS

    Cash / Liquidity Mgmt - CashNavigatorPayments - DKIB PaymentServiceBanking -Quartz+ PB Services

    Front-Office

    Finance

    BPMTeamWorks

    ControlGMT

    Target Architecture

    Main IT Projects OTC Equities Processing into Summit

    Description

    Benefits

    Replace Murex Equity and the supporting infrastructure by using the existing Summit system (usedfor the processing of OTC IRD, OTC FX Options and Credit Derivatives) to process OTC Equity

    Derivatives. It is planned to integrate the processing of OTC Derivatives into one team in FFT.

    Deadline (approx.)

    Rationale

    Support the settlement process for the changed trading profile, risk reduction, fulfil internal and external regulatory requirements,robust platform, greater flexibility towards future challenges in volume and complexity. Without this investment the volume andcomplexity growth planned by the business cannot be supported.

    Total Cost of Ownership 4,073 k EUR Return on investment 188 %

    NPV 6,004 k EUR Payback period 25 months

    Source: Dresdner Kleinwort PMO Project presentation Equities V1 7.ppt

  • 8/2/2019 Applications and Systems

    20/23

    19

    The Baseline 2

    The Projects 14

    The Priorities 23

    The Target Architecture 28

    The Next Steps 43

    Appendix 45

    Content

    Section Slide

  • 8/2/2019 Applications and Systems

    21/23

    20

    The Next Steps

    Detail the major projects

    Provide updated figures on savings and investments

  • 8/2/2019 Applications and Systems

    22/23

    Appendix

  • 8/2/2019 Applications and Systems

    23/23

    22

    The Ops Processes

    Top Down Processes

    Trading

    Enhancement of Trade Capture

    Confirmation & Documentation

    Settlment & Payments

    Brokerage, DRE, Other payments & Billing

    Positions

    Key Events Management

    Collateral Management

    Position Management

    Cash Management

    Margining

    End of Lifecycle

    Expiry

    Unwinding / Sale

    Management

    Continuous Improvement

    Management Information & Reporting

    Support

    Reference Data

    Reconciliation

    Investigation

    Claims Customer Support

    Risk Analysis, Compliance, Audit Confirms

    The following processes have been defined during the Top Down approach: